Top Banner
GEO600 Status Update Harald Lück Hannover, April 2005
24

GEO600 Status Update Harald Lück Hannover, April 2005

Jan 24, 2016

Download

Documents

Aelwen

GEO600 Status Update Harald Lück Hannover, April 2005. S4. Feb 22nd – March 23rd Two manned shifts/day (5-21 UTC), 1 ‚expert on duty‘ 8-8UTC Overnight SMS alarms to ‚expert on duty‘ Locking status DAQS (DCUs running, frame making, timing, calibration) Temperatures Vacuum - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • GEO600 Status UpdateHarald LckHannover, April 2005

  • S4Feb 22nd March 23rdTwo manned shifts/day (5-21 UTC), 1 expert on duty 8-8UTCOvernight SMS alarms to expert on dutyLocking statusDAQS (DCUs running, frame making, timing, calibration)TemperaturesVacuumInstrumental duty cycle 97.5%

  • Typical S4 Sensitivityh [1/sqrt(Hz)]

  • S4Glitchy periods within the first week

  • Glitches occurred mainly during seismically quiet times

  • Curing the glitches(temporarily)

    (What is a jump? :-)

  • Intermediate Mass of Mounting Unit 3 probably touched coil holder frame

  • After unstickng MU3by rotating it

  • BLRMS during S4

  • Strange sine gaussian glitchesh [1/sqrt(Hz)]

  • Strange sine gaussian glitches ctnd.

  • Strange sine gaussian glitches ctnd.

  • Calibration of GEO600Time-domain calibration methodOptimization routine quasi-continuously estimates parameters of optical responseCalibration lines give known differential arm-length disturbanceThese points are fit to a modelUpdate rate is 1Hz

  • Michelson Servo Error PointsPQ

  • On-line optical TF measurementsactuatorCALP and Q

  • Optical&Electronic Gain

  • Calibration

  • Calibrated EP Quadrature Signalsh [1/sqrt(Hz)]

  • Combining hP(t) and hQ(t) IIICreate filters from noise floor estimatesh(t) = Pfilter{hP(t)} + Qfilter{hQ(t)}sQQsPPsPQ

  • Combining hP(t) and hQ(t) resultsGet the best of hP and hQ plus a little extra!h [1/sqrt(Hz)]

  • Steps after S4PR fast autoalignment, Unity gain ~4-5Hz

    Improve seismic long. FF & long.->IM tilt FFIncrease PR factor by changing PR mirror 1.35% -> 0.1%Change laser, increase power to ~12W, i.e. ~5W @ MPRLock interferometer with ~7kW internal power

    TF fluctuates and depends on tuning