GENERAL REQUIREMENTS FOR SCADA AND AUTOMATION · PDF file General Requirements for SCADA and Automation Systems – STS 550 1 Purpose This document describes Hunter Water requirements

Mar 23, 2020

ReportDownload

Documents

others

  • Standard – Technical Specification STS 550 TRIM: HW2009-2368/2/31/.001

    Warning – This document is current at time of printing or downloading. It may be reviewed and amended prior to the noted review date at the discretion of Hunter Water Corporation.

    Version: 1.0 Page 1 of 62

    Date Approved: 181214

    Hunter Water Corporation A.B.N. 46 228 513 446

    Standard Technical Specification for:

    GENERAL REQUIREMENTS FOR SCADA AND AUTOMATION SYSTEMS

    STS550

    This Standard Technical Specification was developed by Hunter Water Corporation to be used for the

    design, construction/installation and/or maintenance of facilities that are, or are to become, the property

    of Hunter Water Corporation. It is intended that this Standard Technical Specification be used in

    conjunction with various other standard and project specific drawings and design requirements as

    defined by Hunter Water Corporation for each particular project.

    Hunter Water Corporation does not consider this Standard Technical Specification suitable for use for

    any other purpose or in any other manner. Use of this Standard Technical Specification for any other

    purpose or in any other manner is wholly at the user's risk.

    Hunter Water Corporation makes no representations or warranty that this Standard Technical

    Specification has been prepared with reasonable care and does not assume a duty of care to any

    person using this document for any purpose other than stated.

    In the case of this document having been downloaded from Hunter Water Corporation's website;

    - Hunter Water Corporation has no responsibility to inform you of any matter relating to the accuracy of

    this Standard Technical Specification which is known to Hunter Water Corporation at the time of

    downloading or subsequently comes to the attention of Hunter Water Corporation.

    - This document is current at the date of downloading. Hunter Water Corporation may update this

    document at any time.

    Copyright in this document belongs to Hunter Water Corporation

  • Standard – Technical Specification STS 550 TRIM: HW2009-2368/2/31/.001

    Warning – This document is current at time of printing or downloading. It may be reviewed and amended prior to the noted review date at the discretion of Hunter Water Corporation.

    Version: 1.0 Page 2 of 62

    Date Approved: 181214

    1 Purpose .................................................................................................................. 7

    2 Interpretation ......................................................................................................... 7

    2.1 Order of Precedence ................................................................................................. 8

    3 Roles and Responsibilities ................................................................................... 9

    3.1 Document Owner ...................................................................................................... 9

    3.2 Hunter Water Responsibilities.................................................................................... 9

    3.3 Contractor Responsibilities ........................................................................................ 9

    4 Definitions............................................................................................................ 10

    5 General Requirements ........................................................................................ 11

    5.1 Compliance and Regulatory .................................................................................... 11

    5.1.1 Legislative Requirements ................................................................................. 11

    5.1.2 Standards ........................................................................................................ 11

    5.2 Quality Accreditation ............................................................................................... 11

    5.3 Contractors ............................................................................................................. 11

    5.4 Materials and Equipment ......................................................................................... 11

    5.5 Computer Equipment .............................................................................................. 12

    6 PLC ....................................................................................................................... 13

    6.1 PLC hardware layout ............................................................................................... 13

    6.2 PLC Software Layout .............................................................................................. 13

    6.3 PLC Software .......................................................................................................... 13

    6.4 PLC IP Address ....................................................................................................... 13

    6.5 PLC Naming Conventions ....................................................................................... 14

    6.5.1 PLC Program File ............................................................................................ 14

    6.5.2 PLC Program ................................................................................................... 14

    6.5.3 PLC Functional Group ..................................................................................... 15

    6.5.4 PLC Hunter Water Function Block.................................................................... 15

    6.5.5 Control Module ................................................................................................ 16

    6.5.6 PLC Program Variable ..................................................................................... 16

    6.5.7 PLC Program Structure.................................................................................... 17

    6.6 PLC Code ............................................................................................................... 18

    6.7 Project Specific Code .............................................................................................. 18

  • Standard – Technical Specification STS 550 TRIM: HW2009-2368/2/31/.001

    Warning – This document is current at time of printing or downloading. It may be reviewed and amended prior to the noted review date at the discretion of Hunter Water Corporation.

    Version: 1.0 Page 3 of 62

    Date Approved: 181214

    6.7.1 Project Specific Function Block naming convention .......................................... 19

    6.8 Alarms .................................................................................................................... 19

    6.9 Analog Alarms ......................................................................................................... 19

    6.9.1 Digital Alarms .................................................................................................. 20

    6.10 Program storage .................................................................................................. 20

    6.10.1 PLC Code .................................................................................................... 20

    6.10.2 SCADA Databases ...................................................................................... 20

    6.10.3 SCADA Code............................................................................................... 20

    6.11 Security ............................................................................................................... 21

    6.11.1 Function Blocks ........................................................................................... 21

    6.11.2 PLC ............................................................................................................. 21

    6.11.3 SCADA ........................................................................................................ 21

    7 Remote Telemetry Unit ....................................................................................... 22

    7.1 RTU Hardware Layout ............................................................................................. 22

    7.2 RTU Software ......................................................................................................... 22

    7.3 RTU Code ............................................................................................................... 22

    7.3.1 RTU Program File Naming Convention ............................................................ 22

    7.4 RTU Addressing ...................................................................................................... 22

    7.5 DNP3 ...................................................................................................................... 23

    7.5.1 DNP3 Class 0 .................................................................................................. 23

    7.5.2 Alarm structure and DNP3 classes................................................................... 23

    8 SCADA ................................................................................................................. 24

    8.1 SCADA Software ..................................................................................................... 24

    8.2 SC