Page 1: Fraser Estuary North Arm Jetty Breaches Project

Juvenile salmon in the Fraser River Estuary

WelcomeWe’ll get started shortly

Fraser Estuary North Arm Jetty Breaches Project

1

Page 2: Fraser Estuary North Arm Jetty Breaches Project

1. Zoom Housekeeping

Mute or

unmute your

microphone

Stop or start

your video

2

Raise hand to speak

Page 3: Fraser Estuary North Arm Jetty Breaches Project

2. Zoom Housekeeping

To change your name, click on

More then Rename

Type comments

in the chat box

3

Dial by your location

+1 778 907 2071

Meeting ID: 623 9517 1219

Email:

[email protected]

Page 4: Fraser Estuary North Arm Jetty Breaches Project

Agenda

1. Opening and introductions

2. Purpose

3. Iona Island WWTP Ecological Projects

4. Questions

5. North Arm Jetty Breaches Project

6. Questions & Discussion

4

Page 5: Fraser Estuary North Arm Jetty Breaches Project

Fraser Estuary North Arm Jetty Breaches ProjectRAINCOAST CONSERVATION FOUNDATION

Dave Scott, Raincoast Conservation FoundationLower Fraser Salmon Program Research and Restoration Coordinator

Lea Elliott, Metro VancouverSenior Policy Analyst, Iona Island Program, Project Delivery

5

Page 6: Fraser Estuary North Arm Jetty Breaches Project

Construction of a breach in the Steveston Jetty, 2019

Purpose

To learn about the

upcoming Fraser River

Estuary North Arm Jetty

Breaches Project and

provide input to Raincoast

Conservation Foundation

about the project.

6

Page 7: Fraser Estuary North Arm Jetty Breaches Project

IIWWTP Ecological Projects

Iona Island WWTP and the North Arm Jetty

7

7

Page 8: Fraser Estuary North Arm Jetty Breaches Project

Iona Island WWTP Project Definition Goals

Wastewater Treatment

Resource Recovery

Community and Park Integration

8

Page 9: Fraser Estuary North Arm Jetty Breaches Project

xwəyeyət (Iona Island)

9

Page 10: Fraser Estuary North Arm Jetty Breaches Project

Disconnected Salmon Migration

10

Page 11: Fraser Estuary North Arm Jetty Breaches Project

Ecological Priorities

11

Page 12: Fraser Estuary North Arm Jetty Breaches Project

IIWWTP

Ecological

Project

Areas

12

Page 13: Fraser Estuary North Arm Jetty Breaches Project

Questions

13

Page 14: Fraser Estuary North Arm Jetty Breaches Project

North Arm Jetty Breaches Project

Construction of a breach in the Steveston Jetty, 2019

14

Page 15: Fraser Estuary North Arm Jetty Breaches Project

Restoring connectivity for juvenile salmon and ecosystem health in the Fraser River estuary

David ScottLower Fraser Research and Restoration Coordinator

Raincoast Conservation Foundation

15

Page 16: Fraser Estuary North Arm Jetty Breaches Project

Salmon and the Fraser River

• Greatest salmon producing river worldwide

• Diversity of populations including ocean type Chinook, sockeye, chum and pink

• Currently significant conservation concerns for Chinook and sockeye

16

Page 17: Fraser Estuary North Arm Jetty Breaches Project

• Must pass through as migratory corridors

• Are thought to rely on brackish water to acclimate to saline ocean conditions

• Often referred to as nursery habitat for juvenile salmon

• Estuaries highly impacted by human activities coast wide

Juvenile salmon use of estuary habitats

Photo: Tavish Campbell 17

Page 18: Fraser Estuary North Arm Jetty Breaches Project

Connectivity and Salmon

• Salmon travel long distances from rearing to spawning grounds

• Salmon extirpated from rivers across Pacific Northwest due to the presence of dams

• Connectivity highly altered by structures such as culverts, tide gates and, jetties and other structures

Estuary

18

Page 19: Fraser Estuary North Arm Jetty Breaches Project

Barriers to fish movements in the Fraser estuary

• >70% of Lower Fraser and estuary habitats lost or disconnected

• Estuary connectivity highly altered by jetties and causeways

19

Page 20: Fraser Estuary North Arm Jetty Breaches Project

The Fraser River estuary

20

Page 21: Fraser Estuary North Arm Jetty Breaches Project

Fraser estuary juvenile salmon research

21

Page 22: Fraser Estuary North Arm Jetty Breaches Project

Field research in the Fraser estuary

22

Page 23: Fraser Estuary North Arm Jetty Breaches Project

23

Juvenile salmon mostly captured in marsh habitats

Me

an

# c

ap

ture

d p

er

sa

mp

ling

occa

sio

n

Eelgrass Marsh Sandflat

Habitat

Year

2016

2017

2018

2019

Chinook

Eelgrass Marsh Sandflat

Habitat

Chum

Chalifour, L., Scott, D. C., MacDuffee, M., Iacarella, J. C., Martin, T. G., & Baum, J. K. 2019. Habitat use by

juvenile salmon, other migratory fish, and resident fish species underscores the importance of estuarine

habitat mosaics. Marine Ecology Progress Series, 625, 145-162.

Page 24: Fraser Estuary North Arm Jetty Breaches Project

24

Harrison, Chilliwack and South Thompson Chinook utilize marsh habitats March to August

Page 25: Fraser Estuary North Arm Jetty Breaches Project

25

Otoliths demonstrate early entry and long estuary residence times for Harrison Chinook

Chalifour, L., Scott, D. C., MacDuffee, M., Stark, S., Dower, J. F., Beacham, T. D., ... and Baum, J. K. 2020. Chinook

salmon exhibit long-term rearing and early marine growth in the Fraser River, BC, a large urban estuary. Canadian

Journal of Fisheries and Aquatic Sciences. https://doi.org/10.1139/cjfas-2020-0247

Page 26: Fraser Estuary North Arm Jetty Breaches Project

Fraser Estuary Connectivity Project

26

Page 27: Fraser Estuary North Arm Jetty Breaches Project

Barriers to fish movements in the Fraser estuary

27

Page 28: Fraser Estuary North Arm Jetty Breaches Project

Steveston North Jetty

28

Page 29: Fraser Estuary North Arm Jetty Breaches Project

Fraser Estuary Connectivity Project

29

Page 30: Fraser Estuary North Arm Jetty Breaches Project

Steveston Jetty Breaches After Construction

West

Breach

Middle Breach

East Breach2019

202030

Page 31: Fraser Estuary North Arm Jetty Breaches Project

Effectiveness Monitoring Summary Results

• 2019 – Total salmon 554 including 152 Chinook, 2 sockeye, 0 pink, 0 coho, 300 chum

• 2020 – Total salmon 1,480 including 297 Chinook, 174 sockeye, 420 pink, 20 coho, 569 chum

31

Page 32: Fraser Estuary North Arm Jetty Breaches Project

Summary of Juvenile Salmon Passage

• 2019 – Low numbers of small chum and ocean type Chinook captured from March to May

• 2020 – All five species of salmon, both ocean-type and stream-type Chinook, large bursts of pink and sockeye related to brood year abundance

• 2020 –Ocean type Chinook captured at breach locations March through August

32

Page 33: Fraser Estuary North Arm Jetty Breaches Project

Proposed North Arm Jetty Breaches

2022

?

2021

?

2023

?

33

Page 34: Fraser Estuary North Arm Jetty Breaches Project

Proposed North Arm Jetty Breaches

2022

?

2021

?

2023

?

34

Page 35: Fraser Estuary North Arm Jetty Breaches Project

Iona Beach & McDonald Slough Causeway Sampling Locations 2018 - 2020

35

Page 36: Fraser Estuary North Arm Jetty Breaches Project

Proposed breach locations

Data loggers

Previous fish sampling sites

New fish sampling sites

Iona Beach & McDonald Slough Causeway Sampling Locations 2021 - 2023

36

Page 37: Fraser Estuary North Arm Jetty Breaches Project

Hydraulic Modelling Study

37

Page 38: Fraser Estuary North Arm Jetty Breaches Project

North Arm Jetty Breach Potential Salinity Impacts

38

Page 39: Fraser Estuary North Arm Jetty Breaches Project

North Arm Jetty Breach Current Velocity Impacts

39

Page 40: Fraser Estuary North Arm Jetty Breaches Project

Flow velocity on outgoing tide

North Arm Jetty Breach Current Velocity Impacts

40

Page 41: Fraser Estuary North Arm Jetty Breaches Project

North Arm Jetty Breach Current Velocity Impacts

Flow velocity on incoming tide

41

Page 42: Fraser Estuary North Arm Jetty Breaches Project

North Arm Jetty Breach Hydraulic Modeling

Connectivity depends on breach invert elevation

42

Page 43: Fraser Estuary North Arm Jetty Breaches Project

North Arm Jetty Breaches Timeline

• Baseline monitoring – spring - summer 2021

• Detailed hydraulic modelling and engineering design - spring 2021

• Finalize lease agreement with VFPA and apply for Transport Canada Authorization – summer 2021

• Phase 1 breach construction - fall - 2021 – winter 2022

43

Page 44: Fraser Estuary North Arm Jetty Breaches Project

Break & Fraser River Connectivity Project Video

44

Page 45: Fraser Estuary North Arm Jetty Breaches Project

Thanks for listening!

45

Questions & Discussion