For Further Information, please contact GTI: www.GTI-Power.com Stan Green Larry Rayman [email protected][email protected]Tele: +1-312-371-9999 Tele: +1-561-414-9696 Two GE Frame 9E Power Plants 2 EACH GE FRAME 9E, PG9161, MS9001 Take advantage of our current availability Financing can be arranged Priced at a fraction of new Gas Turbines International, LLC. (GTI) is offering for sale 2 each GE PG9161 Frame 9E Power Packages. 50 HZ, 116.4 MW, each Dual Fuel, Low Hours, Complete BOP, & Includes 2 Transformers. GTI’s Power Generation Services: •Complete Power Plant Installations •Supply, Install and Commission •Operation & Maintenance •Specialist Agreement for Gas Turbine and Balance of Plant •Plant Rehabilitation & Relocation •Training •Complete Engineering & Design Capabilities •Financial Strength •OEM Support •Refurbished and Warranted •Turnkey Visit us on our website: www.GTI-Power.com Date of Manufacture- 1992 Total Hours Fired- 15,000 Total Starts- 800
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
For Further Information, please contact GTI: www.GTI-Power.com
Two GE Frame 9E Power Plants 2 EACH GE FRAME 9E, PG9161, MS9001
Take advantage of our current availability
Financing can be arranged
Priced at a fraction of new
Gas Turbines International, LLC. (GTI) is offering for sale 2 each GE PG9161
Frame 9E Power Packages. 50 HZ, 116.4 MW, each Dual Fuel, Low Hours,
Complete BOP, & Includes 2 Transformers.
GTI’s Power Generation Services: •Complete Power Plant Installations •Supply, Install and Commission •Operation & Maintenance •Specialist Agreement for Gas Turbine and Balance of Plant •Plant Rehabilitation & Relocation •Training •Complete Engineering & Design Capabilities •Financial Strength •OEM Support •Refurbished and Warranted
•Turnkey
Visit us on our website: www.GTI-Power.com
Date of Manufacture- 1992 Total Hours Fired- 15,000 Total Starts- 800
GE Frame 9E Gas Turbine Plant 2 EACH GE FRAME 9E, PG9161, MS9001
Rated Output (Generator Terminals) MW 116.4 per Unit
MS9001 RATINGS NATURAL GAS DISTILLATE BASE PEAK BASE PEAK OUTPUT- MW 116.4 125.7 114.2 123.3 HEAT RATE-Kcal/kWh (LHV) 2608 2598 2631 2621 HEAT RATE- Btu/kWh (LHV) 10350 10310 10440 10400
SCOPE OF SUPPLY Gas Turbine with essential auxiliaries, Gas Turbine Control System Generator, Starter Device and all auxiliary equipment Excitation and excitation control equipment Gas Supply line and valves from gas receiving station Gas Emergency stop valve, governor valve and actuators Gas Vent stack, Distillate supply pipeline and valves for connecting into overland supply Lubricating oil main pump AC driven pump, DC Driven pump, Jacking oil pump Lubricating oil tanks, filters, coolers and purifiers Clean oil tank and pipe work All pipework and valves for lube system Cooling water system including pumps, filters, coolers, fans, pipework and valves Air intake filters, silencer, ductwork and ancillary equipment Exhaust gas ductwork and silencer Exhaust stack, Auxiliary drive gear unit Automatic barring and inching gear Control oil supply including pumps, filters, valves, actuators and pipework Gas Generator protection equipment Plant supervisory and condition monitoring equipment Pressure, temperature, vibration and flow measuring instrumentation Local instruments, gauges, controls and panels Gas Turbine enclosure and ventilation equipment Gas Detectors and display panel Special maintenance tooling Full set of Manuals Plant drawings
For Further Information, please contact GTI: www.GTI-Power.com
1. Distillate inlet. Sale will include tanks if wanted. 2. Gas termination at fire shut off valve on the upstream side (fuel gas meters are not included). 3. Air inlets are included 4. Gas exhaust includes the chimneys. 5. Electrical termination.
A) 132/14KV Transformer on 132KV bushing. This allows synch on 3GO/4GO with Generator Transformer back energised.
B) Essential Services Boards 1 and 2 remain allowing purchaser to take Essential Services Boards 3 & 4.
C) Station Boards 1 and 2 remain allowing purchaser to take Unit Boards 3 and 4 D) Unit Transformers 3 and 4 are included in the sale.
E) Generator Transformers 3 and 4 are included in the sale