Top Banner
Field Development Competencies & Services Technip Germany GmbH
25

Field Development Competencies & Services - · PDF fileTPGY Overall Organization. 6 ... WAMBA NUMBI Angola WAFA MELITAH Libya SKIKDA Algeria BONNY ISLAND Nigeria EL BORMA Tunisia

Jan 30, 2018

Download

Documents

trinhphuc
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Field Development Competencies & Services - · PDF fileTPGY Overall Organization. 6 ... WAMBA NUMBI Angola WAFA MELITAH Libya SKIKDA Algeria BONNY ISLAND Nigeria EL BORMA Tunisia

Field Development

Competencies & Services

Technip Germany GmbH

Page 2: Field Development Competencies & Services - · PDF fileTPGY Overall Organization. 6 ... WAMBA NUMBI Angola WAFA MELITAH Libya SKIKDA Algeria BONNY ISLAND Nigeria EL BORMA Tunisia

2

Contents

I. Technip Germany

II. Field Development

Page 3: Field Development Competencies & Services - · PDF fileTPGY Overall Organization. 6 ... WAMBA NUMBI Angola WAFA MELITAH Libya SKIKDA Algeria BONNY ISLAND Nigeria EL BORMA Tunisia

3

I. Technip Germany

Page 4: Field Development Competencies & Services - · PDF fileTPGY Overall Organization. 6 ... WAMBA NUMBI Angola WAFA MELITAH Libya SKIKDA Algeria BONNY ISLAND Nigeria EL BORMA Tunisia

4

Technip Germany Offices

Project Meeting Rooms

TASK FORCEBuildingTECHNIP GERMANY GmbH

Theodorstrasse 9040472 DüsseldorfGermany

Page 5: Field Development Competencies & Services - · PDF fileTPGY Overall Organization. 6 ... WAMBA NUMBI Angola WAFA MELITAH Libya SKIKDA Algeria BONNY ISLAND Nigeria EL BORMA Tunisia

5

TPGY Overall Organization

Page 6: Field Development Competencies & Services - · PDF fileTPGY Overall Organization. 6 ... WAMBA NUMBI Angola WAFA MELITAH Libya SKIKDA Algeria BONNY ISLAND Nigeria EL BORMA Tunisia

6

TECHNIP GERMANY – Product Portfolio

PROCESS PLANTS MATERIAL HANDLING DISTRIBUTION

• Refining plants• Chemical plants• Petrochemical plants• Gas Oil Separation Plants• Re-injection units

• Sulphur handling• Coke Calcining• Direct reduction iron• Aluminium fluoride

• Pipeline systems• Flow lines• Pressure boosting stations• Gas storages• Field development• Tank farms

SUPPORT TO THE POWER INDUSTRY

• Lifetime monitoring system• Surge analysis• Fluid dynamics• Vibration equalizer• Damage analysis

Page 7: Field Development Competencies & Services - · PDF fileTPGY Overall Organization. 6 ... WAMBA NUMBI Angola WAFA MELITAH Libya SKIKDA Algeria BONNY ISLAND Nigeria EL BORMA Tunisia

7

TECHNIP GERMANY – Scope of Services

Studies and Conceptual Design Basic & Detail Design

EPC Implementation

Process optimisation and conceptual engineeringEconomic and financial viability analysisCost - benefit analysisCost estimation and assets evaluationRehabilitation and rationalisation programs

Project managementFEED verification / endorsementDetail designHSE responsibilityProcurement of all materials and equipmentConstruction management

Value engineeringProcess simulationSystem design and hydraulic simulationsCost estimating and tariff calculationOperation and maintenance philosophies

Commissioning & Start-up

Commissioning planning and supervisionCoordination of vendor representativesLoop checksTraining HSE responsibilityAs-build documentationHand over

Page 8: Field Development Competencies & Services - · PDF fileTPGY Overall Organization. 6 ... WAMBA NUMBI Angola WAFA MELITAH Libya SKIKDA Algeria BONNY ISLAND Nigeria EL BORMA Tunisia

8

Global Procurement NetworkEPC internet-based procurement system

HoustonLos Angeles

Kuala Lumpur

Aberdeen

ParisRome

Rio de Janeiro

DüsseldorfRegional

Procurement Manager

GlobalProcurement

Officer

Commodity Family

Managers

A worldwide network for increased flexibility and competitiveness

Page 9: Field Development Competencies & Services - · PDF fileTPGY Overall Organization. 6 ... WAMBA NUMBI Angola WAFA MELITAH Libya SKIKDA Algeria BONNY ISLAND Nigeria EL BORMA Tunisia

9

II. Field Development

Page 10: Field Development Competencies & Services - · PDF fileTPGY Overall Organization. 6 ... WAMBA NUMBI Angola WAFA MELITAH Libya SKIKDA Algeria BONNY ISLAND Nigeria EL BORMA Tunisia

10

Overview

► Field Development and Underground Storage Projects are very similar• Field Development

– In-field lines (multiphase)– Process plant, a real challenge– Export pipelines (gas, oil, condensate, others …)– Re-injection lines (gas and/or water)

• Underground Storage– Withdraw (multiphase, but only gas and water)– Process plant, drying and compression are the main units – Import / Export pipeline (gas)– Injection (gas)

► Very suitable projects for TPGy• TPGy is the pipeline and underground storage

competence center of the TP Group• Process excellence of all TP offices

Page 11: Field Development Competencies & Services - · PDF fileTPGY Overall Organization. 6 ... WAMBA NUMBI Angola WAFA MELITAH Libya SKIKDA Algeria BONNY ISLAND Nigeria EL BORMA Tunisia

11

Typical Process Plant for Field Development

Page 12: Field Development Competencies & Services - · PDF fileTPGY Overall Organization. 6 ... WAMBA NUMBI Angola WAFA MELITAH Libya SKIKDA Algeria BONNY ISLAND Nigeria EL BORMA Tunisia

12

Underground Gas Storage FacilitiesStorage – Site, above ground installation

Page 13: Field Development Competencies & Services - · PDF fileTPGY Overall Organization. 6 ... WAMBA NUMBI Angola WAFA MELITAH Libya SKIKDA Algeria BONNY ISLAND Nigeria EL BORMA Tunisia

13

Underground Gas Storage FacilitiesStorage - Characteristic

Compressor Unit

►Type of Compressor• Turbo compressor• Reciprocating compressor• Centrifugal and axial compressor• Rotary screw compressor

►Arrangement of Engines• Serial• Parallel

►Operation pressure• Inlet: 40 to 80 bar• Outlet: 100 to 220 bar

Page 14: Field Development Competencies & Services - · PDF fileTPGY Overall Organization. 6 ... WAMBA NUMBI Angola WAFA MELITAH Libya SKIKDA Algeria BONNY ISLAND Nigeria EL BORMA Tunisia

14

Underground Gas Storage FacilitiesStorage - Characteristic

Drying Unit

►Types of Drying Processes• LTS-system• Molecular sieves• Glycol unit• Vortex technology

►Selection criteria• Impurity of gas• Pressure range at withdrawal

►Dew Points (average)• Water: -8 °C at 70 bar• HC: -2 °C at 70 bar

Adsorption

Twister

Glycol

Page 15: Field Development Competencies & Services - · PDF fileTPGY Overall Organization. 6 ... WAMBA NUMBI Angola WAFA MELITAH Libya SKIKDA Algeria BONNY ISLAND Nigeria EL BORMA Tunisia

15

Scope of Services of Technip Germany

Page 16: Field Development Competencies & Services - · PDF fileTPGY Overall Organization. 6 ... WAMBA NUMBI Angola WAFA MELITAH Libya SKIKDA Algeria BONNY ISLAND Nigeria EL BORMA Tunisia

16

Technip Germany Expertise and Scope of Services for FD Facilities

• Basic engineering and dehydration studies

• Compressor capacity optimisation

• EPC and EPCM execution models

• Project financing in liaison with EIB, WB, ADB, etc.

• Technip Group global procurement network

• Close relationship to a leading material research institute (MFI)

• Close relationship to gas storage operators

• Preferred access to construction equipment through Maats equipment pool

Page 17: Field Development Competencies & Services - · PDF fileTPGY Overall Organization. 6 ... WAMBA NUMBI Angola WAFA MELITAH Libya SKIKDA Algeria BONNY ISLAND Nigeria EL BORMA Tunisia

17

FD References of Technip Germany

Page 18: Field Development Competencies & Services - · PDF fileTPGY Overall Organization. 6 ... WAMBA NUMBI Angola WAFA MELITAH Libya SKIKDA Algeria BONNY ISLAND Nigeria EL BORMA Tunisia

18

Field Development (FD) & Underground Storage (UGS)Country Client Type of Contract Product Year

Germany EKB (BP/DONG/ZMB) EPCM UGS 2009 – 2011

Austria OMV FEED UGS 2009

Germany EDF FEED / EPCM UGS 2009 - 2011

France GDF EPCM UGS 2008 – 2014

Belgium Fluxxys Consultancy UGS 2008 - 2010

Iran STATOIL / HYDRO (ANARAN) FEED FD 2007 - 2008

Libya HAROUGE (VEBA OIL) (AMAL) EPC FD 2005 - 2008

Iran HYDRO (AZAR) FEED FD 2006 - 2007

Germany IVG (ETZEL) Conceptual UGS 2006

UAE ADCO (NEB) EPC FD 2003 - 2006

Turkey LURGI (MARMARA) Detail (part) UGS 2004 - 2006

Libya WINTERSHALL (JAKHIRA) EPC (I and II) FD 1998 - 2004

Iran HYDRO (KUSK-HOSSEINIEH) Conceptual FD 2004

UAE ADCO (NEB) FEED FD 2002

Turkmenistan TURKMENNEFTEGAS EPC FD 1997 - 1998

(KAMYSHLDSHA)

Romania ROMGAZ Feasibility UGS 1997

Germany STATOIL (ETZEL) EPC UGS 1991 - 1994

Germany SW SINGEN (SINGEN) EPC UGS 1994

Germany SGW AHAUS (EPE) EPC UGS 1987 - 1990

Germany SW BRETTEN (BRETTEN) EPC UGS 1989

Page 19: Field Development Competencies & Services - · PDF fileTPGY Overall Organization. 6 ... WAMBA NUMBI Angola WAFA MELITAH Libya SKIKDA Algeria BONNY ISLAND Nigeria EL BORMA Tunisia

19

Technip References in Field Development

ROZENBURGNetherlands

STEIPERNorway

PARENTISFrance

VAL D’AGRIItaly

HEIMDAL N.SEANorway

MORECAMBEIrish Sea

FRIGGNorth Sea UK

GARUPABrazil

NEUQUENArgentina

JUSEPINVenezuela

HIDRAArgentina

HOBBSNew Mexico

STEELMANCanada

WEST PEMBINACanada

KEG RIVERCanada

SOUTH RAINBOWCanada

BATTLE LAKECanada

MISTOregon

GILBYCanada

WHITECOURTCanada

LUMUTBrunei

MANNAPADIndia

MALAMPAYAPhilippines

TERRENGANUMalaysia

PORT HEDLANDAustralia

BINTULU Sarawak

LABUANMalaysiaMANGISTU

Kazakhstan

ASTRAKHAN 1Russia

ORENBURG 3Russia

ORENBURG 2Russia

ORENBURG 1Russia

FYODOROVSKRussia

SAMOTLORRussia

ASTRAKHAN 2Russia

CabindaAngola

WAMBA NUMBIAngola

WAFA MELITAHLibya

SKIKDAAlgeria

BONNY ISLANDNigeria

EL BORMATunisia

ARZEWAlgeria

COBO PAMBIAngola

N’KOSSACongo

ZAKUMAbu Dhabi

ASABAbu Dhabi

EL ISBASyria

KHALDA WEST Egypt

NORTH FIELD 2Qatar

AHMADHIKuwait

ZIRKUAbu Dhabi

KHABAZIraq

HABSHANAbu Dhabi

SOUTH PARSIran

MESSAIEEDQatar

BURGANKuwait

NORTH FIELD 1Qatar

HARADHSaudi Arabia

SHAH FIELDAbu Dhabi

ABU EL BUKHOSHlAbu Dhabi

ASSALUYEHIran

WEST QURMAIraq

OVER 100REFERENCES

OVER 100REFERENCES

Page 20: Field Development Competencies & Services - · PDF fileTPGY Overall Organization. 6 ... WAMBA NUMBI Angola WAFA MELITAH Libya SKIKDA Algeria BONNY ISLAND Nigeria EL BORMA Tunisia

20

Field Development - FEED - Iran ANARAN - Field Development Project

► Contract Award:• August 2007

► Completion Date:• May 2008

► Client:• STATOIL HYDRO, Norway

► Contract Value:• Approx. 5 mio. €

► Scope of Work: FEED• Phase A Reimbursable Rates

Phase B Lump Sum• FEED for an Oil and Gas Field Development

in Iran, including In-field Lines, GOSP, Export Pipelines and Cost estimation +/-10%.

Page 21: Field Development Competencies & Services - · PDF fileTPGY Overall Organization. 6 ... WAMBA NUMBI Angola WAFA MELITAH Libya SKIKDA Algeria BONNY ISLAND Nigeria EL BORMA Tunisia

21

Field Development - FEED - Iran AZAR - Oil and Gas Field Development

► Contract Award:• June 2006

► Completion Date:• February 2007

► Client:• HYDRO, Norway

► Contract Value:• Approx. 5 mio. €

► Scope of Work: LSTK – FEED• FEED including Familiarization Phase for an

Oil and Gas Field Development in Iran, including In-field Lines, GOSP and Export Pipelines.

Page 22: Field Development Competencies & Services - · PDF fileTPGY Overall Organization. 6 ... WAMBA NUMBI Angola WAFA MELITAH Libya SKIKDA Algeria BONNY ISLAND Nigeria EL BORMA Tunisia

22

Field Development - Study - Algeria HOGGAR - Oil and Gas Field Development

► Contract Award:• August 2006

► Completion Date:• September 2006

► Client:• EON

► Scope of Work:• Pre-feasibility Study including CAPEX

Calculation for an Oil and Gas Field Development in Algeria, including In-field Lines, GOSP and Export Pipelines.

Page 23: Field Development Competencies & Services - · PDF fileTPGY Overall Organization. 6 ... WAMBA NUMBI Angola WAFA MELITAH Libya SKIKDA Algeria BONNY ISLAND Nigeria EL BORMA Tunisia

23

Field Development - EPC - Libya AMAL - Produced Water Treatment & Injection Plant

► Contract Award:• 2005

► Completion Date:• PAC 2008

► Client:• Harouge Oil Operations (formerly Veba Oil

Operations) / Libya • Bonatti / Italy

► Contract Value:• 30 mio. €

► Scope of Work: LSTK – EPC:• Produced Water Treatment Plant / Low and

High Pressure System including Induced Gas Flotation, Filtration, Transfer and High Pressure Pumps and P/L (24,000 BPD Water Stream) in Libya.

• 41 km; 6” - 10”; Grade B - X52

Page 24: Field Development Competencies & Services - · PDF fileTPGY Overall Organization. 6 ... WAMBA NUMBI Angola WAFA MELITAH Libya SKIKDA Algeria BONNY ISLAND Nigeria EL BORMA Tunisia

24

Field Development - EPC - UAE NEB - North East BAB - Oil Field Development (Phase 1)

► Contract Award:• May 2003

► Completion Date:• Mechanical Completion December 2005

► Client:• Abu Dhabi Company for Onshore Oil

Operations (ADCO), UAE

► Contract Value:• 153 mio. US $

► Scope of Work: LSTK – EPC• Oil Production from two Fields, Al Dabb‘iya

(Offshore) Shallow Water / Sabkhat and Rumaitha (Onshore) Desert Area includingnew Central Processing Plants (CPP) in UAETechnip Germany Scope:Pipelines / Flowlines (~530 km / 3”-20” Off-/ Onshore), Electrical Works along the Pipe Route

Page 25: Field Development Competencies & Services - · PDF fileTPGY Overall Organization. 6 ... WAMBA NUMBI Angola WAFA MELITAH Libya SKIKDA Algeria BONNY ISLAND Nigeria EL BORMA Tunisia

25

Field Development - EPC - LybiaJAKHIRA - Gas Utilization Plant

► Contract Award:• Phase 1: 1998• Phase 2: 2002

► Completion Date:• Phase 1: 2001• Phase 2: 2004

► Client:• Wintershall AG, Germany

► Contract Value:• 130 mio. DM

► Scope of Work: LSTK - EPC• Gas Separation Plant / Ethane Separation

including Compression Stabilization, Dehydration, Fractionation and Export (125,000 Nm³ Feed Gas Stream).