1 Federal Highway Federal Highway Administration Administration Work Zone Safety and Work Zone Safety and Mobility Rule Mobility Rule Implementation of Updates to Implementation of Updates to 23 CFR Section 630, Subpart J 23 CFR Section 630, Subpart J Presented by Tracy Scriba Federal Highway Administration
44

Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

Dec 31, 2015

Download

Documents

rhonda-cook

Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to 23 CFR Section 630, Subpart J Presented by Tracy Scriba Federal Highway Administration. Topics. Overview of the Updated Rule Developing and Implementing a Work Zone Policy - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

1

Federal Highway AdministrationFederal Highway Administration

Work Zone Safety and Mobility Work Zone Safety and Mobility RuleRule

Implementation of Updates to Implementation of Updates to 23 CFR Section 630, Subpart J23 CFR Section 630, Subpart J

Presented by Tracy ScribaFederal Highway Administration

Page 2: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

2

TopicsTopics

• Overview of the Updated Rule• Developing and Implementing a Work Zone

Policy• Implementing Agency-Level Processes and

Procedures• Implementing Project-Level Procedures

– Significant Projects– TMPs

• Implementation and Compliance• Implementation Guidance

Page 3: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

3

Overview of the Updated RuleOverview of the Updated Rule• Establishes requirements and provides guidance for:

– Systematically addressing WZ safety and mobility impacts– Developing strategies to help manage these impacts

on all Federal-aid highway projects

• Timeframes– Published Final Rule September 2004– Must implement rule provisions by October 2007

• “Must implement” means:– Recipients of Federal-aid funds will adapt practices & policies– These emerge as internal business changes and contract

changes

Page 4: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

4

Provisions – In a NutshellProvisions – In a Nutshell

Project-Level Procedures to Assess and Manage Project-Level Procedures to Assess and Manage Impacts on Individual ProjectsImpacts on Individual Projects

Agency implemented policy for the systematic Agency implemented policy for the systematic consideration and management of WZ impactsconsideration and management of WZ impacts

Processes and procedures to implement and sustain Processes and procedures to implement and sustain WZ policyWZ policy

Page 5: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

5

Developing and Implementing Developing and Implementing a Work Zone Policya Work Zone Policy

Page 6: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

6

Developing and Implementing a WZ Policy – Developing and Implementing a WZ Policy – Related ProvisionsRelated Provisions

Section 630.1006 Work Zone Safety and Mobility Policy:

• Requires agencies to implement a policy for the systematic consideration and management of WZ impacts on all Federal-aid highway projects.

• Requires the policy to address WZ impacts throughout the various stages of the project development and construction.

• Allows flexibility in the form the policy may take: Processes, procedures, guidance.

• Recognizes that the policy may vary based on the characteristics and expected WZ impacts of individual projects or classes of projects.

• Recommends that agencies institute this policy using a multi-disciplinary team and in coordination with FHWA.

• Encourages agencies to implement the policy for non-Federal-aid projects and programs as well.

Page 7: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

7

Who Is Responsible for Development and Who Is Responsible for Development and Implementation of the WZ Policy?Implementation of the WZ Policy?• Development and implementation of agency policy is

generally a function of internal agency management.

• Rule recommends that the WZ policy be instituted using a multi-disciplinary team and in partnership with FHWA.

• Several agencies may decide to work together.

Page 8: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

8

Policy Development and Implementation ProcessPolicy Development and Implementation Process

Page 9: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

9

Components of a WZ PolicyComponents of a WZ Policy• Key components for consideration in a WZ safety and

mobility policy are:– Vision statement – Goals and objectives– Specific policy provisions for application during project

delivery

• The following components may also be helpful to include in the WZ policy:– Definitions and explanation of terms– Stakeholder and team information– Roles and responsibilities– Contact person(s)– Policy exemption criteria and process

Page 10: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

10

Ideas for Specific Policy ProvisionsIdeas for Specific Policy Provisions• Classification of projects based on expected WZ

impacts, e.g., – Criteria for significant projects (beyond those in the Rule)– Project types that might trigger certain agency

procedures (e.g., type of TMP, use of lane rental)

• WZ performance standards/requirements, e.g.,– Queue length limits or WZ delay limits– Requirements for the use of law enforcement

• Policy guidance and agency processes and procedures, e.g., – Training requirements

Page 11: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

11

Implementing Agency-Level Implementing Agency-Level Processes and ProceduresProcesses and Procedures

Page 12: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

12

Implementing Agency-Level Processes and Implementing Agency-Level Processes and ProceduresProcedures• Agency processes and procedures help:

– Institutionalize, streamline, and standardize WZ safety and mobility practices

– Support decision-making during the different stages of program and project delivery

• Rule specifically addresses agency processes and procedures for:– WZ assessment and management (encouraged)– Use of WZ data (required)– WZ related training (required)– Conducting process reviews (required)

Page 13: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

13

WZ Assessment and Management Procedures – WZ Assessment and Management Procedures – Related ProvisionsRelated ProvisionsSection 630.1008(b):

• Encourages agencies to develop and implement procedures to assess WZ impacts in project development, and to manage safety and mobility during project implementation.

• Requires that the scope of WZ assessment and management procedures be based on the characteristics of projects or project-classes. – Intended to account for the variation that exists in project

types, characteristics, and complexity.

Page 14: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

14

WhyWhy WZ Assessment & Management Procedures?WZ Assessment & Management Procedures?

• WZ assessment and management procedures can provide a framework within existing project development processes to help agencies:– Identify and understand the WZ safety and mobility impacts of road

projects. – Understand the WZ safety and mobility implications of alternative project

options and design strategies. – Identify significant projects and better allocate WZ management

resources to projects likely to have greater WZ impacts. – Identify transportation management strategies to manage the expected

WZ impacts of a project. – Estimate costs and allocate appropriate resources for the

implementation of the WZ management strategies. – Implement the strategies and monitor and manage WZ impacts during

construction, maintenance, or utility work, and adjust the TMP if needed. – Conduct post-construction WZ performance assessment for assessing the

performance of WZs and to improve WZ policies, practices, and procedures.

Page 15: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

15

Examples ofExamples of WZ Assessment and Management WZ Assessment and Management ProceduresProcedures• Procedures for WZ impacts assessment with varying rigor

and intensity of assessment based upon the expected impacts of projects.

• Procedures and criteria for identifying and categorizing significant projects.

• Procedures and project criteria that trigger the consideration of certain types of project options and management strategies.

• Procedures for developing TMPs based upon certain categories or intensity of WZ zone impacts.

• Procedures for monitoring TMP and WZ zone performance during construction.

• Procedures for overall performance assessment for process and procedural improvement.

Page 16: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

16

Tools to Assess WZ ImpactsTools to Assess WZ Impacts• Agencies are encouraged to look at developing or

modifying existing tools to meet their unique needs. Some tools that can be used alone or in combination are:– Sketch-planning and systems planning analysis tools like travel demand

modeling tools, the ITS Deployment Analysis System (IDAS), etc. – Higher-level project impacts analysis tools like Highway Capacity Manual (HCM)-

based tools, QuickZone, QUEWZ, Micro-BenCost, etc. – Operational-level traffic analysis and simulation tools like VISSIM, PARAMIX,

CORSIM, NETSIM, etc. – CA4PRS – Construction Analysis for Pavement Rehabilitation Strategies

• More information about these tools is available at http://ops.fhwa.dot.gov/wz/traffic_analysis.htm

Page 17: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

17

Use of WZ Data – Related ProvisionsUse of WZ Data – Related Provisions

Section 630.1008(c):

• Requires agencies to use WZ data at both the project and process-levels to manage and improve work zone safety and mobility. – Project level: Improvements while projects are underway– Process level: Broad improvements over time

• Recommends that agencies maintain data and information resources that are necessary to support the use of WZ data for the above activities.

• Rule does not require the reporting or submission of WZ data.

Page 18: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

18

Using WZ Data at the Project-LevelUsing WZ Data at the Project-Level• Rule requires agencies to use field observations, available WZ

crash data, and operational information to manage WZ impacts for specific projects during implementation.

• Use of WZ data should support efforts to:– Manage the safety and mobility impacts of projects more effectively during

implementation. – Develop a basis for procedures to assess work zone impacts in project

development.

• Does not require additional data collection during project implementation, but rather the use of available information. – However if little or no data are available, some new collection or tracking may be

needed.

Page 19: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

19

Using WZ Data at the Process-LevelUsing WZ Data at the Process-Level• Rule requires agencies to continually pursue improvement of WZ

safety and mobility by analyzing WZ crash and operational data from multiple projects to improve agency processes and procedures.

• Project-level data/information from multiple projects may be compiled and analyzed to identify trends and determine if there are common problems that could be remedied by a change in policy or practices.

• WZ data may be used to conduct post-construction evaluations, support process reviews, develop lessons learned, and ultimately improve agency policies and procedures.

– This data and information typically becomes available during project implementation and it needs to be retained and maintained for post-construction analyses.

Page 20: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

20

Maintaining Data and Information ResourcesMaintaining Data and Information Resources• Rule recommends that agencies maintain data and information

resources necessary to support the use and analysis of WZ data.

• Some of the data needed to conduct WZ performance monitoring during implementation as well as post-implementation assessments should be available from pre-existing sources.– Data collection or data storage and retrieval systems may need to be altered to

take full advantage of available information resources.

• Developing new data and information resources or modifying existing resources to support the effective use and analysis of WZ data will likely be an evolutionary process that occurs over time.

Page 21: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

21

Implementation of Training – Related ProvisionsImplementation of Training – Related Provisions

Section 630.1008(d):• Agencies must require appropriate training for personnel involved

in the development, design, implementation, operation, inspection, and enforcement of work zone related transportation management and traffic control.

• Agencies must require periodic training updates for these personnel. These periodic training updates are to reflect changing industry practices and agency processes and procedures.

• Clarifies appropriate training as training that is relevant to the job decisions that each individual is required to make.

• No specific topics that must be covered in the training

• No specific format for delivery of training required

• No set/standard frequency for training updates

Page 22: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

22

Who Needs to be Trained and Who Provides the Who Needs to be Trained and Who Provides the Training?Training?• Personnel involved in development, design, implementation,

operation, inspection, and enforcement of WZ related transportation management and traffic control need to be trained.

• Agencies may have internal and external (design or engineering service consultants) training needs.

• Agencies will need to cooperatively ensure that skills and abilities commensurate with WZ responsibilities are developed for external personnel, such as law enforcement enforcement and incident responders.

• Agencies are not solely responsible for providing training or for updating all training courses to reflect changing industry practices

Page 23: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

23

WZ Process Reviews – Related ProvisionsWZ Process Reviews – Related Provisions

Section 630.1008(e):• Requires agencies to perform a process review at least every 2 years to

assess the effectiveness of their WZ safety and mobility procedures.

• Provides options for agencies to conduct the process review– Evaluation of work zone data at the agency-level. – Review of randomly selected projects across a variety of jurisdictions

• Recommends that appropriate personnel, who represent the project development stages and the different offices within the agency, as well as the FHWA, participate in the process reviews.

• Allows participation of other non-agency stakeholders in the reviews as appropriate.

• Explains that process review results are intended to lead to improvements in agency WZ processes and procedures, data and information resources, and training programs, that ultimately enhance efforts to address safety and mobility on current and future projects.

Page 24: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

24

Possible Aspects of Process ReviewsPossible Aspects of Process Reviews• While the basics of process reviews will remain the same as they previously

were, these reviews will also need to include some additional aspects.

• Examples of questions that the process reviews may help answer:– Is a WZ Policy in place and being implemented?– How is the agency using WZ safety data? Operational data?– Are significant projects being identified in accordance with the Rule and agency

policy?– Which strategies have proven to be either more or less effective in improving the

safety and mobility of WZs? – What other strategies can be considered for implementation? Are there certain

combinations of strategies that seem to work well? – How do WZ performance, the effectiveness of strategies, or areas of

improvement vary between day work and night work? – Should policies or agency procedures be adjusted based on what has been

observed or measured?

Page 25: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

25

Implementing Project-Level Implementing Project-Level Procedures: Significant ProjectsProcedures: Significant Projects

Page 26: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

26

What is a Significant Project?What is a Significant Project?• A project that a State or local transportation agency

expects will cause a relatively high level of disruption.

• The Rule provides a specific, more detailed definition of significant project in Section 630.1010:– A significant project is defined as one that, alone or in combination with other

concurrent projects nearby, is anticipated to cause sustained work zone impacts that are greater than what is considered tolerable based on State policy and/or engineering judgment.

– All Interstate system projects within the boundaries of a designated Transportation Management Area (TMA) that occupy a location for more than three days with either intermittent or continuous lane closures shall be considered as significant projects.

Page 27: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

27

Significant Projects and Transportation Significant Projects and Transportation Management AreasManagement Areas• What is a Transportation Management Area (TMA)?

– 23 U.S.C. 134 (i)(1)(A) & (B) requires the Secretary of Transportation to designate as a TMA each urbanized area with a population of over 200,000 individuals.

– In addition, at the request of the Governor and metropolitan planning organization (MPO) (or affected local officials), other areas may be officially designated as TMAs by the Administrators of the FHWA and the FTA.

– The TMA designation applies to the entire metropolitan planning area(s).

• Is there a list of designated TMAs?– A list of the areas designated as TMAs is contained in the July 8, 2002 Federal

Register on pages 45173 to 45178 http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=2002_register&docid=02-16998-filed.

Page 28: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

28

Significant Projects – Related ProvisionsSignificant Projects – Related ProvisionsSection 630.1010:

• Agency must identify upcoming projects that are expected to be significant.

• Identification of significant projects should be done as early as possible in the project delivery and development process

• In cooperation with the FHWA.

• The agency's WZ policy provisions, the project's characteristics, and the magnitude and extent of the anticipated work zone impacts should be considered when determining if a project is significant or not.

• Whether or not a project is considered to be significant determines which transportation management plan (TMP) requirements apply to the project.

Page 29: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

29

Why Identify Significant Projects?Why Identify Significant Projects?• To help agencies allocate resources more effectively to projects

that are likely to have greater impacts.

• To help agencies think through project coordination and scheduling issues.

• Classifying projects as early as possible in program delivery will help answer key questions.

Page 30: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

30

Identifying Significant ProjectsIdentifying Significant Projects• Done by a multi-disciplinary team of the agency and its project

partners, including the FHWA and other appropriate regional stakeholders

• Ideally identified during the systems planning phase of project delivery, when Statewide Transportation Improvement Programs (STIPs) and regional Transportation Improvement Programs (TIPs) are developed. – An agency may need to reconfirm whether a project is significant or

not during subsequent project development stages.

• May either be qualitative or quantitative process (or both)

• Analytical tools can be helpful for assessing whether a project meets an agency's quantitative criteria for significant projects.

Page 31: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

31

Significant Projects – Exception RequestsSignificant Projects – Exception Requests

If a project is considered significant as a result of the TMA provision but the agency does not believe that the project causes sustained WZ impacts:

• Agency can request an exception, from the FHWA Division Office, to the requirements triggered by the classification.

• Can be individual project or a class/category of similar projects

Page 32: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

32

Implementing Project-Level Implementing Project-Level Procedures: Procedures:

Transportation Management Plans Transportation Management Plans (TMPs)(TMPs)

Page 33: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

33

What is a TMP?What is a TMP?• A TMP lays out a set of coordinated strategies and describes

how these strategies will be used to manage the WZ impacts of a project.

• The scope, content, and level of detail of a TMP may vary based on the agency's WZ policy and the anticipated WZ impacts of the project.

• The components of TMP needed for a project are based on whether the project is determined to be a "significant project."

• A TMP must be developed for every Federal-aid project.

Page 34: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

34

TMPs – Related ProvisionsTMPs – Related ProvisionsSection 630.1012 :

• For significant projects, the TMP shall consist of a Temporary Traffic Control (TTC) plan as well as transportation operations (TO) and public information (PI) components.

• For projects that are not classified as significant projects, the TMP may consist only of a TTC plan. However, agencies are encouraged to consider TO and PI issues for these projects as well.

• A TTC plan shall be consistent with the provisions under Part 6 of the Manual on Uniform Traffic Control Devices (MUTCD) and with the WZ hardware recommendations in Chapter 9 of American Association of State Highway and Transportation Officials (AASHTO) Roadside Design Guide. TTC plan may be incorporated in the TMP by reference, such as reference to elements in the MUTCD or approved standard agency plans or manuals. TTC plans may also be specifically designed for individual projects.

• Pre-existing roadside safety hardware must be maintained at an equivalent or better level than existed prior to project implementation.

Page 35: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

35

TMPs – Related Provisions (cont.)TMPs – Related Provisions (cont.)• Agencies should coordinate with appropriate stakeholders in developing a

TMP.

• The provisions for a TMP shall be included in the project's Plans, Specifications, and Estimates (PS&Es). The PS&Es shall either contain all the applicable elements of an agency-developed TMP, or include provisions for a contractor to develop a TMP at the most appropriate project phase, as applicable to the agency's chosen contracting methodology for the project.

• Pay item provisions for implementing the TMP shall be included in PS&Es, either through method-based (pay items, lump sum, or combination) or performance-based specifications (performance criteria and standards).

• Trained person: The agency and the contractor shall each designate a trained person at the project-level who has the primary responsibility and sufficient authority for implementing the TMP. The designated personnel have to be appropriately trained (per § 630.1008(d) of the Rule).

Page 36: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

36

TMP Development and Implementation ProcessTMP Development and Implementation Process•The TMP development process is iterative and evolves

during the development of the project design.

•Developing the TMP will involve identifying applicable

strategies to manage the impacts of the work zone.

•The costs for the management strategies need to be

incorporated in early project estimates and the budgeting

process to ensure that funding is available for TMP

implementation.

•As the TMP evolves, it is important to reassess the

management strategies to confirm that the work zone

impacts are addressed and the necessary budget for the

project is still available.

•The TMP may be re-evaluated and revised prior to and

during implementation and monitoring.

•Both project-level and program-level assessments of

TMPs are recommended to evaluate the effectiveness of

the management strategies and improve TMP policies,

processes, and procedures.

Page 37: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

37

Potential TMP ComponentsPotential TMP Components1. Introductory Material

2. Executive Summary

3. TMP Roles and Responsibilities

4. Project Description

5. Existing and Future Conditions

6. Work Zone Impacts Assessment

7. Work Zone Impacts Management Strategies

8. TMP Monitoring Requirements

9. Contingency Plans

10. TMP Implementation Costs

11. Special Considerations

12. Attachments

Page 38: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

38

Implementation and ComplianceImplementation and Compliance

Page 39: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

39

Implementation and Compliance ProvisionsImplementation and Compliance Provisions• Implementation provisions are provided in Section 630.1014:

– Agencies are required to work in partnership with the FHWA to implement their respective work zone policies and procedures.

– At a minimum, FHWA shall review the conformance of the agency's policies and procedures with the Rule, and reassess the agency's implementation of its procedures at appropriate intervals.

– Agencies are encouraged to address implementation of the Rule in their respective stewardship agreements with the FHWA.

• Compliance provisions are provided in Section 630.1016:– Agencies are required to comply with all the provisions of the Rule by October 12, 2007. – Agencies may request variances from the compliance requirement on a project-by-project

basis: • For projects that are in the later stages of development at or about the compliance date, and • If it is determined that the delivery of those projects would be significantly impacted as a result of

the Rule"s provisions.

Page 40: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

40

Partnership Partnership

• Staff from FHWA Division Offices, Resource Center, and Headquarters will work with their agency counterparts to support implementation and compliance efforts:– Review the agency's existing WZ policies and procedures to assess

conformance and compatibility with the provisions of the Rule. – Support the agency in writing or revising its policies, agency-level procedures,

and project-level procedures that conform to the Rule. – Reassess the agency's implementation of its WZ procedures at appropriate

intervals. – Help incorporate the provisions of the Rule in their respective stewardship

agreements.

• FHWA HQ will continue to provide guidance and share practices via its web site and printed materials

Page 41: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

41

Implementation Funding SourcesImplementation Funding Sources• Some existing sources of funding may be applied toward implementing

elements of the Rule.

• Current funding sources for deploying certain transportation management strategies could include use of National Highway System (NHS), Interstate Maintenance (IM), Surface Transportation Program (STP), STP set-aside, Congestion Mitigation and Air Quality (CMAQ) Improvement Program, Intelligent Transportation System (ITS), and 402 funds.

• Some WZ safety training may also be eligible for funding through a new Work Zone Safety Grants program established in the Safe, Accountable, Flexible Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU).

• Smaller scale funding sources include the use of Technology Transfer, Local Technical Assistance Program (LTAP), and FHWA Operations Support Program funds.

Page 42: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

42

The Rule and SAFETEA-LUThe Rule and SAFETEA-LU• Section 1110 of SAFETEA-LU requires FHWA to

establish guidelines for the use of and expenditure of funds for traffic control, positive protection, and law enforcement. SAFETEA-LU also requires FHWA to require the use of separate pay items in contracts to assure compliance with these requirements.

• FHWA is currently assessing options for addressing this SAFETEA-LU requirement.

• While this section of SAFETEA-LU may ultimately affect some part of the updated work zone Rule, as of now, SAFETEA-LU has no effect on the Rule and agencies should continue to implement the Rule as promulgated.

Page 43: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

43

Implementation ResourcesImplementation Resources• 4 Implementation Guides http://www.ops.fhwa.dot.gov/wz/resources/final_rule.htm

– Rule Overview– Public Information and Outreach– TMPs– Impacts Assessment

• Road Safety Audits (RSAs) Guidance http://safety.fhwa.dot.gov/state_program/rsa/

• QuickZone Traffic Impact Analysis Tool http://www.tfhrc.gov/its/quickzon.htm

• Full Road Closure for Work Zone Operations http://www.ops.fhwa.dot.gov/wz/construction/full_rd_closures.htm

• Innovative Contracting Guidance http://www.ops.fhwa.dot.gov/wz/contracting/index.htm

• ITS in Work Zones http://www.ops.fhwa.dot.gov/wz/its/index.htm

• Work Zone Training Courses. http://www.nhi.fhwa.dot.gov/

• Manual on Uniform Traffic Control Devices (MUTCD) http://mutcd.fhwa.dot.gov/

• Traffic Control Handbook for Mobile Operations at Night - Available from the FHWA HQ Office of Safety.

Page 44: Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to

44

Final Rule Web SiteFinal Rule Web Sitehttp://www.ops.fhwa.dot.gov/wz/resources/final_rule.htm

• Content available:– Implementation Guide– Public Information and Outreach Guide– TMP Guide– FAQs– Brochure and fact sheets– Rule language– Presentations on the Rule– Examples

• Planned content:– Other Guidance Documents– Training Opportunities

FHWA Work Zone Web Sitehttp://www.fhwa.dot.gov/workzones