Exploitation of wastewater produced in a town Project by: -Doglioli Alberto -Rossi Edoardo -Peduto Chiara -Agcaoili Ralph -Frezet Filippo Progetto e-gomotion 2013 Team saetta mcqueen
8

Exploitation of wastewater produced in a town Project by: -Doglioli Alberto -Rossi Edoardo -Peduto Chiara -Agcaoili Ralph -Frezet Filippo Progetto e-gomotion.

Mar 28, 2015

Download

Documents

Justin Dillon
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Exploitation of wastewater produced in a town Project by: -Doglioli Alberto -Rossi Edoardo -Peduto Chiara -Agcaoili Ralph -Frezet Filippo Progetto e-gomotion.

Exploitation of wastewater produced in a town

Project by:-Doglioli Alberto-Rossi Edoardo-Peduto Chiara -Agcaoili Ralph -Frezet Filippo

Progetto e-gomotion 2013Team saetta mcqueen

Page 2: Exploitation of wastewater produced in a town Project by: -Doglioli Alberto -Rossi Edoardo -Peduto Chiara -Agcaoili Ralph -Frezet Filippo Progetto e-gomotion.

We have chosen the community of S. Mauro Torinese, a town of 19000 inhabitants in the subburbs of TurinThis community produce 208.22 tons of CO2 daily

CO2 emission in S. Mauro area

Private vehiclesmunicipality transportsOther

Page 3: Exploitation of wastewater produced in a town Project by: -Doglioli Alberto -Rossi Edoardo -Peduto Chiara -Agcaoili Ralph -Frezet Filippo Progetto e-gomotion.

Our aim is to decrease the emission of CO2

The School buses provided by the municipality represent our target

We can obtain the decrase of CO2 emission by using electrical buses and our pilot scheme is a plant that uses biomass to produce energy

Page 4: Exploitation of wastewater produced in a town Project by: -Doglioli Alberto -Rossi Edoardo -Peduto Chiara -Agcaoili Ralph -Frezet Filippo Progetto e-gomotion.

The wastewater from the town is at the moment piped to sewage system and it’s channeled to a purification plant.

In the picture on the right you can see the area choosen to build the plant

Our treatment plant will be connected directly to the sawage system in oreder to obtain the raw material to be transformed in green energy

Page 5: Exploitation of wastewater produced in a town Project by: -Doglioli Alberto -Rossi Edoardo -Peduto Chiara -Agcaoili Ralph -Frezet Filippo Progetto e-gomotion.

We visited a well working establishment in Cavallermaggiore (CN) where the energy resulting from dung fermentation is produced .

Biosolids treatment produce gas that is piped into a generator unit which transform it into electrical energy

Page 6: Exploitation of wastewater produced in a town Project by: -Doglioli Alberto -Rossi Edoardo -Peduto Chiara -Agcaoili Ralph -Frezet Filippo Progetto e-gomotion.

A single silo contein 30.000 tons of biosolids. The production cycle last 45 daysThe generator unit produces 1000kw/h

Page 7: Exploitation of wastewater produced in a town Project by: -Doglioli Alberto -Rossi Edoardo -Peduto Chiara -Agcaoili Ralph -Frezet Filippo Progetto e-gomotion.

To improve our plant we will use even the compost heap

Raw material used by our plant

Biosolids

Compost heap

H2O

- 213.750 Kg

- 974.700 Kg

- 4.275.000 Kg

TOT= 5.463.450 Kg (5.463 t)

Page 8: Exploitation of wastewater produced in a town Project by: -Doglioli Alberto -Rossi Edoardo -Peduto Chiara -Agcaoili Ralph -Frezet Filippo Progetto e-gomotion.

Using 5463 tons of sewage we’ll produce about 197 kw/hSchool buses will be feeded during the night and the energy produced during the day will be exploited to power other municipality services (for exemple mail delivery).