Initials – MPS__________ date__________ Initials - Consultant__________ date__________ Exhibit A – Project Identification Exhibit B – Project Charter / Project Intent Exhibit C – Project Scope Exhibit C – Project Schedule Exhibit D – Project Budget Exhibit E – Owner Supplied Documents Exhibit F – Sample Notice to Proceed Exhibit G – Project Communications Plan Exhibit H.1 – Deliverables: % Complete and Approvals Exhibit H.2 – Deliverables: Feasibility Approval Phase Exhibit H.3 – Deliverables: Scope Approval Phase Exhibit H.4 – Deliverables: Final Cost Estimate Approval Phase Exhibit H.5 – Deliverables: Quality Control Approval Phase Exhibit H.6 – Deliverables: Procurement Approval Phase Exhibit H.7 – Deliverables: Contract Administration Phase Exhibit H.8 – Deliverables: Project Close-out Approval Phase Exhibit H.9 – Deliverables: Additional Services Exhibit J.1 – Consultant’s Fee Exhibit J.2 – Consultant’s Reimbursable Expenses Exhibit J.3 – Consultant’s Hourly Rates Exhibit K – City of Minneapolis Special Structural Inspections
22
Embed
Exhibit A Project Identification Project Charter / Project ...facilities.mpls.k12.mn.us/uploads/exhibits_v6-1_-_2018_0108.pdf · Exhibit B – Project Charter / Project Intent ...
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Construction Budget: $xxxx The construction budget above includes all costs, in all project phases, for the following Uniformat II Level 2 group elements:
A10 – Substructure A20 – Basement Construction B10 – Superstructure B20 – Exterior Enclosure B30 – Roofing C10 – Interior Construction C20 – Stairs C30 – Interior Finishes D10 – Conveying D20 – Plumbing D30 – HVAC D40 – Fire Protection D50 – Electrical E10 – Equipment E20 – Furnishings (EXCLUDING E2020 Movable Furnishings. INCLUDING all appliances and work surfaces in
the kitchen and non-portable fixtures and equipment throughout the building) F10 – Special Construction F20 – Selective Building Demolition (EXCLUDING F2020 – Hazardous Components Abatement) G10 – Site Preparation G20 – Site Improvements G30 – Site Mechanical Utilities G40 – Site Electrical Utilities G50 – Other Site Construction
Construction cost estimates will be presented in Uniformat II Level 4 detail. Construction cost estimates will include estimated costs (where applicable) for:
1) Occupied building construction 2) Cost escalator to the mid-point of construction 3) General conditions 4) Phasing costs 5) Insurance and bonding costs 6) Design contingency equal to:
a. 15% of all construction costs (including 1-5 above) at Feasibility Approval (if applicable) b. 10% of all construction costs (including 1-5 above) at Scope Approval c. 0% of all construction costs (including 1-5 above) at Final Cost Estimate Approval
The documents checked (“x” or ‘‘”) below represent some, but not necessarily all, of the deliverables provided by the Owner to support completion of work defined by this contract.
Exhibit A – Project Identification
Exhibit B – Project Charter
Exhibit C – Project Schedule
Exhibit D – Project Budget
Exhibit E – Project Budget
Exhibit F – Project Communications Plan
Exhibit G.1 – Deliverables: % Complete and Approvals
The documents checked (“x” or ‘‘”) below represent some, but not necessarily all, of the deliverables required to complete this phase of work. As such, the documents below constitute the minimum acceptable deliverables.
Compensation for Project Services as defined herein is a fixed fee of: $ (Basic Design Services) $ (Basic Construction Services) $ (Total Basic Services Fee) The above Basic Design Services fees will be allocated to the phases of work as shown below:
Phase of Basic Design Services: ------
Feasibility Approval Phase (if any) % percent
Scope Approval Phase % percent
Final Cost Estimate Approval Phase % percent
Quality Control Approval Phase % percent
Procurement Approval Phase % percent
Total Basic Design Services 100% One hundred percent
The above Basic Construction Services fees will be allocated to the phases of work as shown below:
Basic Design Services above % percent
Phase of Basic Construction Services: ------ percent
Construction Administration Phase % percent
Warranty Approval Phase % percent
Project Close-out Phase % percent
Total Basic Construction Services 100% One hundred percent
Compensation for Additional Project Services (if any) is a fixed fee of: $ (Additional Design Services) $ (Additional Construction Services) $ (Total Additional Services Fee)
Project Reimbursable Expenses are invoiced by the Consultant. The following list of items or services are acceptable Project Reimbursable Expenses: A.) Blueprints (see below) B.) Mylar Reproducible (see below) C.) Mileage (Rate per IRS) (NO MARKUP) D). Postage
E.) Delivery Charges
F.) Digital Prints $.21 per sq ft
G.) Faxes $.25/page
H.) Outside Reproduction with back-up
I.) Photographic/Film (If photos are available to the Owner for use)
J.) In House Reproduction: B/W 8 ½ x 11 = $.10/copy 11 x 17 = $.10/copy (NO MARKUP)
Color 8 ½ x 11 = $.50/copy 11 X 17 = $1.50/copy (NO MARKUP)
In-house Reproduction: Blueprints:
12” x 18” $0.33
15” x 21” $0.48
17” x 22” $0.57
18” x 24” $0.66
22” x 34” $1.15
24” x 36” $1.32
30” x 42” $1.90
Mylar Reproducibles:
12” x 18” $3.75
15” x 21” $5.46
17” x 22” $6.50
18” x 24” $6.60
22” x 34” $13.00
24” x 36” $14.25
30” x 42” $21.90
Special Reimbursable Expenses:
Special Reimbursable Expenses are reimbursable to the Consultant. These expenses require prior District approval. The following expenses are typical but not limited to:
Land Surveying Testing Services Any Consultant required to design the project scope that is not identified as a provider of project services (permissible only with the written approval of the Owner). Consultant Firm_______________________
By__________________________________ Position in the consultant firm:_______________________ (Printed name)
Provide the names and billable rate of the Consultant design team assigned the following roles. Provide additional roles and names as the project scope requires. Consultant affirms that the billable rates below will remain in effect for the duration of the project.
Job Title used in this contract: Person assigned to these roles: Hourly Rate:
The work perfomed and deliverables received pursuant to the requirements of the above contract is hereby approved , subject to any exclusions and notes provided below.
Deliverable group Deliverable category Deliverable document Notes or exclusions
Admin documents Communications documents
Design documents Constructability documents
Cost documents
Design documents – Site plan, floor plan(s), massing models, elevations, sections, etc.