(P. J. S.) Establishment: Nov.1959 No.17, Varshow St., Nejatollahi Avenue. Tehran 15986-89611, Iran. Tel: (+9821) 8890 1799, 8890 3389 Fax: (+9821) 8890 5378 E-mail: [email protected]
(P. J. S.)
Establishment: Nov.1959
No.17, Varshow St., Nejatollahi Avenue. Tehran 15986-89611, Iran.Tel: (+9821) 8890 1799, 8890 3389 Fax: (+9821) 8890 5378
E-mail: [email protected]
Content
Profile 3
About Parham
Organization chart
Board of Directors
Statistics
List of Projects
Experience in Special Marine works
Construction of Railway Ro-Ro Terminal, Amirabad Commercial Port.
Construction of Fuel berth at Pars Service Port of Pars Special Economic Energy Zone (PSEEZ).
Construction of Eastern Quay and Increasing the Basin Depth at the end of Western Quay at PSEEZ service port.
Construction for Development of Anzali Commercial Port (9 Wharfs)
Construction of 3 berths at PSEEZ service port
Construction of berth No. 1 and Construction of the Commercial berth at Anzali Port
Amirabad Commercial Port , Basin No. 1 (Eastern, South & Western Quay: 9 Wharfs)
Kaveh commercial cargo jetty.
Construction of New Passenger Harbour, at Bandar Gaz
Construction of three Pumping Stations; Karoon River,
General Cargo Berth; Chabahar Port
Chabahar Ring Road Bridge
List of Owned Equipments
Chabahar Port Complex ; Berth and Ro-Ro Jetty (Naval Base)
4
6
7
7
12
35
14Construction of Eastern & Western Breakwater & Dykes, Anzali Port.
CONSTRUCTION Co. (P. J. S.)
10 Wharfs, Breakwaters & Dykes
4.60m3
0018
14
Bandar Anzali Port, Caspian Sea, IRAN
Parham Construction is one of the leading Iranian construction companies. Established in 1959, it has
been a reliable heavy civil engineering contractor in the Iranian market. With utilizing large fleet of const ruct ion p lants and deep foundation machinery's as well as technical expertise, Parham is capable of conducting all types of deep foundation works even at the hardest conditions onshore and offshore.
Parham Construction Company applying
, methodologies, and equipment for post-tensioning works related to marine structure, pilling, bridges, buildings, towers, tunnels, slope stabilization and other c i v i l app l i ca t i ons above and underground.
Parham Construction Company is the first Iranian Contractor for execution of in situ concrete piles with different type of excavation and also piling with soldier pile system, and equipped by different kind of machinery for deep foundation, piling, excavation, and in situ piles.
Company
since
Parham Construction Company has successfully completed a jetty and one of the most advanced Caspian Sea rail ferry link-spans.This system has been installed in basin No. 1 of Amirabad commercial port and al l complementary design and construction stages were supervised & implemented by Parham's technical staff.
In recent years, Parham with emphasize on experience and technical staff, exerted the value engineering and offered optimum plan in big and important national projects, and caused quality improvement, cost benefit and reduction in time of projects. In this regards, Amirabad commercial port (9 wharfs), Anzali port development (10 wharfs) and multi purposes berth in South Pars Energy Special Zone (5 wharfs) could be mentioned.
Dywidag System International
of Germany (D.S.I)
CONSTRUCTION Co.
Field of Activities:
About Parham
Profile 5
3 Pre-stressed Reinforced Concrete Structures: bridges, buildings and so on, post-tensioned
and pre-tensioned, applying D.S.I system specification, equipment for pre-stressing and post-tensioning works.
marine structure, pilling,
2 Piling a) Bored piles (cast in situ reinforced concrete piles). b) Fabrication and driving of prefabricated reinforced concrete piles. c) Pile driving, steel piles, sheet piles.
4 Heavy Reinforced Concrete Structures: bridges, towers, reservoirs and heavy reinforced concrete foundation.
1 Construction of Marine Structures: piers, wharf, jetties, quay walls, Break waters.
5 Civil and Road Construction Works
(P. J. S.)
Qualification: By Vice president of MPO (Managing and Planning Organization) Class1: In The Field Of Water, Subfield Of Marine Structures, with 4 authorized activities.Class1: In The Field Of Road & Transportation, with 4 authorized activities.Class5: Oil & Gaz, with 4 authorized activities.
PerojectManager 1
PerojectManager 1
CONSTRUCTION Co.
Organization Chart Financial Status
PerojectManager 1
ProjectManager 1
Board or Directors
Managing Director
Advisors Auditing
TechnicalDepartment
AdministrationDepartment
Project Planning& Control
Department
Legal &ContractsDepartment
FinancialDepartment
IT
logisticDepartment
ProcurementDepartment
QA/QCDepartment
HSEDepartment
Central Warehouse
CentralRepair Shop
Organization Chart
Profile 7(P. J. S.)
Nationality IranianProfession Civil EngineerPosition in Firm Managing DirectorYear of Birth 1947
Education
Experience Record
1992 to 2014
1985-1992
1977-1985
1975 - 1977
1975 - 1975
1971 - 1973
PARHAM Construction Company
1974 - 1975
ALI AKBAR KHODABAKHSHI
“B.Sc. in Civil Eng., Tehran University, Tehran, 1969."M.Sc. in Civil Eng., Tehran University, Tehran, 1971
Chairman of the Board & Project Manager
3 Multipurpose Berths-Pars Service Port.
2 Eastern Berths-Pars Service Port.
Fueling Berth-Pars Service Port.ANZALI Berths.
3 AMIR ABAD Commercial Port.GHESHM KAVEH Jetty
LENGEH Port Jetty.KAROON Pump Station- 3 Projects
ROK Company.Project Manager
"Project Manager of BUSHEHR Port Jetty.
ROOTS CompanyProject Manager
IRAN-TRANSFO Factory.ALIAF-TEHRAN Factory.ALIAF SHIRAZ Factory.
Mounbel Company Managing Director
"Several Building Projects in HAMADAN.
ARIKAN CompanySite Manager
"Site Manager of SARCHESHME Dam.
MACADAM Company Site Manager
"Site Manager of MOGHAN Irrigation Network Project
MESA Company Site Manager Deputy
"Site Manager Deputy of MOGHAN Diversion Dam.
Key Personnel
2015 to Date PARHAM Construction Company
Managing Director
Profile 9CONSTRUCTION Co.
MOHAMMAD REZA MOUSSAVI KERMANI
Nationality IranianProfession Civil EngineerPosition in Firm Member of the BoardYear of Birth 1949
Education
Experience Record
1987 to Date
1981-1987
1977-1981
1976 - 1977
1975 - 1976
1970 - 1974
PARHAM Construction Company
Managing Director and Project Manager
"IRAN BANDAR Complex
"CHABAHAR Berths
"CHABAHAR Shortcut Bridge
"ANZALI Berths
Representative of Road and Transportation Minister Client's Representative of CHAHBAHAR Triple Ports
KNOCK WAY CompanyManaging Director
BONYAD & ALP ConsortiumSite Manager
"Site Manager of KAMYARAN Residential Complex
Civilization Organization Supervisor
MACADAM Company Site Engineer
"MOGHAN Irrigation network
Military Organization Technical Office Engineer
"Technical Office Engineer of Air force ResidentialComplex
“B.Sc. in Civil Eng. Polytechnic University of Technology, 1970
1974 - 1975
Key Personnel
Nationality IranianProfession Civil EngineerPosition in Firm Chairman of the BoardYear of Birth 1931
PARHAM Construction Company
Managing Director and Project Manager
SADEGH ADIB SAMII
"M.Sc. in Civil Engineering, Tehran University, 1957."B.Sc. in Civil Engineering, Tehran University, 1955.
"Multipurpose Berths of AMIR ABAD Commercial Port
"Container Berths of AMIR ABAD Commercial Port
"Rail Way Ro-Ro Berth of AMIR ABAD Commercial Port
"KAROON Pump Station- 3 Projects
"CHABAHAR SHAHID KALANTARI Port
"IRAN BANDAR Complex
"Rehabilitation DARREH-NARGESI SHIRAZ Bridge
"SEFID-ROOD Bridge
"ASTANE-ASHRAFIE Bridge
"MOND Bridge
"AMOL Shortcut Bridge
PIROOZ Company.Site Manager
"TEHRAN-KARAJ Express Way (Parts 5&6).
IRAN-KAMPSAX Consultant.Supervisor
"Supervisor of TEHRAN-AMOL Road."Supervisor of KERMANSHAH-SLAMSHAHR Road.
PARHAM Construction Company General Manager
1969-1995
1965-1968
1957-1964
Experience Record
2015 to Date:
Education
Key Personnel
PARHAM Construction Company Chairman of the Board
1996-2014
Nationality IranianProfession Chemical EngineerPosition in Firm Member of the BoardYear of Birth 1935
Experience Record
PARHAM Construction Company
"Multipurpose Berths of AMIR ABAD Commercial Port
"Container Berths of AMIR ABAD Commercial Port
"Rail Way Ro-Ro Berth of AMIR ABAD Commercial Port
"Site Manager of TEHRAN-KARAJ Free Way (Parts 5&6).
PARHAM Construction Company General Manager
2002 to Date
1999-2002
1959-1999
Nationality IranianProfession Civil & Marine Engineer
Year of Birth 1951
Education
Experience Record
1990 to Date
1989-1990
1980-1989
1978 - 1980
1974 - 1978
PARHAM Construction Company
Profile 11
RASOUL YAZDANI
Head of Central Technical Office
B.Sc. in Civil Engineering, University of Tabriz, 1974.
Head of Central Technical Office
"Multipurpose Berths-Pars Service Port.
"Eastern Berths-Pars Service Port.
"Fueling Berth-Pars Service Port.
"ANZALI Berths.
"AMIR ABAD Commercial Port.
"GHESHM KAVEH Jetty
"LENGEH Port Jetty."GAZ Port
"CHABAHAR Commercial Port"KAROON Pump Station- 3 Projects
Sazeh Pardazi Iran Consultant Eng.Supervision Advisor
"Marine Projects
Iran NEDECO Port Consultant EngineersHead of Site Supervisor
"CHABAHAR Shahid Kalntari Port "CHABAHAR Shahid Beheshti Port
Iran NEDECO Port Consultant EngineersTechnical Office Manager
GECIMA Consultant EngineersSite Supervisor"KHORAMSHAHR Berths
SOHRAB YADEGARDJAM
B.Sc. in Chemical Engineering Tehran University, Tehran,1959Education
Member of the Board and logistic& Procurement Manager
"Port of Kangan and dayyer, breakwaters and piers."Construction of Eastern pier of Imam Port and repair works on western pier."Mond great bridge, on bushehr-kangan road.
"Bridges on minab-sirik road.
"Construction of great bridge of bardestan and a port of bushehr-lenge road."Chabahar iran Bandar port complex, (CIBPC) Piers, basin, buildings, etc.
"The great bridge over sephidrood river, Astane ashrafiyeh, rasht-lahijan road."Construction of Railway Ro-Ro Terminal, Amirabad Commercial Port."Construction of Fuel berth at Pars Service Port of Pars Special EconomicEnergy Zone (PSEEZ).
"Reconstruction and Development of Anzali Commercial Port Facilities
Representative of Road and Transportation Minister Deputy of soil mechanic laboratory
"Tehran office work
IRAN KAR Company.Site manager
"Site Manager Hamedan& Khosravi.
Position in Firm
CONSTRUCTION Co. (P. J. S.)
Key Personnel Key Personnel
Profile 13
Some of completed Projects
Urban potable water piping network
Sefid rood Big bridge
Chabahar berth, Iran BandarNaval Base
Chabahar Naval Base Ro-Ro & landing craft berth
Hormozgan Steel Complex
Kalantari Port, Commercial wharf
Bandar Gaz, tourist port
Karoon pump stations
Lengeh Port, Jetty development Kaveh Jetty, Qeshm Island
Anzali Port, jetties development plan, including several contracts, 10 berths in 1722m total,
7.5m draft, 2560m crane rail foundation
Amirabad Port, Commercial wharfs, includingseveral contracts, 8 berths in 1500m long,7.5m draft, 1896m crane foundation
PSEEZ (Assaluyeh) service port, 3 multi-purposeberths
PSEEZ (Assaluyeh) service port, 2 eastern berthsand dredging of western basin
Tehran ProvinceGuilan Province
Konarak
Konarak
Hormozgan
Sistan ProvinceGolestan Province
Ahwas
Bushehr
Qeshm
Anzali
Mazandaran
Assaluyeh
Assaluyeh
1988
1990
19911991
1992
1995
19961997
19971999
2003
2004
2004
2005
Amol-Chelaw ring road bridges
Genaveh-Daylam main road
Chabahar Naval Base, jetties & Buildings
Chabahar multi-purpose jetties
Mazandaran
Bushehr Province
Konarak
Konarak
1982
1983
1988
1988
Project Name
Bardestan Bridge and Bushehr-Lengeh road
Mond big bridge
East jetty of Imam Port
Minab-Sirik road, bridges
Breakwaters & Jetties of Kangan & Dayyer Ports
Shahreza-Behbahan main road
Chaloos foot bridge
Bushehr industrial zone plan
Location
Bushehr Province
Bushehr Province
Khuzestan province
Hormozgan
Bushehr Province
Isfahan Province
Chaloos
Bushehr Province
CompletionDate
1973
1976
1976
1977
1977
1978
1978
1979
Duration (months)
20
36
20
18
24
46
12
28
61
45
36
3622
39
1226
48
7618
60
30
9
96
96
25
22
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
9
10
11
12
No.
1
2
3
4
5
6
7
8
24
16
12
38
29
2006
20072007
2007
2007Assaluyeh
Mazandaran
Mazandaran
Mazandaran
Anzali
Amirabad Ro-Ro berth
Amirabad Truck berthAmirabad Ro-Ro railway berth
Anzali Service Port
PSEEZ fuel berth
CONSTRUCTION Co. (P. J. S.)
32 AnzaliConstruction of Eastern & Western Breakwater & Dykes, Anzali Port. 2014 50
Passenger terminal Anzali33 2013 12
CONSTRUCTION Co. Profile 15
Work Period: 2008- to 2014
Major work quantities: Volume of the stones for Mattress, Core, Filter & Armor layers = 1,281,000 m3 (Type of concrete armor, xblocVolume of the concrete armor(xbloc): 58,700 m3Formwork = 293,700 m2Weight of xblocs = 4.80 to 11.00 tonNumber of xblocs = 17,400
2,562,000 ton)
(P. J. S.)
Construction of Eastern & Western Breakwater& Dykes, Anzali Port, Caspian Sea
Employer:Location:Contract Amount:
Ministry of Road and Transportation, PMO Anzali, Gilan Province, Iran. 116,000,000 USD
Construction of Eastern Breakwater with 1,334m long & max. depth -6.50,Eastern dyke with 1,479m long, Weastern Breakwater with 1,669m long & max. depth -10.50, & western dyke with 314m long.
Brief Description of Work:
2014
Experience in Special Marine works
Construction of Railway Ro-RoTerminal, Amirabad Commercial Port, Caspian Sea
Employer:Location:Contract Amount:
Ministry of Road and Transportation. Amirabad Port, Mazandaran Province , Iran.
21,000,000 USD
Brief Description of Work: Construction of quay wall by use of soldier pile method with cast in situ concrete piles with diameter
of 45cm, 75cm and 142cm, (steel piles as casing drives first, and after concreting immediately the steel pipes pulls out, using heavy-duty vibro hammer), also construction of deadman wall with application of D.S.I post-tensioning system. Construction of a 54 meter dual link-span, hydraulicly powered, fully electronically controlled capable of servicing current Caspian sea rail-ferry vessels of 28 and 54 wagon class.
CONSTRUCTION Co. Profile 17
Work Period: 2008-2013
earthwork = 329,000 m3; Concrete = 14,000 m3; drilling =15,180 m; reinforcement = 970 tons; number of piles =484; depth = 18m
(P. J. S.)
Work Period: 2010-2013
Link-span quantities and specifications :Bridge = 130 ton Span 1 + 130 ton Span 2Towers = 24 ton middle + 38 ton frontCylinders = 4 phi 320 Middle + 4 phi 250 FrontHydraulic = 3,000 litresPower Unit = dual 75 kW electromotorsControl system = Schnieder PLC + Siemens Simatic
2013
Experience in Special Marine works
Major work quantities: Length of berth: 339m
Construction of Fuel berth at Pars Service Port, Pars Special Economic Energy Zone (PSEEZ), Persian Gulf
Iranian Oil Ministry, Pars Special Energy Economic Zone Co.Assaluyeh, Boushehr Province, Iran10,000,000 USD
CONSTRUCTION Co. Profile 19
Brief Description of Work:
3 concrete = 1260 m ; steel work = 923 tons; number of 56" piles = 36; length of piles = 930m; number of 70" mono piles = 6; length of each pile = 36m;
number of 75" mono piles = 4; length of each pile = 36m Man power used: 1050 man-monthCompletion Date: 2007
Major work quantities:
Work Period: 2005-2007
Employer:Location:Contract Amount:
Steel Piles and Concrete deck Over the steel Superstructure, driving of steel vertical and inclined piles with diameter 56"and length between 36 m to 48m, making the steel superstructure with steel plates on the ground, installing of steel superstructure, Concreting of deck over superstructure, Driving of mono piles as dolphins with diameter of 70" and 75", 36 m length, installing of fenders, quick release bollards and ladders. (depth - 20 CD)
Experience in Special Marine works
(P. J. S.)
2007
Construction of Eastern Quay, Increasing the Basin Depthof Western Quay, PSEEZ Service Port, Persian Gulf
Iranian Oil Ministry, Pars Special Energy Economic Zone Co.Assaluyeh, Boushehr Province, Iran. 47,000,000 USD
CONSTRUCTION Co. Profile 21
Brief Description of Work: Construction of the Quay by use of Anchored Soldier Pile system with piles of 56 and "26" diameter, using construction of concrete piles caps and 520m length deadman wall post-tensioning D.S.I system application, (basin depth - 13 CD)
Length of Jetty=520m;number of piles = 1357;length of piles = 21,450 m;earthwork = 920,000 m3;
concrete = 20,000 m3;
reinforcement = 1920 tonsMan power used: 1600 man-monthCompletion Date: 2005.
Major work quantities:
Employer:Location:Contract Amount:
(P. J. S.)
2005
Experience in Special Marine works
Construction of 3 berths at PSEEZ Service Port, Persian Gulf
Iranian Oil Ministry, Pars Special Energy Economic Zone Co.Assaluyeh, Boushehr Province, Iran. 32,000,000 USD
CONSTRUCTION Co. Profile 23
Brief Description of Work:
post-tensioning D.S.I system application, (basin depth - 13 CD)
Length of Jetty =730m; number of piles = 1582; length of piles = 21,410 m; earthwork = 353,200 m3; concrete = 14,150 m3;
reinforcement = 1035 tons Man power used: 1800 man-monthCompletion Date: 2004.
Major work quantities:
Employer:Location:Contract Amount:
(P. J. S.)
2004
Experience in Special Marine works
Construction of the Quay by use of Anchored Soldier Pile system with piles of 56 and "26" diameter, using construction of concrete piles caps and 730m length deadman wall
Construction for Development of AnzaliCommercial Port (9 Wharfs), Caspian Sea
Ministry of Road and Transportation. Anzali, Gilan Province, Iran. 115,000,000 USD
CONSTRUCTION Co. Profile 25
Brief Description of Work: Construction of quay wall by Anchored Soldier Pile methods with cast in situ concrete piles of 75cm diameter, Also construction of 1500m length of deadman wall using post-tensioning D.S.I system application,.(Basin depth is -7.5 CD).
Length of berth =1,500m; earthwork = 303,000 m3; number of piles = 6,546; drilling = 40,220 m; concrete = 39,100 m3; reinforcement = 3,920 tonsMan power used: 1100 man-monthCompletion Date: 2004.
Major work quantities:
Employer:Location:Contract Amount:
Construction of berth No. 1 and Construction of the Commercial berth at Anzali Port, Caspian Sea
Ministry of Roads and Transportation. Anzali, Gilan Province, Iran.7,000,000 USD
Brief Description of Work: Construction of quay by use of
Anchored Soldier Pile method with cast in situ concrete piles of 75cm diameter, Also construction of 220m length of deadman wall using post-tensioning D.S.I system application, (basin depth -7.5 CD). Also conducting under water demolish of existing landing craft ramp.
Length of berth: 220m Major work quantities:
Employer:Location:Contract Amount:
(P. J. S.)
2004
2006
Experience in Special Marine works
earthwork = 38,000 m3; number of piles = 1,190; drilling = 5,590 m; concrete = 5,900 m3; reinforcement = 653 tonsMan power used: 400 man-monthCompletion Date: 2006.
Construction of Amirabad Commercial Port, Basin No. 1 (Eastern, South & Western Quay: 9 Wharfs)
Ministry of Roads and Transportation.Amirabad Port, Mazandaran Province, Iran.80,000,000 USD
CONSTRUCTION Co. Profile 27
Brief Description of Work: Construction of quay by use of Anchored Soldier Pile method with cast in situ concrete piles of 56” in diameter (basin depth -7.5CD), also construction of Ro - Ro and multi purpose jetty and 1559m length of dead man using post-tensioning D.S.I system application wall and dredging of the surrounding area of the proposed pier and jetty.
Major work quantities:
Employer:Location:Contract Amount:
(P. J. S.)
2003
Caspian Sea
Experience in Special Marine works
Length of berth: 1,584m
earthwork = 798,000 m3; number of piles = 2,902; drilling = 45,873 m; concrete = 67,295 m3; reinforcement = 4,965 tons
Completion Date: 2003. Man power used: 1000 man-month
Construction of Kaveh commercial cargo jetty
Qeshm oil industries Marine facilities Co.Qeshm Island, Hormozgan Province, Iran5,700,000 USD
CONSTRUCTION Co. Profile 29
Brief Description of Work: Driving of 56" diameter and 48m in length steel pipes. Off-shore driving tools used in this project were a heavy-duty hydraulic vibro hammer and Delmag diesel pile driver (type D100-13) both operating from a floating barge.
length of piles = 2500m; number of piles = 193; seabed = -20 C.D. Man power used: 180 man-monthCompletion Date: 1999
Major work quantities:
Employer:Location:Contract Amount:
Construction of Pumping Stations; Karoon River,
Brief Description of Work: Construction of 3 units of pumping station (each unit with a discharge capacity of 36m3/sec). using of soldier pile method for construction of basin walls.
capacity of each unit: 36m3/sec;earthwork = 350,000 m3; concrete = 32,000 m3; reinforcement = 4300 tons; drilling = 30,500m; number of piles = 1826Man power used: 520 man-monthCompletion Date: 1995
Major work quantities:
Employer:Location:Contract Amount:
Sugar Cane Industry. Ahwaz, Khouzestan Province , Iran. 18,000,000 USD
(P. J. S.)
1999
1995
,Persian Gulf
Experience in Special Marine works
Construction of New Passenger Harbour, at Bandar Gaz, Caspian Sea
CONSTRUCTION Co. Profile 31
Brief Description of Work: Construction of 2 berths by the method of soldier pile system with cast in situ concretepiles of 50cm diameter (basin depth-4.5CD), together with construction of break
water.
Length of Quay wall = 150m; earthwork = 485,000 m3; concrete = 3500 m3; reinforcement = 900 tons; drilling = 7600m;
number of piles = 770Man power used: 240 man-monthCompletion Date: 1996
Major work quantities:
Employer:Location:Contract Amount:
Ministry of Roads and Transportation. Bandar Gaz, Golestan Province, Iran.7,300,000 USD
(P. J. S.)
1996
Experience in Special Marine works
Construction of General Cargo Berth; Chabahar Port, Oman Sea
CONSTRUCTION Co. Profile 33
Brief Description of Work: Construction of the jettyby use of the Anchored Soldier Pile system with cast in situ concrete piles of 150cm diameter.
Length of Jetty: 220m with the relevant dolphins; earthwork = 118,000 m3; concrete = 14,000 m3; reinforcement = 2400 tons; drilling = 7300m, number of piles = 335Man power used: 230 man-monthCompletion Date: 1996
Major work quantities:
Employer:Location:Contract Amount:
Three Member Committee. Chabahar, Sistan Balouchestan Province, Iran. 6,900,000 USD
Construction of Chabahar Port Complex ;
Berth and Ro-Ro Jetty (Naval Base, Oman Sea)
Brief Description of Work: Assembling of floating dock berth with the relevant mooring dolphins on top of the single piles and construction of landing-craft ramp by method of soldier pile with cast in situ concrete piles of 150cm diameter, (basin depth -11CD)
earthwork = 204,000 m3; concrete = 53,000 m3; number of piles = 456; reinforcement = 4500 tons; drilling = 10,500m Man power used: 520 man-monthCompletion Date: 1992
Major work quantities:
Employer:Location:Contract Amount:
Three Member Committee. Konarak Naval Base, Sistan and Balouchestan Province , Iran. 7,700,000 USD
(P. J. S.)
1996
1992
Experience in Special Marine works
CONSTRUCTION Co. Profile 35
List of Owned Equipments
Brief Description of Work: Construction of the bridge with a length of 100m and width of 25.6m with beam span of 33m using post-tensioning D.S.I German system application.
Length of Bridge: 100m Man power used: 60 man-month Completion Date: 1994
Major work quantities:
Employer:Location:Contract Amount:
Three Member Committee. Chabahar, Sistan Balouchestan Province, Iran.600,000 USD
Experience in Special civil works
Construction of Chabahar Ring Road Bridge
(P. J. S.)
1994
CONSTRUCTION Co.
List of Owned Equipments
(P. J. S.)
Commendations
Profile 37
CONSTRUCTION Co. (P. J. S.)
Basin No.1(9 Wharfs and Railway Ro-Ro Terminal)
Bandar Amirabad Port, IRAN Caspian Sea,
(P. J. S.)
Establishment: Nov.1959
No.17, Varshow St., Nejatollahi Avenue. Tehran 15986-89611, Iran.Tel: (+9821) 8890 1799, 8890 3389 Fax: (+9821) 8890 5378
E-mail: [email protected] May 2018