Commercial Vehicle Business Unit Enterprises Process Manual 2005 Enterprises Process Manual 2005 Version : 4
CK
Commercial Vehicle Business Unit
Enterprises Process Manual2005
Enterprises Process Manual2005
Version : 4
C O N T E N T S
Introduction
CVBU Enterprise Process Model
Leadership and Corporate Citizenship
Strategic Planning
Internal and External Communication
Performance Improvement and Change Management
Market Development
Vendor Management
Channel Partner Management
New Product Introduction
Service Design
A
B
1
2
3
4
5
6
7
8
9
S.No Item Name No of Pages
5
1
3
2
3
3
5
5
3
5
4
S.No Item Name No of Pages
C
D
10
11
12
13
14
15
16
17
18
19
List of Process Owners
Abbreviations
Sales and Operations Planning
Manufacturing
Sales Planning
After Sales Service
Facilities and Environment Management
Human Resource Management
Information and Knowledge Management
Finance and Budgeting
Vehicle Financing
Organizational Governance
S.No Top Level Process No of Sub-processes
2
?
2
6
4
4
5
8
8
14
3
3
S.No Top Level Process No of Sub-processes
31.3.2005
TATA Motors, CVBU
31.3.2005
INTRODUCTION
In year 2002-03, Enterprise Process Manual comprising of 18 Enterprise Level Processes was published.
In the year 2003-04 it was reviewed and 19th process (Organisational Governance) was added. In this year
Enterprise Processes Manual - Part II, comprising Turtle diagrams of 90 + next level sub-processes was also
published.
In the year 2004-05, all the 19 Enterprise Level Processes & their sub-processes were reviewed by
respective Processes Owners and Facilitators along with the users across all the locations.
The changes recommended by the processes owners have been incorporated. This manual is a compilation
of documentation of 19 Enterprise Level Processes and their sub-processes, duly vetted by respective
process owners & facilitators. The 19 Top Level (Enterprise level) Processes have been documented
in the form of Process Maps and Process Definition Sheets, whereas all the Sub Processes have been
documented in the form of Turtle Diagram.
This manual supersedes all earlier versions of Enterprise Process Manual and Sub-process Manual
Introduction
31.3.2005 A.1
31.3.2005
TATA Motors, CVBU
Purpose of Process Documentation :
w Clarify Responsibility for the Process
w Clarify scope of the Process
w Establish Measures
w Facilitate Process Improvement
w Knowledge Sharing
Process Map indicates flow of process and responsibilities.
Output
Sub-process/Activity
XXXX
Inputs
Sub-process/Activity
XXXX
Decision End of Cycle
Sub-process/Activity
XXXX
Sub-process / ActivityResponsibility
Introduction
31.3.2005 A.2
31.3.2005
TATA Motors, CVBU
Process Definition Sheet (PDS) gives following information :
6 Process Owner6 Process Objective6 Inputs6 Key Steps6 Outputs6 Customer of the process6 Divisions / Depts involved6 Efficiency / In Process Measures6 Effectiveness / End / Output Measures6 Core Values it supports6 ISO / TS 16949 clause ref6 Revision Status.
Process Identification Number
Each Process has been given unique Process Identification Number (PIN), which is mentioned on theProcess Definition Sheet. (e.g Leadership - CVBU-EL-01)
Revision Status Indicator :Revision status of the process will be mentioned on Process Definition Sheet as under :
00
01
Version Status code
New Release
1st modification
Introduction
31.3.2005 A.3
31.3.2005
TATA Motors, CVBU
Turtle Diagram methodology has been used for documenting attributes of these sub processes
Sub Process Mapping :
Mapping of sub Processes
Inputs
Method /Practices
Key Steps in theSub-Process
Measures/Indicators
Outputs
Identification Numbering Scheme for Sub Processes :
Each Sub-process has been assigned a unique identification number. It is derived as follow :
Sub Process ID = Main Process ID suffixed by Sr. No within the process. For example, 2 Sub processes of Strategic Planning process (CVBU-EL-02) are numbered as CVBU-EL-02-01 and CVBU-EL-02-02
Introduction
31.3.2005 A.4
31.3.2005
Management of Processes :
TATA Motors, CVBU
Copies of the manual are being issued to the Owners / Process Chiefs of the Processes included in the Manual and Divisional / Functional Heads at each location, for their reference for management of processes
Holder of the controlled copy is responsible for safe custody of the copy and hand over to the successor in the event of the transfer / separation and inform BES. BES maintains a copy number wise distribution list.
A booklet, “ Enterprise Process Management Guide”, has also been prepared and circulated to provide inputs to Process / Sub-process Owners on systematic process management
Role of Divisional / Departmental Co-coordinators and Divisional Representatives (DR) of ISO / TS :
1. In order to demonstrate alignment of divisional / departmental processes and processes in EPM the respective
department are requested to link their processes with appropriate process in the EPM.
2. Ensure that the measures and indicators of concerned Top level Process / sub Process are incorporated
appropriate in SQDCM, BSC and ISO / TS documents.
3. Communicate changes, if any, to BES Pune
Updation of Manual :
All the Process Owners are requested to review their respective processes and their Process Definition Sheets, in the month of
April or May every year and communicate the page wise changes, if any, to BES, Pune by the month end.
On receipt of changes, BES will incorporate the same in the respective pages along with revision number. BES will then send
controlled copies of the revised / additional pages to all the Holders of the Manual. The controlled copyholders responsible for
replacing revised pages in their respective copy and destroying old pages.
Introduction
31.3.2005 A.5
Expectations, Statutory Requirements
VALUE CREATION PROCESSES
Market DevelopmentChannel Partner Management
Demand Creation Processes
Sales PlanningVehicle Financing
Demand Fulfilment Processes
Design Processes Production & Delivery Processes
Service Processes
New ProductIntroduction
ServicesDesign
Sales & Operations
Planning
Vendor Management
Manufacturing
After Sales
Service
SUPPORT PROCESSES
Human Resource ManagementFacilities & EnvironmentManagement
Information & KnowledgeManagement
Finance & Budgeting
CU
ST
OM
ER
and
O
the
r S
take
Ho
lde
rs(E
mp
loye
es,
Inve
sto
rs, G
ovt
, So
cie
ty)
MA
NA
GE
ME
NT
PR
OC
ES
SE
S
Lead
ersh
ip &
Co
rpo
rate
Cit
izen
ship
Org
anis
atio
nal
Go
vern
ance
Inte
rnal
& E
xter
nal
Co
mm
un
icat
ion
Stra
teg
ic P
lan
nin
gPe
rfo
rman
ce Im
pro
vem
ent
&
Ch
ang
e M
anag
emen
t
l
l l
l
l
l
l
ll
l
l
l
l
l
ll l
l l
Enterprise Process ModelCommercial Vehicles Business Unit
B31.3.2005 B
SRL Process No Name of Process Process Owner Location
1 CVBU-EL-01 - Leadership and Corporate CitizenshipMr Ravi Kant, Executive Director (CVBU) Mumbai
Mumbai
Mumbai
2 CVBU-EL-02 - Strategic Planning Mr Ajit Venkataraman, Head (Strategy Planning) - CVBU
3 CVBU-EL-03 - Internal and External Communication Head (Corporate Communications)
4 CVBU-EL-04 - Performance Improvement and Change ManagementMr K C GirotraVice President (Lucknow Works &
Lucknow
5 CVBU-EL-05 - Market Development Mr Shyam ManiVice President (Sales & Marketing)- CVBUMr P G ShankarHead (CVBU International Business)
Mumbai
6 CVBU-EL-06 - Vendor Management Mr P M Telang President (Pune & Dharwad)
Pune
7 CVBU-EL-07 - Channel Partner Management Mr S M SharmaHead (Customer Support) - CVBU
Mumbai
8 CVBU-EL-08 - New Product Introduction Mr R A BijlaniHead (NPI Projects) CVBU
Pune
9 CVBU-EL-09 - Service Design
Mr S M SharmaHead (Customer Support) - CVBUMr S Y DeshpandeAGM (Customer Support) CVBU
Mumbai
Thane
10 CVBU-EL-10 - Sales and Operations Planning Mr R K GhoshGeneral Manager (Non-Vehicle Business)
Mumbai
TATA Motors, CVBU List of Top Level Process Owners
31.3.2005 C.1
TATA Motors, CVBU
SRL Process No Name of Process Process Owner Location
11 CVBU-EL-11 - Manufacturing Mr A P Arya President (JSR & Lucknow )
Jamshedpur
12 CVBU-EL-12 - Sales PlanningMr Shyam ManiVice President (Sales & Marketing)- CVBUMr P G Shankar
Mumbai
13 CVBU-EL-13 - After Sales ServicesMr S M SharmaHead (Customer Support) - CVBUMr S Y DeshpandeAGM (Customer Support) CVBU
Mumbai
Thane
14 CVBU-EL-14 - Facilities & Environment Management Mr Z SaitGeneral Manager (Technical Services)
Pune
15 CVBU-EL-15 - Human Resource ManagementMr P P KadleExecutive Director (Finance & Corporate Affairs)along with HR Team
Mumbai
16 CVBU-EL-16 - Information and Knowledge ManagementMr Probir MitraGeneral Manager (Information Technology)Mr U K MukherjeeMr Rajesh Kumar
Pune
MumbaiMumbai
17 CVBU-EL-17 - Finance and Budgeting Mr R S ThakurGeneral Manager (Corporate Finance)Mr P C BandiwadekarHead (Treasury) Tata Motors Group
Mumbai
18 CVBU-EL-18 - Vehicle Financing Mr A I RebelloChief (Tata Motors Finance) Mumbai
19 CVBU-EL-19 -Organisational Governance
Mr P P KadleExecutive Director (Finance & Corporate Affairs)Mr H K SethanaCompany Secretary
Mumbai
List of Top Level Process Owners
31.3.2005 C.2
TATA Motors, CVBU Abbreviations
Abbreviation ExpansionAbbreviation Expansion
5 S
A Matls
A/C
ABP
ADD
Aggr
AMC
AO
APC
Assy
APL
APPC
ARAI
AS
ASO
Tool for Work Place Improvement
Auto Materials
Account
Annual Business Plan
Ancillary Development Department
Aggregate
Annual Maintenance Contract
Area Office
Annual Plant Capacity
Assembly
Auto Planning
Auto Planning Production and Control
Automotive Research Association Of India
Accounting Standards
Area Service Office
Avg. Average
B/O
BC
BES
BHPC
BKY
Bought out
Burden Centre
Business Excellence Services
Bureau of Hire Purchase & Credits
Bhavishya Kalyan Yojana
BMS
Board or BOD
BOM
Bill Marketing Scheme
Board of Directors
Bill of Material
BPR Business Process Re-engineering
BRC
BSC
BU
BVQI
C0-C1-C2-C3
Business Review Committee
Balanced Scorecard
Business Unit e.g. CVBU
Bureau Veritas Quality India
Codes indicating status of customers
CAC
CAD
Capex
CEC
CII
CET
CFM
CFT
C-HRD
CIF
CIMS
CIO
Customer Assistance Centre
Computer Aided Design
Capital Expenditure
Corporate Ethics counsellor
Confederation of Indian Industries
Concept Evaluation Team
Centralised Fund Management
Cross Functional Team
Corporate Human Resource Division
Cost Insurance Freight
Customer Issue Management system
Chief Information Officer
31.3.2005 D.1
TATA Motors, CVBU Abbreviations
CIRO
CKD
CLT
CMS
Context, Inputs, Reactions, Outcomes
Completely Knocked Down
Cross Locational Team
Cash Management System
CMs Country Managers
CMVR Central Motor Vehicle Regulation
COB Commencement of Business
COBIT A widely accepted IT control framework
COIN Corporate Web site
Cost of Poor Quality
Component
Construction
Committee of Sponsored Organization
Corporate
Channel Partners
Process Capability
Central Quality
Central Tool Room ( JSR )
Central Receipt Documentation Office
Customer Relationship Management
Central Receipt Store
Customer Support
Customer Satisfaction Index
Customer Satisfaction Management and Measurement
Customer Data Base
Abbreviation ExpansionAbbreviation Expansion
COPQ
Comp
Const
COSO
Corp
CP
Cpk
CQ
CRDO
CRM
CRS
CS
CSI
CSMM
CTR
CDB
CV
CVBU
Cx
DAC
DAM
Commercial Vehicles
Commercial Vehicle Business Unit
Centre Of Excellence
Drive Away Chassis
Dealer Account Manager
DD
DEC
Demo
DENIS
Dlr
Dept.
Devp or Dev
DFMEA
Div or Divn
Divl
DML
DMR
Dealer Development
Divisional Ethics Counselor
Demonstration
Design and Engineering System
Dealer
Department
Development
Design Failure Mode Effect Analysis
Division
Divisional
Design Modification List
Design Modification Request
31.3.2005 D.2
TATA Motors, CVBU Abbreviations
DMS
DOE
DOM
DR
Dealer Management System
Design Of Experiment
Domestic
Divisional Representative
DSI
DSL
DSM
E& I
ED
Dealer Satisfaction Index
Direct Supply to Line
Dealer Sales Manager
Evaluation and Improvement
Executive Director
Enterprise Leve
Executive Director ( Finance & Corporate Affairs)
European Economic Committee
Executive Grade
Environment Management System
Earnest Money Deposit
Engineering
Environment Management
Effective Point Advice
Executive Sanction Request
Enterprise Process Model
Enterprise Processes Manual
Equivalent
Engineering Research Centre
Environment Risk Management
Export Specification
EL
ED ( F & CA )
EEC
EG
EMS
EMD
Engg
Env. Mgt
EPA
EPM
EPM
Eq.
ERC
ERM
ES
ESR
Abbreviation ExpansionAbbreviation Expansion
ESS
EVA
EVR
EXIM
FBV
Early Separation Scheme
Economic Value Addition
Export Vehicle Request
Export & Import Bank of Central Government
Fully Built Vehicle
FCOD
FI
FIBRES
FLG
FMEA
Finance Committee of Directors
Finance Module of SAP
Fact And Information Based Reverse Engineering Of Strategies
Factory Logistic Group
Failure Mode Effect Analysis
GEO
FR
GAAP
GDP
GIN
GM
Group Executive Office
Frequency Rate
Generally Accepted Accounting Practices
Gross Domestic Product
Goods Inward Note
General Manager
31.3.2005 D.3
TATA Motors, CVBU Abbreviations
HQ
HR
HRA
Hrs
HVAL
HVTL
Head Quarter
Human Resource
House Rent Allowance
Hours
Heavy Vehicle Axles Limited
Heavy Vehicle Transmission Limited
Industrial
International Business
Global Software Company
Industrial Relations Committee
Industrial Relations
Internal Return Ratio
Institutional Sales or Indian Standards
International Organization for Standardization
Key Performance Areas
Information Technology
Joint Development Council
Just In Time
Jamshedpur
Continuous Improvement Tool
Kilogram
Ind
IB
IBM
IRC
IR
IRR
IS
ISO
IT
JDC
JIT
JSR
KAIZEN
Kg
KPAs
Govt.
GR
HDFC
Head ( TS / STDI )
FS
Government
Goods Receipt
Housing Development Finance Corporation - Bank
Head ( Technical Specification / Standards I)
Free Service
Abbreviation ExpansionAbbreviation Expansion
KPI
KPM
KRA
L & L
LEC
LIC
LKO
Key Performance Indicators
Key Performance Measure
Key Result Area
Listening & Learning
Locational Ethics counsellor
Life Insurance of Corporation
Lucknow
LL
Loc
LOI
LT
MAP
LOB
Lot By Lot
Locational
Letter of Intent
Long Term
Moving Average Price
Line OF Business
MASOP
Matls
MBE
MBPA
Material Accounting System for Outside Processing
Materials
Management By Ethics
Modification Break Point Advice
MC Management Committee
31.3.2005 D.4
TATA Motors, CVBU Abbreviations
Abbreviation ExpansionAbbreviation Expansion
Mfg or MFG
MCCC
MD
MEPA
Mgr
Mgmt or Mgt
MIDC
MIS
Manufacturing
Maha Customer Care Campaign
Material Defect
Modification Effective Point Advice
Manager
Management
Maharashtra Industrial Development Corporation
Management Information System
MPA Measure Performance Areas
MPC Material Pricing Committee
MPL&P Material Planning and Purchase
MR Market Research
MRP Material Requirement Planning
MT Mid Term
MTBF Mean Time Between Failure
MTR
MTTR
NC
NCRs
Mid Term Review
Mean Time To Repair
Non Conformity
Non Conformity Reports
Mths Months
OHS Organizational Health Survey
NOC No objection certificate
NPA Non Performing Assets
NPI New Product Introduction
NVB Non Vehicular Business
OC Operations Committee
ODMR Over Due to Maturity Ratio
OE Original Equipment
OFI Opportunity for ImprovementMM Materials Management Module of SAP
No. or No Number
Organization
First Batch of New Product
Personal Computer
Product Complaint Reports
Pre Delivery Inspection
Process Definition Sheet
Production Engineering
Provident Fund
Operations
Org
P & L
P0 (P Zero )
PC
PCR
PDI
PDS
PE
PF
Oprns
OJT On the Job Training
Profit & Loss
31.3.2005 D.5
TATA Motors, CVBU Abbreviations
Abbreviation ExpansionAbbreviation Expansion
PFMEA
PHQ
PI
PIN
PL
PLA
Plng or Plg
PM
PMS
PM Fund
Process Failure Mode Effect Analysis
Parts Head Quarter
Perpetual Inventory
Process Identification Number
Pre launch Production Batch of New Product
Personal Ledger Account ( Type of Excise Account)
Planning
Plant Maintenance
Performance Management System
Prime Minister's Fund
PPC
PMs
PO
PP
PPAP
Production Planning and Control
Product Managers in IB
Purchase Order
Pre Production Batch of New Product
Product Planning Approval Of Parts
Parts Per MillionsPPM
PPR Product Performance Report
Proc Process
Prodn or Prod Production
PSD Productivity Services Department
QMS
PSG
PSY
Q & A
QA
QC
QCD
QFD
QI
QP
R & D
Quality Management System
Product Strategy Group
Pariwar Suraksha Yojana
Questions and Answers
Quality Assurance
Quality Control
Quality, Cost , Delivery
Quality Function Deployment
Quality Index
Quality Plan
Research & Development
Reprocessing List generated in SAP
Regional Parts Manager
Respective
Excise Register 23
Regional Manager
Risk Management through Control Self Assessment
Regional Office
Return on Investments
(Engine) Reconditioning (Cell), Sub unit of Tata MotorsRECON
Repro
Resp
RG 23
RM
RMCSA
RO
ROI
RPM
Rs Rupees
RSM Regional Sales Manager
31.3.2005 D.6
TATA Motors, CVBU Abbreviations
Abbreviation ExpansionAbbreviation Expansion
RSO Regional Sales Office
RUPD A name of vehicle component
RWH Regional Warehouse
R-Y-G Red-Yellow-Green
S Supervisory Grade Employees
S&OP Sales and Operations Planning
SC
SDT
SEBI
Steering Committee
Self Directed Team
Security and Exchange Board of India
SAP An ERP Package
SHQ
Serv
SGA
Sales Headquarters
Service
Small Group Activity
Society of Indian Automobile ManufacturersSIAM
SLA Service Level Agreement
SMH Standard Man Hours
SO Sales Office
SOB Share Of Business
SP Strategic Planning
SE Service Engineer
SR
SPD
Specs
SPP
SQA
SQDCM
SQIG
Sr
SSG
SRM
Severity Rate
Spares Parts Division
Specifications
Strategic Planning Process
Supplier Quality Audit
Safety, Quality, Delivery, Cost , Morale
(Measurement System)
Supplier Quality Improvement Group
Senior
Strategic Sourcing Group
Supplier Relationship Management
ST
STU
SVCVP
State Transport Undertakings
Tata Motors Certified Garage
Skill-Versatility-Cross-Versatility-Performance
(benefit Scheme for Operatives)
SWOT Strengths Weaknesses Opportunities and Threats
TASS Tata Authorised Service Station
TB Trial Balance
TBEM Tata Business Excellence Model
TCCI Tata Council for Community Initiative
TCG
Short Term
SSI Supplier Satisfaction Index
31.3.2005 D.7
TATA Motors, CVBU Abbreviations
Abbreviation ExpansionAbbreviation Expansion
TCOC or Coc
TDS
TEPS
TKSP
TM or M
TMF
TML or TM
TPL
TS
TQMS
Tata Code Of Conduct
Tax Deduction at Source
Telco Employee Pension Scheme
Telco Karmachari Sahakari Patpedhi
Tata Motors Managerial (Grade)
Tata Motors Finance
Tata Motors Limited
Technical Parts List
Technical Specifications
Tata Quality Management Services
TWL
TS 16949
TSS
TTL
TV
Tata Work Level
Technical Specifications 16949
Tata Service Stations
Tata Technologies Limited
Television
Vehicle CombinationVC
VCM Value Chain Management
VD Vehicle Despatch
Veh Vehicle
VF Vehicle Financing
US United States
VFJ Vehicle Factory Jabalpur
WIP Work-in-Progress
V-M-V Vision - Mission - Values
VOC Voice of Customer
VOR Vehicles Off Road
VP Vice President
VQA Vendor Quality Audit
w.r.t. with respect to
WBS Works Breakdown Structure
VQR Vendor Quality Rating
Year-on-Year
Work Order
Companies (Auditors Report ) Order, 2003.
A name of British Standard
A name of German Standard
Y-O-Y
WO
CARO
DIN
EN
31.3.2005 D.8
CVBU - EL - 01
EPM Process Name:
Principal Process Owner:
CVBU-EL-01-01 Revisit Vision & Mission & Set Direction ED (CVBU)
Empowering employees ED (CVBU)
Manage Social Responsibilities
Leadership and Corporate Citizenship
EPM Process No:
Leadership and Corporate Citizenship
Mr Ravi Kant ED (CVBU)
Head Corporate HR / Locational HR Heads
CVBU-EL-01-02
CVBU-EL-01-03
Sub Process Name Sub_Process OwnerSub_Proc No
TATA Motors, CVBU Leadership and Corporate Citizenship
31.3.2005 1.1
Unit of MeasureIn-Process/ Efficiency Measure Unit of Measure Output Measure / Effectiveness Measure
Corporate Citizenship Index, Community Index Index
CSI, DSI, Employee Satisfaction (OHS) Index
TBEM Assessment Score No
ROCE Percentage
EDs and Plant & Functional Heads
All Stakeholders
Integrity, Customer Focus, Passion For Engineering and Corporate Citizenship
5.1
Process Revision / Modification HistoryDetails of Modification Issued / Modified by Approved By
New Release BES, Pune
Revised Process Owners / Facilitators
.
Adherence to stakeholders’ engagement plan Percentage
Adherence to SPP process, Adherence to Action Plan
Percentage
Divisions Involved
End Customer
Core Values Embedded
ISO /TS16949(2002) Clause Ref.
Date of Modifn Modification No.
01/06/03 00
31/03/05 01
§ Vision, Mission & Core Values of TATAGroup, CVBU V/M/V
§ Global / Indian Automobile and Transportation Industry Scenario/ Domain Knowledge
§ Stakeholders Expectations§ Findings of TBEM Assurance process
and TBEM Internal & External Assessments,corporate assurance feedback
§ OHS, CSI and DSI findings§ TCOC, TCCI, Agenda
Ø Capture Stake holders expectations through stakeholders' engagementØ Derive overall Business DirectionØ Formulate Long Term & Short Term Business Plans and initiatives
incorporating Financial, Environmental and Social objectives and seek commitment of team members.
Ø Create supporting organisation Structure and allocate resourcesØ Development and Empowerment of EmployeesØ Encourage learning and sharing. Recognise and reward team members'
performanceØ Seek periodic feed back and review plans and targets
ü Revised CVBU Vision & Mission Statement
ü Achievement of Financial, Social and Environmental objectives
ü Employee Satisfactionü Satisfaction of other
stakeholders
CVBU - EL - 01
Process Owner
PROCESS DEFINITION SHEET
Process Title
Process Objective
Process Identification No. ( PIN) :
Leadership and Corporate Citizenship
Higher Level Linkage-
Incorporating Effective Leadership System
Mr. Ravi Kant (ED CVBU)
INPUT KEY STEPS OUTPUT
TATA Motors, CVBU Leadership and Corporate Citizenship
31.3.2005 1.2
Understand stakeholder
needsand higher
levelobjectives
Derive MissionSet Direction
and Plan financial, social
and environmental
objectives
Formulate LT/ST Strategy
Identify Initiatives & Champions
Communicate and build
commitment.
Organise align and allocate
resourcesCreate Matrix Org structure
Review and adjust to
achieve planAdapt to new challenges
Build, Motivate, Empower Teams for
accelerated change
Process Owner : Mr. Ravi Kant ED (CVBU)Process objective : Incorporating Effective Leadership System
Create a culture of high performance
Develop, reward and recognize
employees
Organise Internal / External Assessment / Surveys analyse &
Improve
Encourage Innovation, Sharing and
Learning
Encourage / participate /
Implement CSR Initiatives , Be a Role Model
Inputs-Vision,Mission &Core Valuesfor Tata GroupCVBU Vision/Mission /ValuesTCOC
Inputs--Global, Indianautomobile and transportation industryscenario-Stakeholdersexceptions-TCCI Agenda Inputs-Internal & Externalchallenges-BRC review
Inputs -- OHS findings- TBEM corporateAssurance Processfeedback- TBEM internal &ExternalAssessmentfindings
Inputs-- Training needs- Individual MPAs- Career needs- Competencies
Outputs-- CVBU V/M- Achievement of Financial, Social, Environmental objectives- Employee Satisfaction Other stakeholder satisfaction
TATA Motors, CVBU Leadership and Corporate Citizenship
31.3.2005 1.3
Effectivenessw Clarity of Mission Statementw Achievement of goals %
Efficiencyw Timeliness of review R-Y-Gw % Internalization of Core Values %
UnitPerformance MeasureHow it operates (Methods/ Practices)1 A team of Steering Committee members and other invitees collates all inputs and discusses all
factors recommends changes in Vision , Mission and Purpose statement to reflect aspirations and intents of CVBU leadership.
2 The proposal is first presented to CVBU Steering Committee for concurrence. Then these are taken to Operations and Management Committee for their approval. Finally the Values & Purpose, Vision & Mission are presented to the Board members for final approval
3 Core Values & Purpose, Vision & Mission are then communicated to employees through display boards and pocket cards of Values & Purpose, Vision & Mission. In the Town Hall communications by the ED and CVBU Steering Committee members to cross sections of employees. Training modules are designed to communicate Core Values & Purpose, Vision & Mission
4 The team working on Strategy Planning Process gets inputs by scanning the global, Indian, Industry situation and collate the data. This team also take inputs from society/community, government agencies, regulatory bodies and various committee reports and prepares business plan proposal. Business Review Committee reviews and approves long term & short term goals. These form input f o r SPP
5 Plan/Functional/ Divisional SCs review their respective Vision and Mission Statement and align it with CVBU.
Inputs
w
w
ww
Present Core Values , Purpose, Vision and Mission of CVBUCore Values , Purpose, Vision and Mission of Tata Motors and Tata GroupStake Holder’ expectationsGlobal and National Industry and Economic environment
Key Steps in – 'Revisit Vision & Mission and Set direction'
1. Review vision and mission and propose changes ,if required2. Approval of SC and MC3. Set long term and short term goals4. Communication to all the units and
employees of CVBU5. Alignment of Vision & Mission statements of all the units with CVBU
Outputs
ww
ww
Core Values and Purpose of CVBUVision and Mission statements of CVBUShort term and long term goalsVision & Mission Statements of Plants/ Functions/ Divisions
Sub process : Revisit Vision & Mission & Set direction
Process Ref : CVBU-EL-01- 01 (version 1.1)Process Owner : ED - CVBUEPM Linkage – CVBU-EL-01 (Leadership) Preparation Date : 31/03/04Modification Date : 31/03/05
TATA Motors, CVBU Revisit Vision & Mission & Set Direction
31.3.2005 1.4
Inputs
ww
w
OHS Feed backFeed back through Skip level meetings, One-on-one discussions with employees by leadersBusiness risks identified through audits
Key Steps in -'Empowering Employees’
1. Review/ define expectations and empowerment channels
2. Define roles, responsibilities & authorities3. Organise Training/ coaching and provide resources.
Encourage out of box/ innovative thinking4. Recognize achievements / advise on improvement5. Take feedback from employees
Outputs
w
ww
Empowered and motivated employees Empowerment schemesNew Ideas and patents
How it operates (Methods/ Practices)1 CVBU Leadership reviews the status of empowerment based on feed back receive from
employees and audit reports and defines/redefines channels for empowerment ( Delegated Powers, CLT, CFT, SDT, Quality circles etc)to cover employees at different levels.
2 Roles, responsibilities and authorities are defined and communicated through formal circulars or through face to face communications
3 Manager/Supervisor/ Team Leader organises training and coaching to bridge the competency gaps. Employees are also nominated to attend seminars, exhibitions and professional meets. Manager/Supervisor/ Team Leader reviews the resource requirement along with concerned person and provides adequate resources. New implemented ideas are awarded on their merits through suggestion box scheme. Exceptional ideas are taken up for patenting
4 Manager/ Supervisor/ Team Leader monitors the performance of his team members , encourages them to share achievements with others and makes suggestions for improvement. The critical areas are audited through formal internal audits to ensure a d e q u a c y of controls
5 Employee feed back is collected through OHS, Skip level meetings and one to one interaction
Performance Measure Unit
Efficiency
Effectiveness
ww
www
No. of employees in CFT’s Nos. No. of employees in SDT’s Nos.
OHS indicatorsSuggestions received / awarded Nos.Areas covered under self certification Nos.
Sub process : Empowering EmployeesSub Process Ref : CVBU-EL-01- 02 (version 1.1)Process Owner : ED CVBUEPM Linkage – CVBU-EL-01 (Leadership System)Preparation Date : 31/03/04 Modification Date : 31/03/05
TATA Motors, CVBU Empowering Employees
31.3.2005 1.5
Inputsw
w
ww
National & International laws and requirements for productsNational and state legislations on Pollution and factory operationsExpectations of key communitiesTCCI Agenda
1. Define and communicate policies to address Quality, Environmental and Community Development aspects
2. Select Key communities ,decide focus areas, assign responsibly and provide budget
3. Encourage participation from employees at all the levels and seek participation of communitymembers in implementation of initiatives
4. Ensure compliance with legal and regulatory requirements 5. Collect and review feed back to ascertain Attainment of
objectives
Key Steps in – 'Managing Social responsibility’
Outputswww
w
w
Policy StatementsCommunity Devp initiativesCompliance with legal/ regulatory requirementsImprovement in Employee satisfactionEnhanced CVBU’s image in public
How it operates (Methods/ Practices)1 Quality policy, and Environmental Policy statements are issued by Chairman of Tata Motors and
communicated to all the Divisional/ Departmental Heads and employees through circulars, booklets , posters etc Areas for Community Development are decided on the basis of TCCI agenda ( Health, water, education)
2 Location HR ( Community Devp) head selects community and areas for assistance based on local needs and seeks budget approval. As a business need CVBU has selected ‘drivers’ as key community at CVBU level
3 Employees as well as members of respective communities are are encouraged to invest their personal time and competencies for social cause. CVBU provides support by donating materials , equipments and other facilities.Incase of natural calamities of high magnitude like earthquake both employees and CVBU to PM Fund / TATA fund to provide relief to affected people
4 Respective Functional/ Departmental Head ensures that all the legal and regulatory requirements are addressed in the product and process design, reviews and monitors the same to ensure the compliance and surpass them where ever possible
5 Feed back is collected through satisfaction surveys, meetings and other informal ways and reviewed in steering committee.
% improvement in OHS indicators %
Corporate Community Initiative Index Nos.
Performance Measure Unit
Efficiency
Effectiveness
w
w
Sub process : Managing Social Responsibility Sub Process Ref : CVBU-EL-01- 03 (version 1.1)Process Owner : Head Corporate HR/Locational
HR Heads EPM Linkage – CVBU-EL-01 ( Leadership
System)Preparation Date : 31/03/04 Modification Date : 31/03/05
31.3.2005 1.6
TATA Motors, CVBU Managing Social Responsibility
EPM Process No: CVBU-EL-02
Principal Process Owner:
Sub_Proc No Sub Process Name Sub_Process Owner
CVBU-EL-02-01 Strategy Development
Strategy Deployment
STRATEGIC PLANNING
Mr Ajit Venkatraman (Head -SP)
Mr Ajit Venkatraman (Head -SP)
CVBU-EL-02-02
Mr Ajit Venkatraman (Head Strategic Planning)
31.3.2005 2.1
TATA Motors, CVBU Strategic Planning
31.3.2005 2.2
PROCESS DEFINITION SHEET
INPUT OUTPUTKEY STEPS
Unit of MeasureIn-Process/ efficiency Measure Unit of Measure Output Measure / Effectiveness Measure
Achievements of targets as specified in BSC Unique as per BSC
Process Revision / Modification HistoryDetails of Modification Issued / Modified by Approved By
Inputs, Steps, Outputs & measures modified Strategy Planning
Percentage
Percentage
Date of Modfn. Modification No.
08/02/05 01
§
§
Global Auto Industry Study§ Macro Economic Analysis
Situation Analysis§ CVBU Vision and Mission§ Market Trends and Opportunities§ Customer requirements§ Needs of Suppliers, Channel Partners and Employees§ Emerging Technologies§ Competitive Data§ Enterprise Risks§ Regulatory requirements§ Operational Capabilities of CVBU
Ø Environment ScanningØ Revisit Vision / Mission / ValuesØ List out Key challenges for Short term & Long termØ Determine Strategic Path- 3 Phase StrategyØ Conduct Business environment analysis & Capability analysisØ Finalise Strategic ObjectivesØ Finalise Operating Plans, CAPEX, Revenue Budgets & CVBU BSCØ Obtain Approval from OC, MC, BRC & BoardØ Develop next level BSCs & Initiatives for Functions & Plants
Review (and update if required) BSCs and Initiatives monthly
ü Operating plans for Product, Marketing, Manufacturing, HR, Sourcing
ü CAPEX and Revenue Budgets BSCs for CVBU , Plant/ functional Heads and their reports
Process Identification No.(PIN) : CVBU - EL - 02 Higher Level Linkage -
Process Title Strategic Planning Mr Ajit Venkatraman (Head Strategic Planning)
Process Objective Develop and deploy short term and long term action plan to achieve business goals
Process Owner
Adherence to process time lines
Adherence to pro-rata targets mentioned in BSCs
Divisions Involved - MC, OC, BOD, SC, ED, BRC, Strategy Planning, Domestic & International Sales & Mktg,NPI, Finance, HR, ERC, Manufacturing, Materials, Internal Audit
ISO / TS 16949 (2002) clause Ref.
End Customer-
Core Values Embedded- 5.4
Stakeholders of CVBU
Integrity, Customer Focus, Passion For Engineering and Corporate Citizenship
BES, Pune01/06/03 00 New Release
TATA Motors, CVBU Strategic Planning
EnvironmentScanning
StrategyPlanning
Revisit Vision/ Mission /Values
Board, BRC
Conduct Businessenvironment &capability analysis
Strategy Planning, IB / Dom.MKT, NPI, Finance, HR,ERC, MFG,Materials, Int. AuditAuto planning
Inputs business environment analysis -- International/ domestic manufactures and
their products- Volumes and Market share treds- Customer needs and preferences - Competition strategies in terms of new
products, marketing schemes- Regulatory requirements- Likely Technological advancements in
products- Benchmarks and competitor information on
product performance- Enterprise Risks- Domestic & International economics
DetermineStrategicPath-3PhaseStrategy
SC, MC,OC, BRC
List out keychallenges forShort term &Long term
SC, OC
Finalise Operating PlansCAPEX Revenue Budgets,CVBU BSC and StrategicInitiatives
SC, MC, OC,Board
Develop next level BSCs &InitiativesforFunctions& Plants
All SCs
Review (and update ifrequired) BSCs andInitiatives monthly
All SCs
Inputs Capability analysis- - Manpower- Manufacturing facilities
suppliers and dealers- design and development
Evaluation &Improvement
THINKOnce in 3 Years-Annual Review
DEVELOP and DEPLOYAnnual
REVIEWMonthly
31.3.2005 2.3
FinalisestrategicObjectives
SC
TATA Motors, CVBU Strategic Planning
31.3.2005 2.4
How it operates (Methods/ Practices)1. Strategic Planning dept. scans the external environment in terms of Global Auto Industry
scenario, Macro Economic Analysis and conducts a Situation Analysis2. Leadership team revisits CVBU Vision and Mission statements. Feedback from previous SPP is
incorporated. 3. Next, the Key challenges for Short & Long term are identified against this broad direction4. The SC then determines Strategic Path i.e the 3 Phase Strategy for CVBU and gets this
approved from the MC, OC and BRC5. Inputs on volumes and market share trends, competitor strategies and product performance,
regulatory requirements, technological advances, benchmarks, internal manpower competencies, design, development and manufacturing facilities, supplier and dealer’s SWOT are collected and analysed by the respective Functions.
6. Strategic objectives are then determined to address the key challenges7. Based on the above analyses, Operating plans for Product, Marketing, Manufacturing, HR,
Sourcing along with CAPEX and Revenue Budgets and CVBU BSC & Strategic Initiatives are t h e n developed. Subsequently these are approved by MC, OC and the Board
Inputsw Global Auto Industry Studyw Macro Economic Analysisw Situation Analysisw CVBU Vision and Mission
statementsw Feedback from previous SPP
for CVBUw Business Environment Studiesw Internal Capability Studies
Key Steps in –'Strategic Planning Process: Strategy Development'1. Environment Scanning2. Visioning3. Strategic Challenges4. Strategic Direction setting5. Strategic Analysis6. Strategic Focus / Objectives7. Target setting & Resource allocation
Outputs
w Operating plans for Product, Marketing, Manufacturing, HR, Sourcing
w CAPEX and Revenue Budgets (Annual Operating Plan)
w CVBU Balanced Scorecard w Strategic Initiatives
Performance Measures Unit
Efficiency
Effectiveness
Adherence to Time line %
Accuracy of projections %
w
w
Name of Sub process : Strategy DevelopmentSub Process Ref : CVBU-EL-02-01 (Version 1.1)Process Owner : Mr Ajit Venkatraman, Head SP Linkage with EPM – CVBU-EL-02 (STRATEGIC
PLANNING )Preparation Date : 31/03/04Modification Date : 31/03/05
TATA Motors, CVBU Strategic Planning
31.3.2005 2.5
Name of Sub Process : Strategy DeploymentSub Process Ref : CVBU-EL-02-02
(Version 1.1)Process Owner : Mr Ajit Venkatraman,
Head SP Linkage with EPM – CVBU-EL-02
(STRATEGIC PLANNING )Preparation Date : 31/03/04Modification Date : 31/03/05
Inputsw CVBU Balanced Scorecard w CVBU Strategic Initiatives
Key Steps in –'Strategy Deployment'
1. BSC Deployment2. Review3. Evaluation and Improvement
How it operates (Methods/ Practices)
1. BSCs are developed for all functions and plants upto CX
level in Plants and Area office level in Sales & Marketing
by respective Steering Committees in line with the CVBU
objectives. Assessments are carried out to ensure alignment of
all divisions / departments / functions/ plants with the overall
CVBU goals.
2. Monthly reviews of BSCs and Initiatives are held by the
respective Steering committees to track the progress against
plans. During the Mid term review, if required, changes and
updates are made to the BSC.
3. The strategic planning process is reviewed and improvements/
changes are made in the next year’s SPP.
Outputsw Cascaded BSCs & Initiatives for
Functions & Plantsw SC Reviewsw Review of the achievements and
drawbacks of the current SPP
Performance Measures Unit
Efficiency
Effectiveness
w Adherence to Time line %
w Attainment of stated targets %
TATA Motors, CVBU Strategy Deployment
CVBU-EL-03
Principal Process Owner:
CVBU-EL-03-01 Manage Internal Communication Head of Corporate Communication /Locational HR Heads
Internal and External Communication
EPM Process No:
Head - Corporate Communication
CVBU-EL-03-02 Manage External Communication
Manage Communication SurveyCVBU-EL-03-03
Head of Corporate Communication /Locational HR Heads
Head of Corporate Communication /Locational HR Heads
Sub_Proc No Sub Process Name Sub_Process Owner
TATA Motors, CVBU Internal & External Communication
31.3.2005 3.1
Adherence to communication schedule % No of Employees covered, No of Communication meetings No
Actual Vs Budget % Communication Effectiveness Index OHS Index
Actual Vs Budget Percentage
Divisions Involved - Corporate Communication, Locational HR, Plant / Functional Heads
End Customer- All Stakeholders
Core Values Embedded- Integrity, Passion for Engineering, Corporate Citizenship, Customer Focus
ISO / TS16949 (2002) Clause Ref. 5.5.3
Process Revision / Modification History-
Date of Modfn. Modification No. Details of Modification Modified by Approved By
01/06/03 00 New Release BES, Pune
31/03/05 01 Review trough process team. Process Team
Process OwnerInternal and External Communication Head Corporate Communication Satisfy Communication needs of Stakeholders and build Company Image
Ø Determine communication needs and set objectives for communication to various Stakeholders
Ø Determine media, frequency and Stakeholder/Location wise responsibility
Ø Manage Internal communication
Ø Manage External communication
Ø Collect and analyse feedbackØ Measure effectiveness
[ Improved Stakeholders' confidence
[ Enhance Company Image.
§ Vision, Mission, Core Values and Directions of CVBU
§ Past Performance and Future Plans
§ Product and Service Standards
§ Quality, Environment and other Policies
§ Tata Code of Conduct
PROCESS DEFINITION SHEET
INPUT KEY STEPS OUTPUT
In-Process / Efficiency Measure Unit of Measure Output Measure / Effectiveness Measure Unit of Measure
CVBU - EL - 03 Higher Level Linkage -
TATA Motors, CVBU Internal & External Communication
Process Title
Process Objective
Process Identification No. ( PIN) :
31.3.2005 3.2
Determine thecommunication needs and set objective forcommunication to
- Employees- Customers (throughMedia)-Suppliers / partners-Investors / Shareholders-Community
SC
-Determine key messagingfor the Company
-Determine stakeholder wise media for communication and frequency
-Assign stakeholder /location wise responsibilities
-Seek budget approval
Head (Corporate Comm)
Process Owner : Head of Corporate CommunicationsProcess objective : Satisfy communication need of
Stakeholder and Build Company Image
Inputs-- Company’s strategic
goals and objectives- Business plans of
Business Units- Products / service
standards- Company / product
Related information
Inputs--OHS-Surveys- Direct employee Contact- Appreciation Programs-Eikona press reviewE
xte
rna
l Co
mm
un
ica
tion
Inte
rna
l Co
mm
un
ica
tion
(E
mp
loye
e)
Collect andanalyse Feedback
HR / CorpCommunication
MeasureEffectiveness ofCommunication
CorporateCommunication
E-mail based communication- external press release andemployee relatedPublish in house journals (forinternal and externalaudiences)Theme based campaignsConduct communicationmeetings at respectivelocationConduct town hall meetingsat respective plantsEvent based circulars andletters from senior leaders toemployees and their familiesProvide employees directaccess to senior leaders(Hotmails, share café, etc)
Loc HR /communications
Press releasePress conferences, interviews with senior leaders by media, investor, opinion leaders and govt.Participation in seminars /exhibitionProduct launches andcorporate eventsFeature stories (corporate) on Tata motorsCorporate advertisingCampaignsCorporate communications
31.3.2005 3.1
TATA Motors, CVBU Internal & External Communication
31.3.2005 3.3
Inputsw Corporate Communication
Guidelines / Policiesw Data and analysis from the
Business Units, Finance and employees
w SIAM reportsw Employee needs and expectationsw OHSw External sources – media/events
Key Steps in – 'Internal Communication Process'
1 - Determine communication needs2 - Analyze and design communication3 - Approval from concerned agencies/EDs/VPs4 - Release the communication5- Follow-up with Employees6 - Monitor and Review
Outputsw House Magazinesw Wall Postersw E mailsw Updation on Intranetsw Town Hall and communication
meetings
Name of Sub process : Manage Internal Communications
Sub Process Ref : CVBU-EL-03- 01 (version 1.1)Process Owner : Head of Corporate
Communications / LOC HR Heads
Linkage with EPM – CVBU-EL-03 ( Internal and External Communication )
Preparation Date : 31\03\04Modification Date : 31\03\05
Efficiency
Effectiveness
w Timeliness of communication w No. of Wall Posters released Now No. of House Journals released No
w OHS feedback on communication Scorew Communication Satisfaction Survey Index
UnitPerformance Measure
TATA Motors, CVBU Manage Internal Communication
31.3.2005 3.131.3.2005 3.4
How it operates (Methods/ Practices)1. Determine communication needs – Inputs as shown are collected from timely
interactions with BUs/ Employees / Finance and aggregated for further use2. Analyze and design communication – These requirements are analyzed and the
communications are designed according to the media and its purpose. House magazines, Wall posters, e mails, Town Hall communications, Intranets such as HR info net, Vibes etc are designed based on this
3. Approval – After designing the communication mode, it is approved from the concerned agencies and finalized with Presidents / Vps and EDs
4. Release the communication – House Magazines, Wall posters are distributed, e mails are sent to the focused groups by the Corporate and Locational Communication Departments. Intranets are updated by the Core groups.
5. Follow-up - After the release, follow up is done with employees for their feedback on yearly basis through OHS and Communication survey
6. Monitor and review: The internal communication is revisited on yearly basis and improvements are done on media, variety, contents and clarity
Inputsw Corporate Communication
Guidelines / Policiesw Data and analysis from the
Business Units and Financew SIAM reportsw Media needs and expectationsw Employee feedback/OHS
Key Steps in –'Manage External Communication Process'
1. Determine communication needs2. Analyze and design communication3. Approval from concerned agencies/EDs/VPs4. Release the communication5. Follow up with the users6. Monitor and Review the process of releasing
Outputs
w Press and media releasew Articlesw Interviews
How it operates (Methods/ Practices)1. Determine communication needs – Requirements are collected from newspapers,
business magazines, TV channels from timely interactions with them and aggregated for further use
2. Analyze and design communication – User requirement is analyzed and the communication is designed according to the media and its purpose. Monthly Press Release, Interviews to newspapers, magazines, TV channels, etc are designed based on this
3. Approval – After designing the communication, it is approved from the concerned agencies and finalized with Presidents / VPs and EDs
4. Release the communication – Press release is forwarded by the Corporate and Locational Communication Departments
5. Follow-up – After the press release, follow up is done for publishing and press cuttings for records
6. Monitor and review: The external communication process is revisited on quarterly basis and modifications are done on distribution pattern, contents and clarity
Efficiency
Effectiveness
w No. of Press Releases No.w No. of Press conferences No.w No of appearances of features in Magazines No.
w Communication Satisfaction Index Indexw Eikona Press Review
Sub process : Manage External CommunicationsSub Process Ref : CVBU-EL-03- 02 (version 1.1)Process Owner : Head of Corporate Communications
/LOC HR HeadsEPM Linkage – CVBU-EL-03 ( Internal and External
Communication )Preparation Date : 31/03/04 Modification Date : 31/03/05
UnitPerformance Measure
TATA Motors, CVBU Manage Internal Communication
31.3.2005 3.5
Key Steps in – 'Manage Communication Survey'
1. Determine communication survey needs2. Analyze and design survey questionnaire3. Prototype testing with few employees4. After modifications, Conduct the survey5. Analyze and put up findings to SC6. Prepare action plan to tackle concerns7. Monitor and review the process of survey
How it operates (Methods/ Practices)1. Determine communication needs – Inputs as shown are collected from timely
interactions with BUs and Employees and aggregated for further use2. Analyze and design questionnaire – The questionnaire is designed with the help of
external experts and internal communications team3. Prototype testing – This questionnaire is then tested with few employees from all
levels and improved, if any suggestions are there4. The questionnaire is distributed as per random sample to all levels of employees – in
Hindi, Marathi and English5. The filled up questionnaires are analyzed and findings are put up to Steering
Committees6. Action Plans are made to tackle the concerns and overcome gaps in the existing system7. The survey process is reviewed once in a year in Communication Steering Committee
TATA Motors, CVBU Manage Internal Communication
Inputsw Corporate Communication
Guidelines / Policiesw Data from the Business Units and
employeesw Employee needs and expectationsw OHS and w Communication Index findings
Outputsw Survey Questionnairew Survey findingsw Action Plan
Efficiency
Effectiveness
w % Completion of Action plans %w Survey findings on attributes Nos.
w Communication Index Index
UnitPerformance Measure
Name of Sub process : Manage Communication SurveySub Process Ref : CVBU-EL-03-03 (version 1.1)Process Owner : Head of Corporate
Communications/LOC HR HeadsEPM Linkage – CVBU-EL-03 ( Internal and
External Communication )Preparation Date : 31/03/04Modification Date : 31/03/05
31.3.2005 3.6
CVBU- EL- 04
Principal Process Owner:
Sub_Proc No Sub Process Name Sub_Process Owner
CVBU-EL-04-01 Process Design & ImprovementHead CVBU /Head Respective Plant
Respective Steering Committee
Performance Improvement and Change Management
EPM Process No:
Mr K C Girotra - VP (Lucknow Works & FBV)
CVBU-EL-04-02 Conduct Internal Assessment
Performance Improvement Through InitiativesCVBU-EL-04-03 Respective Steering Committee
TATA Motors, CVBU Performance Improvement and Change Management
31.3.2005 4.1
Adherence to Audit/Assessment schedule % TBEM Score, No of certified Auditors/ Assessors No.
Initiatives planned Vs achieved No Performance Improvement achieved vis-à-vis Target %
Adherence to review schedule % Reduction in NCs No.
Divisions Involved - SC, All the Plant / Functional/Divisional Heads, Certified Assessors
End Customer- Process Owners, Stake holders
Core Values Embedded- Integrity, Customer Focus, Passion For Engineering and Corporate Citizenship
ISO /TS16949(2002) Clause Ref. 8.5.1, 7.1.4
Process Revision / Modification History-
Date of Modfn. Modification No. Details of Modification Modified by Approved By
01/06/03 00 New Release BES, Pune
31/03/05 01 Modification process review Process Team
INPUT KEY STEPS OUTPUT
In-Process / Efficiency Measure Unit of Measure Output Measure / Effectiveness Measure Unit of Measure
w Strategic Objectivesw Internal and External Audit and assessment
findingsw Customer / stakeholder feedback / requirementw Benchmarks/ Competition data on factors
affecting the business and corresponding CVBU status
w Recommendations from Consultantsw National/ International Standards
applicable to CVBUw Statutory requirementsw TBEM assessment findingw Best Practices
[ Improvement of Organisational performance
[ Process Improvement
Ø Ascertain whether need is for A) Establishing systematic process. OR B) Quantum / Break through Improvement in performance
Ø Identify and drive initiatives for achieving quantum/breakthroughperformance improvements
Ø For continuous improvements manage process systematically :o Evaluate requirements and Define and establish processo Set targets , monitor performanceo Seek stake holder feed back Review process performance
through self assessment/audito Identify scope for improvement and prioritizeo Simplify & improve process by improving Sub-processes
TATA Motors, CVBU Performance Improvement and Change Management
PROCESS DEFINITION SHEET
CVBU - EL - 04 Higher Level Linkage -
Mr. Ravi Kant (ED CVBU)
Continuous Improvement of Organisational Performance
Process OwnerPERFORMANCE IMPROVEMENT AND CHANGE MANAGEMENTProcess Title
Process Objective
Process Identification No. ( PIN) :
31.3.2005 4.2
Ascertain whether need is for A) Establishingsystematic process. OR
B) Quantum / Break through Improvement in performance
SC / respProcess Owner
Studyrequirements,evaluatealternatives,select best possible way and Seek acceptance of all the concerned
Resp Agency/ Team
Define process/ procedures & measures,acquire resources, conduct pilot Run, train users and implement process/ changes
Process Owner/Resp Agency
Seek customer/ other stake holders, feed back. Review process performance. Get process assessed/ audited
Process Owner Div/Dept Head
Set targets, ,monitor performance andcontrols
Process Owner,Divl/Dept Head
Inputs-- Strategic Objectives Statutory Changes- Comparison of Performance with Competition/Benchmark on key Factors- TBEM Assessment Feed back- Audit feedback- Feedback from Statutory audits- Best practices from otherorganizations.- Recommendations fromConsultants
Process Owner : Mr K C Girotra (Luknow Works & FBV)Process objective : Continuous improvement of Organizational Performance and Processes
Study findings and prioritize OFI
Process OwnerDivisional Head
Major Changes
Development and deployment
Review
A or B
A
Minor/ urgent
changes
Define Initiative & Owner
SC / resp Process Owner
Drive Initiative to getdesired result
Initiative Owner
B
Min
or
cha
ng
e/
sim
plif
ica
tion
TATA Motors, CVBU Performance Improvement and Change Management
Assessment & Proposal on improvement
31.3.2005 4.3
Inputsw Request/ feed back from
agencies involved ( Incl. Internal Customers)
w Assessment / Audit reportsw New or changing Business needs /
Statutory requirementsw Strategic intent for adopting global
best practices
Key Steps in – 'Process Design and Process Improvement'
1. Ascertain need and assign responsibility2. “As is study”and evaluate alternatives3. Define new / improvised process 4. Seek approval for resources5. Devp. Of computerized system where
required, User training , pilot run and finalize process and procedures .
6. Plan Implementation7. Monitor process for efficiency and effectiveness
Outputsw New/ Improved processes and
procedures
How it operates (Methods/ Practices)1. Concerned process owner analyses inputs and ascertains need for new process /
improvement in existing process. He assigns responsibility to a competent person if process/ change is limited to his area. Otherwise he takes help of concerned specialty function ( BES/ PSD/Central Planning/ Central QA / IT Team etc). Such person/dept acts as a change agent).
2. Change Agent studies As is process, scans technologies and best practices in the industry, evaluates alternatives and evolves new/ improvised process/ procedure in consultation with all the agencies involved/ affected.
3. Process owner gets resource approval for Capital equipment /revenue expenses / manpower through normal procedure.
4. TTL provides IT Support.5. Integration tests and Pilot runs are conducted to confirm meeting of all the requirements.
The new / improvise process/ procedure is documented to define activity wise roles & responsibilities and circulated to agencies involved.
6. Change Agent carefully plans Implementation/ change over. After successful implementation the process is handed over to users and process owner for operation and monitoring .
7. Process owner and users monitor process for Efficiency and effectiveness
Sub process : Process Design and Improvement Sub Process Ref : CVBU-EL-04- 01 (version 1.1)Process Owner : Head CVBU / Head Respective PlantEPM Linkage – CVBU-EL-04 ( Performance Improvement and Change Management) Preparation Date : 31/03/04Modification Date : 31/03/05
TATA Motors, CVBU Process Design & Improvement
Efficiency
Effectiveness
6 Adherence to schedule %6 % fulfillment of requirements %
6 No of Processes gone through E & I No.
UnitPerformance Measure
31.3.2005 4.4
Inputsw External assessment/ audit criteria
and methods/ practicesw Feed back from participating
divisions and assessors/ Auditors regarding previous audit/ assessment
w Last external assessment/ audit reports
Key Steps in – 'Conduct Internal assessment/ Audit'
1. Maintain a bank of trained and certified Internal Assessors/ Auditors
2. Define frequency Prepare Schedule3. Prepare/ review criteria/ guidelines/ checklist4. Organize Assessment/ Audit 5. Send report to assesses/ audited and plant/CVBU head6. Recognition to assessors/ auditors and Divn/Dept and
collect feed back from them
Outputsw Assessment / Audit score
Assessment / Audit report giving Strengths & OFIs
How it operates (Methods/ Practices)1. Selected/ nominated high performers are trained by competent external agencies
(eg.TQMS, CII, BVQI)and certified by them wherever necessary. In other cases they a r e trained by internal experts / Trainers (eg.5S- SQDCM)
2. Audit/ assessment frequencies are decided by owner of respective audit/ assessment process ( eg. Head of BES- TBEM/ BSC/5S & SQDCM, Head of CQ- ISO TS)
3. Criteria/ Guidelines/ Check lists are prepared/ reviewed by respective audit/ assessment process owner with involvement of auditors once in a year
4. Assessment/ Audit process and efficiency / effectiveness of process is monitored by a champion nominated by the respective audit/ assessment process owner.
5. Communicate audit findings for review and improvement by resp. Divisions/depts6. Assessors/ Auditors and participating divisions are recognized in a special function.
This opportunity is also used for collecting informal feed back.
Sub process : Conduct Internal assessment/ Audit
Sub Process Ref : CVBU-EL-04- 02 (version 1.1)Process Owner : Resp. Steering CommitteeEPM Linkage – CVBU-EL-04 (Performance Improvement
and Change Management) Preparation Date : 31/03/04Modification Date : 31/03/05
TATA Motors, CVBU Conduct Internal Assessment / Audit
Efficiency
Effectiveness
6 Adherence to schedule %
6 No. of Trained/ Certified Auditors/ Assessors Nos.6 No. Of Divisions covered Nos.6 Improvement in Division’s scores Nos.
Performance Measure Unit
31.3.2005 4.5
Inputsw Balanced Score Card
Key Steps in – 'Performance Improvement through Initiative'
1. Define Initiative, measures, and owner2. Assemble team define objectives and set targets.3. Primary Data Collection 4. Idea generation, evaluation and action plan
preparation.5. Implementation and progress reviews6. Share achievements and learning
Outputsw Achievement of quantum
improvement in the performance
How it operates (Methods/ Practices)1. Initiatives are taken to help achieving stretched targets in KPAs. SC assigns ownership to
a Sr. Executive. Standard templates are used for defining initiative and measures. Initiative owner is empowered to select team members as well as to take necessary actions.
2. Initiative owner assembles team. Help of external consultants is provided where necessary. Training is organized wherever need arises.
3. Team collects data, generate ideas through brain storming/ bench marking and prepares action plan
4. Initiative owner/ SC and concerned department approves action plan for implementation and allocates resources.
5. Same team or different team oversees the implementation.6. The team shares achievements and learning by way of presentation in communication
meetings. The team decides to launch next phase/ wave if necessary.
Efficiency
Effectiveness
6 Adherence to schedule %
6 Target vs Actual performance %
Sub process : Performance Improvement through Initiative
Sub Process Ref : CVBU-EL-04-03 (version 1.1)Process Owner : Resp. Steering CommitteeEPM Linkage – CVBU-EL-04 ( Performance Improvement
and Change Management)Preparation Date : 31/03/04Modification Date : 31/03/04
TATA Motors, CVBU Performance Improvement Thru Initiatives
Performance Measure Unit
31.3.2005 4.6
CVBU-EL-05
Principal Process Owner:
EPM Process No:
Mr Shyam Mani - VP (Sales & Marketing ); Mr P G Shankar - Head (CVBU International Business)
Market Development
Sub_Proc No Sub Process Name Sub_Process Owner
CVBU-EL-05-01
CVBU-EL-05-02
CVBU-EL-05-03 Determine Customer Groups & Market Segments
Determination of Customer & CP Satisfaction
Promote Products of Tata CV entire Range
CVBU-EL-05-04
CVBU-EL-05-05
Prepare Marketing Business Plan
Forecast Demand at Product - Segment Level
Product Managers / Customer Support / MR
Product Managers / Sales / Regional Managers
Head of Market Research / Country Managers
Product Managers / Sales / Regional Managers
Product Managers / Sales / Regional Managers
TATA Motors, CVBU Market Development
31.3.2005 5.1
PROCESS DEFINITION SHEET
TATA Motors, CVBU Market Development
In-Process / Efficiency Measure Unit of Measure Output Measure / Effectiveness Measure Unit of Measure
§ CVBU Strategic Objectives§ Industry/Country Demand Forecasts§ Market Share and Volume Targets
(Dom / IB)§ QFD & other MR Reports§ Customer Feedback§ Plant Capacities & Capabilities§ Government Regulations§ Technological Innovations§ RSO/ IB & Channel Partner Stocks and
Requirements§ Sales Process Feedback
Ø Derivation of Operational Vision (Dom / IB)Ø Gather Data through various QFD exercises and AnalysisØ Review Market Segmentation (Dom/IB)Ø Assess New Product Requirements & market OpportunitiesØ Development of Annual Business Plan, Short Term and Medium Term Plan
(Dom / IB)Ø Development of Product Pricing Plan and Sales Promotion PlanØ Assessment of Resource Requirement and Allocation of Resources Ø Preparation of Segment-wise, Region Country wise, Monthly Volumes and
Market Share Targets and communication of the same to ROs/ Country Offices and Channel Partners
Ø Performance Review and Gap Analysis for corrective Actions
Understand CV Markets, Explore Opportunities and Strengthen Presence in chosen Segments and Geographies
Higher Level Linkage-
Process Owner Mr Shyam Mani VP - (Sales & Mktg.)Mr P G Shankar Head - (CVBU IB)
ü Annual Marketing Planü New Product Requirementsü New Markets ü Sales Promotional Schemesü Growth in Sales
Monthly and Quarterly Reviews of Market Share & Volumes achieved vis-à-vis Targets (Growth in Sales)
Details of Modification Issued / Modified by Approved By
New Release
Divisions Involved -
End Customer -
Core Values Embedded
ISO /TS16949(2002) Clause Ref.
Date of Modfn Modification No.
01/06/03 00
31/03/05 01 Modification through process review
BES, Pune
Process Team
Product Mgt. , SHQ (Dom / IB), ROs, AOs, Country Offices, Dealer Development Cell and Channel Partners /SC
Channel Partners and Customers of TATA Commercial Vehicles
Integrity, Customer Focus, Passion For Engineering and Corporate Citizenship
5.2
%Nos.
Key Accounts TouchedNew Segment / Markets developedMarket Share & Volumes achieved
Nos.Nos.% / Nos.
CVBU-EL-05
Process Title
Process Objective
Process Identification No. ( PIN) :
INPUT KEY STEPS OUTPUT
MARKET DEVELOPMENT
Process Revision / Modification History-
31.3.2005 5.2
Process Owner : Mr. Shyam Mani (Domestic) / Mr P G Shankar (IB)Process objective : Understand CV Markets (Dom / IB), Explore Opportunities and
Strengthen Presence in Chosen Countries / Segments and Geographies
- Budget Requirements toFinance & Budgeting- Market Requirement toS &OP and Sales Planning
Requirements to -- NPI Process- Human Resource Mgt- Channel Partner Mgt.- Services Design- After Sales Services
Derive OperationalVision- Review Dom. / IB Strategy- Scan Dom / International CV markets- Country - wiseBall Park MarketAnalysis based on Market Scope
(SHQ /Product Managers(PMs) / Country Managers(CMs))
Data Gatheringthrough various VOC / QFD exercisesand Analysis
- Evolve applicationmatrix for TATAproduct suitability inthe select regions /countries afterscanning product / profitability
- Short List ChosenSegments / countriesin Dom / IB areas
(SHQ / PMs / CMs)
Preparation of -- Annual Business Plan forCVDom / IB
- Product Plan-ST Plan (1Yr.)- MT Plan(2-3 years),
- Product Pricing Plan
- Resource RequirementPlan
( SHQ / PMs / Cms)
Plan for NPI for tapping niche market / new Dom., IB segments
(PMs / NPI Group / CMs)
Sales / Service / Spares Network Enhancement Plan (Sales Head / PMs)
Manpower Requirement Plan(Sales Head / CHRD)
Channel Partner Management Plan
(Sales Head / PMs / DD/ CMs)
Sales Promotion InitiativesPlan / Schemes
(Sales/PMs/RMs/CMs)
Evolve VOC/ QFD exercises / Customer Clinics / Feedback
Programs (SHQ/MR/RMs/CMs/AMs)
Are the resourcesadequate?
Preparation of MarketingPlan -
-Region-wise, Country wise (n+2), Segment wise Monthly Volumes Targets and Market Share Targets
- Communication to ROs and Channel Partners(Dealers / Distributors - IB...)
(SHQ/ PMs / CMs )
Implementation and Review of-Sales, Service Spares Performance of Channel Partners (Dealers / Distributors- IB / TASS, TSS, etc)(Seek feedback from Sales Planning Process)-Analyze the gaps and consider corrective actions as inputs to next marketing review (MTR/ Final)
(Sales / PMs / CMs)
Inputs--CVBU Strategic Objectives-Market Share targetsDom / IB -Volume Targets(Dom / IB)-Profitability
Inputs --Industry / Country-wise Demabd Forecasts,-Dealer / Distributor Sign-off & adequacy,-Customer Feedback-QFD feedback & other MR / Country Survey Reports-Govt. Regulations in various geographies-Technological Innovations- Govt. & Industrial Requirements, -Plant Capacities & Capabilities
Inputs - -Plant Production Reports-RSO / ShipYard Stocks and Requirement-Channel Partner ( Dealer / Distributor-IB Stocks & Requirement
Inputs --Sales Process Customer Pipeline,-Customer CategoryConversion rates,-Market Coverage Plan
Yes
No
TATA Motors, CVBU Market Development
31.3.2005 5.3
UnitPerformance Measure
Efficiency
Effectiveness
w No of NPI or Variants Planned Vs Achieved Nos.w No of new segments / markets identified Nos.
w Achievement of Targets Vs Actual Nos. / % (Volume & Market Share)
Inputsw Product Segment level Mkt. Research
Data / Country Scan reportsw CVBU Business Strategy (Dom / IB) w Competition Data w Customer Complaintsw VOC / QFD Reportsw Product Demo / Road Show Reports w Government / Country Regulationsw New Product Launches Plannedw Past Trend of Sales Volumes w Business Drivers
Key Steps in sub-process-'Prepare Marketing Business Plan''
1. Seek and Analyze data2. Prepare Product - segment Level Business Plan (Dom/IB)3. Execution of plan
Outputsw Product gaps to NPIw Network expansion requirementsw Non-product requirements to
CS/NVB w Marketing Budgets to Regional
Product Managers Human Resource requirement
to C-HRDw Sales targets to Salesw Plan for NPI, Product variants
execution
w
How it operates (Methods/ Practices)1. Seek and Analyze Data (Product Managers / Country Managers) 6 Product Managers capture customer requirements (individual & Key customer groups) and other relevant
data through various VOC/QFD exercises, CIMS, feedback from RO/ AO/ CS/ Country offices, Government regulations, etc.6 Use various Listening approaches to seek Customer requirements
6 Product Managers along with Sales & Market Research collates and analyze the data on customer requirements, applications, market trends, technology and new products.
6 The Regional / Country Managers and Area Officers communicates all data on the sales, competitive sales, market share gain/ loss, Channel Partner Off take / Shipment / retail sale / pending EVRs / Stock levels & Customer requirements to the Product Managers.
2. Prepare Product - Segment Level Business Plan ( Dom / IB) (Product Managers)6 The Product Manager along with Head (Sales & Marketing-Dom/IB),Market Research, Country Managers analyzes the data received from all these sources to prepare the Long Terms (5-10 years),
Medium Term (2-5 years) and Short Term (Annual) Business plan. 6 Considering overall Business plan of CVBU, Product Managers (Dom /IB) compare the analyses of current
area / Country scans , marketing business plan and conduct gap analysis with respect to requirement of new products / variants, network viability / expansion needs, promotional needs, HR resource requirement etc
6 Business Plan (annual- Dom /IB) ) is further explored for New products/ variants required, Network expansion required, HR resource requirement, Sales Volume targets for year, etc. and communicated to respective division
3. Execution of Plan (Area / Country Sales & Product Managers) 6 Product Managers & Sales Head prepare quarterly/ monthly region-wise, dealer-wise product segment level
off- take / shipment plan considering inputs from Annual S & OP meeting 6 Product Managers prepare Budgets for Sales Promotion region-wise on quarterly basis.6 Product Managers decide requirement for the NPI / Product features.(Details in Brackets indicate involvement of various agencies)
Sub process : Prepare Marketing Business Plan Sub Process Ref : CVBU-EL-05-01 (version 1.1)Process Owner : Product Managers / Sales
/Regional ManagersFrequency : Yearly / Mid-TermEPM Linkage : CVBU-EL-05 ( Market Development )Preparation Date : 31/03/04Modification Data : 31/3/05
TATA Motors, CVBU Market Development
31.3.2005 5.4
UnitPerformance Measure
Efficiency
Effectiveness
6 Adherence to schedule R-Y-G
6 Accuracy of forecast % (Variance – Forecast Vs Actual )
Inputsw Economic growth rate projections
and other Macro – economic parameters
w Country Scan reports w Historical data (Time Service
Software) for Short term ( ST) forecasting
w Market share targets (Dom /IB) w Sector wise growth estimates (Region
/ Country) w Market Survey Reports
Key Steps in sub- process - 'Forecast demand at Product-Segment Level'
1. Seek data and study various inputs 2. Prepare Forecasting framework3. Analyze accuracy of forecasts
Outputsw Industry / Country Volumes forecast w for- Long Term (5 years)
- Annual (1 year)- Short Term (Quarterly, Monthly)
How it operates (Methods/ Practices)1. Seek data & study various inputs (Market Research) - 6 Market Research / Country Managers collect data for demand forecasting on an ongoing basis. The
data includes economic growth rates (Dom /IB) and other macro- economic parameters, projections of freight / passenger movement, GDP, EXIM trade, Bank Rates, Railway & Diesel prices, replacement / incremented truck demand, Regulatory norms prevailing in various regions / countries, etc.
2. Prepare Forecasting framework (Market Research / Country Managers) -6 MR / Country Managers evolve Industry/ Country volume forecast for Long Term (5 Years), Annual /
Quarter / Monthly basis a) Long term forecasting (3 - 5 years)
6 Analytically freight availability due to economic growth is calculated 6 Freight divided between major modes of transport e.g. Rail, Road, Waterways, Airways 6 Road transportation share converted into number of trucks required to carry 6 Depending upon our market share the truck volume are ascertained 6 Replacement requirement is added to arrive at Long term forecasting b) Annual forecasting 6 Using above inputs demand forecasting is worked out analytically 6 Replacement volume is added to arrive at annual forecasting c) Short term forecasting ( next 3 - 6 month) 6 Process uses the special statistical analysis software package FORECAST PRO 6 Generate for next 3-6 month projection For IB, Country Managers seek the help of their own
resources / experts in the respective countries for the above.3. Analyze accuracy of forecasts (Market Research / Country - Product Managers) - 6 MR / Country Managers analyse monthly Actuals Vs Forecast for past data for further use.
(Details in Brackets indicate involvement of various agencies)
Sub process : Forecast demand at Product - Segment Level
Sub Process Ref : CVBU-EL-05–02 (version 1.1)Process Owner : Head of Market Research /
Country ManagersFrequency : Yearly / Mid-TermEPM Linkage – CVBU-EL-05 (Market Development )Preparation Date : 31/03/04Modification Date : 31/3/05
TATA Motors, CVBU Forecast Demand at Product - Segment Level
31.3.2005 5.5
Inputs! Performance Targets for Channel Partners ( Dom / IB )!Business Guidelines as per CP Agreement!Governance Guidelines!Controlled Procedure Manual
UnitPerformance Measure
Efficiency
Effectiveness
w Segmentation Review and frequency of Review No. of Reviews
w Changes in segmentation over a period No. of Changes
w No. of Solutions Developed for each Sector Nosw Improvement in CSI %
Inputsw w
ww
w ww
SIAM / Countrywide guidelinesEmerging Customer & Market
trends (Dom/ IB)CVBU strategy (Dom/IB)Listening & Learning feedback on Product, Usage
and GeographyNVB servicesCluster AnalysisCompetition Segmentation
Key Steps in sub- process - 'Determine Customer Groups &
Market Segments' 1. Study various inputs & evolve
segmentation Plan2. Determine Market Segments 3. Determine Customer Groups
Outputsw Product based segments w Geography based Region-
Country-wise structures w End-use based sectors for
sectoral solutions
How it operates (Methods/ Practices)1. Study various inputs and evolve segmentation plan (Product Managers) 6 Product Managers (Dom / IB), Marketing Research / Country Managers study various factors influencing market conditions, CVBU capabilities and thrust
areas.This is done through use of various listening and learning approaches and VOC/ QFD exercises and Application Matrix
2. Determine Market segments (Product Managers) 6 Product / Country Managers and MR determine segmentation of the market
based on Product, Usage and Geography and SIAM / Country classification 6 Product based Lines of Business (M & HCV, LCV, SCV , Bus, NVB.. ) 6 Usage based segmentation
( Sectoral business production in Cement, Steel, etc.) 6 Geography based segmentation (Secondary segmentation based on regions / countries, etc. 3. Determine Customer groups (Product Managers) 6 Form Customer groups based on nature of usage, fleet size, etc. for focus
attention (such as, Institutional Sales (IS), State Transport Undertakings (STU), Individual Customer, etc.
(Details in Brackets indicate involvement of various agencies)
Sub process : Determine Customer Groups & Market Segments Sub Process Ref : CVBU-EL-05-03 (version 1.1)Process Owner : Product Managers / Sales / Regional ManagersFrequency : Yearly EPM Linkage– CVBU-EL-05 (Market Development )Preparation Date : 31/03/04Modification Date : 31/03/05
TATA Motors, CVBU Determine Customer Groups & Mkt. Segments
31.3.2005 5.6
Inputsw CVBU past data on product & Non
product issues w Customer / CP complaintsw CVBU SC inputs regarding CSI /
DSI
Key Steps in sub- process - 'Determination of Customer and
Channel Partner Satisfaction'1. Identify issues impacting customer satisfaction2. Develop Questionnaire3. Interview Customers of Tata & Competition4. Analyze data 5. Prioritize areas of improvements and prepare action plan
Outputsw Customer Satisfaction Index (CSI)w Dealers Satisfaction Index (DSI)w OFIs / Areas of concernw Customer Satisfiers & Dis-satisfiersw Prioritized areas for improvement in CSI / DSI
How it operates (Methods/ Practices)1. Identify issues impacting Customer satisfaction (MR/ CS/ Product Managers) 6 MR along with Product Managers/ Sales/ CS/ NVB decides the scope of the CSI / DSI study to be
undertaken , issues, segments, sample size, attributes, method of determination (Internal / Third Party ) and comparative standard (own performance / competitor performance), etc.
2. Develop Questionnaire (Market Research) 6 MR develops questionnaire which covers positively worded statements covering above aspects 3. Interview Customers of Tata & Competition (MR/ Surveying Agency)6 MR carry out interviewing of customers of Tata and competition through in- house or third party
agency. This is done for a sample size arrived statistically, on 5 points Likert scale 4. Analyze data (Market Research) 6 MR / Third Party consultant analyse data using regression and factor analysis. The analysis is
carried out to identify areas of concern for CVBU & its relative positions with respect to competition5. Prioritize areas of improvements and prepare action plan (MR/ CS/ Product Managers) 6 MR identifies areas of concern & communicates to Product Managers/ CS/ NVB (both product / non
product) -Product Managers / CS/ NVB prepare and deploy action plan for improvements in CSI / DSI(Details in Brackets indicate involvement of various agencies)
Sub process : Determination of Customer & CP Satisfaction
Sub Process Ref : CVBU-EL-05-04 (version 1.1)Process Owner : Product Managers / CS / Market
Research Frequency : Yearly / Mid-TermEPM Linkage – CVBU-EL- 05 (Market Development )Preparation Date : 31/03/04 Modification Date : 31/03/05
TATA Motors, CVBU Determine Customer Groups & Mkt. Segments
Efficiency
Effectiveness
w CSI / DSI for CVBU %
w % Improvement is CSI / DSI %w Areas of improvement identified Nos
Performance Measure Unit
31.3.2005 5.7
UnitPerformance Measure
Efficiency
Effectiveness
w % Usage of Budget – Target Vs Actual %w % Increase in Sales Volume & Market share of % Regional Product Managersw No. of Product Campaign programs arranged Nos.w No. of schemes designed Nosw Expenses - Budget Vs Actual per vehicle Rs/Veh
w Increase in awareness of targeted customers and % general public, regarding Tata Motors CV Product
Range and Services
Inputs! Performance Targets for Channel Partners ( Dom / IB )!Business Guidelines as per CP Agreement!Governance Guidelines!Controlled Procedure Manual
Inputsw CVBU Focus areasw Purchase Drivers w Industry Forecast – Short Termw Sales Pipelinew Targets for marketing product segment w Marketing Budgetw Emerging Customer & Market Trendsw Analysis of Application Matrix
Key Steps in sub process - 'Promote Products of Tata CV entire Range'
1. Study Emerging Customers & Market Trends2. Allocate budget for CV products – Overall target achievement3. Plan Market Devpt. & Design Schemes4. Plan & Execute Sales Promotion Initiatives 5. Measure effectiveness
Outputsw Increase in Sales volume and Market
Sharew Region wise budgets for Product
Promotion
How it operates (Methods/ Practices)1. Study Emerging Customers & Market Trends (Product Managers) 6 Product Managers heads study emerging customers and market trends and other inputs such as Sales Pipelines, ST industry forecast, CVBU focus areas, etc.2. Allocate budget for CV products - Overall target achievement (Product Managers) 6 Product Managers seek annual budget for Market planning activities from CVBU Business Plan 3. Plan Market Development and Design Schemes (Product Managers) 6 After studying the inputs and volume targets Product Managers Heads plan market and design schemes considering targets for Volume and Market share. 6 The Budgets are then further divided Region wise according to the targets and Regional Product Managers while operating within given budget design product level incentives schemes, advertising, road shows, demos, etc. Channel Partners Regional level schemes such as inputs are also sought during demos, advertising actual expenses, etc.. 4. Plan & Execute Sales Promotion Initiatives (Product Managers/ Marketing Communications) 6 Product Managers plan Sales Promotion activities such as advertising and publicity in
consultation with Corporate Communications department, who in turn involve various advertising agencies for Sales Promotion.
5. Measure effectiveness ( Product Managers)6 Product Managers/ Regional Product Managers keep track of Budget Usage and target
achievements and use this as input for further market planning activities (Details in Brackets indicate involvement of various agencies)
Sub process : Promote Products of Tata CV entire Range Sub Process Ref : CVBU-EL-05-05 (version 1.1)Process Owner : Product Managers / Sales / Regional Managers Frequency : Yearly / Mid-TermEPM Linkage – CVBU-EL- 05 (Market Development )Preparation Date : 31/03/04 Modification Date : 31/03/05
TATA Motors, CVBU Promote Products of Tata CV entire Range
31.3.2005 5.8
Vendor ManagementTATA Motors, CVBU
CVBU-EL-06
Principal Process Owner:
EPM Process No:
Mr. P M Telang - President (Pune and Dharwad Works)
Vendor Management
Sub_Proc No Sub Process Name Sub_Process Owner
CVBU-EL-06-01
CVBU-EL-06-02
CVBU-EL-06-03 Tooling Assistance to Vendors
Procurement from Suppliers
Monitor & Improve Vendor Performance
Locational Process chief: Locational ADD / Materials Heads
CVBU-EL-06-04
CVBU-EL-06-05
Development of New Vendors
Development of Item
J S Hegde
Head Materials of respective plant
P K Sinha
J S Hegde
V N Bedekar
31.3.2005 6.1
Process Revision / Modification History
Details of Modification Issued / Modified by Approved By
New Release
Process Identification No.(PIN) :
Process Title-
Process Objective-
- VENDOR MANAGEMENT
-
INPUT OUTPUTKEY STEPS
Output Measure / Effectiveness MeasureIn-Process / Efficiency Measure Unit of Measure Unit of Measure
--
Divisions Involved -
End Customer -
Core Values Embedded
ISO / TS16949(2002) Clause Ref.
Date of Modfn. Modification No.
01/06/03 00
31/03//05 01
§ Sourcing Strategy & Requirement
§ Current Vendor Capabilities and Performance
§ ISO - TS 16949 Procedures
§ Drawings and Specifications
§ Cost Targets
Ø Assess Current Resources
Ø New Vendor Development
Ø Development of New Part / Services
Ø Procurement of developed Parts/ Services
Ø Monitor Vendor Performance and Vendor Rationalisation
Ø Vendor Quality Upgradation
Develop and Maintain a Bank of Reliable Vendors
Higher Level Linkage-
Process Owner Mr. P M TelangPresident (Pune & Dharwad Works)
Cycle Time of Vendor / Part Development
Quality of Supplies
ADD, Auto Materials, QA, MPC, SPD
Modification through process review
BES, Pune
Process Team
Vendor ManagementTATA Motors, CVBU
Monitoring Progress vis-à-vis targets
Head of Manufacturing, CVBU SC
Integrity, Customer Focus, Passion For Engineering and Corporate Citizenship
7.4
ü Competent Vendor Base
ü Direct Material Cost Reduction
ü Quality Supplies
Percentage
Lead Time for new Vendor Development
No of Self Certified Vendors / % CQ suppliers
Parts with 2 or less Vendors / Vendor Rating
varience wrt Target Cost / Budget
Nos., Percentage
Percentage
Nos. / Rs
PROCESS DEFINITION SHEET
CVBU-EL-06
31.3.2005 6.2
Vendor ManagementTATA Motors, CVBU
Process Owner : Mr. P. M. Telang - President (Pune & Dharwad Works)Process objective : Develop and maintain a bank of reliable vendors for
inputs in vehicle manufacturing, assembly & spare parts operation
Develop new Vendor asper sourcing guidelinesDevelop Secondary vendors for Criticle Subprocesses
Vendor Devp. Agency -Monitor Vendorperformance
Vendor Devp.Agency / Matls/ QA
DevelopMaterial / Service
Vendor Devp.Agency
Current vendorcapable to produce
Inputs--SourcingStrategy-current vendorCapabilities,-Product Requirement
-Receive MaterialRequirement plan,-Assess currentresource
Vendor Devp. Agency
Performance satisfactory?
Vendor Deselection forconsistent poor performance
Matls -Access QualitySystems-Award CQCertification-Vendor Quality Upgradation
QA / Matls
-Provideschedules forRegularProcurement-Decide Share of Business
Matls, MPC
Inputs--Indent for devpt. Of items / service-Drawings & Specifications-Vendor Capabilities,-Cost and ScheduleTargets,-Alternative Options-ISO-TS 16949Procedure
Output--Feedback on Quality,Cost and Delivery-Vendor RatingProcess.-Internal / ExternalCustomer Feedback,-design & ManagementCapabilities of Vendor.
No
Yes
No
Yes
Inputs-Annual Monthly SalesPlan for Vehicle and Spare Parts
31.3.2005 6.3
UnitPerformance Measure
Development of New VendorsTATA Motors, CVBU
Inputs6
6
6
6
Make or Buy decisionIndents for new partsRequest from materials agency for an alternate source.Information on suppliers gathered through exhibition, advertisements
Key Steps in - 'Development of New Suppliers'
1. Maintain existing Suppliers data base2. Identify the need for a new source3. Assess capability of prospective Suppliers including
management & technological capability4. Select Supplier & organise site visit5. Seek approval & allot Supplier code
Outputs6 Reliable supplier for Direct inputs
in vehicle manufacturing & assembly fulfilling QCDDMS rating norms
How it operates (Methods/ Practices)1. Maintain existing Suppliers database -6 Buyers of dev. Agency maintain information of existing suppliers (category of items, capacity, capability &
their speciality if any).2. Identify the need for a new Source -6 Scrutinize part indents / requests based on criteria 1) New Technology 2) Cost Competitiveness
3) Volume requirement v/s Capacity of existing Suppliers 4 ) Performance of existing Suppliers.3. Assess capability of prospective Suppliers through CFT–6 Get Supplier information in specified form and shortlist potential Suppliers. Check Quality systems, financial capability, machine & equipment capability, adequacy of management, design
capability, setup etc.4. Select Supplier & organise site visit –6 Head of development agency ( ADD ) forms CFT of Materials, ERC, QA and Pricing committee
and assign team leader. 6 Team leader prepares site visit plan and communicate to Supplier and members.6 Team conducts site visit & submit team visit report to Materials Head.
5.Seek approval & allot Supplier code –6 Development agency prepares Supplier approval proposal in standard format with teams
recommendations and obtain Plant head’s approval through MPC. Based on approval Finance allots Supplier code and updates Supplier data.``
Sub process : Development of New Vendors Sub Process Ref : CVBU-EL-06- 01 (version 1.1)Process Owner : P K SinhaEPM Linkage– CVBU-EL-06 ( Vendor Management )Preparation Date : 31/03/04Modification Date : 31/03/05
Efficiency
Effectiveness
6 New supplier development within time line No. of Days of project schedule6 VQR trend over a period No. of Mths6 Ppm trend Positive6 Cost reduction offered Y-O-Y basis Rs. Crore / %
(Value / %)
Vendor Process Audit rating Index
31.3.2005 6.4
Development of ItemTATA Motors, CVBU
Inputs6 Indent from planning Agency6 Recommendation from
Materials Agency6 Drawing / specifications6 Quality standards
Key Steps in - 'Development of Item '
1. Identify sources2. Get quotations3. Negotiate & finalize price4. Procure samples5. Complete PPAP6. Procure pilot lot7. Transfer of items
Outputs6 Transfer of developed item to
Materials Agency
How it operates (Methods/ Practices)1. Identify sources - 6 Concern buyers of development agency study the item requirement and select
Supplier from current Suppliers if available, else develop new Supplier.2. Get quotations- 6 Buyers send enquiries along with drawing specs to Suppliers, obtain their quotations and prepare
comparative statement3. Negotiate & Finalise price – 6 Buyers study price breakup and call Suppliers for negotiation. They finalize price and obtain
pricing committee’s approval for price and terms & conditions 5. Procure samples – 6 Buyers raise PO on a Supplier and procure sample lot. CQ checks sample lot and prepare
inspection report. CQ obtains ERC approval where necessary. Buyers communicate inspection report to Supplier.
6. Procure pilot lot - 6 After acceptance of samples, Buyers procure pilot lot and obtain CQ approval.7. Transfer of items 6 Buyers prepare transfer note, obtain signature from Central Quality and Logistics group
on transfer note. Buyers hand over transfer note to concerned Materials agency from whom the request was received. Development agency short closes their purchase order
Sub process : Development of Item Sub Process Ref : CVBU-EL-06- 02 (version 1.1)Process Owner : J S HegdeEPM Linkage – CVBU-EL-06 ( Vendor
Management )Preparation Date : 31/03/04Modification Date : 31/03/05
UnitPerformance Measure
Efficiency
Effectiveness
w No of items items transferred as per Nos.time line
No of parts having two or less vendors Nos.Quality performance of Vendorsw ( % rejection ) %w Ppm level / trend for the part Positive
31.3.2005 6.5
Tooling Assistance to VendorTATA Motors, CVBU
Inputs6 Budget approval6 Request for Tooling from Suppliers6 Corporate guidelines
Key Steps in - 'Financial / Tooling Assistance'
1. Assess tooling requirement & decide make or buy2. Negotiate Tool cost with Supplier3. Procure Tooling 4. Handover Tooling to Supplier5. Annual verification of Tooling
Outputs6 Providing Tooling to Supplier
How it operates (Methods/ Practices)1. Assess tooling requirement & decide make or buy6 Buyers of Development ( Dev. ) Agency assess Suppliers Tooling assistance requirement and
take make or buy decision in consultation with Planning & PE. Agreement is done with Supplier as per Corporate Guidelines where Tooling is made / bought by Suppliers on our behalf. For in-house Tooling indents are raised on Planning.
2. Negotiate Tool cost with Supplier6 For bought out tooling on receipt of quotation from Supplier, Buyers of Dev. Agency finalize
Tooling cost with the help of CFT ( QA, PE, ADD & Planning ) and obtain approval for Tooling cost and type of assistance ( e.g. upfront payment / amortization ) as per procedure.
3. Procure Tooling –6 Negotiate rate and raise purchase order for Tooling through Machine Purchase on Tool
manufacturer by following capital item procurement procedure.4. Handover Tooling to Supplier–6 Tooling is directly delivered by Tool manufacturer to Supplier. Tooling is tested by Supplier.
Based on acknowledgment of Supplier dummy GIN & Delivery Note are prepared. Payment to Tool manufacturer is made on the basis of certification of Supplier that Tooling is giving desired output. Based on acknowledged delivery note Finance capitalizes the Tooling.
5. Annual verification of Tooling–6 Buyers of respective materials agency maintain list of Tooling given to Suppliers on loan basis.
They verify Tooling every year and submit the report to Finance
Sub process : Tooling Assistance to VendorsSub Process Ref : CVBU-EL-06- 03 (version 1.1)Process Owner : J S Hegde
EPM Linkage – CVBU-EL-06 ( Vendor Management )Preparation date : 31/03/04Modification Date : 31/03/05
UnitPerformance Measure
Efficiency
Effectiveness
6 Adherence to target dateTarget V/s6 Adherence to verification schedule actual date
6 Variance of budget V/s actual incurrence %
6 On time development of components %
31.3.2005 6.6
Procurement From SuppliersTATA Motors, CVBU
UnitPerformance Measure
Inputs6
6
6
6
Production forecastSPD , CKD & other plant call upItem transfer note from development agencyPrice revision approvals
Key Steps in - 'Procurement from Suppliers'
1. Annual Review of Rates & Suppliers performance
2. Obtain price / quota approval3. Raise POs and amendments4. Resolve Supplier issues
Outputs6 Scheduling agreements and
amendments6 Procurement as per schedule
How it operates (Methods/ Practices)
1.Annual Review of Rates & Suppliers performance –
6 Buyers identify scope for improvement by reviewing item / suppliers combinations for poor
quality and cost performance based on the previous year’s data and current market trend and
targets. Wherever necessary e – procurement events are conducted and alternate sources are
identified. Inform development agency to develop an alternate source. Rates are negotiated.
2.Obtain price / quota approval-
6 Buyers negotiate rates and recommend revised quota (SOB) to Pricing committee based on
price and performance of existing as well as newly developed source. Pricing Committee
approves rate & quota and update quota in the system.
3. Raise POs and amendments -
6 Buyers raise POs for requirement in line with production plan, transfer note and quota approval
and communicate PO / amendments details to Suppliers.
4. Resolve Supplier issues –
6 Materials Agency head / buyers arrange formal or informal joint meetings with Suppliers and QA
to discuss issues regarding quality and delivery with a view to improve suppliers’ capability.
Sub process : Procurement from Suppliers Sub Process Ref : CVBU-EL-06- 04 (version 1.1)Process Owner : Head Materials of respective
plantEPM Linkage – CVBU-EL-06 ( Vendor
Management )Preparation Date : 31/03/04Modification Date : 31/03/05
Efficiency
Effectiveness
ww SOB adherence %
w Supplier satisfaction index Indexw Vehicles with short fitment Nosw Cost reduction Rs. per
Vehicle
Cycle time for action on transfer note No. of Days
31.3.2005 6.7
TATA Motors, CVBU
UnitPerformance Measure
Inputs6
6
6
Monthly Q, C, D data for each SupplierWarranty feedbackPDI report
Key Steps in - 'Monitor and Improve Vendor Performance'
1. Monthly monitoring of PPM level2. Review of vendor rating 3. CQ certification of new Vendors 4. Monitoring and Audit of CQ Vendors5. Performance based rewards & recognition
Outputs6
6
Vendor ratingCQ suppliers
How it operates (Methods/ Practices)1. Monthly monitoring of PPM level -6 Central Quality collects Supplier-Part wise monthly primary & line rejection data and arrives at
PPM l evel. The feedback is given to Suppliers for improvement.2. Review of vendor rating -6 Every quarter Vendor rating is computed on the basis of quality, cost, delivery and warranty
performance of Vendor. Vendor rating is used for determining Share of business ( SOB ), development of new parts and de-selection of vendors.
3. CQ certification of new Vendors –6 Central Quality and material agencies encourage suppliers to establish Quality Management
Systems at his end. Central Quality assesses quality systems of Vendors and awards Self Certified ( CQ ) Vendors status if he attains desired level..
4. Monitoring and Audit of CQ Vendors– 6 CQ vendors are audited for compliance as per pre-determined frequency. Suppliers give PDI
certificate for every consignment.5. Performance based rewards & recognition–6 Suppliers with high Vendors rating are considered for new part development and higher SOB.
Suppliers with consistent low rating are given lesser business or deselected. 6 Cost of primary / line rejection and warranty failed parts are debited to the Suppliers.6 CQ Vendors are considered for Direct Supplies to Line ( DSL ).6 Incoming quantity is checked on random basis and Suppliers are penalized for short receipts
Sub process : Monitor and Improve Vendor Performance
Sub Process Ref : CVBU-EL-06-05 (version 1.1)Process Owner : V N BedekarEPM Linkage – CVBU-EL-06 ( Vendor
Management )Preparation Date : 31/03/04Modification Date : 31/03/05
Efficiency
Effectiveness
w
w ISO Certified / self certified vendors %w Vendor rating %w Improvement trend in Vendor rating Rs/eqw Trend in MD Rejection Cost Vehw Suppliers below 200 PPM
% adherence to audit schedule %
%
Monitor and Improve Vendor Performance
31.3.2005 6.8
Channel Partner ManagementTATA Motors, CVBU
CVBU-EL-07
Principal Process Owner:
Sub_Proc No Sub Process Name Sub_Process Owner
EPM Process No:
Mr S M Sharma - Head ( Customer Support )
Channel Partner Management
CVBU-EL-07-01
CVBU-EL-07-02
CVBU-EL-07-03
Assess Requirement of Channel Partners
Select and Appoint New Channel Partner
CP Performance Monitoring & Audit
Sales Service Spares IB
Dealers TASS Distributors Importers/Distributors
Head - DD
Head - DD
Head - DD
Head- CS Head - LOB4 Head-IB
Head- CS Head - LOB4 Head-IB
Head- CS Head - LOB4 Head-IB
31.3.2005 7.1
Process Revision / Modification HistoryDetails of Modification Issued / Modified by Approved By
New Release
Process Identification No.(PIN) :
Process Title-
Process Objective-
CVBU-EL-07
- CHANNEL PARTNER MANAGEMENT
-
INPUT OUTPUTKEY STEPS
In - Process / Efficiency Measure Unit of Measure Output Measure / Effectiveness Measure Unit of Measure
Divisions Involved -
End Customer -
Core Values Embedded
ISO / TS16949(2002) Clause Ref.
Date of Modfn. Modification No.
01/06/03 00
31/03/05 01
§ CVBU Strategy
§ Long Term & Short Term Business Plans
§ Territory/ Segment-wise Market
Potential and Market Share Targets
§ Existing Channel Partners (CP)
Performance
§ CSI / DSI Survey Findings
§ Competition Data
Ø Assess Territory/ Segment-wise requirement of Channel Partners
Ø Induction of new Channel Partners wherever required
Ø Set Targets
Ø Provide Process and Training Support
Ø Monitor Performance against Targets
Ø Performance Based Rewards and Recognition to Channel partners
Ø Periodic audit at CP
Ø Collect feedback from Channel Partners as well as from Customers
ü Territory-wise Network of
Dealers, Service Stations and
Spare Parts Distributors
ü Channel Partner Satisfaction
ü Customer Satisfaction
Develop & Maintain Bank of Reliable and Motivated Channel Partners for Sales & Service
Higher Level Linkage-
Process Owner Mr S M Sharma Head Customer Support
Appointment of CPs as per Schedule, No CPs where Sales/ Service Processes Introduced
Dealer & Customer complaints monitoring
Nos. No. of CPs availableNo of Outlets availableDSI and CSI
Market Share & Volumes achieved
Nos.
Dealer Development, Vehicle Financing, Customer Support, LOBs, Sales, Service HQ
Modification through process review
BES, Pune
Process Team
Monthly Sales, Service and Spare Parts Performance of CPs
Nos.
Nos.
Index
%, Nos.
Channel Partners
Integrity, Customer Focus, Passion For Engineering and Corporate Citizenship
7.2, 8.21
Channel Partner ManagementTATA Motors, CVBU
PROCESS DEFINITION SHEET
31.3.2005 7.2
Process Owner : Heads of Sales (Dom /IB), Customer Support and NVBProcess objective : Develop and Maintain a bank of reliable and
motivated Channel Partners for Sales and Service.
Ascertain region-country wise requirementof new channelPartners andinvite applications
DD / CS / NVB / IB
SeekAcknowledgement for TCOC,-Set Schedule and Issue LOI
DD/CS/NVB/IB
Receive &ScrutinizeApplications,Analyze FinancialCapability and short list
DD/CS/NVB/IB
-Due diligence -site visits & interview
DD/CS/NVB/IB
FindingsOK?
No
Reject / Refund EMD
Review complianceProgressw.r.t.Schedule
DD/CS/NVB/IB
Commencementof Business (COB)-Sign off AgreementsWith CP as per prevailing regulations in the region/country
DD / CS / NVB / IB
Review Territory-country and Product Segment wiseChannel PartnersScenario and CP Promotion policies -Set Targets and Initiatives
DD/Sales/CS/NVB/IB
Channelpartners
Adequate?
-Set / Reviewperformanceexpectations(Volume, Quality & Financial ) for each CP
Sales/DD/CS /NVB/IB
-Monitor andreview monthly/quarterly/ yearlyperformanceagainst Targets
Sales / DD /CS/NVB/IB
Performancebased Reward /Recognition at the Channel Partner meet / other functions
Sales / DD/CS / NVB/IB
Periodic auditof systems/ processes atCP’s end
DD/CS/NVB/IBInternal Audit
Organise Dealermeet and ThirdParty Surveys
DD/ CS /NVB
Support for establishing process and Training DD/ CS /NVB/IB
Inputs--CVBU strategy (Dom /IB)-LT & ST business Plans-Territory / Country product segment wise potential & market share Targets.-Existing CP’s performance-CSI / DSI survey findings-Competition Data
No
Inputs-Territory / Country Potential and Past Performance
Channel Partner ManagementTATA Motors, CVBU
Yes
Yes
31.3.2005 7.3
Inputs(Dom /IB )w CVBU Marketing Plan
w Competitors network reach in CV (Dom/IB) Market (Sales & Service)w CVBU’s strategic directions Global /
domestic presence in chosen product segments/ markets
w Benchmark / Competition dataw CSI findingsw Un-presented territory with market
potentialw Growth potential of territory /
country & market share (Sales & Service)
w Country-Region-wise Sales / Service Market Share targets
How it operates (Methods/ Practices)
1. Study and analyze existing network capacity & reach and identify
gaps w.r.t. CVBU Marketing ( Dom / IB ) Plan.
6 Map TML Network reach and identify gaps w.r.t competition network &
2.wheeler network. Identify locations.
6 Prepare CP-wise annual plan for Sales, Service and Spares, identify gaps
2. Assess the need for presence of CVBU Channel Partners in the niche
market /region/country
6 Study long term strategic directions and guidelines given by SC
6 Niche market study and competitive position of CVBU in terms of channel
presence is carried out.
6 Prepare Network expansion ( Domestic / Global ) plan for Sales, Service
and submit to SC for approval.
3. Develop and Implement Sales / Service network ( Dom / IB) expansion
Plan
Key Steps in sub - process - 'Assess requirement of Channel Partners'
1. Study and analyze existing network Capacity & reach and identify gaps
2. Assess the need for CVBU Channel Partners (Dom / Global)
3. Develop and Implement Sales / Service network (Dom/IB) expansion plan
Outputsw Probable locations for new Sales
outlets / workshops w Product Segment wise and Region-
country wise requirement of new Channel Partners
w Service network expansion plan.
Sub process : Assess Requirement of Channel PartnersSub Process Ref : CVBU-EL-07-01 (version 1.1)Process Owner : Heads of DD Cell / CS / NVB / IBFrequency : Yearly EPM Linkage – CVBU-EL- 07 (Channel Partner Management) Preparation Date : 31/03/04Modification Date : 31/03/05
UnitPerformance Measure
Efficiency:w No of CPs identified Vs Target Nos.w % increase in reach planned % of districts /
countries represented
Efficiency:w CSI w.r.t. availability of Channel Partner Indexw DSI / TSI w.r.t. territory Indexw Coverage of territory where competitor is No. of Locations
present
Assess Requirement of Channel PartnersTATA Motors, CVBU
31.3.2005 7.4
Performance Measure Unit
Efficiency
Effectiveness
w No of CPs appointed against the plan Nos.
w Avg. Time for new CP introduction No.of Days
w Conversion rate of LOI into COB. %
Inputs-w Corporate Guidelines and approvalw Network Expansion (Dom /IB) Planw Existing CP’s performance in the region / country w CSI / DSI findingsw Competition Data
Key Steps in sub- process - 'Select & Appoint New Channel Partner’
1. Identify suitable prospects2. Assess on-site : due diligence3. Recommend suitable candidates for LOI4. Verify LOI compliance and approve COB5. Authorization to start business
How it operates (Methods/ Practices)1 - Identify suitable prospects6 Float advertisement for Channel Partner for Sales, Service and Spares
(as the case may be) 6 Send Application Form to desirous candidates (Application seeks the details of the candidates, financial strength, past profile,etc ) 6 Receive application with necessary documents
6 Evaluate application based on the profile of the applicant 6 Short List candidates for site visit and due diligence
2 - Assess on site : due diligence6 Assess Financial viability of the candidate,
6 Conduct site visit and interview 6 Verify information stated in application,financial papers, due diligence 3 - Recommend suitable candidates for LOI 6 Recommend suitable candidates for LOI ( Letter of Intent)6 Study clauses to be incorporated in the agreement for safeguarding the potential risks. 6 Seek ED / Chairman approval and issue LOI to the selected candidates
6 Explain Tata Code of Conduct to LOI holder4 - Verify LOI compliance and approve COB ( Commencement of Business) 6 LOI holders to complete infrastructural and other requirement in stipulated time6 COB is approved by ED(CVBU)/Chairman for the LOI holders complying the
requirements.5 - Authorization to start business6 LOI holder sign the agreement as per the rules prevailing in the region and TCOC
contract with TML and is authorized to start business. On compliance of Building, infrastructure and other required resources and training he becomes Authorized Channel Partner of TML
Sub process : Select and Appoint New Channel PartnerSub Process Ref : CVBU-EL-07-02 (version 1.1)Process Owner : Heads of DD Cell / CS/ NVB/ IBFrequency : Yearly EPM Linkage - CVBU-EL- 07 (Channel Partner
Management) Preparation Date : 31/03/04Modification Date : 31/03/05
Select & Appoint New Channel PartnerTATA Motors, CVBU
Outputsw Increase in network (Dom/IB) reachw Addition of new CPs to networkw Increase in Sale of vehicles / spare
parts through CPw Improvement in CSI / DSI w Letter of Intentw Commencement of Business (COB)
31.3.2005 7.5
Key Steps in sub - process- 'CP Performance Monitoring & Audit'
1. Set performance expectations2. Monitor & review monthly / quarterly/ annual performance vis-à-vis targets3. Render Training Support 4. Recognize high performance5. Conduct periodic audit and organize third party surveys
Inputsw Performance Targets for Channel Partners ( Dom / IB )w Business Guidelines as per CP Agreementw Governance Guidelinesw Controlled Procedure Manual
Outputsw Monthly/Quarterly/Annual CP
performance reportsw Workshop profitabilityw Adherence to TCOCw Compliance to TS requirementsw Adherence to Governance /
Performance Guidelines/TCOCw Audit Recommendationw Compliance to TS requirements
How it operates (Methods/ Practices)1 - Set performance expectations 6 Performance expectation w.r.t. Sales / service & spare parts are set and
informed to Channel Partners (Dom /IB) 2 - Monitor and review monthly / quarterly /annual performance vis-à-vis targets 6 Channel Partners send Sales / workshop performance and spare parts sales
to concerned AO / Country Managers who in turn forward the same to DD/ Sales /CS / NVB / IB as the case may be.
3 - Render Training Support 6 DD/STC/ Sales Process team (IB) render training for Channel Partners
(Dom/IB) staff in consultation with concerned Sales / CS / NVB / IB personnel4 - Recognize high performance 6 Good Sales / Services and Spares performance (region/ product segment-wise) is
rewarded in regular National / International Channel Partner meet and other functions.5 - Conduct periodic audit and organize third party surveys 6 Audit w.r.t. statutory complaints Sales / Service Process Implementation, Project Vishwas, Operation raid etc.
Sub process : CP Performance Monitoring & Audit Sub Process Ref : CVBU-EL-07-03(version 1.1) Process Owner : Heads of DD / CS/ NVB / IBFrequency : Yearly / Mid TermEPM Linkage – CVBU-EL- 07 (Channel Partner
Management) Preparation Date : 31/03/04Modification Date : 31/03/05
CP Perfomance Monitoring & AuditTATA Motors, CVBU
Efficiency
Effectiveness
w Adherence to audit schedule R-Y-G
w L/B/D, S/B/D, V/B/D AgainstBenchmarks
w No. of Non-conformities observed during Nos. audit and resolvedw Service Market Share %
Performance Measure Unit
31.3.2005 7.6
New Product IntroductionTATA Motors, CVBU
EPM Process No:
Principal Process Owner:
Sub_Proc No Sub Process Name Sub_Process Owner
Head NPI
New Product Introduction
CVBU-EL- 08
Mr R A Bijlani - Head NPI Project - CVBU
CVBU-EL-08-01
CVBU-EL-08-02
CVBU-EL-08-03
Development of NPI Product Plan
Budgeting of NPI Project
Monitoring Execution of Project NPI Proejct Manager
NPI Project Manager
CVBU-EL-08-04
CVBU-EL-08-05
Product Design & Development
Process Planning Head Planning
Head ERC
31.3.2005 8.1
New Product IntroductionTATA Motors, CVBU
PROCESS DEFINITION SHEET
INPUTS
Details of Modification Issued / Modified by Approved By
New Release
Divisions Involved -
End Customer -
Core Values Embedded
ISO / TS16949(2002) Clause Ref
Date of Modfn. Modification No.
01/06/03 00
31/03/05 01
§ CVBU Strategy and Business Plan§ CV market Needs & opportunities§ Tata Motor’s and Competitor's
Product Profile§ Technologies available§ Internal Capabilities§ Competitor Analysis§ QFD, VOC§ Benchmark Data§ CMVR Requirement
Ø Product Strategy & Product Plan ReviewØ Receive and analyze customer requirementsØ Project InitiationØ Concept selectionØ Project classificationØ Concept and Project approvalØ Design Release, validation & certification-Ø Planning of Facilities, Vendor DevelopmentØ Quality Proving, Process validation Launching of Product
ü Timely Introduction of new product meeting quality and cost targets
Higher Level Linkage-
Adherence to time schedule while driving of project.
Colour indicator : Green - 0 to 2 monthsYellow - 2 to 4 monthsRed - 4 months and above
New Products / variants introduced against target
New Products / variants cycle time against target
Achievement of Quality targets
Actual Vs Budgeted Project and Product cost
Nos.
% Adherence
Product Strategy Group, SC, NPI, MKTG, ERC, Auto planning, ADD, PE, MPC, SSG
Integrity, Customer Focus, Passion For Engineering and Corporate Citizenship
5.4.2, 7.3
Modification through process review
BES, Pune
Process Team
% Variation
% w.r.t. target
CVBU - EL - 08
Process Title Mr R A Bijlani Head NPI CVBU
Process Objective Timely Introduction of New Product to market requirement
Process Owner
Process Identification No.(PIN) :
KEY STEPS
New Product Introduction
OUTPUTS
In-Process / Efficiency Measure Unit of Measure Output Measure / Effectiveness Measure Unit of Measure
Process Revision / Modification History-
31.3.2005 8.2
Process Owner : Mr R A Bijlani Head NPI CVBUProcess objective : Timely, cost effective offering of new product
to Market as per customer requirement
ProductStrategy andProduct PlanReview
PSG / SC /NPI Office
-Evaluation of Marketopportunities with the help of Concept Evaluation Team (CET)-New Project Initiation(Define product requirements, customer segments, Productpositioning,Price and volume)-Appoint ProjectManager
PSG / NPI Office
Understand customerRequirement-Workout alternateconcepts (Packaging,styling, Cost )-Prepare PreliminaryBusiness Case
Project Manager and ERC
Selection ofConcept - ProjectClassification-Time schedule-Product Definition-Prepare BusinessCase-Seek approval of PSG
Project Manager / NPI Office
-Finalise BasicLayout and Stylingand Ergonomics-Finalise vehicle &aggregate-performancespecification and review cost
ERC /Projct Manager
-Detail design-Alpha Prototypemanufacturing &testing(aggregates, and crash)-Review of design and modification
ERC/Project Manager
Inputs--CV MarketData-CompetitorAnalysis-NewTechnologies-CVBUStrategy
Inputs--New ProductRequirement-MarketOpportunities-Competitor’sOfferings
Inputs--New Technology(Advanced Engg.)-QFD-Voice ofCustomer-Benchmarks
Inputs--System LevelBenchmarks-Keycomponentsuppliers-DFMEA-PFMEA
-Process Planningand Estimate Sheetrelease-Control Planpreparation-Vendor Development-Plan and acquire/install facilities &toolingAPL/Plant Engg./ QA/ADD
-Design validation-Beta prototype mfg& testing-Review of design modification-CMVR Certification/Homologation-Release of design for pre-production batches
ERCProject Manager
Launching ofProduct
Regular Production
Quality Proving & Process Validation, Testing for volume Prodn.(PO,PP and PL batch Production)Project Mgr /Line Mgr.
New Product IntroductionTATA Motors, CVBU
31.3.2005 8.3
UnitPerformance Measure
Inputsww
w
w
CVBU StrategyNew product proposals from Marketing and ERCMarket Research inputs on Indian as well as International market potential and competitionResource availability
Key Steps in- 'Development of NPI Product Plan'
1. Evaluate opportunities and prepare proposals
2. Prepare segment wise list of options.3. Prioritize projects4. Approval of NPI plan
How it operates (Methods/ Practices)1. Analyze Research inputs and select segment/s for NPI that support CVBU’s
strategy2. Review proposals from Marketing and ERC and short list segment wise
proposals on the merits of business case.3. Review resources committed for projects in hand, availability of Financial
resources as well as ERC capacity and prioritize projects and prepare NPI plan and estimate resource requirement for implementing the plan.
4. Seek approval of PSG and CVBU Steering committee’s approval
Efficiency:w Quarterly release of Product plan
(variance w.r.t. Time) %
Effectivenessw Product Plan communicated to
all related functions %
Sub process : Development of NPI Product PlanSub Process Ref : CVBU -EL-08-01 (version 1.1)Process Owner : Mr R A Bijlani Head NPI CVBUEPM Linkage : CVBU-EL-08 ( NPI )Preparation Date : 31/03/04Modification Date : 31/03/05
Development of NPI Product PlanTATA Motors, CVBU
31.3.2005 8.4
Outputsw Approved Product plan of NPI
Projects
Efficiency
Effectiveness
w %
w No. of Products launched as per schedule. Nos.w Products meeting deliverables w.r.t. %
Customers’ expectations.
Actual time taken w.r.t. base line
Inputsw Product Specs & Featuresw CAPEX Budget approvalsw Targets for Quality and Cost of
productw Project Cost & time targets and
Gantt chart
Key Steps in -'Execution of NPI Project'
1. Form CFT of representatives from related Functions/ Departments
2. Periodic review of activities by Functional Heads3. Periodic review by Project manager4. Periodic Internal Audit of documentation by NPI
Project office 5. Phase gate clearances ( DR0…DR5)6. Productionisation
Outputsw Introduction of new product as per
Time schedule, targeted Project and Product cost and meeting customer deliverables
How it operates (Methods/ Practices)1. Project Manager and core team is nominated by NPI department head. Nominations for CFT are
sought from the functions/ departments that have a role to play in the concerned NPI Project. The nominated person acts as single point of the concerned function/ department.
2. Concerned Function/ Department Head assigns NPI project related activities pertaining to his area to suitable persons and reviews as part of routine communicates progress through CFT member of his department
3. Project Manager interacts with concerned departments as well as conducts review meetings to resolve issues, if any,and to ensure that quality, cost and time targets are met.
4. Project Manager uses standard formats ( Designed and maintained by NPI Project office in the form of soft copy on website “COIN”) for phase wise documentation.NPI Project office conducts periodic internal audits to assure NPI department head that documentation is in order.
5. On reaching prescribed mile stone the Project Manager request for Phase Gate (DR1..DR5) review by PSG/ SC. During the Phase Gate reviews, the project is reviewed for its viability & progress,budgets are reviewed and gate way clearance is given. NPI Project Office maintains record of Gateway Sign Offs and budget approvals
6. After DR 5 sign off, Project Manger oversees productionisation of the new product, co-ordinates with concerned departments resolving issues,if any, and to ensure validation of designs and processes for required production rate. The product is then handed over to manufacturing .
Sub process : Monitoring Execution of NPI Project
Sub Process Ref : CVBU-EL-08-03 (version 1.1)Process Owner : NPI Project ManagerEPM Linkage : CVBU-EL-08 ( NPI )Preparation Date : 31/03/04Modification Date : 31/03/05
Monitoring Execution of NPI ProjectTATA Motors, CVBU
UnitPerformance Measure
31.3.2005 8.5
Efficiency
Effectivenessw Maintain or Better Project Cost at %
targeted Valuew Maintain or better Product Cost at %
targeted value
Inputsww
w
ww
Product Specs & FeaturesHistorical Cost data for products, tooling, machines etc.Target price and volume projectionsProject Classification guide-linesTimeline templates
Key Steps in- 'Budgeting of NPI Projects'
1. Classify the project 2. Plan timeline 3. Estimate Project Cost,Estimate Product
cost, Payback Period, IRR/ EVA4. Seek Capital Budget Approval and
communicate to all the concerned5. Monitor Expenses against budget
Outputsw Project wise Budget approval
from Corporate Office
How it operates (Methods/ Practices)1. Classify project ( New product, variant, upgrade etc) using standard guide lines based on
Product Specs and Features, in consultation with ERC2. Seek broad tech. Specs, dimensions and features from ERC and communicate to all the
NPI team members to enable them to estimate cycle time, effort and cost for activities in their function/ department.
3. Seek estimates (time, efforts and cost) from team members activities in their function/department. Draw Gantt chart for project. Estimate accounting head-period wise budget requirements and total cost of the project .estimate allowable product cost. Estimate paybackperiod, IRR/ EVA and prepare business case and put up for approval of project as well as capital budget.
4. Explain and justify requirements to approving authorities ( PSG,Corporate Planning,SC etc) and seek approval for project and CAPEX. Receive Budget Codes CAPEX from Corporate Planning. Review capital budget requirements indicated by functions/ departments and allocate capital budget and allot works budget codes (WBS element) to them through Project Group of Central Planning ( Auto Planning) of plant.
5. Attach Budget Codes to work Order/ Expense and collect cost through Legacy/ SAP system
Sub process : Budgeting of NPI ProjectSub Process Ref : CVBU-EL-08-02 (version 1.1)Process Owner : NPI Project ManagerEPM Linkage : CVBU-EL-08 ( NPI )Preparation Date : 31/03/04Modification Date : 31/03/05
Budgeting of NPI ProjectTATA Motors, CVBU
UnitPerformance Measure
31.3.2005 8.6
Efficiency
Effectiveness
w Cycle time of design and development Days
w Target Vs actual Cost of Design and Testing %w Targeted Vs estimated cost of product %
Inputsw Performance expectationsw Concept alternativesw Styling themesw Packagingw System level bench marksw Cost targetsw Tata Motor’s standards,National &
International standards and rules ( TS,IS,DIN,EN etc standards and CMVR ,EEC rules etc)
Key Steps in-'Product design & development'
1. Design Initiation Document.(DR1)Finalize basic layout, styling and performance specifications ( Dr2)
2. Design Aggr. and Comp.,insert new parts in DENIS and release for ‘Alfa’ prototype
3. Built ‘Alfa’ prototype and carry out testsDR3)4. Review design, incorporate required changes and
release for ‘Beta’ prototype5. Testing and ARAI certification.( Dr4)6. P0 and PP batch production and validation7. Final release of Drawings and TPLs(DR5)8. Validate design based on service feed back
How it operates (Methods/ Practices)1. On clearance of DR0 stage, NPI Project Manger indicates the broad performance expectation
and cost targets. Feasibility is studied, concept is selected, product profile and technical targets are proposed
2. On receiving DR1 clearance Basic layout/ mock ups are prepared, performance specifications are proposed, inputs from key component suppliers are taken ,initial FMEA is performed and Proposal giving product specifications, styling & packaging , layout and design cost & timeline estimate is given to NPI project manager for putting up business case.
3. On receiving DR2 clearance detailed designs are prepared and released for Alfa prototype. prototype is developed and tested. After incorporating changes, if required, back is given to Project Manager for seeking approval for validating business case.
4. On receiving DR3 clearance, Beta Prototype tests are conducted, full design is validated, ARAI certification is obtained and DR4 clearance is taken for P0 and PP batch production
5. P0 and PP batches are produced and tested as per planned production processes, changes recommended by QP team are analysed, designs are validated, drawings are modified where required and DML is released for full scale production after obtaining DR5 clearance.
6. After launch of product based field feed received from service is analysed to validate design. Drawing are modified where require and released through DML to APL for introducing change in production.
Outputsww
New VC NoRelease of drawings/CAD data and TPL
Sub process : Product design and development Sub Process Ref : CVBU-EL-08-04 (version 1.1) Process Owner : Head ERCEPM Linkage – CVBU-EL-08 ( NPI )Preparation Date : 31/03/04Modification Date : 31/03/05
Product design and development TATA Motors, CVBU
UnitPerformance Measure
31.3.2005 8.7
Efficiency
Effectiveness
w Adherence to schedule %
w Planned vs actual cycle time of production No. processes
How it operates (Methods/ Practices)1. Make or buy decision is taken on the basis of manufacturing strategy. Based on this decision BOM is
created in the computerised system with appropriate condition of supply.2. Based on condition of supply planning releases indents for development of bought out components,
raw materials, castings, forgings etc; on source development agency ( ADD/ A Matls )3. Planning plans processes for all the shop made items, consults production and PE/ Tool room,
conducts PFMEA for critical item, estimates time and releases Estimate Sheets after time validation by PSD for use of Costing, Production, PSD. Planning also releases indents for new tools & tooling, machines ,equipments etc for in-house manufacturing or procurement.
4. Planning conceives shop layout and gives indents for material handling & storage equipments, building and other infrastructure facilities as required.
5. Planning co-ordinate with concerned agencies till all the required facilities , machines ,tooling areprovided and tested. During productionisation, planning validates all the processes and cycle time for required production rate.
Inputsw Drawings , TPL and Drawing / CAD
dataw Volume projectionsw Plant master, Capacity utilisation
and Cost Center dataw Manufacturing Strategyw New Technologies & trends in
manufacturingw Budget Approvals and cost
targets
Key Steps in-'Process Planning'
1. Take “Make or Buy” decision for components &aggregates and create BOM/ APL TPL
2. Release indents for Bought items/ materials3. Monitor the DML progress till implementation4. Plan Processes shop made items/ aggregates, 5. Prepare and release Estimate Sheets and indents
for new tools & tooling and inspection equipment etcthrough computerised system
6. Release indents for machines, material handling & storage equipments and building & infrastructure facilities
7. Validate processes for desired production level8. Capital Budget requirement for Auto
Outputsw Validated process & Estimate sheet
Indents for new tooling, inspection & testing equipments, machines, material handling & storage equipments, Building and infrastructure facilities.w Indents for development of bought out
components and materialsw Bill of Material – APL TPL Estimate
sheets and stage part drawings
Sub process : Process Planning Sub Process Ref : CVBU-EL-08-05 (version 1.1) Process Owner : Head PlanningEPM Linkage – CVBU-EL-08 ( NPI )Preparation Date : 31/03/04Modification Date : 31/03/05
Process Planning TATA Motors, CVBU
UnitPerformance Measure
31.3.2005 8.8
Service Design
EPM Process No:
Principal Process Owner:
Sub_Proc No Sub Process Name Sub_Process Owner
Understanding Customer Needs
Design of New Services
Pilot Run of New Service
Introduction of New Service
Mr S M Sharma - Head (Customer Support), Mr S Y Deshpande - AGM (Customer Support
CVBU-EL- 09
CVBU-EL-09-01
CVBU-EL-09-02
CVBU-EL-09-03
CVBU-EL-09-04 Mr. S. Y. Deshpande
Service DesignTATA Motors , CVBU
Mr. S. Y. Deshpande
Mr. S. Y. Deshpande
Mr. S. Y. Deshpande
31.3.2005 9.1
--
CVBU- EL- 09 Process Identification No.(PIN) : Higher Level Linkage-
Process Title-
Process Objective-
SERVICES DESIGN
INPUT KEY STEPS OUTPUT
§ Business Plan of LOB4§ Data on Spare parts & Service Long term and
Short term § Customer Satisfaction Survey and Dealer
Satisfaction Survey Findings§ Channel Partner / Customer feedback about
current Service Processes§ Past Performance of services § Govt. / ISO / SIAM guidelines § CMVR Norms§ Vehicle Features§ CVBU BSC
Process Owner Mr S M Sharma Head (Customer Support)Mr S Y Deshpande AGM (Customer Support)
Ø Data analysis and identifying new opportunitiesØ Identification of challenges and key customer expectationsØ Improvement of Existing Services / Designing of new services, if requiredØ Assessment of economic viability of new/ improvised services and
Approval from SCØ Define Process ResponsibilitiesØ Test / Pilot Run of new/ modified servicesØ Acquisition of Resources Ø Introduction of New ServiceØ Training of CPs.Ø Establish Control and Monitoring MechanismØ Conduct Periodic Surveys
ü Introduction of Customer Friendly and Cost Effective Service Processes
ü Services and Revenue from NVB (LOB-4)
Introduction of new services to support customers of CVBU products to maintain it throughout its life and enhance value for money , Growth of Non Vehicular Business (NVB)
In-Process/ efficiency MeasureAdherence to schedule of Introduction, Cycle Time of the Service
Customer Complaints
Orders on hand
Unit of Measure Output Measure / Effectiveness Measure Unit of Measure
%
Nos.
No.of Service Processes designed and deployedProfitability of CPs
CSI and DSI
Turnover and Profitability of NVB (LOB-4)
Service Market share
Nos.
Index
Rs. Crs / Percentage
%
%
Nos.
Divisions Involved -
End Customer
Core Values Embedded-
ISO / TS 16949 Clause Reference-
Process Revision / Modification History-
Service HQ, NVB HQ
Channel Partners and Customers of TATA Commercial Vehicles
Integrity, Customer Focus, Passion For Engineering and Corporate Citizenship
Date of Modfn.
01/06/03
Modification No
00
Details of Modification
New Release
Issued / Modified by
BES, Pune
Approved By
31/3/05 01 Modification through process review Process Team
Service DesignTATA Motors, CVBU
PROCESS DEFINITION SHEET
31.3.2005 9.2
-Analyse data,identitychallenges &key customerExpectationsregardingservices-Identify newproposal
NVB HQ /Service HQ
-Reviewperformanceof currentServices, NVBperformance,Pricingstrategies andincentivesPrepareBusiness Plan NVB HQ / Service HQ
Prioritiesimprovements/ new serviceintroduction,
-Definerequirements
NVB HQ /Service HQ
-Study needs-Evolve alternatives-Project cost benefits-Select alternative-Analyse anticipated risks-assess resource requirement andseek SC approval
NVB HQ /Service HQ
Process Owner : Mr S M Sharma, Head - Customer Support; Mr S Y Deshpande - Customer Support
Process objective : Introduction of new services to support customers of CVBU products to maintain it throughout its life and enhance value for money-Growth of Non Vehicular Business(NVB)
DefineProcessDeliverychannel andresponsibilities
NVB HQ /Service HQ
-Test / Pilot Run -Review and incorporatechanges, ifnecessary-Plan and Acquireresources-Training ofChannel Partner
NVB HQ/Service HQ
-EstablishControls andReviewMechanism-DefineMeasures areindicators-AssignResponsibilities-Introducenew /improvementserviceNVB HQ/Service HQ
Inputs--Market Survey Data
-Customer / Dealersatisfaction survey feed
back.-Market Research data.
Competition Data-Requirement relatedto new productsIntroduced by the company-Changes in ServicesEnvironment
Inputs--CVBU BSC,-ASO Reports,-Customer feed back,-Channel PartnersFeedback,-Govt./ ISO / SIAMguidelines w.r.t.. WorkSystems,PollutionNorms, ProductFeature etc
Inputs--Technologies-Best Practices-Benchmarkdata
Seek customer / channel Partner feedback throughInternal / Third partySurveys
NVB HQ / Service HQ
Service DesignTATA Motors, CVBU
31.3.2005 9.3
Key Steps in sub - process- 'Understanding Customer Needs'
1. Analyse inputs and decide upon attributes for data collection2. Gather feedback from customer 3. Assess customer feedback and analyse Satisfiers and Dis-satisfiers4. Prioritise needs
Performance Measure Unit
Nos.Nos.Nos.
Effectiveness6 No. of needs identified Nos.
Sub process : Understand Customer Needs Sub Process Ref : CVBU-EL-13-01 (version 1.1)Process Owner : Mr. S. Y. DeshpandeEPM Linkage – CVBU-EL- 09 ( Services Design )Preparation Date : 31/03/04Modification Date : 31/03/05
Outputsw Identified Needs / preferences /
requirements of – -Present Customers
-Potential Customers -Competition Customers -Future Customersw Opportunities for Improvement
Efficiency6 No. of seminars. Plan v/s conducted6 No. of customers meets Plan v/s conducted6 No. of campaigns. Plan v/s conducted
Input6 Capturing customer voice at various touch points such as
a. Customer visiting Dlr/TASSb. Customer visits/ contactsc. Customer meets/ mechanic
meetsd. Campaignse. Technical seminarsf. training meets
6 Competition offerings 6 CSI & DSI Survey Findings6 Channel Partners Feedback6 Regulatory Requirements
Understand Customer NeedsTATA Motors, CVBU
How it operates (Methods / Practices)1. Analyse inputs an decide upon attributes for data collection (CS) -6 Study various inputs and decide whether the Customer requirement study w.r.t. services, would be
carried out in-house or by third party. 6 Define Sources, Customised Listening and Learning Approaches and customer feedback access
mechanisms for different customers such as current, former, potential or competition customer 6 Assign responsibilities for gathering feedback to various agencies such as RO, AO and Channel Partners
as appropriate.6 Competition data is collected by customer visits, by visiting their group dealers/ customers
2. Gather feedback from customer (CS) -6 Based on market segmentation ( Product Groups ) and customer relationship framework (Individual /
Institutional / Key Accounts) and pre-determined L & L Approaches, NVB / CS / LOBs gather the feedback from various customers. This feedback is gathered through telephone survey by external agency, post-repair survey on larger Dealers/ TASS / MCCC feedback
3. Assess customer feedback and analyse Satisfiers and Dis-satisfiers (CS) -6 Respective LOB heads/ CS assess feedback received from various cross section of the customer( both
product and service related ) . Product related feedback is used as one of the inputs for NPI while issues related to After Sales Services are taken up for action by NVB and Customer Service.
4. Prioritise Needs (CS) - 6 Based on the feedback received w.r.t. Customer needs and CVBU strategic guidelines LOBs/ CS prioritise
the needs for further actions. (Details in Brackets indicate involvement of various agencies)
31.3.2005 9.4
Key Steps in sub - process - 'Design of New Service'
1. Define Service features 2. Naming the process & process owner3. Process Mapping4. Define Delivery Channel5. Define Service Standards6. Seek Approval
Outputs6 New / Improved service process
How it operates (Methods / Practices)1. Define Service features (CS)- 6 Analyse customer expectations and competition
offerings and arrives at characteristics of proposed services.2. Naming the process & process owner (CS)6 After service features of new process is finalised, name the process & process owner
3. Process Mapping (CS)6 The entire process, covering the new/modified features, is mapped
4. Define Delivery Channel (CS) -6 Define delivery channel e.g. Channel Partners or in-house through VCM / CAC / CRM programs,
allocate resources in such a way to enable integration of leading technology into the proposed service (e.g. VCM / SAP support to services), define skill and training requirements. Factors such as concentrated demand, financial variability and suitability of current service are considered while deciding delivery channel
5. Define Service Standards (CS) -6 Define service levels and service standards to be followed, establish control and review
mechanism6 Define in-process and output measures & indicators and targets for the same6 Define process responsibility for introduction of new / improved services to Service Owners 6 Define mode of service free or paid
6. Seek Approval-6 Head Customer Support present the draft new / improved service in the meeting with all
stakeholders, incorporate modifications, if required and seek approval from concerned SC members for the pilot run
(Details in Brackets indicate involvement of various agencies)
Performance Measure Unit
Efficiency
Effectiveness
6 No. of new services designed / improved
6 % Customer needs fullfilled
%
%
Sub process : Design of New ServiceSub Process Ref : CVBU-EL-09-02 (version 1.1)Process Owner : Mr. S. Y. DeshpandeEPM Linkage – CVBU-EL- 09 ( Services
Design )Preparation Date : 31/03/04Modification Date : 31/03/05
InputsCustomer needs & expectations6 Changes in Service Environment 6 Competition Offering6 Best Practices / Benchmark Data6 Budget Allocated6 New proposals from RPMs /
RSMs / Channel Partners6 Past Performance data/Feedback6 CMVR Regulations
Design of New Service / Improvement in Existing Service ProcessTATA Motors, CVBU
31.3.2005 9.5
Inputs6 New / improved Service Process
Key Steps in 'Pilot Run of New Service'
1. Prepare set-up for new service2. Identify and schedule resources3. Training of concerned agencies e.g.
channel partner, TML, field staff, service office4. Conduct Pilot Run5. Capture and incorporate changes, if any
Outputs6 Satisfaction from the new / improved
service (proposed) 6 Improvements / modifications
suggested in the service under test
How it operates (Methods/ Practices)1. Prepare Set-up for new / improved service6 Considering the steps and guidelines for Service, decide the time and
location where the pilot run of the proposed service is to be conducte 2. Identify and schedule resources 6 Identify resources such as material, equipments and the persons
involved from both sides ( Tata Motors and Channel Partners, as appropriate). Explain the role of each person involved in the new service. 3. Training of concerned agencies e.g. channel partner, TML, field staff, service office4. Conduct Pilot Run 6 Conduct Pilot run of the service 6 Compare the observations and results against desired ones.6 Identify areas for improvements and seek suggestions
5. Capture and incorporate changes, if any 6 Based on the feedback of pilot run and suggestions received if any,
incorporate the changes in the service under question.
(Details in Brackets indicate involvement of various agencies)
Performance Measure Unit
EfficiencyAdherence to schedule
% of processes piloted reaching intoduction Effectiveness
%
%
Sub process : Pilot Run of New ServiceSub Process Ref : CVBU-EL-09-03 (version 1.1)Process Owner : Mr. S. Y. DeshpandeEPM Linkage– CVBU-EL- 09 ( Services Design )Preparation Date : 31/03/04Modification Date : 31/03/05
Pilot Run of New ServiceTATA Motors, CVBU
31.3.2005 9.6
Key Steps in sub - process -'Introduction of New Service'
1. Assess workload & plan implementation2. Make Training Module & training for concerned agencies3. Start implementation of New Service4. Review the effectiveness for six months.5. Transfer the process to EL - 13
How it operates (Methods / Practices)1. Assess Workload & Plan implementation -6 Assess efforts for implementation and decide time table so as to plan6 Based on efforts required Service Owner decides service charges in case
of paid service considering organizational market sentiments, priorities, breadth to be covered, time to acquire resources, etc. in consultation with all stakeholders
2. Make Training Module & training for concerned agencies –6 Service Owner seeks the faculty, training module and organizes the
training (Class Room / OJT as appropriate) for the persons involved from both, the channel partners and AO / RO staff.
3. Start implementation of New Service 6 Launch New Service in the presence of all stakeholders at predetermined
location, monitor the observation as free/ paid service
4. Review the effectiveness for six months6 Seek constantly feedback either directly from customer or through Channel
Partners till the New / Improved service is stabilized.5. Transfer the process to EL – 13 (Details in Brackets indicate involvement of various agencies)
Performance Measure Unit
%No. of Days
Effectiveness6 DSI with respect to new service6 CSI
Index
Index
Efficiency6 New / Improved Services introduced 6 Time required to introduce new / improved
service adherence to plan
Sub process : Introduction of New Service Sub Process Ref : CVBU-EL-09-04 (version 1.1)Process Owner : Mr. S. Y. DeshpandeEPM Linkage – CVBU-EL- 09 ( Services Design )Preparation Date : 31/03/04Modification Date : 31/03/05
Introduction of New ServiceTATA Motors, CVBU
Outputs6 Addition of New / Improved
Service
Inputs6 New / improved service process
ready after pilot run6 Resources and infrastructure 6 Training module for the ersonnel6 Competent staff
31.3.2005 9.7
Sales and Operations Planning
EPM Process No: CVBU-EL-10
Principal Process Owner: R K Ghosh - GM - Non Vehicular Business
Locational Process Chiefs: Locational PPC Head
Sub_Proc No Sub Process Name Sub_Process Owner
CVBU-EL-10-01 Prepare Monthly/Annual Business Plan (Dom & IB) S & OP committee
CVBU-EL-10-02 Production Scheduling & Sequencing Head of APPC of Respective Plants
31.3.2005 10.1
TATA Motors, CVBU Sales and Operations Planning
Process Revision / Modification History
Details of Modification Issued / Modified by Approved By
New Release
Process Identification No.(PIN) :
Process Title-
Process Objective-
CVBU-EL-10
SALES & OPERATIONS PLANNING (S & OP)
INPUT OUTPUTKEY STEPS
In - Process / Efficiency Measure Unit of Measure Output Measure / Effectiveness Measure Unit of Measure
Date of Modfn. Modification No.
01/06/03 0025/11/04 01
Sales and Marketing§ Budget from ABPs, Market
forecast, Requirements from LOBs & Product Managers IB§ Plant feedback
Plants§ Manufacturing strategy,
Market forecast, plant wise capacity, Vendor Capabilities§ Back log of previous month,
Priorities of SalesAvailability of Vessels for
Ø Preparation of Annual Production Plan for Vehicles and Spares including International Business
Ø Compilation of model-wise, month-wise Plan, including ExportØ Review and Finalization of plant-wise Production plan Ø Scheduling of day-wise production and dropping planØ Review of Production Booking & monthly review of Delivery performance.Ø Mid term review of sales and production plansØ Annual review of S&OP process for it's effectiveness
ü Fulfillment of Market Demand
ü Plant-wise, Model-wise
production plan for
Manufacturing
Translate Sales Requirement into Production Plan for On-time Delivery
Higher Level Linkage-
Process Owner Mr R K Ghosh General Manager (NVB)
Modification
BES, Pune
Process Team
PROCESS DEFINITION SHEET
Daily, Monthly delivery against plan
ISO /TS16949(2002) Clause Ref.
Release of production set on Target
Delivery compliance Report
Divisions Involved -
End Customer-
Core Values Embedded-
No.of Days
%
No.of Days
Variation in schedules on Production
Delivery Vs Plan for vehicles , parts
Delivery Vs Plan for CKD/SKD and aggregates
No
%
%
5.4, 7.2
Sales (Domestic & IB), LOBs, APC, Logistics, Institutional Sales, GMs manufacturing from plants, PMs (IB)
Manufacturing Plants , Sales
Integrity, Customer Focus, Passion For Engineering and Corporate Citizenship
31.3.2005 10.2
TATA Motors, CVBU Sales and Operations Planning
Process Owner : R K Ghosh – GM (NVB)Process objective : Translate Sales Requirement into Production Plan for On-time Delivery
-Prepare AnnualProduction plan forVehicle & Spares(Domestic / IB) &Recon, IndAggregatesMid term review of Sales Plan
S&OP/ APC *
-Compile Plant/model/month wise demand forVehicles & Spares(including Export)
S&OP / APC
-Review / FinalizeplantwiseManufacturing Planincluding InterPlant Transfers
S & OP / APC
Day wiseProductionSchedule &Dropping Plan
Plant APPC
Daily review ofProductionBooking
Plant Mfg.
Inputs-
Sales & Marketing-Budget from ABPs-Market forecast-Requirements from LOBs & IBPlants :-Manufacturing strategy-Market ForcastPlant wise capacity-Vendor Capacities
Sales and Operations PlanningTATA Motors, CVBU
Evaluate the effectiveness & relevance of S&OP process Annually in EPM review meetings for improvement
Modify the production plan for rest of the year
Production as per schedule?
Continuewith thePlan
No
Mid term review (MTR) of Sales Planduring the year/month
Yes
Inputs-
-Back log ofprevious month-Market forecast-Plant feedback-Prorities of Sales (domestic & IB)
Output-
-Model wise daily production plan-Input for Manufacturing(CVBU-EL-11)Inputs for MaterialsPlanning - Vendor Mgmt(CVBU-EL-06)
* S & OP consists of Sales (Domestic & IB), LOBs, PMs (IB), In-charge of Auto Produn & APC of respective plants, Logistics,Institution Sales
31.3.2005 10.3
Key Steps in- 'Annual / Monthly Production Planning '
1. Derive model wise requirement2. Finalize VFJ , IB – CKD/SKD, LOB -4 requirements3. Finalize interplant aggregates requirements4. Finalize plant wise production plan5. Agreement on delivery plan6. Communicate & Monitor Plant wise performance
against production/ delivery plan
Annual/Monthly Production Planning &Delivery Performance Review TATA Motors, CVBU
Input6 Sales forecast from Marketing
(Dom & IB)6 VC wise vehicle schedules from Mktg. ( respective Sales & Mktg. to upload into
SAP)6 Plant wise capacities & constraints6 Supplier capabilities6 Finished goods stock position6 Strategic Input from CVBU Steering
Committee
UnitPerformance Measure
Efficiency6 Preparation of plans on scheduled dates6 Preparation of delivery compliance report
No. ofdays
Effectiveness6 Actual dispatches V/S Production Plan of vehicles ,CKDs /SKDs6 %achievement of delivery target of LOB4 reqmt.6 Order wise schedule adherence for VFJ /IB6 Release order wise delivery performance for Govt. orders
%
%%%
Sub process : Annual / Monthly Production Planning & Delivery Performance Review
Sub Process Ref : CVBU-EL-10 - 01 (version 1.1) Process Owner : S& Op committee – (Heads of Vehicle
Sales ,Domestic &IB , & LOB-4 , GM s Mfg.& PPC heads )
EPM Linkage : CVBU-EL-10 ( Sales & Operations Planning)Preparation Date : 31/03/04Revision Date : 25-11-04
Outputs1. Annual / Monthly Plant wise / Model
wise production plan. 2. Delivery performance report against
agreed delivery plan (Plant APPC)
How it operates (Methods/ Practices)1. Derive model wise requirement
6 Regional Managers and Country Managers (IB) forward sales forecast to respective logistics group of marketing (domestic & IB)
2. Finalize VFJ , IB – CKDs/ SKD & LOB -4 requirements 6 Collect requirements from VFJ and IB for CKD /SKD.6 Collect plant wise requirement from Spare Parts and Industrial aggregates & Recon
3. Finalize Interplant aggregate requirements : 6 Collect Aggregate requirements of every plant from other plants. 6 Consolidate model wise total requirement of vehicle and aggregates.
4. Finalize plant wise production plan 6 Model wise sales and LOB-4 requirements are discussed in the joint meeting of
PPC (Production Planning & Control ) of all the plants and sales.6 Plant wise rolling production plan ( Vehicle + Aggregates for other plants ), and
LOB-4 requirement is finalized after taking in to consideration plant & supplier capability constraints. 5. Agreement on delivery plan
6 Agreement between Marketing and GM s Mfg Plants on delivery plan6 Agreement between Vehicle Sales Heads, LOB-4 Head on delivery plan
6. Communicate & Monitor Plant wise production plan6 Circulate finalized production plan to PPC of all Plants, Sales and Finance. 6 Review production plan V/s daily actual dispatches.6 Make midcourse changes, if necessary, in consultation with PPC of respective
plants and communicate changes to all concerned.6 Monthly review of plant delivery performance against agreed delivery plan
31.3.2005 10.4
Inputs6 Sales Plan for the Month6 Production plan as agreed by S
&Op Committee6 Feedback from materials agencies
and Factories of all plants
Key Steps in- 'Production Scheduling & Sequencing'
1 Assess sales & production plan & get VC clearance.2 Communicate production plan3 Prepare vehicle dropping sequence.4 Prepare despatch schedule for LOB-4 requirements
and other Plants. 5 Monitor progress.
Outputs6 Daily dropping sequence and
schedule as per plan.6 LOB - 4 and other plants call up
How, it operates (Methods/ Practices)1. Assess sales / production plan and get VC clearance
6 PPC of respective plant assesses and consolidate model wise requirement of Vehicles, aggregates & spare parts.
6 Marketing to raise DS/ES with ERC and get the vehicle release / VC 6 Marketing to raise schedules only after VC clearance by NPI /APL
PPC obtains VC cost from Finance.2. Communicate Production Plan
6 Inform model wise requirement of Vehicles, Aggregates required by other plants and all requirements of LOB-4 to Factory heads, vehicle despatch, Finance and materials agencies.
3. Prepare Vehicle Dropping Sequence6 Considering sales priorities decide vehicle batches and daily production sequence of Aggregates
in consultation with Factories. Communicate daily dropping sequence to all concerned.4. Prepare Dispatch Schedule for LOB -4 requirements & Other Plants
6 Make Agency / aggregate / item wise and date wise despatch plan in consultation with production and materials agencies. Communicate LOB-4 call up to all Agencies.
5.6
6
Monitor ProgressCommunicate Sales Order wise daily despatches to IBCollect daily dispatches of vehicles & spares data and compare with the plan. Revise balance schedule if necessary and communicate.
Sub process : Production Scheduling & SequencingSub Process Ref : CVBU-EL-10-02 (version 1.1)Process Owner : Head of APPC of respective Plant EPM Linkage– CVBU-EL-10 (Sales & Operations
Planning)Preparation Date : 31/03/04Revision Date : 25-11-04
Production Scheduling & SequencingTATA Motors, CVBU
UnitPerformance Measure
Efficiency6 Release of production schedule on target date.6 Deviation wrt target date
No. ofdays
Effectiveness6 No of changes in the sequence during the month 6 Delivery Vs. plan , vehicles, parts, VFJ s ,CKDs
No
%
31.3.2005 10.5
ManufacturingTATA Motors, CVBU
PROCESS DEFINITION SHEET
Details of Modification Approved By
New Release
Date of Modfn. Modification No.
01/06/03 00
05/02/05 01
§ S & OP Schedule Vehicles/SKD/CKD/Spare parts§ Vendor Capacity, Quality feedback sales
orders, Dealer Balance, Incoming PPM§ ISO / TS16949, ISO14001 guidelines§ Manufacturing Process Capability§ Manpower Competencies§ Customer's expectations / complaints§ New Parts variants / New Products / New
Vehicles
Ø Material scheduling and logisticsØ Produce Vehicles/SKDs / CKDs/ Aggregates / componentsØ Delivery of Vehicle/SKD/CKD/SpareØ Analysis of customer complaintsØ Implementation of design modificationsØ Maintenance
ü Production and dispatch of Vehicles / SKDs/ CKDs/ Aggregates / components as per requirements
Higher Level Linkage-
Process Owner A.P. Arya - President (JSR & LKO Works)
Commonising process documents across locations
Issued / Modified by
BES, Pune
Process Team
Daily / Monthly adherence to schedule
Rejection / Rework / Process audit, Cpk Values,Internal PDI
Daily /Monthly Prodn Plan, Inventories, Production
Inventory Levels , ProductivityVariable conversion cost , Direct Matl Cost
Divisions Involved -
ISO /TS16949(2002) Clause Ref.
Variable conversion cost
End Customer-
Core Values Embedded-
Percentage
Rs.
As Applicable
Nos, Rs.
Rs. / Index
Rs.S&OP, Manufacturing, Despatch, Materials, QA, PSD,APL, CPL, APPC, MaintenanceSales Head
Integrity, Customer Focus, Passion For Engineering and Corporate Citizenship
Warranty cost , Break even point
No of Vehicles manufactured
QI, Rejection / Rework, Warranty complaints/PDI defects / COPQ
Asset Turn , Safety Index
Inventory
Rs. , Nos
No
As Applicable
%, Index
No of days /Rs.
7.5
Process Title
Process Objective
Process Identification No.(PIN) : CVBU- EL- 11
Produce and Deliver Quality Products as per S&OP Plan
MANUFACTURING
INPUT KEY STEPS OUTPUT
In-Process/ efficiency Measure Unit of Measure Output Measure / Effectiveness Measure Unit of Measure
Process Revision / Modification History-
31.3.2005 11.2
Process Owner : A P Arya President (JSR and LKO)Process objective :Produce & Deliver quality products as per S & OP plan
Disposal of scrap /waste/ Effluents
Purchase / Admin /Plant Engg.
-Deliver product toRSOs / Directdelivery to Dealers& Institutionalcustomers/Govt./Port for Export-Despatch ofcomponents toSPDs / Other plants
Dispatch
Maintain Machine &Equipments
Prodn / Maintenance
-Production Casting,Forging,Components//Aggts. and Vehicle-Monitor productivity and quality. CLIPScore & conversioncost elements, WIP
Prodn/PSD/QA
Scheduling of Material
(Refer Next page)
Prepare / Review Daily /shift wise schedule ofProduction andManpower deploymentplan
PPC / Prodn
-Derive MonthlyProduction Planand man power at shop level.-Review &reallocatemanpower
Production
-Review and acquire -Facilities-Machines,tooling &equipments-Inspection/Testingequipment-Man power APL / Manufacturing/QA
-Annualforecasting formaterial,manpower andplant capacityrequirement
APC/ SteeringCommittee
Inputs--Business
Plan-Volume
Forecast,-Production
strategy,-New Product
Variants
Inputs--Capital &
Revenue budgetapprovals
-Line Capabilities-Manpower Gaps
-Process plan-Process flow
chart and Qualitycontrol plans
-productivity andcost targets
-ImrovementInitiatives
Inputs--Monthly
Productionprogram
(S&OP)Including
requirementfrom LOB 4
-Bill ofMaterial
Inputs--Balance
Requirement wrtmthly plan.
-Line Capabilities-Attendance
data-Matl Supply
-DailyProduction Report
ProductivityTarget
Inputs--SPC/ Control plan
-CQ Audit findings-Quality feedback
(drive away chassis)-Pre Delivery Inspn
-Warrantycomplaints
-Data on Internalfailures
-SLAs & SQDCMtargets
Inputs--Sales
Order fromSHQ / Ros
-CreditAvailability on
Dealer’s A/C
Product Delivery(Refer Next Page)
ManufacturingTATA Motors, CVBU
31.3.2005 11.3
Scheduling of Material
Raise Pos on Vendors and STOs on Plants
Materials/MPC
Provide Monthly Vehicle Dropping Plan for Mfg units / ShopsProd Plng & Con
Release Schedules on Vendors and follow up
Matls / FLG
Receipt, Inspection, Binning, Storage of MaterialCRDO / Stores/ QA
Rejections / Scrap/ obsolete items despatch / disposal
Issue Matl / tools toLine, Despatch matl to plants and Vendors for processing
Inputs§ Production Plan for the Year/Month§ Veh. Dropping Sequence for the Month / 3-days/ day§ Approved Vendor base (Vendor - Parts - SOB)§ Daily Shortage List from stores§ Stock Condition of components§ Despatch information on aggregates
Product Delivery
Receive Vehicles / spares from Works / other RSOs
Check/ Inspect as perChassis Check Sheet and AcknowledgeDespatch
Storage andDelivery of vehicles/ Spares to Dealer / TSS / Inter RSO / RWH Transfers inter RSO transfers as advised by ROResp. RSO / RWH
PDI and Delivery of vehicle spares to Customer
Dealer / TSS
Transporter PaymentMonitor DespatchesResp Plants
ManufacturingTATA Motors, CVBU
Material Audit, Stock Verification and reconciliation
Vehicle / Spares Requirement from Dealers / TSS
31.3.2005 11.4
1. Pos on Vendors/ STOs on plants2. Release schedules on Vendors3. Follow up with Vendors/ plants4. Receipt, Inspection & Storage of material5. Issue / Despatch Materials6. Material Stock Reconciliation as per norms
Key Steps in-'Material Scheduling & Logistics'
Outputs6 POs on Vendors.6 Schedules on Vendors.6 Availability of material for production.
Inputs6 Production Plan for the Year/ Month6 Vehicle Dropping Sequence for the
Month / 3-days / day6 Approved Vendor base (Vendor-
Parts-SOB)6 Daily Shortage List from stores6 Stock Condition of components6 Despatch information on aggregates
UnitPerformance Measure
Efficiency6 Average Inventory (Auto) No. of Days of
Consumption6 Non-moving Inventory Rs.6 Stock reconciliation (Gross discrepancy
value as % of stocks value) %
Effectiveness6 Chassis Line stoppage due to b/o Hours/ Month
material shortage6 Deficient vehicles due to auto %
materials - % of total vehicles6 Incoming ppm Ppm6 Premium Freight Rs.
Sub process : Material Scheduling & LogisticsProcess Ref : CVBU-EL-11-01 (version 1.1)Process Owner : Head Materials- Pune - JSR - LKO EPM Linkage – CVBU-EL-11 ( Manufacturing ) Preparation Date : 31/03/04 (updated 05/02/05)
How, it operates (Methods/ Practices)1. POs on vendors
Pos are released by respective Materials Group on vendors with respect to terms & contracts and share of business allocation based on Annual Production Plan. Aggregates like Engine, Gear Box, Axles, Cowls, Cabs etc are scheduled (thru STSA & STO’s) on respective plants
2. Release Schedules on Vendors Buyers (Respective Material Group) evaluates material requirements through MRP (on SAP) and Applicability Matrix
(Off- line) and release monthly/ / daily schedules on suppliers through system based on daily vehicle dropping plan, SPD & other plant requirements and share of business.
3. Follow up with Vendor / Plants Concerned Material Group evaluates Availability/ Requirements on daily basis and follow up with Suppliers to ensure receipts
in line with schedules and monitor transit consignments till those are received. 4. Receipt, Inspection & Storage of material
CRS/ CRDO prepares Goods Receipts ( GR ) document at materials gate in line with schedules and handover Invoice with GR sticker/ material tags to transporters/ vendors. Transporters/ vendors go through security check and deliver material to respective FLGs/stores. Stores receive material and update acknowledged quantity in the system. Material having CQ/ No Inspection status need no inspection and taken in to bin stock. Items having LL ( Lot by lot ) inspection status are checked by SQA/ VQA . SQA/ VQA updates inspection decision in the system. Accepted material is taken in to bin stock and rejected material is either sent to concerned Supplier or scrapped as per procedure. In case of exigencies, deviations are sought from QA/ ERC and material accepted (time- bound OR quantity bound)
5. Issue / Despatch of Material Depending on space availability in manufacturing line and inspection status of part-vendor, materials are delivered directly to
line. Other items received in stores on JIT basis and delivered to line as per requirements. In case of MASOP where raw material is supplied by TML to supplier, raw materials is dispatched to vendors as per requirements of respective Material group requirements through Central Dispatch Section (CDS)
6. Arrange Material Stock Verification and further reconciliation as per norms Materials audit arranges PI as per schedule at every stores and submit PI discrepancy report to materials Head. For selected
high value Class A & B items, once every quarter. For other items,once every year. For Class C items, Material verification and stock reconciliation done every three years.
Material Scheduling & LogisticsTATA Motors, CVBU
31.3.2005 11.5
Inputsw B/O materials, aggregates and
componentsIn-house materials, aggregates and componentsProduction schedule Estimate sheets/routings Support from other functionsQuality plan/work instructions/Control PlansResources, manpower, direct material, Indirect material/tools, machines, equipments and vehicles.
w
wwww
w
Key Steps in - 'Produce Vehicles/Aggregates/Components '
1. Prepare production schedule 2. Allocate manpower3. Ensure availability of material, tooling,
equipment4. Production of parts, aggregates and vehicles5. Monitoring of quality, productivity, safety and
cost
Outputsw Vehicle, aggregate, component
as per quality norms and S&OP
How, it operates (Methods/ Practices)1. Prepare production schedule 6 Based on vehicle production/dispatch schedule and spare parts call up, each
factory/shop works out Production Schedule. 2. Allocate manpower 6 Each factory/shop works out its manpower requirement on the basis of production
plan and productivity targets and redistribute manpower and communicate net shortage/excess to HR.
3. Ensure availability of materials, tooling, equipment 6 Respective factory/shop co-ordinates with concerned agencies to ensure on time
availability of material, tools, machines etc.4. Production of parts and aggregates 6 Production activities are carried out as per estimate sheets / routings.
Operatives carry out in process inspections/checks as per quality plan/ work instructions. Central QA performs audit checks to ensure that laid down system is being followed.
5. Monitoring of quality, productivity, safety and cost 6 Factory/Plant management reviews production, productivity, quality and cost on
daily/monthly basis and takes corrective action as required.
Sub process : Produce Vehicles/Aggregates/ComponentsSub Process Ref : CVBU-EL-11-02 (version 1.1)Process Owner : Factory/Divisional Head Pune - JSR - LKOEPM Linkage– CVBU-EL-11 ( Manufacturing )Preparation Date : 31/03/04 (updated 05/02/05)
Produce Vehicles/Aggregates/ComponentsTATA Motors, CVBU
Efficiencyww
Eq. Unit./ Man/ Year RatioVariable Conversion Cost / Unit Rs./ Unit
Effectivenesswwwww
w
w
w
S&OP Schedule Adherence CLIP ScoreQuality Index IndexFirst Shot OK (Aggregate/ Assy Line Level) %COPQ Rs./ UnitProcess Capability Improvement (Machining) Ppk > 1.67 for identified processes %Process Capability Improvement (Non-measurable) % Conformance > 99.73 %Process Capability Improvement(Tightening) Ppk > 1.33 %Safety index (SR & FR) Index
Performance Measure Unit
31.3.2005 11.6
Key Steps in - 'Vehicle, SKD/ CKD and Spares Despatch '
1. Prepare dispatch plan for rollout2. Make materials ready for dispatch3. Picking and Packing (for Spares/ CKD/ SKD)4. Document preparation for dispatch5. Dispatch
Sub process : Vehicle and Spares Despatch Sub Process Ref : CVBU-EL-11- 03(version 1.1)Process Owner :
EPM Linkage – CVBU-EL-11 ( Manufacturing )Preparation Date : 31/03/04 (updated 05/02/05)
Heads Vehicle Despatch,Exports & CKD,Auto services- Pune -JSR - LKO
Efficiency measuresw Spare Parts – Dispatch Float Days
Effectiveness measureswwwww
Total Packing Cost as % of total dispatch value %Transit Accidents/ Total Vehicles %Spare Parts-S&OP Sch adherence (%) %Customer Complaints (DAC/ SKD/ CKD/ Spares) %Vehicles/ SKD/ CKD reaching destination on time %
Performance Measure Unit
Inputsw
w
w
w
S & OP (Spares, SKD/ CKD, Vehicles) from SHQ/ Plant APPCChassis, SKD/ CKD, finished components and aggregatesPacking List, Packing List materials, Packing materialsApproved transporters
Outputswww
Vehicle despatchSpare parts despatch as per call upSKD/ CKD Dispatch
Vehicles, SKD/ CKD & Spares DespatchTATA Motors, CVBU
How it operates (Methods/ Practices)1. Prepare dispatch plan for rollout: 6 Respective Dispatch department coordinates with SHQ/ Spare Parts/
Other Plants and prepares dispatch plan for vehicles (model wise), SKD/ CKD/ Spares (Consignment wise) for dispatch
2. Make materials ready for dispatch: 6 VD/ Exports readies the vehicle/ Spares / SKD/ CKD for dispatch (by
providing canopy, RUPD, rust prevention treatment on vehicles, aggregates and components)
3. Picking and Packing (for Spares/ CKD/ SKD): 6 Materials to be dispatched is collected from production divisions and
brought to dispatch stores. These are packed and readied for dispatch to required destinations as per schedules from other plants and spare parts department
4. Document preparation for dispatch: 6 For vehicle dispatch, appropriate kit is added to the vehicle to be rolled
out. Invoice is prepared by VD/ Exports as per excise department requirements
5. Dispatch: As per in-built system for SOB, transporter is arranged for each vehicle OR consignment of Spares/ SKD/ CKD and handed over for dispatch to transporter
31.3.2005 11.7
Inputsw
wwwwwww
Warranty reports / field analysis from service Vehicle PDI reports Complaints through DAC/ PCR/ CIRFailed parts for analysisIn plant Dealer PDICustomer Satisfaction surveyCustomer GrievancesCustomer Interactions through meets, campaigns, visits, etc.
Key Steps in - 'Analysis Of Customer Complaints '
1. Receive complaints & failed parts2. Preliminary review by Service and
allocation to concerned agencies3. Root cause investigation and analysis4. Identification and initiation of corrective
action5. Monitoring and Review6. Issue of break point7. Documentation 8. Feedback from field
Outputsw
w
ww
w
Corrective/ Preventive Action (Modified product / processes)Break Point for introduction of modifications Investigation reports Opportunities of improvements for ERC / NPI & CSComplaint trend
How it operates (Methods/ Practices)1. Receipts of complaints & failed parts -6 Service dept. of respective Plant 1) receives on-line complaints data based on PCR & CIR and failed parts from channel partners and warranty reports,
field analysis reports, information on Customer grievances and meets from Service Head Quarter. 2) offers complaints data, reports, information to warranty committee ( representatives of Service, QA, ERC & Manufacturing ) for investigation 3) arranges display of failed parts. 6 PDI ( Pre Delivery Inspection ) defects are directly sent from Service Head Quarter to QA once a month.
2. Preliminary review by Service and allocation to concerned agencies Based on customer complaints received, the following reports are generated by Service and communicated to ERC, QA and manufacturing:6 Product Performance Reports – complaint- and cost-wise analyses for each model. Issues are codified complaint code wise. These are based on 24/ 36-
month product performance6 Fortnightly Report – detailing Top 20 complaints in each model in the last 6 months6 Service Meetings – with Production, ERC, QA / CQ /SQIG6 Committee ascertains the cause of failure and assigns responsibilities to respective production centres
3. Root cause investigation & analysis6 Production centres perform root cause analyses with help of suppliers (bought out) and QA and Metallurgy (In-house) using methods like DOE technique
and Ishikawa Diagrams. Findings are communicated to the concerned agencies for corrective actions6 Based on investigation, Committee defines liability of failed Part and communicate findings to respective Channel Partner / RSO. PDI defects are
forwarded to respective factory for necessary action. SQA / VQA/ CQ (Warranty cell) returns failed parts to Supplier. 4-6. Initiation of corrective actions, Monitoring and Review, and Issue of Breakpoint –6 QA raises Design Modification Request ( DMR ) and forward to Standards I at Pune or Technical Services at JSR & LKO. They forward DMR to all
concerned Agencies within and across plants and collect their comments. Based on concurrence the DMR is forwarded to ERC / NPI for approval. 6 ERC studies the request and incorporate necessary changes in the drawing and communicate changes through Design Modification List (DML) to all the
concerned.6 Respective factory takes corrective actions on PDI defects and inform QA / CQ.6 QA / CQ takes up with Suppliers to improve their process / materials quality as per report. 6 Planning study process and identify layout, logistics, Machines / Equipments problems and take corrective actions6 QA / CQ tracks progress on actions identified till it is implemented. Control parameters are revisited after tryout.
7. Documentation – each of these corrective actions are circulated to relevant agencies – manufacturing, sales, service 8. Feedback from field on these corrective actions are sought for further review
Sub process : Analysis Of Customer Complaints Sub Process Ref : CVBU-EL-11- 04 (version 1.1)Process Owner :
EPM Linkage – CVBU-EL-11 ( Manufacturing )Preparation Date : 31/03/04 (updated 05/02/05)
Head (QA,CQ,Customer Support) Pune - JSR - LKO
Efficiencyw Cycle time for complaint resolution
(VOR, Design, Technical) Days
Effectiveness wwwww
Reduction in PDI complaints %Reduction in field failure complaints / expenses %CSI %Quality Index IndexWarranty Expenses Rs. / Veh
Performance Measure Unit
Analysis Of Customer ComplaintsTATA Motors, CVBU
31.3.2005 11.8
Key Steps in - 'Implementation of Design Modifications'
1. Communicate design modifications2. Planning of design change3. Implement design change4. Update & release BOM based on
MEPA / MBPA
How it operates (Methods/ Practices)1. Communicate design modifications -
6 Standards I ( Pune ) / Technical Services ( JSR & LKO ) communicates design modifications to all concerned Agencies. All modifications are coordinated by Standards I ( Pune ) / Technical Services ( JSR & LKO ). Coordinating Agency raise EPA (Effective Point Advice ) and communicates details of modification and role of each Agency ( Planning, ADD, Production, QA, Materials, PE etc.), based on DML received from ERC.
2. Planning of design change –6 Coordinating Agency 1) prepares implementation schedule in consultation with all concerned agencies, 2)
obtains feedback from respective Agency on stocks of present parts, lead time of development of new parts / tooling etc. and monitors progress, 3) obtains samples. Concerned departments take necessary action in line with EPA and communicate status to coordinator.
3. Implement design change –6 Coordinator 1) arranges tryout with the help of concerned shops and obtain QA’s acceptance. 2) decides
implementation date after consulting all the agencies and with a view to minimize inventory of obsolete parts. If necessary implementation is done gradually, in phases, to minimize wastage.
4. Update & release BOM based on break point -6 Concerned shop Implements design modification on specified date. QA issues MEPA for Components &
Aggregates and MBPA for Chassis. Based on break point details coordinating Agency incorporates changes in the BOM and release it for production.
Outputsw EPA (effective point for
Components & Aggregatesw MBPA ( Modification Break Point
Advice ) for Chassis/ MEPA (Modification Effective Point Advice) for Components & Aggregates
w Revised BOM in Denis and SAP
advise )
Efficiencyw Number of DMLs /EPAs outstanding No.
Age-wisew Age of outstanding DMLs / EPAs No. of
DMLs / EPAs
Effectiveness
w % EPAs implemented vis-à-vis Plan for three categories A, B and C %
Performance Measure Unit
Sub process : Implementation of Design Modifications
Sub Process Ref : CVBU-EL-11-05 (version 1.1)Process Owner : Head (TS / STDs I)
Pune -JSR - LKO EPM Linkage – CVBU-EL-11 ( Manufacturing )Preparation Date : 31/03/04 (updated 05/02/05)
Inputs ww
DML from ERC, APL/ CPLTechnical part list on-lineDrawings released by ERC/ APL/ CPL
Implementation of Design ModificationsTATA Motors, CVBU
31.3.2005 11.9
Key Steps in -'Maintenance '
1. Derive monthly schedule from annual PM Plan
2. Carry out PM as per schedule and checklist
3. Plan and deploy corrective actions based on PM Feedback
Outputsw Machine Healthw Availability of machines /
equipment for production
Sub process : MaintenanceSub Process Ref : CVBU-EL-11- 06
(version 1.1)Process Owner : Respective CX/
Maintenance InchargesEPM Linkage – CVBU-EL-11
( Manufacturing )Preparation Date : 31/03/04
(updated 05/02/05)
How it operates (Methods/ Practices)1 Derive monthly schedule from annual PM Plan6 Annual PM Plan is prepared for all equipment and machines by respective divisional/ factory
maintenance departments based on their criticality and availability in the year6 Beginning each month, specific date wise PM schedule is developed for machines and
equipment in consultation with production centres.6 Respective Maintenance departments perform the following on an annual basis:6 Spares planning – based on manufacturers’ catalogue, machine inspection report and
breakdown analysis report6 Procurement of spares – POs are raised for spares based on feedback generated through PM
Checks. 6 Monthly PM schedule is intimated to respective production/ process owner for release of
machines/equipment 2. Carry out PM as per checklist6 PM checklist is revisited and revised on need basis by Maintenance groups6 Maintenance plans and allocates required manpower for PM of each machine/ equipment on
daily basis6 PM group carries out PM and the PM report is vetted by respective production centres
3. Plan and deploy corrective actions based on PM Feedback
Efficiencyw Adherence to PM Plan %w Maintenance Cost Rs.
Effectiveness w % Downtime %w MTBF/ MTTR Minutes
UnitPerformance Measure
Inputs
w Manufacturer’s Catalogue
w Machine Inspection report
w Preventive Maintenance Plan
w Breakdown Analysis Report
w Feedback from QA / Production
on machine capability ( Cpk).
MaintenanceTATA Motors, CVBU
31.3.2005 11.10
Principal Process Owner:
Sub_Proc No Sub Process Name Sub_Process Owner
CVBU-EL-12-01 Set Sales Targets and Prepare Sales Plan Sales and Product Management Heads
Sales Planning
EPM Process No:
Mr Shyam Mani - VP (Sales & Marketing) , Mr P G Shankar - Head CVBU International Business
CVBU-EL-12-02 Manage Off- Take / Shipment Targets
Manage Pipeline and Retail SaleCVBU-EL-12-03 Area Managers / Country Managers
CVBU-EL-12-04 Maintain Customer Database DAM(Dealer Account Manager) / Country Manager
CVBU-EL- 12
Sales and Product Management Heads
TATA Motors, CVBU
31.3.2005 12.1
Sales Planning
TATA Motors, CVBU
PROCESS DEFINITION SHEET
Process Title- Sales Planning Process Owner
Process Objective- Strengthen and Support Sales and Distribution
INPUT KEY STEPS OUTPUT
In-Process / Efficiency Measure Unit of Measure Output Measure / Effectiveness Measure Unit of Measure
ww
Annual Business Plan(Dom / IB)Last Year Performance
w RSO, Dealer Stocks & Requirements (Dom);IB, Distributor Stocks & Requirements (IB)
w Monthly Production Planw Sales Processes Feedbackw Activity Plan w Finance / Incentive / Sales Promotion
Schemes
Ø Analysis of Business Plan( Dom / IB)Ø Preparation of Channel Partner Level Monthly Sales PlanØ Communicating model-wise requirement to Plant for Manufacturing Ø Managing Market Share Targets and Off take / Shipment and retail sales
targetsØ Managing RSO / IB / CP level Stocks and Receivables Ø Managing customer pipeline using Sales ProcessesØ Reviewing of Sales Performance, Analysis of Gaps and planning actions for
next month
ü Market Requirement to S & OP ü Sales achieved vis-à-vis the
targets
Mr Shyam Mani VP (Sales & Marketing)Mr P G Shankar Head (CVBU IB)
Daily Pipeline C0-C1-C2-C3Monthly Review of Conversion Rate C0 to C1 to C2 to C3
Nos.
Nos.
LOB Heads, SHQ, ROs, AOs, Dealer Development Cell and Channel Partners Channel Partners and Customers of TATA Commercial Vehicles Integrity, Customer Focus, Passion For Engineering and Corporate Citizenship5.4, 7.2
Divisions Involved -End Customer- Core Values Embedded- ISO /TS16949(2002) Clause Ref.
Monthly Pipeline C0-C1-C2-C3
Annual Sales volume
Nos.
Nos.
Process Revision / Modification History-
Details of Modification Approved ByDate of Modfn. Modification No.
01/06/03 00 New Release BES, Pune
Issued / Modified by
31/03/05 01 Modification through process review Process Team
Process Identification No.(PIN) : CVBU- EL- 12 Higher Level Linkage-
31.3.2005 12.2
Sales Planning
w Market Requirement to Sales & Operation planning
w Plant Level Manufacturing Plans
Process Owner : Mr Shyam Mani – VP (Sales & Marketing), Mr P G Shankar – Head (CVBU-IB)Process objective : Strengthen and Support Sales and Distribution.
-Seek and analyze Inputsfrom AnnualBusiness Plan
Sales ( Dom/IB ) / Product Mgrs-PM/ Country Mgrs.-CM
-Prepare MonthlySales Plan -Dealer-wiseAllocation ( n+2 basis for IB) - Raise EVRs (for IB)-CommunicateModel-wiserequirement toPlants
Sales / PM / CM
Prepare Dealer / Distributor (IB) Level Model- wise off-Take / Shipment and Retail Sales Plan
Sales / PM /CM
-Manage MarketShare Targets,-RSO/ IB Stocks,off-take/ shipmentand Receivables
Regional-Country-Area Offices/Logistics-Dom / Oprns & Shipping-IB
-Manage customer pipeline to achieve sales Targets C0-C1-C2-C3-Provide TrainingSupport to Channel Partners-Manage stocksat Channel Partners end
RM/AM/CM/ SPCP team
Review SalesPerformance-Weekly, Monthly-Gap Analysis - Feedback on OFIs based on pipeline analysis –corrective actions for the next month AM/DAM/DSM
Inputs-
w Annual Business Planw CP requirementw Production Plan
Inputs-
w Plant Production Reports,w RSO / IB Stock Reports w Channel Partner Stock
reports
Inputs-
w Day-wise Customer Pipeline
w Market coverage planw Control Measures
Inputs-
w Individual SE’s / CP Pipelines,
w Activity Plans,w Incentive /w Promotionalw Schemes, etc
Sales PlanningTATA Motors, CVBU
31.3.2005 12.3
Inputsw Market share targets ( Dom / IB)w Sales Forecast (Industry / Country ) w Past Sales Data of CVBUw Competitor Sales Data
Key Steps in sub- process :'Set Sales Targets and Prepare Sales Plan’
1. Gather data on Product Sale 2. Seek Forecasting data3. Set Targets
Outputsw Region-Country-Area-wise Off-
take / Shipment Planw Channel Partners-wise,
segment- wise allocation of Shipment / Retail Targets
How it operates (Methods/ Practices)1. Gather data on Product Sale (SHQ (Dom / IB) / RO / AO)
6Data on region wise off take and retail sale (model wise) is compiled by RM/ AMs and sent to SHQ 6Competition data is provided by MR through FIBRES and other internal sources for Dom. While Country Managers provide the same for their respective countries through their internal sources2. Seek Forecasting data (Product Managers) 6Product managers/ SPCP team gathers information in terms of Sales trend, segment wise industry / country volume projections (Source: MR for Domestic, AM/RM/Journals / Sales Process data/ IB_CVBU strategy document for IB)3. Set Targets (Product Managers) 6Based on above data SHQ (Sales / PM / CM ) work out overall sales plan and set Region wise targets in consultation with Regional Managers
(Details in Brackets indicate involvement of various agencies)
Sub process : Set Sales Targets and Prepare Sales Plan
Sub Process Ref : CVBU-EL-12-01(version 1.1) Process Owner : Sales and Product Management
HeadsEPM Linkage : CVBU-EL- 12 ( Sales Planning )Frequency : Yearly / Half yearlyPreparation Date : 31/03/04Modification Date : 31/03/05
Set Sales Targets and Prepare Sales Plan TATA Motors, CVBU
Efficiency
Effectiveness
w
ww
Adherence to schedule of Target setting andreview R-Y-G
Off-take /Shipment Target Vs. Achievement Nos.Retail Sale Target Vs. Achievement Nos.
Performance Measure Unit
31.3.2005 12.4
Inputsw Channel Partner past data,w Plant Capacities & capabilitiesw Region-Country-Area wise off- take
/ shipment targets w RSO / IB Stock
Key Steps in sub- process :'Manage Off-take/ Shipment Targets'
1. Get Requirement from Channel Partners 2. Set off-take/ shipment targets and sign off contract with CPs3. Get month-wise indent / EVRs from CPs, 4. Manage off-take / shipment & delivery to CPs
Outputsw Off-take Sale to Channel Partnersw Region-wise RSO Despatch Plan
for Plants
How it operates (Methods/ Practices)1. Get requirement from Channel Partners (RM/ Country Managers / AM)– 6 Area and Account Managers seek product segment level requirement from Channel Partners on Annual as well
as monthly basis ( monthly for deomestic, n+2 basis for IB) which is then communicated to SHQ (Dom / IB) 6 Product Managers and Sales Heads review the requirement w.r.t. Business Plan which include Production
Planned at various plant and new products planned for launched. Feasibility of product requirement is checked with Plant NPI and communicated back to the channel partners.
2. Set off-take/ shipment targets and sign off contract with CPs (Sales/ PM/CM/CP)- 6 After reviewing the adequacy and discussion with CPs , SHQ allots region-wise product segment wise off-take targets to all RMs / CMs, cascaded down upto Channel Partner level by RM / CM . Review with CPs by RM and with RM by SHQ is carried out periodically. Channel Partner sign off annual requirement with SHQ (Dom / IB). 3. Get month-wise indent/ EVR from CPs (RMs/ CMs/ AMs)6 AM / DAM discuss with Channel Partners and seek firm indent / EVRs for the next month (n+2 basis for IB). RM
consolidate this firm off take based on RSO Stock position and communicate to SHQ (Dom). EVRs (IB) are sent to IB-Operations by Country Managers.
4. Manage Off-take / shipment & delivery to CP’s (RM/CM/AM/Logisitics)-6 SHQ (Dom/ IB) collates vehicles requirements from CPs including Institutional Sales, Exports, etc.
Production Plan and Dispatch Plan is finalized in Sales and Operations Planning (S&OP) meeting. 6 Sales Logistics / IB-Operations communicates Plants, the day-wise dispatches to be made to RSO and Dealers .
AO/ IB advices RSO/ Shipyard to deliver the vehicles as per agreed indent from respective RSO to the dealers/ shipment with the help of Account Managers. CP-wise off-take/ shipment position is reviewed periodically at SHQ and corrective actions are evolved from both sides such as Sales Promotion, boosting production levels etc. (Details in Brackets indicate involvement of various agencies)
Sub process : Manage Off-take / Shipment Targets
Sub Process Ref : CVBU-EL-12-02(version 1.1) Process Owner : Sales and Product Management
Heads EPM Linkage : CVBU-EL- 12 ( Sales Planning)Frequency : Yearly / MonthlyPreparation Date : 31/03/04Modification Date : 31/03/05
Manage Off-take / Shipment Targets TATA Motors, CVBU
Efficiency
Effectiveness
w Channel Partner-wise month-wise off-take / shipment Nos.
w Vehicle Inventory No. of Days
w Off-take / Shipment - Target vs.Achievement Nos.
Performance Measure Unit
31.3.2005 12.5
Inputsw Requirement from the Channel
Partnersw Stock Status ( Dom / IB )w Region-Country-area wise off-take /
shipment targetsw Customer pipe line at the end of the
month (Product segment level )
Key Steps in sub- process'Manage Pipeline and Retail Sale'
1. Sales Planning at the start of the month2. Prepare designed pipeline, Market Coverage Plan and key activity plan3. Monitor customer pipe line 4. Periodic Review and Corrective Actions
How it operates (Methods/ Practices)-1. Conduct Sales Planning meeting after Retail Closing (AM/ DSM) -6 AM and Sales Manager of the channel partner conduct meeting of all SEs in which previous month performance is
reviewed in terms of control measures, market coverage sheet is filtered and live customers are carried forward. 2. Prepare designed pipeline , Market Coverage Plan and Key Activity Plan -6 SE’s prepare Customer Pipeline based on retail targets given to them by DSM. This consists of 4 customer categories viz.
C0,C1,C2 and C3.C0- Customers who are willing to buy TATA vehicle, customers having competition vehicles , lost customers, Owners of TATA vehicles who have not purchased TATA vehicle in last 3 years C1- Customers who have taken quotation from TML CV dealersC2- Customers who have booked the vehicle by giving token payment or LOI or Letter from financierC3- Customers who have bought TATA vehicle. He remains as C3 for 3 years from the date of delivery( average period for re-buying )
6 Retail sale is executed through Dealers/ TSS (for Dom.) and Distributors (for IB) 6 Through Customer pipeline, SE finds out no. of customers he need to contact based on his conversion factors and plans
the visit accordingly. He prepares list of customers and visit plan which is known as ‘Market Coverage Plan’3. Monitor pipe line (SE / DSM/ AM / SP team (IB) ) - 6 DSM compiles and integrates SE / dealership daily pipeline and communicate to AM / CM which is further cascaded to
AO / RO/ Country level4. Review Activity Plan and incorporate Corrective Actions (DSM/ AM) - 6 Depending upon the pipe line status, AM / DSM review and modify Activity Plan and plan corrective actions for current as
well as next month(Details in Brackets indicate involvement of various agencies)
Sub Process : Manage Pipeline and Retail Sale Sub Process Ref : CVBU-EL-12-03(version 1.1) Process Owner : Area / Country Managers EPM Linkage : CVBU-EL- 12 ( Sales Planning) Frequency : Daily / MonthlyPreparation Date : 31/03/04Modification Date : 31/03/05
Manage Pipeline and Retail Sale TATA Motors, CVBU
Efficiency
Effectiveness
w Conversion Factor of SEs % w Loss of Customers %
w Retail Sale Planned Vs. Achieved Nos.w Customer Coverage per unit target Nos.
Performance Measure Unit
Outputsw Achievement of retail salew Optimized stock levelsw Channel Partner’s order / EVRs
on TML
31.3.2005 12.6
Inputsw Requirement of customer related
data (Market Coverage Sheets)w Marketing Research and Sales
Planning w Invoices for vehiclesw Referrals from existing customers w Data from Financiers, RTO, Demo,
Publications, etc.
Key Steps in sub- process 'Maintain Customer Database'
1. Seek Customer Information 2. Record Customer Information & Requirement in Customer Information Form 3. Compile and Update Data Base4. Maintain Data Base
How it operates (Methods/ Practices)-1. Seek Customer Information (SE) -
6 Sales Executives of dealership/distributorship goes to customer as per his Market Coverage Plan and collects the customer information
6 Customer Information is also sought during demonstration of TML new products2. Record Customer Information and Requirement in Customer Information Form ( F001) (SE)-
6 Sales Executive fills customer information in the prescribed form – F001 (Customer Information Sheet ).
6 This form ( F001) primarily consists of key information related to customer such as Name, address, Birthday, Phone, Income level, preferred financier, Fleet Size and Application, etc.
3. Compile and Update Data Base (SE/ DSM) - 6 Hard copies of all F001 forms are compiled at Dealership level and also updated in customer
module of the web-based CRM ( Customer Relationship Management) package. 4. Maintain and Use Customer Data Base (SE/ DSM/ DAM)
6 All SEs of dealership use the CDB while preparing costumer pipeline and Market Coverage Plan
6 CDB available in the system is used by SHQ for multi-purpose, e.g. sending mailer, new product information to customers, Market Research etc.
(Details in Brackets indicate involvement of various agencies)
Sub process : Maintain Customer Database Sub Process Ref : CVBU-EL-12-04(version 1.1) Process Owner : Dealer Account/Country
ManagerEPM Linkage – CVBU-EL- 12 ( Sales Planning)Frequency : Yearly / Monthly Preparation Date : 31/03/04Modification Date : 31/03/05
Maintain Customer Database TATA Motors, CVBU
Efficiency
Effectiveness
w CDB ( Customer Data Base ) size / SE Nos.w On- time updation of F001’s uploaded
in CRM Nos.
Performance Measure Unit
Outputsw Updated Customer Database file
with Dealershipw CDB in Web-based CRM system
31.3.2005 12.7
TATA Motors, CVBU After Sales Service
Sub_Proc No Sub Process Name Sub_Process Owner
CVBU-EL-13-01 RMs/ RSMs/ RPMs/ Channel Partners
CVBU-EL-13-02 Mr. S. Y. Deshpande
CVBU-EL-13-03
CVBU-EL-13-04
Deliver Post- Sales Services
Warranty & Free Service Handling
Spare Parts Management
Complaint Management
RMs/ RSMs/ RPMs/ Channel Partners
Mr. S. Y. Deshpande
EPM Process No: CVBU-EL-13
Locational Process Chiefs :
After Sales Service
Mr S M Sharma - Head (Customer Support)
31.3.2005 13.1
PROCESS DEFINITION SHEET
Process Revision / Modification HistoryDetails of Modification Approved By
New Release
In - Process / Efficiency Measure Unit of Measure Output Measure / Effectiveness Measure Unit of Measure
Date of Modfn. Modification No.
01/06/03 00
31/03/05 01 Modification through process review
Issued / Modified by
BES, Pune
Process Team
Response Time, Cycle time of Warranty Claim Settlement/ Bill Settlement
Days.
Index, %
Process Identification No.(PIN) :
Process Title-
Process Objective-
CVBU-EL-13
After Sales Service
Providing Efficient and Cost Effective After Sales Services
Higher Level Linkage-
Process Owner Mr S M Sharma Head (Customer Support)
INPUT OUTPUTKEY STEPS
§ Divisional BSC§ Service Processes and Service Standards § CSI (Customer Satisfaction Index) / DSI
(Dealer Satisfaction Index) Findings§ Channel Partner / Customer feedback § Competition and Benchmark Data§ Segment wise customer requirement
Ø Set / Review Service Standards Ø Work out segment and location-wise Channel Partner requirement Ø Communicating Service Delivery Processes and Standards to Channel
PartnersØ Providing Training SupportØ Deliver Services through Channel PartnersØ Process Bills/ ClaimsØ Collection of feedback and resolve complaintsØ Conduct Audits and Review performanceØ Give feed back to Product/ Services Design
ü Efficient Delivery of Services ü Feedback to Product / Service Design
Percentage / No of days
Customer Complaints Nos.
Divisions Involved -
End Customer- Core Values Embedded-
ISO /TS16949(2002) Clause Ref. 7.5.1.8
Service HQ, Regional Offices, NVB HQ
Channel Partners and Customers of TATA Commercial Vehicles Integrity, Customer Focus, Passion For Engineering and Corporate Citizenship
% Adherence to set Standards. Average time for ComplaintResolution / Claim Settlement / Bill Settlement / Repairs / Service
CSI and DSI
After Sales ServiceTATA Motors, CVBU
31.3.2005 13.2
Process Owner : Mr S M Sharma – Head (Customer Support)Process objective : Provide Efficient and Cost Effective After Sales services
After Sales Service
-Continue withthe Process-Coductperiodic auditChannelPartners-AnalyseCustomer &Channel Partnerfeedback
Service HQ /NVB HQ
-Feedback to Product /Services Design forImprovement
Need tochangeservice
standards?
-SettleChannelPartner’s Billsand Claims-AggregateServiceDeliveryFeedbackfrom all regionscentrally
Service HQ /NVB HQ
-ReviewChannelPartnerperformancevis-à-vis
targets-AnalyseChannelPartnerfeedback and take correctiveactionROs
-ProvideService to theCustomer (Free / paid /Warranty)-Collect & send customerfeedback RO-Attendcustomercomplaints
ChannelPartner
Yes
Communication/ Training toChannelPartners andtheiremployeesregardingdelivery ofservices
ROs
-Assessmentof Resourcesrequired w.r.t.region /demographiccoveragedesired
Service HQ /NVB HQ /ROs
-Set / ReviewKPIs / Standardsfor Service
-CommunicateNew process andnew / revisedservice standards
Service HQ/ NVB HQ
Inputs--Divisional BSC,-Segmentwise Customer requirements.-CSI / DSI Surveys,-Feedback from Customer /Channel Partner-New services & Service Standards,-Competition and Benchmark Data
No
TATA Motors, CVBU
31.3.2005 13.3
Deliver Post - Sales Services
Inputsw Policy on warranty, free service &
repairsw Norms/ guidelines on infrastructure
trained manpowerw Guidelines to channel partnersw Service interval info specific to each
modelw Customer requirements.
Key Steps in sub- process - 'Deliver Post–Sales Services'
1. Provide Free / Warranty services 2. Provide Paid Services & Repairs3. Gather Customer feedback4. Input on product performance &
complaints to plant
Outputsw Repair / rectification of complaints
on customer vehiclesw Maintenance service to customer
vehiclesw Data on product performance &
failures.
UnitPerformance Measure
Efficiencyw Repeat complaints %w Vehicle Turnaround time Hours
Effectivenessw Improvement in CSI/ DSI %w Increase in Service Market share %
Sub process : Deliver Post-Sales Services Sub Process Ref : CVBU-EL-13-01
(version 1.1)Process Owner : North – Mr. S Panigrahy,
South – Mr. K C Sen East – Mr. P B Patro,
West – Mr. N J Shah EPM Linkage : CVBU-EL-13 ( After Sales
Services )Preparation Date : 31/03/04Modification Date : 31/03/05
TATA Motors, CVBU
How it operates (Methods/ Practices)
1. Provide Free / Warranty Services – ( RMs / RSMs / RPMs / Channel Partners)
6 Customer gets Free Service Coupons / Warranty Cards at the time of purchase of the vehicle
including Terms and Conditions for the same.
6 Channel Partners provide Free Service to the customers of commercial vehicles on receipt of Free
Service coupons. Parts if found failed under warranty, during warranty period is also replaced.
Complaints beyond warranty, scheduled services are attended on charge basis.
6 Provide 24-hour toll-free assistance through CAC ( Customer Assistance Centre).
2. Provide Paid Services & Repairs- ( RMs / RSMs / RPMs / Channel Partners)
6 Following Services are provided to customers on Payment basis
# Annual Maintenance Contract
# All types of repairs on Tata vehicles
# Fitment of RECON Engines
3. Gather Customer feedback (Channel Partner / ASO) :-
6 Channel Partner / Field Staff seek Customer feedback for transactional as well as and overall service
experience
4. Input on product performance & complaints to plant
6 Channel partners provide feedback on product performance and complaints
(Details in Brackets indicate involvement of various agencies)
31.3.2005 13.4
Key Steps in sub-process- 'Warranty & Free Service Handling'
1. Set Guidelines on Warranty / Free Service2. Warranty Handling & delivery of FS by
Channel Partners3. Scrutinize Warranty Claims & FS Bills4. Failed parts managements system5. Conducting weekly warranty meetings
Outputsw Acceptance / rejection of Warranty
claimw Replacement of failed partsw Settlement of warranty claims & free
service bills Improvement in customer satisfaction
w PPRs to plant for product improvements
w Improvement in dealer satisfaction
Warranty & Free Service Handling
UnitPerformance Measure
Efficiencyw Average Warranty claim settlement No. of Daysw time Average FS bill settlement time No. of Days
Effectiveness
w DSI - Satisfaction with warranty & FS bill Metric DSI scoresettlement
Sub process : Warranty & free service handlingSub Process Ref : CVBU-EL-13-02 (version 1.1)Process Owner : Mr S Y DeshpandeEPM Linkage : CVBU-EL- 13 ( After Sales Services ) Preparation Date : 31/03/04Modification Date : 31/03/05
How it operates (Methods/ Practices)1. Set Guidelines on Warranty / Free Service – (CS)
6 Customer Support set guidelines on ‘Warranty Terms and conditions’ for all products. These guidelines are communicated to all Channel Partners through “Warranty Policy & Procedures Manual”, service circulars and warranty wall charts
2. Warranty Handling & delivery of FS by Channel Partners – 6 Channel Partners handle warranty on customer’s vehicle as per “Warranty Policy and Procedures
Manual” & guidelines issued from time to time.6 Channel Partners verify warranty period , raise claim through VCM, accept or reject the claim and send
to Central Warranty Cell at Thane, for further action3. Scrutinize Warranty Claims & FS Bills
6 Central Warranty Cell scrutinize the claims uploaded through VCM and credit note is generated for accepted claims .6 ASO conducts warranty audits as per prevailing guidelines.
4. Failed Parts management system –6 Channel partners pack failed parts and handover to inbound logistic partner for dispatch to respective
plant Service Office5. Conduct weekly warranty meeting (RA/ MFM/ HVAL/ HVTL)
6 Failed parts are presented in Weekly Warranty Committee meetings for ratifications of claims accepted by channel partner and further analysis is carried out by the concerned CFT.
(Details in Brackets indicate involvement of various agencies)
TATA Motors, CVBU
Inputsw Tata Motors guidelines for Freew Service / Warrantyw Warranty claims & free service
bills through VCM
31.3.2005 13.5
Spare Parts Management
Key Steps in sub- process - 'Spare Parts Management'
1. Develop Market & Product Management2. Procure Parts3. Fulfill Customer Orders 4. Training of CP personnel
Sub process : Spare Parts Management Sub Process Ref : CVBU-EL-13-03 (version 1.1)Process Owner : RMs / RSMs / RPMs / Channel Partners EPM Linkage – CVBU-EL- 13 ( After Sales Services ) Preparation Date : 31/03/04Modification Date : 31/03/05
Efficiencyw % execution of orders in time %w Inventory (No. of days Sales) No. of Daysw No. of raids on spurious parts dealers/
Manufacturers Nos.
Effectivenessw % increase in Market share %w CSI on spares availability %
How it operates (Methods/ Practices)1. Develop market and Product Management (PHQ) 6 Parts HQ carry out Sales and Marketing of Parts using Market Development, Channel Partner Management and Sales Planning processes,
sub- processes and transactional process2. Procure Parts (PHQ Procurement Group) 6 Parts are procured as per demand identified by various product groups 6 In-house parts are ordered on respective plants while Bought parts are procured through
Ancillary Suppliers3. Fulfill customer orders (RWH) 6 Parts are stored at various warehouses and distributed to various destinations such as
Dealers and Distributors. Inventories are controlled as per guidelines. Customer complaints, if any, are handled by field staff and/or forwarded to PHQ for further action
4. Training of CP personnel (RPMs) 6 RPMs identify training needs of CP personnel and provide relevant training inputs either
on site or at training location (Details in Brackets indicate involvement of various agencies)
TATA Motors, CVBU
Performance Measure Unit
Outputsw Network Reach w Enhanced Sales and Market
Shares of Tata Partsw Control on spurious parts w Competent staff at CP
Inputsw Plant / Supplier capacityw Market survey datew Targets for Parts, Business
and marketing
31.3.2005 13.6
Complaint Management
Key Steps in sub-process- 'Complaint Management'
1. Receive customer complaints 2. Register, acknowledge, assign for
resolution & close complaints with customer3. Analyze of product & non- product related
complaints4. Identify scope for Improvement & review
complaint management
Sub process : Complaint Management Sub Process Ref : CVBU-EL-13-04 (version 1.1)Process Owner : Mr S Y DeshpandeEPM Linkage - CVBU-EL- 13
( After Sales Services ) Preparation Date : 31/03/04Modification Date : 31/03/05
Efficiencyw Complaint acknowledgment time
within 24 Hrs % w Average complaint Resolution time No. of Days
Effectivenessw CSI – Product parameters Index
Performance Measure UnitHow it operates (Methods/ Practices)1. Receive Customer Complaints (CAC)
6 Customer assistance Center receives product / non product related complaints through varied access mechanism, such as through MS- mail / letters, verbal, telephone, etc. Touch points for receiving complaints are Dealer / TASS, AO, RO, HOs, SHQ, Mfg plants etc.
2. Register, acknowledge, assign for resolution & close complaints with customer (CAC)6 All complaints are registered in complaint management system on VCM, acknowledged in 24 hrs and
assigned to relevant agency for resolution.6 Feedback given to customer on closure.6 Complaints not resolved in target time are escalated to departmental heads.
3. Analysis of product and non- product related complaints (CAC)6 CAC analyse all complaints every month.6 MIS on resolution time v/s targets is given to all departmental heads.6 Product related issues are sent to Mfg/ QA/ ERC for product improvement/ corrective action &
feedback received through MBPA, ICMs & letters.6 Non product related issues are sent to dept heads & followed up for corrective action.6 Feedback on improvements conveyed to customers through mass communication such as Service
Information, OK Tata, Channel Chat, etc.4. Identify scope for improvement and review complaint management
6 Complaint management process is reviewed annually in the light of inputs from L&L approaches, CSI study feedback and TBEM OFIs
(Details in Brackets indicate involvement of various agencies)
TATA Motors, CVBU
Inputsw Customer Complaints
Outputsw Resolution of Complaintsw Improvements identified for
implementationw Improvement in CSI/ DSI
31.3.2005 13.7
TATA Motors, CVBU Facilities and Environment Management
Sub_Proc No Sub Process Name Sub_Process Owner
EPM Process No: CVBU-EL-14
Locational Planning, Construction & Environment HeadsLocational Process Chiefs:
Mr Z Sait - GM (Technical Services)Principal Process Owner:
CVBU-EL-14-01
CVBU-EL-14-02
CVBU-EL-14-03
CVBU-EL-14-04
CVBU-EL-14-05
Organize and Upgrade Facilities
Asset Management
Create Infrastructure
Operate & Maintain Infrastructure
Environment Management
Planning Head
Planning Head
Locational Construction &Plant Engineering Heads
Locational Head of Environment Dept./Respective Process Owner
Facilities and Environment Management
Locational Construction &Plant Engineering Heads
31.3.2005 14.1
Process Title-
Process Objective-
OUTPUT
§ Manufacturing Strategy§ Volume Forecast § Process Flows§ Quality and Environment Policy§ ISO 14001 & ISO / TS 16949 requirements§ Statutory Rules / Regulations§ New Technologies
Ø Review of existing facilities /Infrastructure/Tooling Ø Assess additional Requirement, 0btain Budget ApprovalsØ Design of New Facilities and ToolingØ Obtain Government Approval /Permission / LicenseØ Manufacturing / Procurement of Tooling and Equipments Ø Construction and Installation of Facilities & EquipmentsØ Operation and Maintenance of Facilities / Tooling /equipmentsØ Monitor Environment related parameters Ø Get Facilities and Process auditedØ Disposal of unserviable Facilities / Tooling /equipments
PROCESS DEFINITION SHEET
Process Identification No. (PIN) CVBU- EL- 14
Process Owner
Higher Level Linkage-
Mr Z Sait GM (Technical Services)
Provide infrastructure facilities & Tooling to Plants and ensure compliance with Environment Policy and Statutory Requirement
In-Process/ efficiency Measure Unit of Measure Output Measure / Effectiveness Measure Unit of Measure
Adherence to Schedule
Value of Quality parameters
Equipment Uptime and Environment Control Parameters
Stage wise Actual Vs Budgeted Costs Divisions Involved -
End Customer-
Core Values Embedded-
ISO /TS16949(2002) Clause Ref.
Percentage
%
Rs
No of Facilities / Toolings provided
Value of Quality parameters for end products / effluent
Compliance with safety Statutory and Environmental Norms, SLA compliance
Cost of Toolings / Facilities / pm index
Projects, Construction, Plant Engineering, Production / Tool Engineering
Manufacturing and Community
Integrity, Customer Focus, Passion For Engineering and Corporate Citizenship
6.3
Process Revision / Modification History-
Date of Modfn.
01/06/0331/03/05
Modification No
0001
Details of Modification
New Release
Modification through process review
Issued / Modified by
BES, PuneProcess Team
Approved By
No
%
Rs
Facilities and Environment Management
INPUT KEY STEPS
Various Various
[ Facilities / Tooling for Production / Services
[ Statutory Compliance[ Environment Protection
TATA Motors, CVBU Facilities and Environment Management
31.3.2005 14.2
Process Owner : Mr Z Sait GM (Technical Services)Process objective : Provide infra-structural facilities and tooling to
Plants and ensure compliance with statutory requirements and Environmental Policy
-Review existing infrastructure / facilities/Tooling and-Assess additional requirement Project / Planning
-study available options for optimum choice as per “Input”-Prepare budgetaryestimate-Obtain necessarystatutory approval
Const./Plant Engg./ES&C/Safety/Env.Mgt.
Prepare detaileddesign and budgetaryEstimateSubmit proposal for approval
Const./Plant Engg./ES&C
Budgetaryapproval
Inputs/Background--Manufacturing strategy-Processes-Volume forecast-Quality and Environmental Policy-Rules and Regulations-New Technologies-QMS / EMS-OHS
Re-allocate resource &continue
-Construction of buildings, infra-structure-Procurement and Installation of Plant / machinery / equipments
Const./Plant Engg./ES&C
Obtain post-commissioningapprovals if requiredSafety/ Env. Mgt
-Review and acquire resource for O & M of facilities
Const./Plant Eng./ES&C /Resp. Process owner
O&M ofFacilities
Const./PlantEngg./ES&C/Resp. Process Owner
TOOLING
Tool Design
Prodn. Engg. / ToolEngg./ CEM/ AutoTools
Manufacturing /Procurement &Commissioning Prodn.Engg./ToolEngg./Plng/CEM
Trouble-shooting/Maintenance /ToolsregrindingProdn.Engg./ToolEngg./RespectiveProcess Owner
Equipmentdue for
replacement?
Continue
Disposal of the unserviceable tooling/facility as per EMS norms Projects / Planning
Modify control procedures/ upgrade facilitiesConst./Plant Engg./ES&C/Respective Process Owner
No
No
No
NoYesYes
Additionalfacilities
required?
ESR Processing
FACILITIES
TOOLING
1
2
1
FACILITIES
2
Monitor equipment performance as per QMS/EMS normsConst./Plant Engg./ES&C/ RespectiveProcess Owner
Operationalgaps ?*
Yes Yes
* Revealed during performance monitoring, audits,mock drills etc.
TATA Motors, CVBU Facilities and Environment Management
31.3.2005 14.3
Inputsw Indents from Planning dept. / other
dept. for new facilities or up gradation of facilities.
w New Product Introduction schedulew Capacity enhancement plan
Key Steps in - 'Organize and Upgrade Facilities'
1. Compile requirements and seek capital budget approval
2. Procure Bought out Facilities3. Procurement of tooling.4. Install, Commission and Capitalize Facilities
How it operates (Methods/ Practices)1. Compile requirements and seek capital budget approval -6 APL / Central Planning collect, collate and prioritise requirements from Planners / other dept.
They compile requirements and forward to Corporate Planning for obtaining capital budget approval. Capital budgets are approved by Board of Directors. APL / Central Planning communicate budget codes to respective Planners / dept. Capital items procurement is approved by Corporate Planning, ED and Plant Head as per delegated powers.
2. Procure bought out facilities –6 Planners 1) contact manufacturers, seek quotations, selects machine / equipments and raise indents on
Purchase dept. for procurement of required facilities of Tooling. 2) prepare Executive Sanction Request ( ESR ), obtains price approval and handover to Purchase Agency. 3) Plan consultant’s service where necessary. 4) Purchase dept. negotiates with Supplier, finalize terms, obtain approval & raise Purchase Order. 5) Stores receives Bought out equipments and arranges to unload and unpack at required location.
3. Procurement of Tooling–6 Planners 1) raise indents on PE / CTR for in house manufacturing. 2) PE / CTR designs, manufacturers
and proves Tooling. 3) Planners coordinate with respective shop for tryout and handover tooling to indenter.
4. Install, Commission and Capitalize Facilities–6 Planners 1) prepare layout of production shop 2) raise contracts depending upon the need of installation
of facilities. 3) Construction and Plant Engineering arrange foundation work, electrical, plumbing and pneumatic work 4) Machine / Equipment and Tooling are installed , commissioned by Supplier or by Planning. These are tested and certified by Planning. A plant code is allotted for each facility and information and is given to Finance for capitalizing through “ Asset
Sub process : Organize and Upgrade Facilities Sub Process Ref : CVBU-EL-14 - 01 (version 1.0)Process Owner : Z Sait GM ( Tech. Services)Linkage– CVBU-EL-14 ( Facilities &
Environment Managements )Preparation Date : 31/03/04Modification Date : 31/03/05
Performance Measure Unit
Efficiency6 Adherence to schedule %
Effectiveness6 Budget V/s actual cost %
TATA Motors, CVBUOrganize and Upgrade Facilities
(Plant, Machines, Tooling, Equipments, Vehicles etc.)
Outputsw Availability of facilities ( Plant,
Machines, Equipments,Tooling, Vehicles etc.).
w Up gradation of Tooling and Facilities
31.3.2005 14.4
Inputsw Asset data basew Asset shifting advisesw Asset disposal proposalsw Manufacturer’s
Guidelines
Key Steps in-'Asset Management'
1. Verification of assets 2. Maintain Assets3. Disposal of Assets
Outputsw Updated Asset data basew Asset verification reportw Disposal of obsolete / surplus
Assets
How it operates (Methods/ Practices)1. Verification of Assets –6 On the basis of available asset list , physical verification of assets are carried out at as per
schedule through agencies like factories , MPL&P , Finance etc.2. Maintain assets–6 Planning dept. of respective division is responsible for 1) annual statutory certification
wherever applicable 2) annual verification of assets & submit report 3) arrange to provide usage confirmation to Finance wherever applicable 4) upkeep of assets 5) maintain assets as per maintenance plan and Manufacturer’s guidelines through concerned maintenance dept.(Refer Sub-process CVBU-EL-11-06) 6) documentation & record change of assets which are shifted from one place to another.7) identify obsolete / non economical assets & recommend for disposal
3. Disposal of assets –6 Custodian / User forwards list of obsolete/ surplus assets to planning. Planning examines
if assets can be put to alternate use. After confirming that assets are obsolete / surplus, Central Planning prepare asset disposal proposal & forward to Finance with back up. Obtain corporate approval for disposal of asset through Finance. Arrange auction of an asset through auctioning agency through MPL &P. After auction is completed , asset database is updated by Finance
Sub process : Asset ManagementSub Process Ref : CVBU-EL-14- 02 (version 1.0)Process Owner : Z Sait GM ( Tech. Services)Linkage – CVBU-EL-14 ( Facilities &
Environment Management )Preparation Date : 31/03/04Modification Date : 31/03/05
Efficiency6 Adherence to asset verification schedule %
Effectiveness6 Physical assets V/s Assets in Master %
Performance Measure Unit
TATA Motors, CVBU Asset Management
31.3.2005 14.5
Key Steps in- 'Create Infrastructure'
1. Need identification & requirement finalization
2. Designing of infrastructure 3. Execute work through contracts4. Seek NOC and handover
How it operates (Methods/ Practices)1. Need identification & requirement finalization -
6 Construction & Plant Engineering review infrastructure requirement based on user feedback, new project requirements and capacity enhancement plans of NPI/Central planning. They workout Capital budget requirement and seek capital budget approval for optimum option through central planning ( JSR & LKO ) / APL ( Pune ). Based on approved budget, Construction & Plant Engineering decide the project plans.
2. Designing of infrastructure 6 Construction & Plant Engineering prepare design of infrastructure and seek approval of concerned
indenting divisions and government agencies. Help of external consultants is taken wherever required.
3. Execute work through contracts –6 For approved designs, capital budget codes are obtained for various items in the project. In case of
repairs and modifications, approval of ED / Plant Head is taken by concerned indenters as per delegated powers. Annual rate contracts are finalized with contractors for repetitive items. Capital items are selected by giving due weightage to environmental norms, through ESR process. Infrastructure work such as construction of road, buildings, electrical installations, plumbing etc. is executed through contractor.
4. Seek NOC and handover –6 Construction & Plant Engineering obtains NOC approvals from concerned local / state government
agencies (Municipal Corporation, MIDC, Electricity Board, Factory Inspectorate, etc). After obtaining approval, facilities are handed over to concerned indenters for use. Wherever required help of concerned department is taken for coordination with government agencies.
Sub process : Create Infrastructure Sub Process Ref : CVBU-EL-14- 03 (version 1.0)Process Owner :
EPM Linkage – CVBU-EL-14 ( Facilities & Environ. Management )Preparation Date : 31/03/04Modification Date : 31/03/05
Locational Construction &Plant Engineering Heads
Inputsw Indent from User divisions for up
gradation of infrastructure.w New projects from Planning / NPIw Capacity enhancement planw Statutory, environmental and
Safety requirements.
Efficiency6 Adherence to schedule %
Effectiveness6 Variance w.r.t. budget %6 No of key deliverables achieved %
Performance Measure Unit
TATA Motors, CVBUCreate Infrastructure
(Bldg., Water Supply, Sanitation, Electricity, Telephone Network)
Outputsw New Infrastructure/
Improvement in infrastructure
31.3.2005 14.6
InputsOperatew Operational requirements of Usersw Regulatory requirements ( Pollution
Control, Safety norms, Electricity Rules etc. )
Maintenance w Break down reports or User complaintsw Preventive maintenance requirementsw Regulatory requirements
Key Steps in – 'Operate & Maintain infrastructure'
1. Assess / review resource requirements2. Off-loading or on-loading decision3. Organize resources4. Operate and maintain facilities5. Audit by Government agencies
How it operates (Methods/ Practices)6 Construction maintains Plant, Roads and immovable assets and Plant Engineering operate and maintains
other infrastructure like Water, Electric, Air supply, generator house, Telephones, oil reclamation etc.1. Assess / review resource requirements -
Construction and Plant Engineering take annual review, estimate volume of annual activities, estimate resource requirements like men, money and equipments and assess skill requirements.
2. Off-loading or on-loading decision -6 Construction and Plant Engineering 1) Assess in-house capability and knowledge / skill availability
2) identify vendors & get quotations 3) compare in-house operational / maintenance cost vs outsourcing cost 4)Take off-loading or on-loading decision based on optimum cost.
3. Organize resources– 6 1) obtain capital / revenue budget approval and reallocate 2) in case of outsourcing raise contracts on
prospective contractors based on their past performance 3) raise indent on Purchase dept. for material procurement.
4. Operate and maintain facilities -6 1) Prepare shift schedule 2) provide services to users as per schedule 3) attend customer complaints 4) prepare
preventive maintenance plan 5) Inventory Management.5. Audit by Government agencies –6 1) Organize audit of government agencies 2) Get infrastructure audited from Government agencies as per
statutory norms 3) Get licenses renewed before expiry
Sub process : Operate & Maintain infrastructure
Sub Process Ref : CVBU-EL-14- 04 (version 1.0)Process Owner :
EPM Linkage – CVBU-EL-14 ( Facilities & Environment Management )
Preparation Date : 31/03/04Modification Date : 31/03/05
Locational Construction &Plant Engineering Heads
Efficiency6 Uptime No of hours6 Zero accidents No of accidents
Effectiveness6 No. of Non Conformity Reports No. of NCRs
(NCRs) raised in external Audits6 Renewal of licenses before expiry No of licenses
renewed beyond expiry
Performance Measure Unit
Outputs
w Uninterrupted service to offices /
plants
w Government approvals
w Customer’s satisfaction
TATA Motors, CVBU Operate & Maintain infrastructure
31.3.2005 14.7
Key Steps in- 'Environment Management'
1. Assess the significant environmental aspects of products and activities
2. Set ‘Control Processes’ and ‘Objectives & Targets’
3. Deploy the process and implement ‘Action Plans’ to achieve ‘Objectives & Targets’
4. Review processes for improvements / and conduct internal / external audits
Outputsw Improvements in environmental
performance (e.g.: reduction inpollution; e.g.: reduction in natural resource consumption; e.g.: elimination of hazardous material etc.)
w Compliance to environmental requirements as per statutory norms
How it operates (Methods/ Practices)[Cross Ref.: EMS Manual at respective locations]1. Assess the ‘significant’ environmental aspects of products and activities as per established EMS procedures-
6 All Process Owners identify the ‘significant’ environmental aspects of products and activities with the help of ERC centrally & Environment Group at respective Works locations.
2. Define Operational Controls, Emergency Action Plans and set ‘Objectives and Targets’ 6 Operational Control Procedures and Emergency Action Plans are established and deployed. Process
requirements are assessed in line with volume and quality requirements. Action Plans are set to achieve environmental ‘Objectives & Targets’ after ensuring availability of resources
3. System Monitoring–6 System performance measures are identified, periodically monitored, reported and analysed for
feedback and corrective actions. 6 Environment Group at respective Works locations coordinates conduct of internal external audits as per
pre-defined schedule. Corrective and preventive actions are taken by concerned Process Owner and shared
4. Review processes for improvements–6 The established EMS is reviewed periodically by Plant Heads at all Works locations to provide direction
and resources as necessary for ‘continual improvement’ of the EMS. 6 Manuals / procedures / work instructions are reviewed and updated in line with changes in statutory
requirements and other inputs and the changes are communicated to all concerned.
Sub process : Environment Management Sub Process Ref : CVBU-EL-14 - 05 Process Owner : Loc. Head of Env. Dept. Operational Owner : Respective Process OwnersEPM Linkage– CVBU-EL-14 ( Facilities &
Environment Management )Preparation Date : 31/ 03/04Revision Date : 31/03/ 05
Inputsw Quality & Environmental Policyw Rules & Regulationsw Plant level waste disposal guidelinesw ISO:14001w New developments
Effectiveness6 Environmental measurements within No.
applicable statutory norms6 No. of Non Conformity Reports (NCRs) No. of NCRs raised in external EMS Audits
Efficiency6 Improvement over previous years
‘environmental performance’
Performance Measure Unit
TATA Motors, CVBU Environment Management
31.3.2005 14.8
Human Resource Management
EPM Process No: CVBU-EL-15
Principal Process Owner :
Sub_Proc No Sub Process Name Sub_Process Owner
CVBU-EL-15-01
Succession Planning
Mr M. B. Paralkar, Mr. N. K. Dutt,Mr. J. Khursigara, Mr. Mayukh Maiti
CVBU-EL-15-02 Mr M B Paralkar and locational IR heads
CVBU-EL-15-03
CVBU-EL-15-04
CVBU-EL-15-05
CVBU-EL-15-06
Develop & Manage H R Strategies
Manage Industrial Relations
Manage Family Size
Learning and Development
Performance Management System
Mr. Mayukh Maiti
Mr.N K Dutt and locational training/MPD heads
CVBU-EL-15-07
CVBU-EL-15-08
Manage Employee Welfare
Employee and Organisational Survey
Mr M B Paralkar and locational HR heads
Mr P P Kadle - ED (Finance and Corporate Affairs)
Mr M. B. Paralkar, Mr. Mayukh Maiti
Mr. S. V. Raje, Mr. D. Sengupta,Mr. L. Samanta, Mr. D. Deshpande
Mr. Mayukh Maiti
TATA Motors, CVBU Human Resource Management
31.3.2005 15.1
Process Definition Sheet
TATA Motors, CVBU Human Resource Management
31.3.2005 15.2
Unit of Measure Output Measure / End Measure Unit of Measure
Modification through process review
BES, Pune
Process Team
On-time ServicesFulfillment of HR demands
Man-days Lost, Absenteeism
Index, %
Budget Vs. Actual Employee Cost
ISO / TS 16949 Reference-
Divisions Involved -End Customer- Core Values Embedded-
Rs
No/percentage
Employee Satisfaction Index
Integrity, Customer Focus, Passion For Engineering and Corporate Citizenship
Attrition Rate, Safety Index
Value Added per unit Wage Bill
Corporate HR and Locational HR, Productivity Services All CVBU Employees , Functional Heads
6.2
% / IndexRatio
Adherence to PlanAdherence to Plan
Process Identification No.(PIN) :
Process Title-
Process Objective-
CVBU-EL-15
Human Resource Management
Source and enhance Human Capital, Attract and retain talent, Create and maintain culture of High Performance, Improve Quality of Life of employees
Higher Level Linkage-
Process Owner Mr. P. P. Kadle (ED, Finance & Corporate Affairs)
INPUT OUTPUTKEY STEPS
Ø Revisit HR Policies, Set Goals, Develop Initiatives
and assign responsibilities
Ø Acquire and allocate Resources
Ø Manage Business Unit wise Corporate HR and
Plant HR Services
Ø Performance Review
Ø Annual Review and Budgeting for the Next Year
§ CVBU Strategy
§ Business Plan
§ Industry Environment
§ Statutory/ Legal Requirement
§ GEO- HR Guidelines
§ Skill-gap Analysis
§ Feedback from Surveys, Communication sessions,
Appeals, Hotline and interaction with Unions
§ Feedback from Partners (Educational Institutions,
Faculty Members, Trainers, etc.) Third Party Survey
Findings
§ Tata Group Guidelines
[ Competent, motivated and satisfied
employees in required strength
[ Culture of High Performance
Budget Proposal
In-Process / Efficiency Measure
31/3/05
01/06/03
01
00 New Release
Details of ModificationModn No. Modified by Approved By
Process Revision / Modification History-
Date of Modfn.
Process Owner : Mr P P Kadle ED (Fin & Corp Affairs)Process objective : Source and enhance Human Capital.
Attract and retain talent,Create and maintain culture of High Performance, Improve Quality of Life of employee.
Outputs--Motivated &
competent workforce as per requirement
-ESI and Drivers ofSatisfaction/
Dissatisfaction
BudgetProposal
Periodic Review ofperformance and reallocateResource
Head - Corp. HR
Manage HR /IR Services at resp. plants
w Manage Family Size (Recruitment & Placement, Opt-sizing and Separations)
w Productivity Services - Manpower Planning, job Evaluation, Productivity Measurement through PSD
w Manage Industrial Relationsw Manage safetyw Employee Training and Developmentw Manage Employee Welfare Services (Transport,
Canteen, Housing, Medical, CumminityCentres etc)
w Performance Mgt(PMS) *Talent/PotentialManagement, Compensation Management
w Manage Employee DatabaseConduct OHS
Resp Plant HR
Manage Corporate HR services-
w HR Service for Corporate offices,Regional & Area offices (similar to that for the Plants)
w Compensation Management for TM andEG grade officers of all the locationsGuidelines/mandate to Loc HR forCompensation of S & below Grades
w Asses Work level of Sr. Officerw Organization Developmentw Special training programs for TM andw EG Grades of all the location
Head Corp.HR
-Acquire andallocateResources
Head-Corporate HR
-Review andFinalise HRPolicies, SetTargets
-DevelopInitiatives andAssignResponsibilities
HR Council
Annual Review andResource BudgetPreparation
HR Council
Continue withProcess
Inputs--CVBU Strategy -Business PlanBudget Approval -Statutoryrequirements -Tata GroupGudelines-Industry Environment-OHS feedback-Third party survey
findings
TATA Motors, CVBU Human Resource Management
31.3.2005 15.3
Key Steps in- 'Develop & manage HR Strategies'
1. Revisit HR Vision & Mission2. Strategic Analysis3. Develop Long term and Short term Plan.4. Develop action plans and BSCs and
seek budget approvals5. Implement & Review HR plans and Policies
Outputsw HR Vision & Missionw HR strategies and policiesw CVBU, HR BSCw Plant HR BSCw HR Initiatives
How it operates (Methods/ Practices)1. At the beginning of every year HR steering Committee revisits HR vision &
Mission and redefines, if necessary, to align it with CVBU & PCBU2. Inputs are analyzed to ascertain SWOTs and resource adequacy3. HR steering Committee / Council develops Short term and long term HR Plans
and Policies to support CVBU’s business Plan.4. Corp and Location HR Steering committees develop BSCs. Identify initiatives and
assign responsibility. Location HR and Corporate HR review resource requirement and seek budget approvals
5. Respective location HR heads and HR Initiative owners implement HR Plans and policies. Implementation of HR Plans and polices is reviewed through SQDCM review, HR BSC reviews and CVBU BSC reviews.
Inputsw HR vision, mission,w Tata Motors long term and short term w Business plan & Objectives.w Industry climatew Statutory/ legal requirements.w Group HR directivesw Employee feedback through surveys
Internal Customer’s expectations and feed back
w Current HR capabilities
UnitPerformance Measure
Efficiency6 Adherence to time frame %
Effectiveness6 Achievement of HR objectives. %
Sub process : Develop & manage HR strategies
Sub Process Ref : CVBU-EL-15- 01(version 1.1) Process Owner : Mr M. B. Paralkar, Mr. N. K.
Dutt, Mr. J. Khursigara, Mr. Mayukh Maiti
EPM Linkage : CVBU-EL-15 (Human Resource Management)
Preparation Date : 31/01/04 Modification Date : 31/01/05
TATA Motors, CVBU Develop & Manage HR Strategies
31.3.2005 15.4
Key steps in –'Manage Industrial Relations'
1. Create structure for managing IR2. Collective bargaining and good relationship with
union.3. Produce career growth opportunities4. Foster co-operation and manage employee
welfare
Outputsw Better understanding between
Management, Union & employees.
w Disciplined work environment
Sub process : Manage Industrial Relations Sub Process Ref : CVBU-EL-15- 02 (version 1.1) Process Owner : Mr M B Paralkar and locational IR headsEPM Linkage– CVBU-EL-15 (Human Resource Management)Preparation Date : 31/03/04Modification Date : 31/01/05
Efficiencyw Adherence to wage settlement plan % adherencew Adherence to meeting schedule &
resolution of problems
Effectivenessw Adherence to IR issues resolved against target % adherence w compliance (Factory Acts & Labor Laws) % compliancew Man days lost due to IR problems Nos.
Performance Measure Unit
Inputsw HR policies HR Strategyw Model standing orderw Workmen related actsw Union
How it works.(Support Processes, Procedures& Methods)1. IR is managed through structure of Plant IRC / JDC , divisional IRC,
Grievances committee and HR personnel acting as contact point for each division.
2. Nurture healthy relations by regular meetings and collective bargaining with union. Resolve the issues raised by bargainable employees or union as per schedule.
3. Create various structures for career growth of bargainable employees such as SVCVP, Bargainable to S scheme, Master craftsman / Mechatronics scheme, Linkage of quality contribution to salary etc.
4. Encourage bargainable employees to participate in SDTs/ SGAs and take the team leadership positions fostering co-operation. Collectively find and improve work environment and conditions. Provide guidance to motivate and improve bargainable employee morale.
TATA Motors, CVBU Manage Industrial Relations
31.3.2005 15.5
Inputsw HR Plansw Sales / production plan and
productivity targetsw New project requirementw Job Profilesw Current manpower
Key steps in-'Manage Family Size'
1. Review / Assess manpower requirement and arrive at net shortage / excesses( Gross / function / Department)
2. Redistribution of manpower3. Manage additional requirement and
surpluses
Sub process : Manage Family Size Sub Process Ref : CVBU-EL-15-03 (version 1.1) Process Owner : Mr M. B. Paralkar,
Mr. Mayukh MaitiEPM Linkage – CVBU-EL-15 (Human
Resource Management)Preparation Date : 31/03/04Modification Date : 31/01/05
Efficiency6 Budget Vs. actual employee cost Rs6 Cost and cycle time of recruitment Months
Effectiveness6 Overall productivity Value added / 6 Recruitment from premium unit wage bill,
institutes % recruitment
Performance Measure Unit
Outputsw Competent employees in required
strength.w Work reorganisation proposalsw Offloading proposals
How it operates (Methods/ Practices) 1. Manpower requirement of various functions / departments is reviewed every
year based on sales / production plan, productivity targets and new technology introduction plan. Explorer opportunities for offloading. Derive shortages / excesses and work reorganisation.
2. Manpower deployment to needy areas to bridge, the gap between manpower available and required, identify the persons for deployment on the basis of suitability of new jobs. Arrange training/retraining through HR (training) as per requirement.
3. Manage additional requirement through i) Contract / Offloading ii) Recruitment of temporaries iii) Cadre recruitment iv) External recruitment
3a. Launch early separation schemes for downsizing as per need.
TATA Motors, CVBU Manage Family Size
31.3.2005 15.6
Inputsw CIRO analysis, CVBU strategic
objectives, HR planw Training Effectiveness Initiatives
analysis
Key Steps in-'Learning and development'
1. Identify training needs 2. Design training plan3. Design / modify training programs 4. Delivery of training programs 5. Evaluation of the programs
Outputsw Fulfillment of identified training
needs w Trained employees
How it operates (Methods/ Practices)1. Training needs are identified by top management and survey is conducted at the
divisional level to collect individual needs from various divisions.2. Training plan is designed, convenient schedules for training are decided and annual
training calendar is prepared.3. Training and MPD analyses the training requirement received and plan training
programs. Training programs are designed in consultation with appropriate agencies.
4. In house programs are planned and calendar is circulated to all the divisions for sending ominations. Training is imparted through internal faculty as well as by external experts. Employees are also nominated for training programs, seminars organised by outside institute.
5. Effectiveness of the training is measured as a reaction of training through CIRO I for all training programs and after 3 months for key programs.
Sub process : Learning and development
Sub Process Ref : CVBU-EL-15- 04(Version 1.1)
Process Owner : Mr.N K Dutt and locational training/MPD heads
EPM Linkage – CVBU-EL-15 (Human Resource Management)
Preparation Date : 31/03/04Modification Date : 31/01/05
Performance Measure Unit
Efficiencyw Training mandays / employee / year Nos.
Effectivenessw CIRO I. Scorew CIRO II .
TATA Motors, CVBU Learning and Development
31.3.2005 15.7
Key Steps in-'Performance management system'
1. Set the Major performance areas and Targets at the individual level and identify the development needs.
2. Conduct Mid year review 3. Conduct Final review at end of the year.4. Arrive at overall performance/potential rating
and carry out normalisation.5. Decide on rewards and compensation
How it operates (Methods/ Practices)1. Decide the Major performance areas and their linkage with the higher level BSC / objectives for each EG/M/S employees at
the beginning of the financial yearii) Assign weight age factors/difficulty levels to all MPAsiii) Set the metric and stretch targets w.r.t. objectivesiv) Identify training and development needsv) Fill up the standard PMS form in consultation with the superior
1a. I) Compare the GAP between targets and actual performance at the end of the 6 months by discussion between employee and superiorii) Analyses the GAPs in expected performanceiii) Arrange resources if requirediv) Provide performance feedback
2. Carry out mid course corrections if necessary after discussion between employee and superior. Review the performance and take corrective actions for improvement
3. Carry out performance appraisal of individual employee by his superior in second half of the financial year and conduct review by respective divisional heads.
4. I) Arrive at overall performance rating, carry out norm alisation.ii) Identify consistent high performers as inputs to various processes like ‘Talent Mgmt. Process’ and for premium training programs.iii) Deselect the consistent low performers
5. Decide rewards / compensation depending upon the performance rating, grade and overall performance of the company.
Sub process : Performance management system
Sub Process Ref : CVBU-EL-15- 05 (version 1.1)
Process Owner : Mr M B Paralkar and locational HR heads
EPM Linkage – CVBU-EL-15 (Human Resource Management)
Preparation Date : 31/03/04Modification Date : 31/01/05
Inputsw BU BSC/Plant BSC/Div. BSC/
CX/Dept BSC as applicable to an employee
w Reward / Compensation Policiesw Competency Maps and job profile
Outputsw Identification of training and
development needsw High performance culture and
motivated employeesw Career planning and succession
planning
Efficiencyw Adherence to PMS schedule % adherence
Performance Measure Unit
Effectivenessw Goodness of fit Degree of fit
TATA Motors, CVBU Performance Management System
31.3.2005 15.8
Key steps in -'Succession Planning'
1. Identify positions for succession planning.2. Identify competencies required for the
successors.3. Identify / Review probable candidates4. Develop successors and monitor readiness.
How it works.(Support Processes, Procedures& Methods)1. Senior executive positions which require successors are identified. 2. Competencies for the successors are identified through work level
study and discussions with concerned executive or his superior.3. Potential candidates are identified by taking inputs from PMS, TWL
& Talent Management followed by collecting two names of successors from top 100 high performers.
4. Performance of successors are monitored through PMS and rating is given as ‘At par’ or ‘ Below level’. suitable development plan is applied depending upon the rating in both cases.
4a. Pen portrait matching is carried out and readiness / migration paths are tracked through colour coding system.Best Fit candidate is selected as successor.
Outputsw Identified successors for
key positions.
Sub process : Succession Planning Sub Process Ref : CVBU-EL-15- 06 (version 1.1) Process Owner : Mr. Mayukh MaitiEPM Linkage – CVBU-EL-15 (Human
Resource Management)Preparation Date : 31/03/04Modification Date : 31/01/05
Inputsw PMS, TWL, Talent
management analysis
Performance Measure
Effectivenessw EG positions mapped % positions mappedw Identified successors
taking key positions Nos.
Efficiencyw positions with identified successors. Nos.
Unit
TATA Motors, CVBU Succession Planning
31.3.2005 15.9
Key Steps in-'Manage employee welfare'
1. Identify welfare service requirements.2. Design welfare services.3. Provide welfare services4. Collect feedback analyse and improve
How it operates (Methods/ Practices)1. Welfare requirements are identified by corporate and locational HR based on needs
expressed by union / employees, geographical location, category of employees / gender and statutory requirements.
2. Services are designed so as to provide services at minimum possible cost , wherever required employee / union views are considered. E.g. Bus routes, location of recreation centers.
3. Services are provided through locational administration department.Following services are provided : Transport facility, interest free festival loans, crèche, maternity leave, housing loans, study leave, public holidays, health care facility, recreation centers, accommodation, schools for employee wards conservation services etc.
4. Employee feedback is collected through various surveys and interactions. Service providers feedback is also collected through interactions. Actions are taken for improvement.
Inputsw HR policiesw Regulatory norms w Expressed and implied needs of
employees requirements.w Budget
Efficiencyw Budgeted vs. actual expenses. Rs.
Performance Measure Unit
Effectivenessw Improvement in employee Survey
satisfaction. score
Outputsw Welfare servicesw Identified Successors for key
positions.
Sub process : Manage Employee welfare Sub Process Ref : CVBU - EL - 15 - 07 (version 1.1) Process Owner : Mr. S. V. Raje, Mr. D. Sengupta,
Mr. L. Samanta, Mr. D. DeshpandeEPM Linkage – CVBU-EL-15 (Human
Resource Management)Preparation Date : 31/03/04
TATA Motors, CVBU Manage Employee Welfare
31.3.2005 15.10
Key Steps in-'Employee and organisational survey'
1. Shortlist issues impacting employee satisfaction2. Improve questionnaire 3. Administer questionnaire 4. Analyse employee category-wise responses 5. Communicate results to management and at all
locations.6. Develop action plans to drive improvements
based on feedback
How it operates (Methods/ Practices)1. Draft questionnaire designed by capturing employee feedback regarding issues
concerning employees at all levels.2. Improve the questionnaire based on the feedback and finalize the questionnaire.
Develop questionnaires as per language convenience for all the three category of employees.
3. Administer the questionnaire as per survey execution plan at all plants / non-plant locations
4. Collate and analyses categoriwise response. Derive important attributes of employee satisfaction.
5. Share results with Steering committee, functional heads and further cascade down through interactive communication sessions.
6. Design action plan to improve important parameters.
Sub process : Employee and organisational survey
Sub Process Ref : CVBU-EL-15-08 (version 1.1) Process Owner : Mr. Mayukh MaitiEPM Linkage– CVBU-EL-15 (Human
Resource Management)Preparation Date : 31/03/04Modification Date : 31/03/05
Efficiencyw Employee and organizational survey
execution and coverage plan % Adherence
Performance Measure Unit
Effectivenessw Issues addressed through the
action plan %
Inputsw HR Policies w Employee feedbacksw New strategic initiatives
Outputsw Employee satisfaction index.w ST and LT action plans
TATA Motors, CVBU Employee and organisational survey
31.3.2005 15.11
Information and Knowledge Management
EPM Process No: CVBU-EL-16
Principal Process Owner :
Sub_Proc No Sub Process Name Sub_Process Owner
CVBU-EL-16-01
Manage Information Services
CIO supported by TTL Project Heads
CVBU-EL-16-02 CIO supported by TTL Project Heads
CVBU-EL-16-03
CVBU-EL-16-04
CVBU-EL-16-05
CVBU-EL-16-06
Information Resource Management
Manage Support System
Manage System Security
Manage Information Storage & Retrieval
Manage Facilities & Network Operations
CIO supported by TTL Project Heads
CIO supported by TTL Project Heads
CVBU-EL-16-07
CVBU-EL-16-08
Manage Information Audit
Knowledge Management
CIO supported by TTL Project Heads
CIO supported by TTL Project Heads
CIO supported by TTL Project Heads
Functional Heads/ Process Owners
Mr Probir Mitra GM (Chief Information Officer)
TATA Motors, CVBU Information and Knowledge Management
31.3.2005 16.1
PROCESS DEFINITION SHEET
TATA Motors, CVBU Information and Knowledge Management
Unit of Measure Output Measure / End Measure Unit of MeasureTime to Develop System
System up time and response time
SLA's between TTL and Users
Details of Modification Approved ByDate of Modfn. Modification No.
01/06/03 00 New Release BES, Pune
Modified by
Process Identification No.(PIN) :
Process Title-
Process Objective-
CVBU- EL- 16
Information and Knowledge Management
Systematize Data collection , analysis and reporting of data, Systimatic Sharing of Knowledge
Higher Level Linkage-
Process Owner Mr Probir Mitra GM (Chief Information Officer)
Ø Ascertain Information needsØ Establish Data SourcesØ Feasibility Study for IT SupportØ Procurement of required Hard ware/ Software through TTLØ Development/ customization of software Ø Testing and User trainingØ Implementation and maintenance of systemØ Periodic review and Up gradation of hardware/
Network/software /Applications support Ø Create knowledge repositories, encourage sharing & learning
§ Business Strategy & Key Initiatives
§ Business Thrust areas
§ Business Transaction Processes
§ Key Performance Measures and Indicators
§ Key control measures
§ Statutory /Business Requirements
IT support Infrastructure
§ Focus areas for knowledge management
ü Predefined user deliverables
ü Information for decision support.
ü Data warehouse
Achieved & Backed up data
ü Knowledge repositories for knowledge
sharing
Divisions Involved -
End Customer-
Core Values Embedded-
ISO / TS16949(2002) Clause Ref. 8.4
TTL Cost Rs. Crs.
Process review and Improvement / Modification History-
OUTPUTKEY STEPSINPUT
In-Process/ Efficiency MeasureDays
Percentage
Index
Divisions using Legacy/SAP-ERP and TTL
Functional/ Divisional Heads
Integrity, Customer focus, Passion for Engineering
Net Work/ Server Up time
Customer Satisfaction surveys by TTL
Percentage
Index
31.3.2005 16.2
Define Information and knowledgeRequirements in terms of contents and Periodicity
Business Process Owner
Identify Data/Information /KnowledgeSources,storage andretrieval needs
Process Owner
Establish Rapoand channel
Process Owner
Study Feasibilityof meeting User/Auditrequirementsthrough existingcomputerisedsystem (SAP/Legacy/ VCM/DENIS/MAPS etc.)
CIO
Develop /customizeapplicationsoftware / Develop IT tenabledrepositories etcand test toconfirm that it meetsrequirement
TTL & USER
ReviewHardware /softwarerequirements
CIO
Inputs -- Information onKPM’s of CVBUPlanning /Forecasting/ DecisionMaking, monitoring &controlling processes(Output, variations,trend / comparisons /bench Marks etc)EmployeesVendors, channelPartners andInvestors/ Financiers- StatutoryRequirementFocus areas forKnowledge Management
Seek budgetapproval and
Procure/ UpgradeHard wares
software
CIO
Inputs -Requirementfor newcomputerisedsystem- 3 yrs ItStrategy ofCVBU
PerformanceOK?
System Audit
Internal Audit
New / Up -gradation of HardWare / Software
required?
ExternalSource
Cost - Benefitanalysisfavorable
Revisit concernedprocesses/ procedures
and redefine ifnecessary
Process Owner
Train and motivateUsers and
Implement system
Process Owner / CIO
Monitor andreview systemperformance
Process Owner & CIO
- UserFeedback
Develop manual/PC based system.
Process Owner
Continue
Inputs -- Transaction/data Volume- No of Uses- User Locations- New systemrequirements
No
Yes
Yes
No
Yes
No
Yes
NoSys
tem
Re
qu
ire
me
nt
TATA Motors, CVBU Information and Knowledge Management
31.3.2005 16.3
Key Steps in-'Information Resource Management'
1. Derive requirements from business strategies (IT Roadmap)
2. Define Enterprise System Architectures3. Plan and forecast information technologies/
methodologies required4. Establish enterprise data standards5. Establish quality standards and controls
Outputsw Enterprise system architecturew Enterprise data standardsw Enterprise quality standardsw IT Roadmapw Investment proposal (Capex)
Sub process : Information Resource Management Sub Process Ref: CVBU-EL-16-01 (version 1.1) Process Owner : CIO supported by TTL Project
HeadsEPM Linkage – CVBU-EL-16( Information & Knowledge Management)Preparation Date : 31/12/04Modification Date : 31/12/05
Inputsw Business strategies & Key initiativesw Knowledge of Business Processesw Recommendations (by TTL) from IT
perspectivew User Requirements & Justificationsw Statutory requirementsw Tata code of conductw Previous audit recommendations
Benchmarks
UnitPerformance Measure
Efficiency
w
w
Adherence to Schedule for key projects
Adherence to Budgets for key projects
Effectiveness
%
%
How it operates (Methods/ Practices)1. Derive requirements from business strategies
Understand the business processesRequirement identification and analysisConsolidate and formulate IT Roadmap
2.Define enterprise systems architectureTake a stock of existing resources and IT trendsDefine the hardware / software requirements
3.Plan and forecast information technologies / methodologiesDecide the different possible IT tools for delivering the desired data and
informationScan the technological developmentsPrepare Investment Proposal/s (Capital Expenditure – Capex)
4. Establish enterprise data standardsServer operating system ( Unix / Linux …)Databases (Oracle, SQL Server …)Networking (fast Ethernet,FDDI / Gigabit …)Desktop (Windows XP / 2000 / NT …)Exchange Server (2003)Virus control (Mc Affee / Norton )
5. Establish quality standards and controls Software development standards (SDLC Processes as per ISO, CMMI…..)Information Security PolicyHardware standards as per the Application / Project Req’s
TATA Motors, CVBU Information Resource Management
31.3.2005 16.4
Efficiencyw Availability of System and Servicesw Stakeholders perception of IT Servicesw Throughput and Response time
Effectivenessw Decrease in cost of operationw Compliance with legislations
Outputsw ROIw Risk Managemenntw Enhanced reputation due to
certificationsw Stakeholders Trustw Automationw Enterprize architecturew Roles and responsibility defined
Sub process : IT Governance Sub Process Ref : CVBU-EL-16-01 (version 1.1) Process Owner : CIO supported by TTL Project
HeadsEPM Linkage – CVBU-EL-16( Information &
Knowledge Management)Preparation Date : 31/12/04Modification Date : 31/12/05
Performance Measure Unit
How it operates (Methods/ Practices)1.Be Driven by Stakeholder value
6 Identify the Stakeholders and understand their expectation6 Benchmark with industry
2. Adopt an IT Governance Focus6 Implement COBIT and obtain BS 7799 certification
3. Strategic Allignment6 Allign IT with the business and its goal6 Provide a flexible, integrated information infra structure to support business strategies.6 Be an agent of change enabling business transformation6 Educating and communicating with IS users
4. Value Delivery6 Cost Optimisation, ROI for IT and its bottom line impact.6 Total cost of ownership of IT Services6 Providing the value of IT
5. IT Asset Management 6 Selectively outsourcing of non core processes to trusted suppliers6 Leveraging Knowledge and skills6 Availability, training retention of key IT personnel
6. Risk Management6 Establishing IT Security to safeguard assets and enabling business recovery from IT failure6 Establishing trust in services and partners6 Providing privacy and resilience
Inputsw Business strategies & Key
initiativesw Knowledge of Business
Processesw Understanding Technology
trendsw Benchmarks
TATA Motors, CVBU IT Governance
Key Steps in-'IT Governance Focus'
1. Be driven by stakeholders value2. Adopt an Governance Framework3. Focus of its
6 Strategic Alignment6 Value Delivery6 IT Asset Management6 Risk Management
31.3.2005 16.5
Inputsw IT Roadmapw Investment Proposal (Capex)w Business processes
Key Steps in-'Manage Support System'
1. Conduct specific needs assessments2. Select information technologies3. Define data life cycles4. Develop enterprise support systems5. Test, evaluate and deploy enterprise
support systems
Sub process : Manage Support SystemSub Process Ref : CVBU – EL – 16 – 02
(version 1.1)Process Owner : CIO (supported by TTL
Project Heads)EPM Linkage : CVBU–EL–16 (Information
& Knowledge Management)Preparation Date : 31/03/04 Modification Date : 31/12/05
Efficiencyw Adherence to schedule for key projects
Effectivenessw Number of defects during implementationw Number of defects post implementation
Performance Measure Unit
%
No.No.
Outputsw Benchmarking / Evaluation Reportw Enterprise support systemw Unit and System Test Reportw User Acceptance Test Reportw Installation Report
How it operates (Methods/ Practices)1.Conduct specific needs assessments
6 Interact with various user groups6 Identify their specific needs
2.Select information technologies6 Scan the latest technologies available in-house as well as outside6 Short list the best option6 Functional coverage6 Performance6 Life of technology
6 Prepare project implementation schedule3.Define data life cycles (Except Infrastructure and Networking)
6 Prepare data flow diagram for a specific application development4.Develop enterprise support systems
6 Identify the desired output6 Design the front-end6 Logical and physical design of the system6 Software development (Coding)
5.Test, evaluate and deploy enterprise support systems6 Confirm the desired output is delivered (Unit and System Test Report)6 Confirm processing time6 Run the pilot and get users’ acceptance (User Acceptance Test Report)6 Install the system (Installation Report)
TATA Motors, CVBU Manage support System
31.3.2005 16.6
Key Steps in-'Manage System Security'
1. Establish systems security strategies and levels
2. Test ,evaluate and deploy systems security and controls
Outputsw Information Security Policy /
Proceduresw Installation Reportsw Information Asset
classificationw Secured Systemsw Segregation of Dutiesw Signoff document - Vendors
Sub process : Manage System SecurityReference : CVBU-EL- 16- 03
(version 1.1)Process Owner : CIO (supported by TTL
Project Heads) EPM Linkage : CVBU-EL-16 ( Information
& Knowledge Management )Preparation Date : 13/01/04Modification Date : 31/12/05
Inputsw IT Roadmapw Enterprise Data Standardsw Enterprise Quality
Standardsw Application Specific
Security Requirementsw Documented IT process
and procedures
How it operates (Methods/ Practices)1.Establish Systems Security Strategies and Levels
6 Design and implement Information Security policies / procedures6 Classification of Information Assets6 Availability of Data and information to end users6 User level awareness of System Security6 Ensure that the system (code and data) is secure from unauthorized access6 Vulnerability assessment on a periodical basis 6 Weekly update of anti-virus software on all servers and PCs6 Automate download and fixation of security patches.6 Withdraw Administrative privileges from end users6 Sign off from Third Party Vendor and ensure compliance with Information Security
requirement6 Deployment of Security Software at the Gateway
2.Test ,Evaluate and Deploy Systems Security and Controls6 Decide the criteria6 Run the pilot and confirm desired results6 Install the system (Installation Report)6 Review on periodical basisRefer sub-process CVBU – EL – 16 – 07 (version 0.0) “Information Management Audits” for audit details.
Performance Measure Unit
Efficiency
Effectivenessw No of PCs getting affected by No.
virusesw No on incidents for
unauthorised access No.w No of Vendors sign off obtained No.
TATA Motors, CVBU Manage System Security
31.3.2005 16.7
Key Steps in-'Manage Information storage & Retrieval'
1. Establish information repositories2. Acquire and collect information3. Store information4. Modify and update / delete information5. Achieve data 6 Enable retrieval of information
How it operates (Methods/ Practices)1. Establish information repositories
6 Understand the business processes6 Estimate the data size, storage space required6 Categories the data / information (BoM, CAD/CAM Data…)6 Estimate the user base for each application
2. Acquire and collect information6 Establish the source6 Identify & execute the process of data / information input
3. Store information6 Establish the norms6 Type of data6 Method of storages6 Back up strategy6 Store as per norms
4. Modify and update / delete information6 Establish the trigger for changing the data / information6 Establish the review frequency6 Establish the access norms
5. Achieve Data 6 Establish Archival Polocies / procedures
6. Enable retrieval of information6 Establish the norms6 Retrieve as per norms
Efficiencyw Data retrieval time for each category of data /
informationw No of occasions on which data could not be
made available(Valid for data center operations)
Hrs.
No.
Performance Measure Unit
Effectivenessw Server crash due to data overload No.
Inputsw IT Roadmapw Business Processesw KPMs and KPIsw Enterprise Data Standardsw Enterprise Quality Standards
Outputsw Norms for storage and retrievalw Backup Strategy
Sub process : Manage Information Storage & Retrieval Sub Process Ref : CVBU-EL-16-04 (version 1.1) Process Owner : CIO (supported by TTL Project
Heads)EPM Linkage – CVBU-EL-16 ( Information & Knowledge Management )Preparation Date : 31/03/04Modification Date : 31/12/05
TATA Motors, CVBU Manage Information Storage & Retrieval
31.3.2005 16.8
Key Steps in -' Manage Facilities & Network Operations'
1. Manage Centralized facilities2. Manage Distributed facilities3. Manage network operations
Outputsw Reliable facilities and network
operations
Sub process : Manage Facilities & Network Operation
Sub Process Ref : CVBU-EL-16-05 (version 1.1) Process Owner : CIO (supported by TTL Project
Heads)EPM Linkage– CVBU-EL-16 ( Information & Knowledge Management )Preparation Date : 31/03/04Modification Date : 31/12/05
Inputsw IT Roadmapw Information Security Policies /
Procedures
How it operates (Methods/ Practices)1.Manage Centralized facilities
6 Identify ownership6 Evolve, monitor and review maintenance schedule6 AMCs and warranty support (Hardware / Software)6 First time installation (Design, Implement, Install)6 Ongoing maintenance (Help Desk, Data Center Management …)6 Up gradation 6 Ensure redundancies for network / communication links.
2.Manage Distributed facilities6 Identify ownership6 Establish a process for interfacing with centralized facilities6 Evolve, monitor and review maintenance schedule6 AMCs and warranty support(Hardware / Software)6 First time installation (Design, Implement, Install)6 Ongoing maintenance (Help Desk, Data Center Management …)6 Up gradation
3.Manage network operations6 AMCs and warranty support(Hardware / Software)6 First time installation (Design, Implement, Install)6 Ongoing maintenance 6 Up gradation
Effectivenessw Availablility of facilities and Network operations %
Efficiencyw System uptime for each of the critical Hrs.
services (e-Mail,application servers …)w Response time for troubleshooting Hrsw Bandwidth management and monitoring
(for Networking)
UnitPerformance Measure
TATA Motors, CVBU Manage Facilities & Network Operations
31.3.2005 16.9
Key Steps in - 'Manage Information Services '
1. Manage libraries and information centers2. Manage business records and documents
Sub process : Manage Information Services
Sub Process Ref : CVBU-EL-16-06(version 1.1)
Process Owner : CIO supported by TTL Project heads
EPM Linkage – CVBU-EL-16 ( Information &
Knowledge Management)Preparation Date : 31/03/04Modification Date : 31/12/05
Efficiency
Performance Measure Unit
Effectivenessw 5”S” Audit scores No.w Document retrieval time Hrs.
Inputsw IT Roadmapw Business Processesw KPMs and KPIsw IT Security Policyw Storage and Retrieval Normsw Statutory requirements
Outputsw Storage & Disposal policiesw Categorized document libraries
How it operates (Methods/ Practices)1.Manage libraries and information centers
6 Identify the relevant business process6 Identify the data / information needs6 Create libraries (Databases, Intranet …)6 Review periodically for obsolescence
2.Manage business records and documents6 Decide the policy taking cognizance of legal
requirements6 Establish coding system / convention 6 Store documents in line with the policy6 Review periodically for obsolescence
TATA Motors, CVBU Manage Information Services
31.3.2005 16.10
Key Steps in -'Formation Management/Audits'
1. Perform IT security Audits2. Perform IT Infrastructure Audits3. Perform Information Quality Audits
Sub process : Information Management Audits
Sub Process Ref : CVBU-EL-16-07 (version 1.1) Process Owner : CIO (supported by TTL
Project Heads)EPM Linkage – CVBU-EL-16 ( Information &
Knowledge Management )Preparation Date : 31/03/04Modification Date : 31/12/05
Efficiency
Performance Measure Unit
Effectivenessw Number of Recommendations &
Findings in Auditsw Recurrence of the Nonconformity
Outputsw Audit Reports
Inputsw IT Roadmapw Information Management
Processw Organizational Databasesw Information Technology
Management Systems and Infrastructure
w Quality Standards (ISO,CMMI…)
How it operates (Methods/ Practices)1. Perform IT security Audits (Vulnerability assessment by IBM)2. Perform IT Infrastructure Audits on (With the help of Internal Audit
Team)6 Datacenter / Operations6 Networking6 Hardware & Software (development and deployment)
support6 Email & Portal support
3.Perform Information Quality Audits to check…6 Usefulness of information6 Information security (Accessibility)6 Information presentation6 Accuracy and reliability of Information
TATA Motors, CVBU Manage Information Audits
31.3.2005 16.11
Key Steps in - 'Knowledge Management'
1. Understand Knowledge requirements2. Encourage Knowledge Sharing 3. Exchange and use knowledge4. Build Knowledge Repositories where
necessary
Sub process : Knowledge Management Sub Process Ref : CVBU-EL-16-08 (version 1.1) Process Owner : Functional Heads/ Process
Owners)EPM Linkage – CVBU-EL-16 ( Information &
Knowledge Management )Preparation Date : 31/03/04Modification Date : 31/12/05
Efficiency
Performance Measure Unit
Effectivenessw Number of ideas shared and replicated on
Share Caféw User base of various intranetsw Number of suggestions in a yearw Number of Procedures / Processes
mappedw Number of Product Modifications
Outputsw Knowledge Repositoriesw Integrated Intranetsw Communities of Practice
How it operates (Methods/ Practices)1. Senior Management and process owners continuously communicate the
6 Business requirements to the respective stakeholders 2. Encourage knowledge sharing through…
6 Suggestion Scheme, Share Café 6 Cross Functional / Locational Assignments6 Dealer meets, Vendor meets6 QFD6 Involvement of suppliers during product development, etc
3. Exchange and Use knowledge6 Various meetings (CFT / CLT / SDT)6 Modify Design / Process / Procedure
4. Build Knowledge Repositories5. Monthly Reports in functions / divisions / departments
6 ISO / TS / EPM Documentation6 Audit / Assessment Reports
TATA Motors, CVBU Knowledge Management
31.3.2005 16.12
Inputsw Senior Management -
Strategic directionw Employees - Suggestion Scheme,
Share Café, Value Engineering Workshops
w Customers - QFD, Planned Interactions with customers e.g. Kulbir Singh Project, Product Review Meetings between Marketing, Service, QA, ERC & Mfg.
w Channel Partners - Dealers’ meets, Workshop Managers’ meet
w Vendors - Vendors’ meets, Involvement in Product Development
w Others - Consultants, ISO / TS / BSC Audits, TBEM External and Internal Assessment Processes
TATA Motors, CVBU Finance and Budgeting
Finance and Budgeting
EPM Process No :
Principal Process Owner :
Sub_Proc No Sub Process Name Sub_Process Owner
CVBU-EL-17-01
CVBU-EL-17-02
CVBU-EL-17-03
CVBU-EL-17-04
CVBU-EL-17-05
CVBU-EL-17-06
CVBU-EL-17-07
CVBU-EL-17-08
Locational Process Chiefs :
Revenue Budgeting
Acounts Payment Management
Resource Management
Risk Management
Employee Services
Statutory Audits
Manage Investor Relations
Product Costing (Auto + Non Auto)
Product costing - Foundry
Product costing - PE
Product Pricing - Vehicle
Direct TaxationProduct Pricing - Spare Parts
Financial Accounting -GAAP
Indirect Taxation
Direct TaxationReceivables Management
CVBU-EL-17-09
CVBU-EL-17-10
CVBU-EL-17-11
CVBU-EL-17-12
CVBU-EL-17-13
CVBU-EL-17-14 FIBRES
EVA drilldown
(Corp Finance , Business planning)
(Corp Finance , Plant - Business planning)
(Corp Finance , Plant - Business planning)
(Corp Finance , Plant Finance)
Head Finance - (Corp Finance , Business planning)
(Corp Finance , Business Planning)
Head Finance - (Corp Finance , Accounts & Taxation)
Head Finance - (Corp Finance , Plant Finance)
(Corp Finance,Businss Planning)
Head Finance - (Corp Finance , Accounts & Taxation)
Head - Shared Services,Corp Finance
Head Finance (Corp Finance - Treasury)
Head Finance (Corp Finance - Treasury)
Head - Shared Services / Corp Head
Finance Head - (Corp Finance , Plant Finance)
Head Investor Relations Dept,Corp Finance
Head Finance - (Corp Finance , Business Planning)
ED's Office
CVBU-EL-17
Mr P P Kadle - ED (Finance & Corp Affairs)
Locational Finance Heads
31.3.2005 17.1
ISO / TS 16949 (2002) Ref
Cost of Capital
No of Days
Ratio
Process review and Improvement / Modification History-
Accuracy of the reports
Adherence to Time schedule of reports
Time for Closing of Accounts, Receivable as No. of Days of Sales
Financial Ratios
Funds Utilisation - Budget Vs. Actual
Divisions Involved -End Customer- Core Values Embedded-
Corporate and Locational Finance Other FunctionsIntegrity, Customer Focus, Passion For Engineering and Corporate Citizenship5.4
Details of Modification Approved ByDate of Modfn. Modification No.
01/06/03 00 New Release BES,Pune
Issued / Modified by
31/3/05 01 Modification through process review Process Team
CVBU- EL- 17
Efficient Funds Management, Statutory Compliance, Provide Support for Decision Making
Higher Level Linkage-
Process Owner Mr P P Kadle ED (Finance & Corp Affairs)
INPUT OUTPUTKEY STEPS
Ø Review and Finalise Financial PoliciesØ Manage Corporate Finance Services
- Funds Management- Budgeting- Consolidation of Accounts and preparation of Financial Statements- Financial Analysis and Statutory Reporting
Ø Manage Locational Finance Services- Vendor Payments, Employee Payments, Costing & Budgeting, Funds Management
Ø Manage Sales Finance Services- Resource & Funds Management for BHPC- Receivables Management & Dealer Credit Control- Vehicle Pricing
ü Funds Availability ü Interest Cost Controlü Financial Analysisü Budgetary Controlsü Working Capital Controlü Statutory Compliance
§ CVBU Strategy§ Business Plan§ Economic Environment§ Financial Resources§ Requirement of External Suppliers and
Customers§ Requirement of Internal Customers§ Statutory Requirement§ TATA group guidelines§ Budget Approvals
TATA Motors, CVBU Finance and Budgeting
Process Title
Process Objective
Process Identification No. ( PIN) :
Finance and Budgeting
PROCESS DEFINITION SHEET
In-Process / Efficiency Measure Unit of Measure Output Measure / Effectiveness Measure Unit of MeasureNos.
R.Y.G.%,Rs. Cr.
%
31.3.2005 17.2
- Review andFinalise FinancialPolicies.-Set Targets andInitiativesFinance Divl.Commitee
- Annual A/C closing,- Financial statements,- Performance Analysis andResource BudgetPreparation
Finance Divl. Commitee
Inputs-- CVBU Strategy,- Business Plan,- Budget Approvals,- Statutory requirements,- Tata Group Guidelines,- Financial Resources,- Economic Environment- Requirement ofExternal Customersand Suppliers,
- Requirements ofInternal Customers.
Process Owner : Head of Corporate FinanceProcess objective : Efficient Funds management, Ensure statutory Compliance, Provide Financial, Information support for Business Decision Making
Outputs- FinancialStatement,BudgetProposals
Manage Finance Services atRespective Plants
*Manage Vendor Payments*Payment of salaries & wages.*funds Management*Sales Accounting*Payment Taxes and Duties*Costing and Budgeting*Plant Level Accounting*Provide MIS on financial performance of the Plant
*Plant Level Cost ReductionPlant Finance Heads
Manage Sales Finance Services -* Resources & Funds Managementfor BHPC.*Receivables Management andDealer credit controls*Vehicle Pricing
Head of sales Finance
Manage Corporate FinanceServices-
* Financial services for Corporateoffices, Regional & Area offices
* Funds Management for CVBU* Budgeting * Consolidation of Accounts and
preparation of Financial Statements* Financial Analysis, MIS and
Statutory ReportingHead of Corp. Finance
Output-- StatutoryCompliance- Improved Utilisationof Financial Resource
Acquire andAllocateResourcesHead Corp.Finance
- Periodic Review ofPerformance,- Reallocation of Resources
Head ofCorp. Finance
Continue with theProcess
TATA Motors, CVBU Finance and Budgeting
31.3.2005 17.3
Key Steps in –'Revenue Budgeting'
1. Preparation of functional budget at plant level and Corporate level
2. Consolidation of budget3. Inclusion of Union Budget impact4. Review and Approval of budget.5. Communication of approved budget to
Functional Heads6. Monitoring and review of budget.
Sub process : Revenue Budgeting Sub Process Ref : CVBU-EL-17-01 (version 1.1)Process Owner : Corporate Finance –
Business Planning EPM Linkage : CVBU-17 (Finance & Budgeting)Preparation Date : 31/03/04Modification 1 : 30/11/04Modification 2 : 20/12/04
How it operates (Methods/ Practices)1. Releasing of Budget guidelines on financial and policy matters2. Preparation of departmental budget and compilation into functional budget at plant
level based on annual production plan and also preparation of functional budget for Sales & Marketing and Corporate Affairs
3. Consolidation of budget at company level4. Present First cut Business Unit budgets to respective EDs5. Incorporate changes (if any) as recommended and represent detailed Business Unit
budget to respective EDs for their recommendation6. Present budget before Operations Committee for recommendation7. Present budget before Management Committee for recommendation8. Incorporate Union budget provisions and prepare final Company budget9. Review and recommend final Company budget for approval10. Circulate the final proposal to Board Sub Committee and receive approval11. Review and approve Company budget by Board of Directors12. Communicate approved budget to concerned Functional Heads13. Analysing variance on monthly basis and proposing modifications (if any) during mid
term review (MTR)14. Seeking approval of MTR as above
Inputswwww
wwwwwww
Vehicle sales planNon vehicle business plan Plant level production planManpower requirement & proposed salary/wage revisionCost saving target R&D BudgetPublicity budgetDepreciation policy.Union budgetDirectives from Board of DirectorsCapital Budget
Outputswwwww
Plant / Div-CX / BC wise budgetBudget updation in systemMIS report.Cost saving reportAbsorption rate for determining standard cost of aggregates / components / assemblies
UnitPerformance Measure
Effectivenessw
%Accuracy of budget(Variance – excluding the effect of change in sales volume)
Efficiencyww
Adherence to Budget Calendar %Timeliness, final budget by 31st march %
TATA Motors, CVBU Revenue Budgeting
31.3.2005 17.4
OutputsProduct cost
w For Vehiclew For Aggregate and assembliesw For componentsw MIS for variance analysis
Sub process : Product Costing (Auto) Sub Process Ref : CVBU-EL-17-02
(version 1.1) Process Owner : Corporate Finance/Plant –
Business Plg EPM Linkage : CVBU-EL-17 (Finance
&Budgeting)Preparation Date : 31/03/04Modification 1 : 30/12/04Modification 2 : 18/01/05
Efficiencyw Correctness of product cost. %
Effectivenessw Availability of cost data for product %
booking and stock valuation.w Absorption of Expenses over output.
Performance Measure Unit
Inputsw Sales/ production plan for the
budget yearw Revenue budget for the year.w Bill of material. (BOM)w Technical part list converted to BOMw Routing for parts/assemblies (SMH)w Actual expenses for each cost
centre for current year period.w Total expenses, which are
apportioned to Auto (e.g. common service, HO expenses, R&D expenses)
w Cost centre master dataw Financial account dataw Asset master data
Key Steps in –'Product Costing'
1. Update year opening price adjusted to budget parameters as planned price for bought out parts
2. Release budgeted cost centre rates.3. BOM explosion4. Analysis of cost sheet (Cost sheet
should be free of errors--- status KA) 5. Mark and release the cost for inventory
valuation and production booking.
How it operates (Methods/ Practices) 1. Cost centre rate is based on actual basis (BC rate of last quarter) and activity involved
(SMH required) to achieve the planned production.2. Condition of supply is being factored in BOM while entering in the system3. BOM consists aggregation of components, subassemblies, and assemblies to vehicle.4. While BOM explosion system looks for planned material cost of each input material. At
each level material cost is aggregated.5. For in house manufactured components (indicated by E99 or E98),Cost centre routing is
picked and conversion cost is calculated based on cost centre rate. At each higher level conversion cost is aggregated.
6. Aggregate cost at each level is product cost .7. Product cost will get released at component level, and for each aggregate where it is
considered for in house product booking. 8. Product is also available at current month average material price as well as weighted
average material price. (This product cost is used for MIS purpose)
TATA Motors, CVBU Product Costing (Auto)
31.3.2005 17.5
Inputsw Asset master data.w Cost center master data.w Financial account data.w Cost/work center dataw R&D (actual+projected)w Bill of Material for products.w MAP’s
Key Steps in –'Product Costing'
1. Work out planned cost2. Work out actual product cost based on 6 Actual Production6 Actual consumption of Matl & labor
3. Analyze Variance4. Prepare MIS and Profitability report5. Consolidation of Cost and MIS Report.6. Cost monitoring, cost audit.7. Non auto (tooling, electronic etc) costing
Sub process : Product Costing Sub Process Ref : CVBU-EL-17-02 (version 1.1) Process Owner : Corporate Finance/Plant –
Business Plg EPM Linkage : CVBU-EL-17
(Finance & Budgeting)Preparation Date : 31/03/04Modification 1 : 30/11/04
Efficiencyw BOM, MAP accuracy %
Effectivenessw Accuracy of data/information. %
Performance Measure Unit
Outputsw Cost of productw MIS.w Cost audit report
How it operates (Methods/ Practices)A. Auto Costing 1. Work out cost centre rates on the basis of budget expenses.2. Work out planned cost.3. Cost head / product wise actual costs are worked out based on actual
production and consumption of material and labor.4. Cost variances are analyzed and MIS reports (direct material
consumption, indirect material consumption etc.) are sent respective departmental heads for necessary action
5. Product cost report are consolidated at CVBU level and product profitability and contribution is analyzed and reports are given to Steering Committee and LOB heads.
B. Non Auto Costing 1. Work out cost center rates.2. Work out actual cost through work order system.C. Carry out auditing by auditors appointed by BOD.D. Seek approval from BOD & signed by E.D.E. Take action on audit findingsF. Share/compare cost comparisons with other plants.
TATA Motors, CVBU Product Costing
31.3.2005 17.6
Key Steps in –'Product Costing'
1. Work out Activity Rates –( Melting, Core, Mould and Finishing )
2. Update activity rates3. Take cost roll-up (item wise cost
bifurcated in to Variable & Fixed cost)
Outputsw Cost of productw Informing Cost to internal
customers for the purpose of transfer accounting
w Excise duty payment for Transfersw Inventory valuationw Quotations for sale to External
Customersw Contribution & Profitability analysis
on outside sale
Sub process Product Costing - Foundry
Sub Process Ref : CVBU-EL-17-02 (version 1.1)
Process Owner CVBU, Pune -Business Planning
EPM Linkage : CVBU-EL-17 (Finance & Budgeting)
Preparation Date : 31/03/04Modification 1 : 27/12/2004
Inputsw Revenue Budget w Production Plan w Asset master data.w Cost center master data.w Cost centre wise Manpower data w Bill of Material for products.
Performance Measure Unit
Efficiencyw Bill of Materials (BOM) Nosw Variance analysis %
Effectivenessw %Accuracy of Cost
How it operates (Methods/ Practices) 1. Collection of revenue expenses – BC wise2. Apportioning the same in 4 activities – Melting, Core, Mould and Finishing3. Working out SMH rate / kg. Liquid metal for melting expense4. Updating activity rates5. Technical data received from plant towards conversion cost6. Working out conversion cost7. Booking of material cost at actual and MASOP cost (outside processing
charges)8. Arriving at total cost 9. Taking cost roll up which gives the product wise cost bifurcated into
Variable Cost & Fixed Cost
TATA Motors, CVBU Product Costing (Non Auto – Foundry)
31.3.2005 17.7
Key Steps in –'Product Costing'
1. Updation of Cost Centre Rates2. Consumption of Direct material
for actual cost(estimate for outside quote)
3. Labour Hour booking for actual cost (estimate for outside quote)
How it operates (Methods/ Practices)1. Cost centre wise booking of actual Labour hours spent on the
Work Order.2. Working out cost centre rates on the basis of Expenditure &
Labour overhead as per SMH (actual booked to WO)3. Actual issue of Direct material to Work Order 4. Actual expense relating to outside processing charges5. Working out total cost after completion of the Work Order6. Working out hike de hike percentage based on the difference
between actual expenses & Budgeted Expenses at the year end.
7. Working out the revised cost.
Inputsw Cost centre master data.w Cost centre wise expenditure
Budget for the yearw Cost centre wise Labour Hours
budget for the yearw Release of Work Order based on
Indents from APL/Technical Services & Pos received from Outside customers for manufacture of Tooling
w BOM release for manufacture of Tooling against WOs.
Efficiencyw Correct booking of Direct Material Rs.w Correct booking of Labour Hours
Performance Measure Unit
Effectivenessw Accuracy of Tooling Cost %
Outputsw Cost of Toolingw MIS – Performance sheet,
variance analysis at overall levelw Quotations for outside Salew Contribution & profitability analysis
on outside Sale of Tooling
Sub process : Product Costing - PE Sub Process Ref : CVBU-EL-17-02 (version 1.1) Process Owner : CVBU,Pune- Business Planning EPM Linkage : CVBU-EL-17 (Finance
&Budgeting)Preparation Date : 31/03/04Modification 1 : 27/12/2004
TATA Motors, CVBU Product Costing (Non Auto – Prodn. Engineering)
31.3.2005 17.8
Key Steps in -'Product Pricing'
1. Determine New vehicle price.2. Approve and Implement new prices3. Review and revise existing
product prices
Performance Measure
Effectivenessw Conformity with pricing norms w Compliance with effective date
%%
Efficiencyw Adherence to schedule %
Sub process : Product Pricing (Vehicle)Sub Process Ref : CVBU-EL-17-03 (version 1.1) Process Owner : Corporate Finance –
Business PlanningEPM Linkage – CVBU-EL-14 ( Finance &
Budgeting )Preparation Date : 31/03/04Modification 1 : 30/11/04Modification 2 : 20/12/04
Unit
Inputsw Sales forecast of new productw New vehicle specificationsw Works cost data from Plantsw Tax applicability w Competitor price dataw Marketing and pricing strategy for
new productsw Profitability targetsw Mktg, sales & distribution cost dataw Current price listw Information about existing product
strategy
How it operates (Methods/ Practices)1. Pricing of new product (model / variant) 6 Information about new product - product features6 Positioning of product vis a vis competitor and current product range of
CVBU6 Obtaining cost data of new product from Works6 Loading margin after considering prices and profitability of current product
and prices of competitor, demand forecast, Marketing and pricing strategy and budgeted profitability of model group6 Sent to Business Head in the specific format for recommendation6 Changes made (if any) as suggested by Business Unit and sent to ED (F &
CA) for recommendation to Chairman’s office6 Final approval from Chairman6 After approval Prices are updated in the system and communicated to 6 Marketing & Sales, Plant Finance, Dealers, Central Excise etc. along with
effective date.2. Pricing of existing product
Conducting periodic review of - Cost data of components / aggregates / assemblies, Impact of Union Budget, Product profitability target, Target market share of product, Marketing and pricing strategy,
Accordingly product prices are revised
TATA Motors, CVBU Product Pricing- (Vehicle)
Outputsw Updated vehicle price lists
available to internal & external customers
w Invoicing of vehicles
31.3.2005 17.9
Key steps in –'Direct taxation'
1. Analyzing Union budget, Income Tax act, Rules, Treaties and case laws
2. Tax planning3. Ensuring compliance of tax law and procedures4. Computation of income5. Payment of taxes to Govt. and filing of Return6. Handling assessment / appeal / notices
Inputsw Income tax act & Rulesw Case laws / tax journalsw Double taxation avoidance
agreementw Union budgetw Financial accountsw Directives from Board of Directorsw Details of transaction data from
Divisions having tax impactw Expert opinion on legal issues
Outputsw Legal compliancew Avoidance of penalty / interest
paymentw Tax savingw Assessment / appeal order
How it operates (Methods/ Practices)1. Study effect of changes in Income tax rate, Law as per Union Budget2. Intimating new tax laws and rates to all Divisions for implementation and ensuring
compliance3. Advising on various tax / TDS issues by reviewing transaction to ascertain tax implication4. Reviewing data received from Divisions for computation of income tax5. Availing all tax incentives applicable6. Making provision for current tax / deferred tax as per Indian / US GAAP and getting it
duly audited7. Computation of effect of transfer pricing in case of International Business8. Computation of income and payment of tax and filing of return of income9. Appearing before tax authorities, making representation and getting assessment
completed10. Filing appeal, liasioning with Tax Counsel and attending appeal hearing11. On receipt of appeal order, lodging claim for consequential effect and obtaining refund due.12. Preparation of contingent liability statement and getting it duly audited13. Collecting data, obtaining valuation report and computing wealth tax payment as per act14. Payment of wealth tax, filing of return and getting assessment done
Performance Measure Unit
Effectivenessw Minimum tax liability – avoidance
of penalty and interest Rs. in croresw Reduction in contingent liability Rs. in crores
Efficiencyw Compliance with statutory requirement %w Timely payment of taxesw Timely filing of returns and claims %
%
Sub process : Direct taxationSub Process Ref : CVBU-EL-17-03 (version 1.1)Process Owner : Corporate Finance – Business
PlanningEPM Linkage – CVBU-EL-14 ( Finance &
Budgeting )Preparation Date : 31/03/04Modification 1 : 30/11/04Modification 2 : 28/12/04
TATA Motors, CVBU Direct taxation
31.3.2005 17.1031.3.2005 17.10
Key Steps in – 'Spare parts Pricing'
1. Determine spare parts price2. Approve and Implement new prices3. Review and revise existing spare parts prices
Sub process : Product Pricing (Spare Parts)
Sub Process Ref : CVBU-EL-17-03 (version 1.1) Process Owner : Corporate Finance –
Business PlanningEPM Linkage – CVBU-EL-14
( Finance & Budgeting )Preparation Date : 31/03/04Modification 1 : 30/11/04Modification 2 : 13/12/04
Efficiencyw Adherence to schedule %
Performance Measure Unit
Effectivenessw Conformity with pricing norms %w Compliance with effective date %
Outputsw Updated spare parts price
lists available to internal & external customers
Inputsw Vehicle sales forecast w New vehicle specifications/
spare part listw Spare parts masterw Serviceable parts list and
technical part listw Purchase contract from Plants
for OE suppliersw Duties / Tax applicability w Cost data for shop made partsw Marketing and pricing strategy w Profitability targetsw Current price list
How it operates (Methods/ Practices)1. Pricing of new parts 6 Information about new product 6 Information of technical part list received from ERC6 Obtaining cost data of shop made parts from Works6 Calculation of landed cost for OE parts from purchase contracts6 Loading margin after considering marketing and pricing strategy , type of parts,
criticality and budgeted profitability6 Sent to AGM (Spare Parts – CVBU) in the specific format for recommendation6 Changes made (if any) as suggested by AGM(Spare Parts – CVBU) and sent to
Head, LOB 4 for approval6 Final approval from Head, LOB 46 After approval Prices are updated in the system and communicated to Marketing
& Sales, Tata Motor Plant Finance, Dealers, Distributors, Central Excise etc. along with effective date.
2. Pricing of existing parts 6 Prices are periodically reviewed and revised when necessary, to maintain
product profitability
TATA Motors, CVBU Product Pricing - (Spare Parts)
31.3.2005 17.11
Key Steps in – 'Financial Accounting'
1. Controlling authorisation for passing accounting entries in the system
2. Correct accounting for income and expense 3. Consolidation of accounts at corporate level4. Preparation of accounts as per Schedule VI requirement and quarterly accounts
as per AS 255. Preparation of accounts as per US GAAP6. Review of financial statement7. Regulatory compliance
Efficiencyw Closing of TB for MIS Ist dayw Completion of Quarterly Accounts in 15 days 15daysw Completion of Annual Accounts . 3Wks w Accuracy and timeliness of Reports %w Number Audit Adjustment Entries . Nos
Performance Measure Unit
Outputsw Management Information Reports .w Quarterly Results as per SEBI.w Consolidation Accounts as per
AS21.w Annual Report w Book on Explanatory Note. w Form 20 as per US GAAP w MD & A as per US GAAPw Prospectus and other Financial
documents
Inputsw Accounting standards and
pronouncements, Indian Companies and Taxation act
w US GAAPw TB from HR & Payroll & BHPC
and other Legacy system .w TB and other FI data from
Subsidiaries and Associates w Data from Vendors for incoming
Materials thru VCM .w Data from Customers on
Warranty and PDI claims w Proof / documents pertaining
income / expense bookingw Bank statement and related info
from Banks thru Internet.
Effectivenessw Number of Audit Issues. Nos.w Adverse comments from External Auditors Nos.
Sub process : Financial Accounting Sub Process Ref : CVBU-EL-17-04 (version 1.1) Process Owner : Corporate Fin – Accounts &
Taxation EPM Linkage : CVBU-17 (Finance & Budgeting)Preparation Date : 31/03/04Modification Date : 30/11/04
How it operates (Methods/ Practices)6 Maintaining FI and Tax master6 General Ledger Accounting, BC wise and cost centre wise booking of entries6 Analysing and reviewing of accounts, periodic clearing of line items 6 Uploading TB from other Systems e.g. HR, BHPC, HVAL / HVTL, CFM6 Carrying out Period End Activities in Finance and in SAP6 Finalising TB after required Accrual, Provision and Adjustments entries6 Carrying out Actuarial Valuation of Employee Leave, Gratuity, Superannuation Fund and
Medical liabilities as per Proviions of Indian and US GAAP 6 Reconciling inter company transactions and passing required inter company elimination entries 6 Preparing schedules e.g.
ØRaw Material and Finished Goods Inventory, Vendor, Customer, Investment ØBorrowings and Fixed Assets Schedules
ØNotes to accounts ØP & L Variance
CARO requirements6 Preparing realigned TB as per US GAAP and passing required US GAAP entries6 Preparing accounts as per Indian and US GAAP
TATA Motors, CVBU Financial Accounting
31.3.2005 17.12
Key Steps in – 'Financial Accounting'
1. Statement of Balances from all TML locations
2. Financial accounting schedules for all assets & liabilities
3. Bank Reconciliation4. Variance analysis of major P & L and
Balance Sheet items5. Reconciliation of TML accounts with
subsidiaries & associates.
Inputsw Common Chart of Accountsw Transactions & Trial balances of
various locationsw Accounting Standardsw Information & data from
subsidiaries & associates
Efficiencyw Completion of Quarterly audit review in 15
days TimeCompletion of Annual Audit Review in 30 days. Time
w Timeliness of Report Time
w
Performance Measure Unit
Effectivenessw Accuracy of Accounts %w Adverse comments from External Auditors Nos
Sub process : Financial Accounting Sub Process Ref : CVBU-EL-17-04 (version 1.1) Process Owner : Corporate Fin – Accounts &
Taxation EPM Linkage : CVBU-17 (Finance & Budgeting)Preparation Date : 31/03/04Modification Date : 30/11/04
How it operates (Methods/ Practices)1. Prepare & audit various accounts (by respective groups at resp.TML locations)2. Prepare
Ø notes to accountsØ Explanatory notesØ Schedule VI requirementsØ CARO requirements
3. Get tax audits done4. Maintain Master Chart of Accounts with justifications5. Adherence to various Accounting Standards
Close follow up & coordination with various TML locations Associates & Subsidiaries
GAAP – Generally agreed accounting practicesUSGAAP – US …Listing Agreement – with the stock exchange where we register our Shares
TATA Motors, CVBU Financial Accounting
Outputsw Company’s consolidated final
accounts duly audited.w Final accounts to meet requirements
of US GAAP.
31.3.2005 17.13
Key steps in –'Indirect taxation'
1. Analyzing tax rules and regulations and their implications in the business
2. Payment of taxes to vendors3. Collection of taxes from customers4. Set off adjustment of service tax against
payment of excise duty5. Payment of taxes to Govt.6. Filing of returns and claiming of refunds
Outputs
w Cenvat creditsw Cost price of Product w Refund claimsw Legal judgmentsw Assessment report by governmentw MIS on contingent liability, status of
cases under appeal
Efficiencyw Timely availment of Cenvat credit/set off
concessions. %w Timely payments of taxes. %w Timely fillings of returns / claims %
Performance Measure Unit
Effectivenessw Adherence to statutory requirements. %
Reduction of contingent liability for excise Rs. crores and sales tax related matters
Sub process : Indirect Taxation Sub Process Ref : CVBU-EL-17-05 (version 1.1) Process Owner : Corporate/Plant LevelEPM Linkage : CVBU-EL-17
(Finance & Budgeting)Preparation Date : 31/03/04Modification date : 24/12/04
How it operates (Methods/ Practices) 1. After budget session Works finance analyses rules & tariffs related to excise duty, sales tax, service tax, & local taxes2. Works finance updates master data related to above3. Implication and effect on product pricing is worked out and conveyed to Sales & Marketing Dept4. Taxes are paid to vendors based on PO terms & conditions against excise on commercial invoices through supplier
payment system5. Works finance avails Cenvat duty credit against excise duty paid on inputs6. Excise duty & sales tax are collected from customers on sold products & separately accounted for7. Service tax collected on services rendered and paid on services availed.8. Works finance makes payments of excise duty for vehicles/components dispatched through PLA or RG23 after netting
off Cenvat credit available9. Set off is being availed on service tax paid on services availed against payment of excise duty
th th10. Excise duty is being paid on 5 of next month, Returns are being submitted by 10 of next month11. Works finance makes payments of sales tax to state/central government every month.
th12. Works finance makes payment of service tax collected on 25 of next month, Returns are being submitted half yearly13. Local taxes (Octroi etc) are being paid by Works finance14. Works finance files submissions, returns and claims refunds in case of concessions15. Coordinating with Legal Dept. for disputed cases16. Works finance prepares schedules, answers to queries of auditors from Excise Dept. and statutory Auditors
InputsExcise Duty.6 Excise rules & tariffs6 Union budget6 Vendor master6 Duty paid excise invoices from vendors6 Product price list.6 Dispatch cum excise documents
Sales Tax6 Invoices of suppliers6 Customer master6 Form C/D/H ,and entitlement
certificates6 Sales tax rules6 Commercial invoices of TML
Service Tax6 Service tax rules6 Invoices of the service providers6 Our invoices for services rendered
TATA Motors, CVBU Indirect Taxation
31.3.2005 17.14
Key steps in –'Direct taxation'
1. Analyzing Union budget, Income Tax act, Rules, Treaties and case laws2. Tax planning3. Ensuring compliance of tax law and procedures4. Computation and payment of taxes to Govt. and filing of Return5. Handling assessment / appeal/ notices6. Handling Tax Audit
Outputsw Legal compliancew Avoidance of penalty / interest
paymentw Tax savingw Tax audit report
Efficiencyw Compliance with statutory requirement %w Timely payment of taxes %w Timely filing of returns and claims %
Performance Measure Unit
Effectivenessw Minimum tax liability Rs. in croresw Reduction in contingent liability Rs. in crores
Sub process : Direct TaxationSub Process Ref : CVBU-EL-17-05 (version 1.1)Process Owner : Corporate Finance – Business
PlanningEPM Linkage – CVBU-EL-14
( Finance & Budgeting )Preparation Date : 31/03/04Modification 1 : 30/11/04Modification 2 : 13/12/04
How it operates (Methods/ Practices)1. Study effect of changes in Income tax rate, Law as per Union Budget2. Intimating new tax laws and rates to all Divisions for implementation and
ensuring compliance3. Reviewing data received from Divisions for computation of income tax4. Making provision for current tax / deferred tax as per Indian / US GAAP5. Collection and payment of TDS, issue of TDS certificates6. Payment of tax and filing of return of income7. Appearing before tax authorities, making representation and getting
assessment completed8. Filing appeal, liasioning with Tax Counsel and attending appeal hearing9. On receipt of appeal order, lodging claim for consequential effect and obtaining
refund due.10. Preparing income tax schedule for tax audit and providing information and data11. Collecting data, obtaining valuation report and computing wealth tax payment as
per act12. Payment of wealth tax, filing of return and getting assessment done
TATA Motors, CVBU Direct taxation
Inputsw Income tax act & Rulesw Case laws / tax journalsw Double taxation avoidance
agreementw Union budgetw Financial accountsw Directives from Board of Directorsw Details of transaction data from
Divisions having tax impactw Expert opinion on legal issues
31.3.2005 17.15
Key Steps in –'Receivable Management'
1. Receipt updation and bank reconciliation2. Monitoring and controlling credit limits3. Incentive payout to dealers / customers4. Dealer / customer account reconciliation5. Follow up and recovery of dues6. Provisioning of bad debts and write off7. Inventory reconciliation and valuation for RSO
stock8. Management of Sales tax payment and
assessment
Outputsw MIS on on receivablesw MIS on incentive payoutw Quarterly sign off with dealers/
customersw MIS on dealership
financial position
Inputsw Customer, Price and Tax master
dataw Sales orderw Payment terms and condition of
order as agreed by managementw Incentive Schemes for
Dealers/Customersw Invoice
Efficiencyw MIS within the target date %w Early warning on dealership financial status timeliness
Performance Measure Unit
Effectivenessw Reduction of overdue receivables Rs in cr.w No. of accounts reconciliation with dealers / %
customersw Control on Credit Management No. of
defaults
How it operates (Methods/ Practices)1. Daily receipt updation based on bank information2. Monthly Bank reconciliation3. Periodic line item clearing in dealer/ customer account against invoice details4. Incentives being credited / paid to dealers / financiers based on offtake / retail performance as per
incentive schemes framed by Marketing Dept.5. Bank Guarantee / Security deposit updation and setting up credit limit with reference
to payment terms and condition 6. Monitoring and reviewing limits,/bank Guarantee .7. Issuing credit to dealer account on account of direct sale commission, interest on delayed delivery, interest on
security deposit 8. Periodic reconciliation of account statement with dealers / customers.9. Follow up of outstanding with customers and Business Unit10. Coordinating with Legal Dept. for disputed cases11. Seeking approval for bad debt provisioning and write off12. Reconciliation of RSO stock and valuation thereof by taking confirmation from respective Works and RSOs
in terms of despatch figure , invoice details and stock transfer memo13. Monthly remittance of sales tax to RSO locations14. Preparing sales tax schedule15. Coordinating in sales tax assessment / appeal cases16. Obtaining order from Sales Tax Dept.
Sub process : Receivable Management Sub Process Ref : CVBU-EL-17-06 (version 1.1) Process Owner : Corporate Finance – Accounts &
Taxation EPM Linkage : CVBU-EL-17 (Finance &
Budgeting )Preparation Date : 31/03/04Modification 1 : 28/12/04
TATA Motors, CVBU Receivable Management
31.3.2005 17.16
Scope: (vendor payments for material & services.)1. Maintenance of master data.2. Receipt of invoices from suppliers3. Invoice verification, payment run4. Process recoveries from suppliers,
reconciliation. 5. Disbursement of payments.6. Financial accounting & audit.
Key Steps in – 'Accounts Payment Mgmt' Outputs
w Cheques to suppliers, contractors
w Accepted Hundiesw Debit notes.w Payment advise spool to
HDFC for supplier payments.w Financial statements w Reconciled accounts.
Inputsw Approval of new vendor.w Service entry sheet/GINsw Purchase orders.w Advance request.w Supplies,invoice.w Recovery advice.
Efficiencyw Accuracy of data. %w Compliance to statutory requirements. %
Performance Measure Unit
Effectivenessw Timely payment – SSI & non SSI No of Days
How it operates (Methods/ Practices)1. Add suppliers in master based on approved advice from purchase and MPC/SSG. Update bank
master data, pay terms data in the system2. Invoices are received by CRDO & executing agency & retained at their end Information flows to
Finance for payments through SAP3. Verify invoices, consider recoveries if any and adjust to amount payable
(Invoice verification for materials is done by system whereas exceptions are cleared by finance)4. Incase of service, invoice verification is done by finance5. Generate hundies in case of BMS supplies6. Plan and run payment processing system to select transactions, based on the date as per pay
terms7. Make advance payments based on advance request, make payment for the bills pertaining to
contract services, capital expenses & other miscellaneous expenses8. Send payment spool to HDFC for cheque printing9. Receive back entire spool, along with payment reference and upload in the system to update
pay details.10. Other bank checks printing & distribution by HDFC and informed11. Reconciliation of payment at vendor level12. Prepare schedules and financial statements & forward to corporate finance for consolidation.
Sub process : Accounts Payments Management Sub Process Ref : CVBU-EL-17-07 (version 1.1) Process Owner : Corporate/Plant LevelEPM Linkage : CVBU-EL-17 (Finance &
Budgeting)Preparation Date : 31/03/04Modification Date : 24/12/04
TATA Motors, CVBU Receivable Management
31.3.2005 17.17
Key Steps in –'Resource Management'
1. Resource Planning2. Finalize Resource outflow from Revenue Budget 3. Work out monthly, income & expenses and
allocate resources4. Track daily collection and expenses5. Take decisions on loans & investments6. Channelise funds(invest or borrow)7. Prepare MIS reports (Board, ED’s, Finance
committee)
Outputsw Plans for utilization of fundsw Plans for investment/loansw MISw Monthly cash flow estimatew External obligations
InputsInternalw Long term plan, annual planw MTR Revieww Monthly Sales and Plant Dataw Daily expense and collection
dataw Capex PlansExternalw Market Related, Interest
Rates, Funds Availability
How it operates (Methods/ Practices)1. Estimate the resource requirements of the company2. Raise funds & plan resources to collect money3. Identify products & Cost 4. Keep daily monitoring5. Decide on loans if required6. Decide to invest excess capital 7. Channelise funds to the required areas 8. Prepare MIS reports9. Measure the costs and take corrective action
Sub process : Resource ManagementSub Process Ref : CVBU-EL-17-08 (version 1.1) Process Owner : Corporate Finance - Treasury EPM Linkage – CVBU-EL-17 (Finance &
Budgeting)Preparation Date : 31/03/04Modification 1 : 30/11/04
Efficiencyw Cost of funds %w Avg Borrowing levels Rs in crsw Overdraft levels Rs in crsw Liquidity Availability Rs in crs
Performance Measure Unit
Effectivenessw Manage the resource availability with
minimum costs %w Adequate return on surpluses %
TATA Motors, CVBU Resource Management
31.3.2005 17.18
Key Steps in –'Risk Management'
Assets Risk1. Identify, control & monitor key Asset risks2. Decide Insurance Policy – risk coverage3. Finalize Insurance Company4. Policy premium payment, claims, maintenance5. Identify liquidity, interest and currency risk6. Take risk hedge measures
Currency Risk1. Identify & monitor key exposures2. Decide risk coverage and instruments3. Decide external risk hedging agencies4. Take risk covers and monitor cost5. Feedback on cost transferred to BU
Outputsw Insurance Policiesw Claims settledw MIS reportsw Risk Cover Reportsw Risk Costs MIS
InputsAsset Riskw Risk Parametersw Assets Valuation Dataw Quotes from Insurance
Companiesw Internal Data on Risk Eventsw External Valuations/Survey
ReportsCurrency Riskw Annual and Six months Cash
flow in Foreign Currency (data from Business Units)
w External data on currency and economic development
How it operates (Methods/ Practices)Asset/ Transit Insurance: (Insurance of plant, building, Transit Insurance)1. To review and assess the probability of event (risk) occurrence2. Observe the statutory insurance compliance3. Identify assets, determine value for insurance coverage (Valuation by professional valuer)4. Decide Insurance policy at Corporate Level. Decide coverage % (whether 100% or partial)5. Call quotations from Insurance companies, negotiate and select.6. Pay Premium, Lodge claims, Maintain Policies at Plants / Non plant locations7. Annual Review of insurance policies coverage and incidents8. Periodic review of underlying processes involved and cost benefit for existing large policies.Currency Risk: (regarding foreign currencies, financial assets – liabilities (interest rate risk, credit risk, etc.)1. Treasury acts a bank for the Business Unit2. Treasury provides a foreign exchange rate to the Business Unit for its budget period and protects BU
at that rate. 3. Treasury then decides to hedge or keep the exposures open and bears the exchange loss or gain.4. Treasury Department every month makes a report to Finance Committee of Directors (FCOD) of its
exchange covers and loss/gain position. There is also a weekly reporting to Executive Director Finance.5. Treasury every quarter sends a compliance report to the Audit Committee
Efficiencyw Cost benefit of insurance processes Rs in crsw Amount of coverage offered Rs in crsw Claims settlement No. of daysw Exchange loss/gain Rs in crsw Risk cover position for company Rs in crs
Performance Measure Unit
Effectiveness
TATA Motors, CVBU Risk Management
Sub process : Risk Management Sub Process Ref : CVBU-EL-17-09 (version 1.1) Process Owner : Corporate Finance - Treasury EPM Linkage – CVBU-EL-17 ( Finance &
Budgeting)Preparation Date : 31/03/04Modification 1 : 30/11/04
31.3.2005 17.19
Key Steps in –'Employee Services'
1. Payment of Salaries and Wages2. Disbursement of Loans as per Company
schemes3. Full and Final settlement of employees4. Manage PF, Superannuation, TEPS, BKY,
PSY schemes5. Payment of separated / ESS Employees6. Investments , Financial Accounting
How it operates (Methods/ Practices)1. Collect attendance data / Leave Cards / slips and update in the system2. Process recovery / payment forms like ( IT declarations, third party deduction
advices, uniforms, HRA, medical reimbursement, telephones etc.)3. Process salary cheques and advice to banks4. Process Loans / advances form (housing loan, PF loan, festival advance etc.)
and disburse loans5. Make full and final settlement of employees on retirement / separation.6. Process ESS salary & provide cheques /payment advise to banks.7. Manage schemes like TEPS, BKY, PSY.8. Provide Income certificates (form 16) to employees, Pass Financial entries, file
returns to government,
Employee services are provided by Locational finance in case of Pune, JSR, LKO plant , where as by Corp. Finance in case of non-plant locations.
Sub process : Employee Services Sub Process Ref : CVBU-EL-17-10 (version 1.1) Process Owner : Plant/Corporate Heads EPM Linkage– CVBU-EL-17 (Finance &
Budgeting)Preparation Date : 31/03/04Modification Date : 24/12/04
Inputsw Employee Payroll master
data.w Guidelines on schemes from
HRw Attendance data/leave cardw Third party (HDFC,TKSP,LIC,
PF Loan etc.) deductions advice
w Loans/savings/declaration & other forms.
Efficiencyw Employee Satisfaction Survey %
Performance Measure Unit
Effectivenessw Timely release of salary By Datew Timely filings of returns /schedules By Datew Accentuations of data.w Release of MIS on time. By Date
TATA Motors, CVBU Employee Services
Outputsw Payments of salaries to Banksw Payment to Third Partiesw Payslips
31.3.2005 17.20
Key Steps in - 'Statutory Audit'
1. Tracking Calendars for Review of Accounts by Audit Committee & the Board .
2. Agree on Audit Scope , define time line and Roles and responsibilities .
3. Conduct Physical Verification jointly in presence of Statutory Auditors
4. Provide Schedules , Accounts and Information for Audit..
5. Clarify and Resolve Audit issues6. Carry out Adjustments arising out of Audit and
Management decisions 7. Clearance and signature of Accounts and issue Audit Reports
How it operates (Methods/ Practices)1. Decide periodicity and scope of audit. 2. Update activity and responsibility schedules in terms of units / location ,
communicate to all concerned and obtain agreement on the same 3. Provide data to Auditors for Audit Planning Memorandum .4. Ensure Physical Verification adjustments are reflected in the system .5. Obtain information from the respective unit and also monitor closing activities
and liaison with the location & the Auditors to ensure timely completion .6. Discuss Audit Report/ Issues at the respective unit level and ensure
appropriate resolution of the same .7. Submit annual report for Shareholders approval.8. Discuss , Clarify and Resolve audited issues at the location and Resolve SRM
points centrally level issues Audit and finalization of report after discussions with Auditors.
9. Presentation ,discussion and approval of Accounts in Audit Committee.
Sub process : Statutory Audit Sub Process Ref : CVBU-EL-17-11 (version 1.1) Process Owner : Plant/Corporate head EPM Linkage– CVBU-EL-17 (Finance &
Budgeting)Preparation Date : 31/03/04Modification Date : 30/12/04
Inputsw Financial Closing and Reporting
Process ( refer document) w Location TBw Schedule of Balances .w Expenditure Variance Analysisw Bank Reconciliation statements w Internal Audit Reports w Minutes of Audit Committee and
the Board .w Physical verification Reports on
Inventory and Fixed Assets .w List of Disputes casesw Internal Processes/procedures.w Audited Accounts from the
Associates and Subsidiaries.
Efficiencyw Adherence to time targets %w Compliance to audit requirements. %w No. of post audit issues. Nos
Performance Measure Unit
Effectivenessw Number of Audit observations Nosw Quality of Accounts -
Audited Outputs & Reports :-w TML - P&L and Balance Sheet as
per Schedule VI disclosurew TML Cash flow statement .w Related Party info as per AS18.w Accounts as per AS 21w Accounts as per US GAAPw Quarterly Accounts As per AS25w Qtly / Annual Results as per SEBI w Auditors Report on CAROw Auditors Report on Accounts and
Cash flow.w Form 20 F for filing to SEC
TATA Motors, CVBU Statutory Audit
31.3.2005 17.21
Key Steps in –'Manage Investor Relations'
1. Communicating the Company performance to the Investor community
2. Interaction with Analysts & Fund Managers3. Participation in Investors Conferences4. Expand & Diversify Investor base5. Feedback of Analyst expectations to
management6. Status of Institutional Investor participation
How it operates (Methods/ Practices)1. Monthly Sales performance/specific event2. Interact with the Analysts on the sales trend and impact on company of the related
event3. Quarterly Financial result4. Prepare the replies for expected analyst queries on the result5. Prepare quarterly review6. Email the review to investor community, simultaneous posting of review on website7. Meeting with Analysts and visiting Fund Managers8. Co-ordinate with ED’s office for meeting with Fund managers9. Prepare company presentations outlining strategy and financial performance for
Investors conferences10. Target potential investors and organize non-deal road shows for interaction with
the management11. Prepare monthly Inst. Investor holding status report12. Provide feedback to management about the analyst expectations
Sub process : Manage Investor Relations Sub Process Ref : CVBU-EL-17-12 (version 1.1) Process Owner : Corporate Finance - Investor
Relations Dept. EPM Linkage : CVBU-EL-17 (Finance &
Budgeting)Preparation Date : 31/03/04Modification 1 : 30/11/04
Inputsw Financial performance (Qtrly /
Annually)w Monthly Sales Performancew Strategy directions – Internalw Analyst Reports - Externalw Performance benchmarks of
domestic and international auto companies - External
w Stock performance - External
Efficiencyw Timeliness of Communication
(after the receipt of base report) No. of days
Performance Measure Unit
Effectivenessw Relative Stock performance Bpsw Inst. Investor Holding % change in
holding
Outputsw Quarterly Revieww Investor Presentationsw Q & A folder for managementw Monthly Inst. Investor
Shareholding Reportw Analyst Expectations
TATA Motors, CVBU Manage Investor Relations
31.3.2005 17.22
Key Steps in –'EVA Drilldown'
1. Delineating CVBU EVA drivers between Plant & Marketing
2. LOB-wise Revenue drivers, Variable Cost Drivers
3. Basis of Fixed Cost (Mktg.) allocation4. Plant-wise Cost Drivers5. Material consumption 6. Expenses under diff heads at the shop level7. Driver drill down sheets for each sales region,
plant and business unit.
How it operates (Methods/ Practices)1. Get details like
6 VC’s sold during the period from respective manufacturing plants6 Dispatches to SPD and interplant from respective plants6 Temporary manpower details for each business unit6 Over Time utilization data from each unit.6 Expense details for each cost driver.
2. Devise driver trees for different decision making levels based on the variables under control at each level
3. Integrate financial measures of BSC into Driver Trees in terms of volumes sales, revenues,variable expenses, working capital, production, variable manufac tur ing exp. fixed costs, plant working capital and fixed assets
4. Provide Excel-based EVA Driver Tools to the operating managers to understand the impact of each variable on EVA driver contribution of individual process, prepare driver sheets for LOB & get feedback from operating units
5. Compare with budgeted driver values and last period driver values6. Evaluate all the capital budgeting proposals fulfilling certain criteria using EVA
Capital Budgeting Excel Tools.
Name of Sub process : EVA Drill Down Sub Process Ref : CVBU-EL-17-13 (version 1.1) Process Owner : Corporate Finance – Business
Planning Linkage with EPM – CVBU-EL-17
(Finance&Budgeting) Preparation Date : 31/03/04Modification 1 : 30/11/04
Inputsw LOB-wise Sales Volumesw Net Realizationsw Plant-wise model-wise sales
volumesw Material consumptionw Expenses incurredw Activity carried (SMH)w Manpower break upw Written down value of assets and
WIP
Efficiencyw Movement of EVA Drivers (Revenues
/ Costs / Capital) for different operatinglevels Rs
Performance Measure Unit
Effectiveness
Outputsw Revenue & Cost driver sheet for
LOBw Cost driver sheet for plant,
business unit and LOBw Quarterly Report / Half yearly
report for business unit / LOB.
TATA Motors, CVBU EVA Drilldown
31.3.2005 17.23
Sub_Proc No Sub Process Name Sub_Process Owner
EPM Process No: CVBU-EL-18
EPM Process Name :
Principal Process Owner:
CVBU-EL-18-01
CVBU-EL-18-02
CVBU-EL-18-03
CVBU-EL-18-04
CVBU-EL-18-05
New Products
Disbursements
Collection
Risk Analysis
V R Likhite
S K Jain
VEHICLE FINANCING THROUGH TMF
A I Rebello - Chief TMF
Channel Development Business Heads / RMs
TATA Motors, CVBU Vehicle Financing
Business Heads / RMs
Business Heads / RMs
31.3.2005 18.1
Process Objective-
INPUT KEY STEPS OUTPUT
w CVBU marketing strategy w Information on market penetration, customer
database and customer preferences w Information on customer profile from
dealers/sales staffw Pipeline sales informationw Information of competitorsw Availability of cheap funds w Information on contracts with customersw MIS on live contracts, overdues.w BHPC Unix-based IT application systemw Continual decision making on TMF margins
Ø Channel Development
Ø Offer new products
Ø Disbursements
Ø Collection
Ø Risk Management
ü Market Reach
ü Market Share
ü New schemes of finance
ü Finance provided / Contracts
completed.
ü Improved cash-flow cycleü Reduction in overduesü Growth in profits, Reduction in
NPAsü Asset repossession
PROCESS DEFINITION SHEET
Process Identification No. (PIN) CVBU- EL- 18
Process Owner
Higher Level Linkage-
Divisions Involved
End Customer-
Core Values Embedded-
ISO / TS 16949 (2002) Clause Ref..
Delay in contract booking
Process Revision / Modification History-
Date of Modfn.
01/06/03
31/3/04
Modification No
00
01
Details of Modification
New Release
Updation of changes w.r.t. organizational restructuring
Issued / Modified by
BES, Pune
BES, Pune
Approved By
Vehicle Financing
Support Sales Growth of Vehicles
Mr A I Rebello Chief (TMF)
New Product sale increase, Increase in customer base
No. of contracts booked, CMS at branchesRepossessed vehicles, No. of contracts ProcessedLoan Disbursals, Penalty collected
Recovery as per Schedule (TMF)
Vehicles financed through TMF,
financing Profit, ODMR, BHPC share increase in new product
Vehicle Finance, Dealer Development, Dealer, TSS
Customers of Vehicles
Integrity, Customer Focus, Passion For Engineering and Corporate Citizenship
Process Title-
TATA Motors, CVBU Vehicle Financing
Unit of MeasureIn-Process/ Efficiency Measure Unit of Measure Output Measure / Effectiveness Measure
Delay in contract booking
Rs.
% increase in marketshare over previous quarter, Retention of Market Share, NPAs as % of SOH
Nos.
%
Nos.
Nos.
%
Rs., %, %
31.3.2005 18.2
Process Owner : Chief (Tata Motors Finance)Process objective : Support Sales Growth of Commercial
To Page-2
Finance through TMFDealer / TSS /TMF
Review AnnualPerformanceand PrepareBudget for nextyear
Chief- TMF
-Review andDecide overallVehicleFinancingStrategy, targetsfor TMF
Chief - TMF
-Review Schemesoffered by TMF-Review and DesignIncentive andPromotionalschemes fand communicate toDealers
Chief- TMF /Sales Head / Rms
Understandfinancing needsof individualcustomer and suggestfinanciersuitable to hisneeds
Dealers/TSS
TMFSuitable
?
Financing ThroughExternal Financers
Dealer / TSS
Inputs-- CVBU’s overall strategy
(Market Expansion for vehicles, Revenue &Profit target, Increases in Non Cyclic Business),
- Financing requirements from End Customers(Territory wise, Segmentwise, Customer profitwise,
- Overall financing Industry scenario (Territory &Segment wise Players, Interest rates, Financing norms)
- Competitor activities- financial Health of Dealers,- Available of Finance and cost & risk of
financing for TMF- Dealer Network Expansion Plans- Regulatory Requirements
Yes
No
TATA Motors, CVBU Vehicle Financing
31.3.2005 18.3
-
Page 2 Vehicle FinancingProcess Owner : Head of TMFProcess objective : Support Sales Growth Vehicle
Outputs-Sale of Vehiclethrough Dealer/TSS,Recovery schedule,Hire PurchaseAgreement
Repossession andAuction of Vehicle TMF
Accident case ?
InsuranceClaiming andsettlementTMF
paymentreceived?
Follow up for BalancePaymentDealer / TMF
Fullpaymentreceived?
Review andAllocateResources(Funds, Agentsand Manpower)
Head of TMF
Manage Agents-Dealers-Collection agents-Direct Marketing Agent-Repossession agent
TMF
FinancingCustomers of TataVehicle-through TATA CP’s-through DM Agents
TMF
-Monitoring &Recovery of Finance-RecoveryPerformance review/ measurementTMF
PassingOwnership toCustomer/Insurance Co. /SuccessfulBidder
TMF
Inputs--Territory wise potentialand target for TMFFund requirementsGuidelines fromCorporate FinancePast Performance ofAgentsGovernment Regulations
Inputs-Customer Proposalthrough Dealer /TSS,Credit Availability,Vehicle FinancePolicies
Inputs-
RepaymentfromCustomers
PassingOwnership toCustomer/Insurance Co. /SuccessfulBidder
TMF
To Page-1
From Page-1
No
Yes No
Yes
No
Yes
TATA Motors, CVBU Vehicle Financing
31.3.2005 18.4
Inputsw Feedback regarding market
penetration from RMs/ sales Staffw Pipeline sales information.w Customer database from TML sales.w Information of competitors
Key Steps in – 'Channel Development'
1. Analyse the input data and information2. Based on the above analyses, open new
branches for TMF3. Appoint new service providers – dealers,
DMAs and collection agents
Outputsw Market Reachw Market Share
How it operates (Methods/ Practices)1. Study feedback on market penetration from field, pipeline sales information,
competition offerings to seek areas to focus on
2. Enhance branch network to attract more customers. Increase number of branches and appoint Regional Representatives
3. Appoint new service providers – Dealers to increase their participation for dealer driven business with TMF, Service Providers (Feet on street), MSP / CSP and Retainers for approaching potential customers & securing contracts.
Sub process : Channel DevelopmentProcess Ref : CVBU-EL-18- 01 (version 1.1)Process Owner : Business Heads/ RMsEPM Linkage – CVBU-EL-18 Preparation Date : 31/03/04Modification Date : 31/3/05
Performance Measure Unit
Efficiencyw Loan disbursals Rs. in crs.w Increase in customer base Nos.
Effectivenessw Vehicles financed through TMF Nos.w Percentage increase over previous Percentage quarter
TATA Motors, CVBU Channel Development
31.3.2005 18.5
Key Steps in – 'Offer New Product'
1. Study the input data including data competitors
2. Design/ evolve new offerings to attract more customers – in terms of interest rates, tenure, amount and discounts
3. Introduce new offerings for customers
How it operates (Methods/ Practices)
1. Study the input data including data on competitors
2. Design/ evolve new offerings to attract more customers – in terms of:
6 Competitive Rates – Obtain funds at low interest rates.
Offer loan rates that are comparable with those of competitors, so as to protect the existing market
share.
6 Loan Tenure – Making financial assistance of TMF more attractive through schemes like “5year
loan tenure”
6 Loan Amount – Flexibility in the quantum of finance provided for big customers, eg. Fleet
operators.
6 Discounts – Offer waiver of charges, special rates etc. during certain festivals and occasions like
new vehicle launch, to boost TML sales & TMF disbursements.
3. Introduce new offerings for customers
Outputsw New Schemes of Financew Market Share
Sub process : Offer New Product
Process Ref : CVBU-EL-18- 02 (version 1.1)
Process Owner : Business Heads / RMs
EPM Linkage – CVBU-EL-18
Preparation Date : 31/03/04
Modification Date : 31/3/05
Performance Measure Unit
Effectivenessw Vehicles financed through TMF Nos.w BHCP Share Increase in new Percentage
product financing
Efficiencyw Loan disbursals Rs. in crs.w New Product Sale increase Nos.
Inputsw Information of competitorsw Availability of cheap funds w Feedback regarding customer
preferences from RMs/ sales Staffw Pipeline sales information.
TATA Motors, CVBU Offer New Products
31.3.2005 18.6
Key Steps in – 'Disbursements'
1. Appraise documents from customers2. Process the documents3. Disburse loans, if found eligible
How it operates (Methods/ Practices)
1. Appraise documents from customers
2. Contract processing & booking – Processing contracts & verification against norms by external service provider.
3. Loan disbursements – Issuing cheques for contracts booked.
Sub process : DisbursementsProcess Ref : CVBU-EL-18- 03
(version 1.1)Process Owner : Business Heads/ RMs EPM Linkage – CVBU-EL-18Preparation Date : 31/03/04Modification date : 31/3/05
Performance Measure Unit
Outputsw Finance provided / Contracts
completed.
Efficiencyw Delay in contract booking Days
Effectivenessw No. of contracts booked Nos.
Inputsw Information on customer profile from
dealers/sales staff.w Information on contracts with
customers from dealers.
TATA Motors, CVBU Disbursements
31.3.2005 18.7
Key Steps in – 'Collection'
1. Arrange collection of receivables through CMS, retainers and dealers
2. In case of defaults beyond 2 months, initiate repossession activities
3. In case of persistent defaults, initiate legal action with help of legal department
How it operates (Methods/ Practices)1. Arrange collection of receivables through: dealers
6 Cash Management System – Implementation of CMS at branches for faster access to EMIs collected by dealers.
6 Retainers – Appointing retainers to follow-up with dealers/customers for overdue recovery.
6 Dealers2. Repossession activities involve taking back the financed vehicles in As Is
Condition3. Legal Action – To initiate legal action for recovery after two consequent defaults.
It also involves imposition of penalty for overdues & its collection
Sub process : CollectionProcess Ref : CVBU-EL-18- 04 (version 1.1)Process Owner : VR Likhite Chief
Operations(TMF)EPM Linkage – CVBU-EL-18 Preparation Date : 31/03/04Modification Date : 31/3/05
Outputsw Improved cash-flow cyclew Reduction in overduesw Growth in profits, Reduction in NPAsw Asset repossession
Performance Measure Unit
Efficiencyw CMS at branches Nos.w Repossessed vehicles Nos.w Penalty collected Rs.w Recovery as per schedule %
Effectivenessw Profit Rs. in crs.w ODMR Percentage
Inputsw MIS on live contracts.w MIS on overdues.w BHPC Unix-based IT application
system
TATA Motors, CVBU Collection
31.3.2005 18.8
Inputsw Information on customer profile from
dealers/sales staff.w CVBU marketing strategyw Continual decision making on TMF
margins
Key Steps in –'Risk Management'
1. Analyse input data for nature of violations by customers
2. Create/ update norms based on inputs
3. Deploy above norms
How it operates (Methods/ Practices)1. Analyse input data for nature of violations by customers2. Create/ update norms for lending based on analysis of inputs
received3. Deploy above norms
Sub process : Risk ManagementProcess Ref : CVBU-EL-18- 05
(version 1.1)Process Owner : SK Jain Chief Credit &
Risk(TMF)EPM Linkage – CVBU-EL-18 Preparation Date : 31/03/04Modification Date : 31/3/05
Outputsw Reduction in NPAsw Asset repossession
Performance Measure Unit
Efficiencyw No. of contracts Nos.
Effectivenessw NPA as percentage of SOH Percentage
TATA Motors, CVBU Risk Management
31.3.2005 18.9
CVBU-EL-19
Principal Process Owner:
Sub_Proc No Sub Process Name Sub Process Owner
EPM Process No:
Organisational Governance
P P Kadle - ED (Finance & Corp Affair)
CVBU-EL-19-01
CVBU-EL-19-02
CVBU-EL-18-03
Manage Organizational Governence
Manage Business Ethics
Manage Busines Risk
Board of Directors
Chief Ethics Counsellor / Location Ethics Counsellors
ED CVBU & Steering Committee.
TATA Motors, CVBU Organisational Governance
31.3.2005 19.1
TATA Motors, CVBU Organisational Governance
Process Revision / Modification History
Details of Modification Issued / Modified by Approved By
New Release
Process Identification No.(PIN) :
Process Title
Process Objective
CVBU-EL-19
INPUT KEY STEPS OUTPUT
Divisions Involved -
End Customer -
Core Values Embedded
ISO / TS16949(2002) Ref.
Modification No.
00
01
§ Statutory Requirements
§ Audit findings.
§ Stakeholder expectations
§ Survey findings.
§ TCOC
§ GEO guidelines
ü Assurance of good
governance to stake holders.
ü Statutory compliance.
ü Enforcement of TCOC for
assuring ethical conduct of
business.
ü Checks & controls for
mitigating business risks.
Higher Level Linkage-
Process Owner
Integrity, Customer Focus, Passion For Engineering and Corporate Citizenship
5.4
Modification through process review
BES, Pune
Process Team
Mr P P Kadle ED (Finance & Corp Affairs)
risk assessment by internal audit.
Accuracy of the reports
Timeliness of reviews & reports.Functions/Dept. covered under risk management. %legal compliance, risk control rating.
Percentage
Percentage
Percentage
In-Process Measure Unit of Measure Unit of MeasureOutput Measure / End Measure
No. of TCOC concerns resolved in target time
Observations made by external auditors/assessors.
No. of concerns resolved in target time100% grievances from investors resolved.100% independent directors100 % statutory complianceImprovement in MBE & OHS indicators.
Corporate/Locational Finance & Internal Audit.
Other Functions
31/3/04
31/3/05
Date of Modfn.
NoPercentagePercentagePercentage
Organizational Governance
Protect shareholder value. Ensure ethical behavior & transparency.
Ø Get and analyse inputs. Create / review governance structure,
Define responsibilities & authorities.
Ø Manage Business risk
Ø Manage Business Ethics
Ø Organize internal audits/statutory audits & surveys.
Review audit/survey findings, Procedure Improvement feedback to BOD
R-Y-GNos.
% functions covered under BRM Nos. Implementation of internal audit accepted recommendation.
PROCESS DEFINITION SHEET
31.3.2005 19.2
Process Owner : Board of DirectorsProcess Objective : Protect Share holder value.Ensure ethical behavior
and transparency
Get and analyseinputs on stakeholderexpectations,statutoryrequirements,Auditfindings, Surveyfindings
Board of Directors
-Create / reviewGovernanceStructure,Defineresponsibilities andauthorities
Board of Directors
Manage Business Risk-Identify, evaluate risk and set controls-Self Assessment by Process Owner & Report-Independent review of selectedprocesses by internal Auditand report-Corrective action by ProcessOwner
ED and Steering Commitee
Manage Business Ethics
- Establish MBE Framework- TCOC Training- Establish concern resolutionmechanism- MBE Survey
Chief Ethics Counsellor
Organise Audits
-Organise Internal / ExternalAudits / Surveys
Functional Heads
Outputs--Assurance of goodGovernance-Statutory ComplianceEnforcement of TCOC-Check & controls for mitigation of business risk
-Receive of the processand Survey Findings-Process Improvement-Feedback to BOD
Chief Ethics CounsellorChief Internal Auditor
Audit CommitteeInputs--StatutoryRequirements-Audit Findings-Share holdesexpectations-Survey findings-TCOC-GEO Guidelines
TATA Motors, CVBU Organisational Governance
31.3.2005 19.3
Inputsww
wwwww
Stakeholder expectationsGuidelines, Rules and Regulations, Statutory requirementTata Code of ConductGroup Purpose StatementBRC/Strategy inputsAudit Committee CharterInternal Audit Charter
Key Stepsin – 'Organizational Governance'
1. Stakeholder engagement for getting expectations and concerns
2. Create/ Review Organization Structure for governance
3. Conduct meetings and reviews4. Organize audits and surveys
Outputsw Governance committeesw Remuneration policy for directorsw Infrastructure for Investor Grievancew Infrastructure for Code of Conductw Governance policies, guidelines,
reports
How it operates (Methods/ Practices)1. Stakeholder engagement – 6 Directors and Leadership continuously interacts with various stakeholders to get their expectations and concerns.
They also interacts with government agencies and take proactive inputs. Quarterly and Half-yearly meetings with investors and shareholders are organized to convey performance and to get their inputs. All other inputs such as rules and regulations, strategy, code of conduct, etc are taken and analyzed for overall governance
2. Create/ review Organization Structure for governance– 6 Board of Directors appoints Executive Directors and Sr. Executives for managing operation. Various Committees
(such as Management Committee, Audit committee of directors, Investor Grievance, Remuneration, etc ) are formed. Roles and responsibilities are defined and powers are delegated. Shareholders appoint the statutory auditors at the Annual General Meeting.
3. Conduct meetings and reviews – 6 Directors and Leadership get regular feed back reports from Functional heads and committees. They also conduct
reviews to monitor deployment of strategy and ensure statutory and legal compliance. 4. Audit Committee Management-4a. Audit committee comprises of three Independent directors. The Committee recommends appointment of the Statutory
auditors for shareholder approval. The Audit plans, Significant audit findings, adequacy of internal controls, compliance with Accounting standards and the Financial Statements are reviewed by the Committee. The Chairman of the Audit Committee is present at the AGM to answer shareholder’s queries and clarification on matters relating to audit. The Audit Committee has approved a Whistle Blower Policy for the Company which protects the Whistle blowers.
4b. To ensure independence and objectivity of the Internal Audit function, the Chief Internal Auditor reports to the Audit Committee. Internal Audit plans are based on the Business Process approach, which ensures coverage of high risk areas every year and all business processes over three years. Internal Audit findings, the action plan and its implementation are discussed and reviewed at all levels of Management. Critical observations and action plans are reviewed at the Audit Committee meeting, at least every quarter along with Actions Taken Report.
Sub process : Manage Organizational GovernanceSub Process Ref : CVBU-EL-19- 01 (version 1.1)Process Owner : Board of Directors EPM Linkage : CVBU-EL-19- Organizational
GovernancePreparation Date : 31/03/04Modification Date : 31/03/05
UnitPerformance Measure
Efficiency:w Attendance of Directors in meetingsw No. of meetings w Timeliness of reviews and reports
Effectivenessw 100 % Statutory compliancew % independent directors w % Grievances from Investors’ resolved
%Nos%
%%%
TATA Motors, CVBU Manage Organisational Governance
31.3.2005 19.4
Inputsw Tata Code of Conduct(TCoC)w Tata GEO’s guidelines for impl. of
TCoCw The CEC, LEC & DEC feedbackw Survey Findings
Key Steps in 'Manage Business Ethics'
–
1. Establish framework for MBE2. Training and communication to all employees,
suppliers and dealers3. Concerns resolution mechanism4. Reporting and sharing5. Evaluations and improvement
Outputsw Enforcement of TCoCw MBE findingsw OHS findings
How it operates (Methods/ Practices)1. Establish framework for MBE–6 Appointment of Chief, Location & Divisional Ethics Counsellor(s). The mechanism to receive and
resolve concern is put in place at each location. CEC functionally reports to Ethics Counselor of Tata Group
2. Training and communication –6 A common training module which covers Tata Code of Conduct. TCoC training is a mandatory
training to all newcomers. After the training a pledge is signed by the employee for adopting the TCoC.
3. Concern resolution mechanism – 6 A concern resolution mechanism exists. Concerns are filed with the CEC/LEC/DEC through emails,
letters (including anonymous letters), intranet, direct lines, Toll free ethics help line, meetings with stake holders, etc. The concerns are recorded with their updated status in an MS Access database. Appropriate agencies are involved for concern resolution by the Ethics Counselors. The resolution of the concern is communicated to the complainant, if known.
4. Reporting and sharing – 6 CEC / LEC report their monthly and quarterly findings to the management as appropriate. The data are
also shared on the intranet5. Evaluation and Improvement–6 Based on the OHS and MBE survey findings, action plans for gaps found are prepared.
Sub process : Manage Business EthicsSub Process Ref : CVBU-EL-19- 02 (version 1.1)Process Owner : Chief Ethics Counselor/ Location
Ethic Counselors EPM Linkage – CVBU-EL-19 (Organizational Governance) Preparation Date : 31/03/04Modification Date: 31/03/05
Efficiencyw No of Concerns resolved to No of
Concerns posted in a yearw Concerns resolved in target time
Performance Measure Unit
Effectivenessw % improvement in MBE and OHS
indicators
%.%
%
TATA Motors, CVBU Manage Business Ethics
31.3.2005 19.5
Inputsw Key business process of each
function/ departmentw Business Risk Management
Guidelines from Tata Motors Audit Committee
w Standard business risk control rating chart.
Key Steps in-'Manage Business Risk'
1. Identify and evaluate Business risk , set controls2. Self assessment by process owner & Report.3. Independent review of selected processes by
Internal Audit.4. Action on Audit feedback, process review
Outputsw Documented key Proceduresw Checks and controls for mitigating
risksw Internal Audit Assessment feedback
How it operates (Methods/ Practices)1. Identify and evaluate Business risk , set controls
6 Divisional / Functional head appoints Risk Champion / co-ordinators6 Risk Champion alongwith respective process owners identifies risks (Financial, Operational, Safety,
regulatory)6 Risk Champion documents the process and defines control mechanisms to mitigate the risk and
defines review frequency.6 Risk champion along with process owner modifies the process, automates where ever possible,
puts system controls.2. Risk Management through Control Self Assessment (RMCSA)
6 At a pre-defined time interval, Individual Process owners carry out control self assessment for their processes under the leadership of their risk champion to ensure the adequacy ofcontrols. Internal Audit facilitates this process of RMCSA.
3. Enterprise wide risk management (ERM)6 An 8-step process for ERM, based on COSO-ERM framework, is now being implemented (Planned
date of completion : Mar-May 2005).4. Independent Review by Internal Audit
6 Internal Audit conducts reviews of selected processes and gives feedback to process owner and Audit Committee
5. Review and improve the process6 Process owners review the processes based on audit feedback for the process improvement
Sub process : Manage Business RiskSub Process Ref : CVBU-EL-19- 03 (version 1.1)Process Owner : ED and Steering CommitteeEPM Linkage – CVBU-EL-19 ( Organizationalovernance) Preparation Date : 31/03/04Modification Date : 31/03/05
Performance Measure Unit
Efficiencyw Functions / depts covered under risk
management
Effectivenessw % Legal compliancew No of Issues raised by Internal Auditw Risk Control Rating
No
%No.
Index
TATA Motors, CVBU Manage Business Risk
31.3.2005 19.6