Top Banner
Quick Step Installation Manual - V18 www.heatmaster.com.au enviro Do...
4

enviro - Heatmaster · Manual-V 1 8 enviro Quick Step Installation Manual enviro 4 Openable Window Door T a l a b k Flue Terminal Indicates areas for flue terminals c c c c d m g

Feb 11, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • Qui

    ck S

    tep

    Inst

    alla

    tion

    Man

    ual -

    V18

    www.heatmaster.com.au

    envi

    ro

    Qui

    ck S

    tep

    Inst

    alla

    tion

    Man

    ual

    envi

    ro

    4

    OpenableWindow

    Door

    T

    a

    l

    a

    b

    k

    Flue Terminal Indicates areas for flue terminals

    c

    c

    c

    c

    d

    m

    g

    d

    PM

    f

    h

    h

    h

    jj

    j

    Use 3 bends only

    Our flexible flue has the ability to bend 3 times between the heating unit and the cowl. This includes the bend straight out of the heater if you’re fluing through the ceiling or floor.

    Make the flue pipe go over the bearers and joists.

    You may bend the flue over joists and bearers. It is recommended that a 20mm clearance be maintained between the smaller gas exhaust flue and combustible materials.

    Fluing where the pipe had a spot lower than the rest.

    Never allow a low spot in the flue. Installing the flue with a dip or “goose neck” can result in reduced efficiency or even prevent the fire from working.

    2

    1

    4

    3

    2

    1

    4

    3 2

    1

    4

    3

    Do...

    Do...

    Never Do...

    Do...

    Using your flexible flue pipeThe Enviro’s revolutionary flue system incorporates one 65mm diameter pipe and one 58mm diameter pipe.

    Configure triangle

    Addition literatureSupplements for flue installation and heat transfer can be obtained by contacting your Heatmaster dealer.

    Key Information – Quick step check list

    *All information contained in this mini summary is correct at the time of publication. This is only a summary and should be read in conjunction with the full installation

    instructions. Pictures are representative only and are not drawn to scale. Installation should be carried out by a licensed gas fitter and any electrical work carried out by a

    licensed electrician.

    Minimum clearances required for balanced flue terminals or the flue terminals of outdoor appliances (according to AS5601-2004[AGA gas installation code] or NZS 5261 [New Zealand]

    a Bellow eaves, balconies or other projections 300 mm

    b From the ground or above a balcony 300 mm

    c From a return wall or external corner 500 mm

    d From a gas meter (M) 1000 mm

    e From an electricaity meter or fuse box (P) 500 mm

    f From a drain or soil pipe 150 mm

    g Horizontal from an building structure 500 mm

    h From any other flue terminal, cowl or combustion air intake 500 mm

    j Horizontally from an openable window, door, or non-mechanical

    air inlet, or any other opening into a building, with the exception of

    sub-floor ventilations 500 mm

    k Vertically below an openable widow, door,or non-mechanical

    air inlet, or any other opening into a building, with the exception of

    sub-floor ventilation 150 mm

    l Minimum horizontal clearance to any surface

    (such as an exterior wall) for vertical terminations 610 mm

    m Minimum height above roof line for vertical termination 600 mm

    0m 1m 2m 3m 4m

    4m

    3m

    2m

    1m

    Example 1

    Example 2

    Example 3

    1

    23

    A 20mm clearance is recommended from the extraction (smaller) flue to combustibles.

    Plumber Incoming gas connection provided – 1/2 inch BSP male connector Page 2

    Gas input – 42MJ high

    32MJ low

    Page 2

    Manifold pressure High (Nat gas) 0.69 Kpa Low (Nat gas) 0.45 Kpa High (LPG) 2.25 KPA Low (LPG) 1.38 KPA

    Manifold pressure is factory set. To check pressure and adjust refer to page 8 of the customer operation information & Installation instructions.

    Electrician Standard flex 2m, 3 pin plug provided. Requires power point with double pole isolation switch.

    Page 2

    Using up to three bends, use this triangle to work out measurements for your 4.5 mtr

    flue. Remember, the first bend out of the Heater is counted as one. The Enviro

    can be flued through the roof, wall or floor. *See your Heatmaster

    dealer for full details.

    Appliance must be tested for correct operation prior to leaving - minimum 20 minutes.If appilance cannot be adjusted to preform correctly contact Heatmaster prior to leaving.

  • Quick S

    tep Installation Manual

    Qui

    ck S

    tep

    Inst

    alla

    tion

    Man

    ual

    enviro

    envi

    ro

    2

    3

    Back view in mm

    453

    180 153

    331 43

    56109

    ø58

    ø65

    Standard

    Extended

    Extended Facsia

    550mmrequired depth

    690mm

    requiredheight

    960mmrequired opening width

    set the Enviro firebox to yourdesired heigh t

    ELEVATION VIEW

    PLAN VIEW

    Frontwall

    Firebox and cowl dimensionsWith it’s revolutionary design, the Enviro can be mounted at any height on the wall. You can choose to install the

    Enviro at ground level with standard fascia or further up the wall with extended fascia.

    Gas imputHigh 42 MJ/h Low 32 MJ/h

    Attaching the fasciaWhile attaching the facsia is straight forward, it is

    important that it remains vertical all the time to make

    sure the top and bottom clip in by way of clips at both

    the top and bottom. (Before fascia can be removed,

    door must be unscrewed and removed)

    Minimum framing dimensions

    Resting on the heathIf mounting the Enviro

    recommended that a

    non combustible hearth

    be used for a minimum

    Further up the wallExtended facsia

    Standard facsia

    A

    B

    D

    C

    Remove all four screws

    Keep vertical

    Move fascia forward

    Note: Clip in manualcontrol on bottom leftside of fascia fascia clips slip

    down over heat box lip

    fascia clips slip down over heat box lipon the bottom lip also.

    pntrol on bottom left

    de of fascia fascia clips slip down over heat box lip

    2

    1

    4

    3

    1 – Electrical power cable (Requires isolation switch)

    2 – Incoming gas connection (1/2” BSP Male connector)

    3 – Extraction fan4 – Incoming air

    A

    B – Your choice of pebbles, coals or logs placed into the

    * C and D are only applicable if installing under bench top and or into Joinery.C – Minimum enclosure height from top of box = 300mmD – 1 Inlet and 1 outlet ventilation with a cross sectional

    area of 5000mm for each.

    STEP

    STEP

    STEP

    STEP

    1

    2

    4

    3

    For inbuilt installation (into a wall)

    Optional freestanding casing

    • Casing H 733 x D 580 x W1080mm

    • 200mm dia cut out in top of casing to allow for decorative rigid flue (to hide flexi exhaust and air intake)

    • Air holes in the back top of casing for air ventilation

    • Provisional holes for both gas line and power cord in rear of casing

    When using the freestanding casing, simply centre unit within the casing and attach fascia (as outlined)

    1080

    733

    580

    440

    200

    440

    150180

    Rear View

    gg

    Access panel advised for servicing if required

    The Enviro'

    s

    flue

    system

    incorporates

    one

    65mm

    diameter

    pipe

    and

    one

    58mm

    diameter

    pipe.

    Circular

    button

    cowl

    -

    210 mm

    diameter

    x

    80mm

    D*150mm

    diameter

    penetration

    hole

    required toaccommodate horizontal discharge.

    Vertical flue

    requires

    150dia x

    900mm Stainless

    flue pipe

    Minimum framing dimensions and clearances from combustibles • Sides =10mm • Back =10mm • Firebox to sit flush with front wall. Do not recess.

  • Quick S

    tep Installation Manual

    Qui

    ck S

    tep

    Inst

    alla

    tion

    Man

    ual

    enviro

    envi

    ro

    2

    3

    Back view in mm

    453

    180 153

    331 43

    56109

    ø58

    ø65

    Standard

    Extended

    Extended Facsia

    550mmrequired depth

    690mm

    requiredheight

    960mmrequired opening width

    set the Enviro firebox to yourdesired heigh t

    ELEVATION VIEW

    PLAN VIEW

    Frontwall

    Firebox dimensions

    With it’s revolutionary design, the Enviro can be mounted at any height on the wall. You can choose to install the

    Enviro at ground level with standard fascia or further up the wall with extended fascia.

    Gas imputHigh 42 MJ/h Low 32 MJ/h

    Attaching the standard fasciaWhile attaching the facsia is straight forward, it is

    important that it remains vertical all the time to make

    sure the top and bottom clip in by way of clips at both

    the top and bottom. (Before fascia can be removed,

    door must be unscrewed and removed)

    Minimum framing dimensions

    Resting on the heathIf mounting the Enviro

    recommended that a

    non combustible hearth

    be used for a minimum

    Further up the wallExtended facsia

    Standard facsia

    A

    B

    D

    C

    Remove all four screws

    Keep vertical

    Move fascia forward

    Note: Clip in manualcontrol on bottom leftside of fascia fascia clips slip

    down over heat box lip

    fascia clips slip down over heat box lipon the bottom lip also.

    pntrol on bottom left

    de of fascia fascia clips slip down over heat box lip

    2

    1

    4

    3

    1 – Electrical power cable (Requires isolation switch)

    2 – Incoming gas connection (1/2” BSP Male connector)

    3 – Extraction fan4 – Incoming air

    A

    B – Your choice of pebbles, coals or logs placed into the

    * C and D are only applicable if installing under bench top and or into Joinery.C – Minimum enclosure height from top of box = 300mmD – 1 Inlet and 1 outlet ventilation with a cross sectional

    area of 5000mm for each.

    STEP

    STEP

    STEP

    STEP

    1

    2

    4

    3

    For inbuilt installation (into a wall)

    Optional freestanding casing

    • Casing H 733 x D 580 x W1080mm

    • 200mm dia cut out in top of casing to allow for decorative rigid flue (to hide flexi flue), horizontal casing also available.

    • Air holes in the back top of casing for air ventilation

    • Provisional holes for both gas line and power cord in rear of casing

    When using the freestanding casing, simply centre unit within the casing and attach fascia (as outlined)

    1080

    733

    550

    440

    200

    440

    150180

    Rear View

    325200

    25

    *25mm Clearance at rear

  • Qui

    ck S

    tep

    Inst

    alla

    tion

    Man

    ual

    www.heatmaster.com.au

    envi

    ro

    Qui

    ck S

    tep

    Inst

    alla

    tion

    Man

    ual

    envi

    ro

    4

    OpenableWindow

    Door

    T

    a

    l

    a

    b

    k

    Flue Terminal Indicates areas for flue terminals

    c

    c

    c

    c

    d

    m

    g

    d

    PM

    f

    h

    h

    h

    jj

    j

    Use 3 bends only

    Our flexible flue has the ability to bend 3 times between the heating unit and the cowl. This includes the bend straight out of the heater if you’re fluing through the ceiling or floor.

    Make the flue pipe go over the bearers and joists.

    You may bend the flue over joists and bearers. It is recommended that a 20mm clearance be maintained between the smaller gas exhaust flue and combustible materials.

    Fluing where the pipe had a spot lower than the rest.

    Never allow a low spot in the flue. Installing the flue with a dip or “goose neck” can result in reduced efficiency or even prevent the fire from working.

    2

    1

    4

    3

    2

    1

    4

    3 2

    1

    4

    3

    Do...

    Do...

    Never Do...

    Do...

    Using your flexible flue pipeThe Enviro’s revolutionary flue system incorporates one 65mm diameter pipe and one 58mm diameter pipe.

    Configure triangle

    Addition literature

    Supplements

    for

    flue

    installation

    and

    heat

    transfer

    can

    be

    obtained

    by

    contacting

    your

    Heatmaster

    dealer.

    Key Information – Quick step check list

    *All

    information

    contained

    in

    this

    mini

    summary

    is

    correct

    at

    the

    time

    of

    publication.

    This

    is

    only

    a

    summary

    and

    should

    be

    read

    in

    conjunction

    with

    the

    full

    installation

    instructions.

    Pictures

    are

    representative

    only

    and

    are

    not

    drawn

    to

    scale.

    Installation

    should

    be

    carried

    out

    by

    a

    licensed

    gas

    fitter

    and

    any

    electrical

    work

    carried

    out

    by

    a

    licensed

    electrician.

    Minimum clearances required for balanced flue terminals or the flue terminals of outdoor appliances (according to AS5601-2004[AGA gas installation code] or NZS 5261 [New Zealand]

    a Bellow eaves, balconies or other projections 300 mm

    b From the ground or above a balcony 300 mm

    c From a return wall or external corner 500 mm

    d From a gas meter (M) 1000 mm

    e From an electricaity meter or fuse box (P) 500 mm

    f From a drain or soil pipe 150 mm

    g Horizontal from an building structure 500 mm

    h From any other flue terminal, cowl or combustion air intake 500 mm

    j Horizontally from an openable window, door, or non-mechanical

    air inlet, or any other opening into a building, with the exception of

    sub-floor ventilations 500 mm

    k Vertically below an openable widow, door,or non-mechanical

    air inlet, or any other opening into a building, with the exception of

    sub-floor ventilation 150 mm

    l Minimum horizontal clearance to any surface

    (such as an exterior wall) for vertical terminations 610 mm

    m Minimum height above roof line for vertical termination 600 mm

    0m 1m 2m 3m 4m

    4m

    3m

    2m

    1m

    Example 1

    Example 2

    Example 3

    1

    23

    A 20mm clearance is recommended from the extraction (smaller) flue to combustibles.

    Plumber Page 2

    Gas input – 42MJ high

    Page 2

    Manifold pressure High (Nat gas) 0.69 Kpa Low (Nat gas) 0.45 Kpa High (LPG) 2.25 KPA Low (LPG) 1.38 KPA

    Manifold pressure is factory set. To check pressure and adjust refer to page 8 of the customer operation information & Installation instructions.

    Electrician Standard flex 2m, 3 pin plug provided. Requires power point with double pole isolation switch.

    Page 2

    Using up to three bends, use this triangle to work out measurements for your 4.5 mtr

    flue. Remember, the first bend out of the Heater is counted as one. The Enviro

    can be flued through the roof, wall or floor. *See your Heatmaster

    dealer for full details.

    Appliance must be tested for correct operation prior to leaving - minimum 20 minutes.If appilance cannot be adjusted to preform correctly contact Heatmaster prior to leaving.

    enviro 17

    Incoming gas connection provided – 1/2 inch BSP male connector *please provide approved 1m flex gas pipe & gas shutoff valve, to allow for removal if required.

    32MJ low

    *IMPORTANT Ensure flue is taught, if running horizontal, Min flue slope 20 mm to avoid water trap

    NOTE: NOT INTENDED FOR FIREPLACE INSERT