    Hands-On Lab

    Embracing Continuous Delivery with ReleaseManagement for Visual Studio 2013

    Lab version: 12.0.30723.00 Update 3

    Last updated: 9/10/2014

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    2/76

    CONTENTS

    OVERVIEW ................................................................................................................................................... 3

    EXERCISE 1: RELEASE MANAGEMENT OVERVIEW .............................................................................. 4

    EXERCISE 2: CONFIGURING RELEASE MANAGEMENT ...................................................................... 11

    EXERCISE 3: DEFINING A RELEASE PATH AND TEMPLATE .............................................................. 19

    EXERCISE 4: RELEASE AUTOMATION EXAMPLE ................................................................................ 30

    EXERCISE 5: RELEASE MANAGEMENT SUPPORT FOR AZURE AND DSC (OPTIONAL) ................ 52

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    3/76

    Overview

    In this lab, you will learn about Release Management for Visual Studio 2013 and its suite of release and

    deployment tools that automate the deployment of applications across the desktop, server, and thecloud. Release Management for Visual Studio 2013 helps development and operations teams integrate

    with Team Foundation Server 2013 to configure and automate complex deployments of their automated

    builds to target environments more easily. Development teams can also model their release processes

    and track approvals, sign-offs, and visualize their release status.

    Note: If you want to skip the overview and configuration exercises and go straight to a live

    demonstration in action, you can start with Exercise 4. If you are new to Release Management,

    however, it is recommended that you at least read the first few exercises for some background

    information.

    Prerequisites

    In order to complete this lab you will need the Visual Studio 2013 virtual machine provided by Microsoft.

    For more information on acquiring and using this virtual machine, please seethis blog post.

    About the Fabrikam Fiber Scenario

    This set of hands-on-labs uses a fictional company, Fabrikam Fiber, as a backdrop to the scenarios you

    are learning about. Fabrikam Fiber provides cable television and related services to the United States.

    They are growing rapidly and have embraced Windows Azure to scale their customer-facing web site

    directly to end-users to allow them to self-service tickets and track technicians. They also use an on-

    premises ASP.NET MVC application for their customer service representatives to administer customer

    orders.

    In this set of hands-on labs, you will take part in a number of scenarios that involve the development

    and testing team at Fabrikam Fiber. The team, which consists of 8-10 people, has decided to use Visual

    Studio application lifecycle management tools to manage their source code, run their builds, test their

    web sites, and plan and track the project.

    Change log

    For Update 3:

    Added optional exercise demonstrating release to Azure using DSC

    Changed Release Management Deployer references to Microsoft Deployment Agent

    http://aka.ms/VS13ALMVMhttp://aka.ms/VS13ALMVMhttp://aka.ms/VS13ALMVMhttp://aka.ms/VS13ALMVM
  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    4/76

    Updated manual release to trigger from Configure Apps | Release Templates instead of Releases

    tab in Release Management Client.

    Added note to end of Ex. 3 regarding tagging support

    Screenshot updates as necessary, other minor edits

    Exercises

    This hands-on lab includes the following exercises:

    1.

    Release Management Overview

    2.

    Configuring Release Management

    3.

    Defining a Release Path and Template

    4.

    Release Automation Example5.

    (optional) Release Management Support for Azure and DSC

    Estimated time to complete this lab: 60 minutes.

    Exercise 1: Release Management

    Overview

    In this exercise, you will learn about the Release Management product and how it interfaces with Team

    Foundation Server to provide an automated deployment solution. You will also see what an example

    release workflow looks like from the Release Management web client.

    1.

    Log in as Brian Keller (VSALM\Brian). All user passwords are P2ssw0rd.

    2.

    The goal of Release Managements architecture is to provide a mechanism where application

    components can be deployed automatically to various target servers in different environments.

    The components may require different configurations on the various servers but we still want to

    deploy the same package to all of them. Another key goal is to keep all the configuration

    information centralized and manage the deployments as part of a business driven release

    workflow that involves multiple roles in the organization.

    3.

    In order to accomplish these goals, Release Management is based on four main components.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    5/76

    Figure 1

    Release Management components

    Note: Starting with Update 3, there is now the option of deploying to environments that

    support DSC (Desired State Configuration). Therefore in this case, without a deployment agent

    running on the target servers, the release operation would push deployment bits to the target

    servers.

    Release Management Server.The server component is the heart of the solution and consists of

    the database, the workflow controller, and a dispatcher that synchronizes activities with the

    target servers.

    Release Management Client.The client comes in two flavors, a Windows Presentation

    Foundation (WPF) based client that exposes all the functionalities of the application and a web-

    client designed for testers, user acceptance approvers and managers.

    Microsoft Deployment Agent.The deployment agent is a service that is installed on the target

    servers where the application components need to be deployed. It is important to note that the

    Release Management Server does not require access to the target servers as all operations are

    based on a pull mechanism from the deployment agent.

    Deployment Tools.The Release Management solution provides various installation tools that

    assist different deployment scenarios such as uninstalling/installing components, deploying

    reports to Microsoft SQL Reporting Services, and moving files to specific locations.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    6/76

    Note:This self-contained virtual machine has all Release Management components installed

    on it for demonstration purposes, including the deployment service.

    4.

    It is important to note that the Release Manage product, after having been acquired by

    Microsoft, will continue to be transformed and integrated into existing tools. The release

    management authoring components will be included in Visual Studio Test Professional, Visual

    Studio Premium, and Visual Studio Ultimate. Everything needed to participate in a release

    process will be included in the Team Foundation Server CAL. Server components will be

    integrated into Team Foundation Server 2013. The deployment agents (which are required for

    each node you deploy on) will continue to be licensed separately.

    5.

    The basic mechanism used in Release Management is to have the users interact with the server

    through the appropriate client where new release requests or stage approvals will trigger

    deployment requests to the next stage in the release path. Launch the Release Management

    web application by navigating tohttp://vsalm:1000/ReleaseManagement. Note that we do notcurrently have any pending approval requests.

    Figure 2

    Release Management web application

    6.

    Select the Previously Approvedlink and note that there was a release triggered by a build of

    the Fabrikam Call Center.

    http://vsalm:1000/http://vsalm:1000/http://vsalm:1000/
  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    7/76

    Figure 3

    Viewing previous approvals

    7.

    Select the link displaying the number of deployed components (just underneath the name Brian

    Keller).

    Figure 4

    Location of components link

    8.

    This shows us the components that were deployed during each stage of the release path. In this

    particular case, it was just a specific build of a web site.

    Figure 5

    Viewing components deployed

    9.

    Press the Escapekey to close the dialog window.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    8/76

    10.

    Note that we can see at a glance that the deployment is currently in the production stage.

    Select the stageslink to view the historical workflow and approvals that occurred to get to that

    point.

    Figure 6

    Location of stages link

    11.

    This dialog window shows the workflow steps and results that occurred in the Prod

    (production) stage. It was manually accepted from the previous stage by Brian Keller,automatically installed to the deployment environment, and finally validated by Brian once

    again.

    Figure 7

    Prod stage historical workflow

    12.

    Select the Previous Stagelink.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    9/76

    Figure 8

    Location of Previous Stage link

    13.

    This stage was setup to be for QA. Note that this stage has more workflow automation in place

    it automatically accepts, installs, and validates the application and then waits for a QA team

    member to approve it.

    Figure 9

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    10/76

    QA stage historical workflow

    Note: The setup used for the stages seen in this lab are for demonstration purposes only. In

    normal scenarios, the QA stage would not automate the acceptance step. It would usually be

    setup for an owner of that stage to decide when to deploy a new version.

    14.

    Select the Previous Stagelink to view the Dev(development) stage history. There is quite a

    bit of automation going on here as well, but note that manual approval was necessary in order

    for transition to the QA stage. This final approver simply indicates that the current version

    meets all needed quality gates and should be made available to the next stage (QA in this case).

    We will see how all of this is configured later on in this lab, but for now just remember that the

    flow through the different stages (Dev -> QA -> Prod) is what we refer to as the release path.

    Figure 10

    Dev stage historical workflow

    15.

    Press the Escapekey to close the dialog window.

    16.

    The paths are composed on the various servers grouped in environments on which the testing

    for the stage is performed. Once an application needs to be deployed to a new environment,

    the server will queue deployment requests to all the required target servers for each

    component of the application. This allows an atomic deployment of all the components.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    11/76

    17.

    The Microsoft Deployment Agent running on each target server monitors the Release

    Management server continually (at a configurable interval) and will pick the installation

    requests for the one or more components it needs to install locally.

    18.

    The deployment agent will then find and download the release package, provided by the

    Release Management Server that calculates the location using the TFS API - if built by TFS - or

    using a predefined UNC path - if not.

    19.

    Finally, the deployment agent downloads any additional executable (batch file, PowerShell

    script, .exe) to be ran as part of the installation. These are additional deployment activities

    beyond the installation itself; creating test data or triggering automated tests are common

    scenarios here.

    Exercise 2: Configuring Release

    Management

    In this exercise, you will learn about the main configuration points that are needed to connect Release

    Management to Team Foundation Server, various settings for Release Management including those that

    apply to the deployment agent services, the configuration of groups and users, and finally the

    configuration of servers and environments.

    1.

    Launch the Release Management clientfrom the taskbar.

    Figure 11

    Release Management client splash screen

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    12/76

    2.

    By default, Release Management will load the Traffic Overviewtab which shows deployments

    moving through all release paths and stages. This shows us that the Fabrikam Call Center

    application has already had a deployment go through each stage of deployment without any

    failures.

    Figure 12

    Traffic overview

    3.

    Lets take a quick look at some of the main configuration tasks that need to be addressed when

    installing and configuring Release Management. Select the Administrationtab followed by the

    Manage TFS link.

    Figure 13

    TFS connection configuration

    4.

    Double-clickon the TFS connection that has already been setup.

    Figure 14

    Loading configuration for TFS connection

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    13/76

    5.

    This connection was setup in the virtual machine ahead of time, but it is important to note that

    the user account used by Release Management needs to have the Make requests on behalf of

    others permission within TFS.

    Figure 15

    Configuring account to connect to TFS

    6.

    Other important settings can be configured in Administration | Settings. The SystemSystem

    Settingstab (default) shows various timeouts, version information, SMTP configuration, and

    license information. These settings are all defaults that were set during the creation of this

    virtual machine.

    Figure 16

    System settings

    7.

    Select the Deployer Settingstab to view the configuration options for all deployer services. For

    example, you can set how often you want the deployment agent to poll the Release

    Management server for packages to deploy.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    14/76

    Figure 17

    Deployer settings

    8.

    Lets take a quick look at the setup of users and groups for Release Management. Navigate to

    Administration | Manage Users.

    Figure 18

    User configuration

    9. Double-clickon the Brian Kelleruser.

    Figure 19

    Viewing user configuration details

    10.

    The Brian Kelleruser is associated with the windows account VSALM\Brian, is designated a

    Release Manager, and is an active member of a few different teams.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    15/76

    Figure 20

    Viewing user configuration details

    11.

    Navigate to Administration | Manage Groupsto take a quick look at how groups can be setup.

    Figure 21

    Group configuration

    12.

    Note that you can create new groups from scratch or you can import them from Active

    Directory or Team Foundation Server. Groups that are imported from AD or TFS in this way are

    linked by default, and will therefore remain synchronized.

    Figure 22

    Importing groups from AD and TFS

    Note: Synchronization is manual (using the Refreshbutton) unless the setting AD/TFS-Based

    Group Refresh Interval is setup to something other than 0 minutes (which is the default).

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    16/76

    13.Double-clickon the QA Team.

    Figure 23

    Viewing group details

    14.

    The Memberstab shows the individual users that are part of the QA Team. You can add moreusers here if desired (since the group is not linked to AD or TFS).

    Figure 24

    Viewing group members

    15.

    Select the Securitytab.

    Figure 25

    Location of Security tab

    16.

    The Securitytab allows you to specify what Release Management permissions that the group

    has. For the purposes of this virtual machine, the team members have full control.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    17/76

    Figure 26

    Group security settings

    17.

    Navigate to Administration | Manage Pick Listsand take note of the Stage Typesdefined here.

    The stage type names defined here are completely arbitrary, and therefore can be molded to fit

    your desired release strategy.

    Figure 27

    Configuring stage types

    18.

    Servers to be used for deployment must have the Microsoft Deployment Agentservice

    installed and configured to connect to the Release Management Server over HTTP or HTTPS. In

    addition, these servers must be explicitly added to Release Management Server. Navigate to

    Configure Paths | Serversand note that the deployment agent service has already been setup

    and configured for this virtual machine.

    Figure 28

    Configuring servers

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    18/76

    Note: Although we wont do so here, the recommended way to add additional deployment

    servers is to select the drop-down arrow next to the Newbutton and then select Scan for

    New.

    19.

    Double-clickon the VSALMserver.

    Figure 29

    Configuring servers

    20.

    There are many options shown here for the selected deployment server, but the general

    takeaway is that you want to configure servers that you add to be uniquely identifiable so that

    Release Management Sever can target them. It is possible to used cloned servers, configure the

    address type to be a gateway, and to have the server use HTTP(S) to grab the deployment bits

    from the drop location (if it a UNC path is not an option).

    Figure 30

    Configuring servers

    21.

    Navigate to Configure Paths | Environments.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    19/76

    Figure 31

    Viewing environment configuration

    22.

    Servers are grouped into environments so that servers are decoupled from release path

    definitions and so that various stages of the release path can be restricted to certain

    environments. Double-clickon the first environment named Int-Dev.

    Figure 32

    Viewing environment configuration

    23.

    As the description states, this environment is meant to define the group of servers used for a

    development environment. If you wanted to restrict the use of this environment to specific

    stages, you could do so in the Stage Type Securitytab.

    Figure 33

    Viewing environment configuration

    Exercise 3: Defining a Release Path and

    Template

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    20/76

    In this exercise, you will learn how a release path and release template are created and configured. You

    will also see how to use the actions and tools provided to deploy an application to the correct

    environment.

    1.

    Now lets look at a release path definition. Navigate to Configure Paths | Release Pathsand

    double-clickon the Fabrikam Call Centerrelease path.

    Figure 34

    Viewing release path

    2.

    This release path defines a three-stage path through Dev -> QA -> Prod using the selected

    environments. Most steps for the first two stages are automated, so the assigned user or group

    does not intervene. Both the Dev and QA stages required approval before the next stage could

    begin.

    Figure 35

    Viewing release path

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    21/76

    3.

    Now lets look at how the Fabrikam Fiber team defined the process used to deploy their web

    application. Navigate to Configure Apps | Release Templatesand then double-clickon the

    Fabrikam Call Centertemplate.

    Figure 36

    Configuring release template

    4.

    The release template designer has a toolbox with control flow building blocks, servers, custom

    components, and a bunch of other actions and tools to help with deployment. Select the

    Propertieslink.

    Figure 37

    Viewing release template properties

    5.

    Here you can see that the release template is set and a build definition is assigned. Also, note

    the option to allow builds to trigger releases. Triggering a release from a build requires the use

    of a modified build template and the installation of the Release Management Client on the build

    server.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    22/76

    Figure 38

    Viewing release template properties

    6.

    Select the Closekey to close the Properties window.

    7.

    The first stage should be selected with its deployment sequence shown below. For the purposes

    of this lab, the deployment sequence is relatively simple to help illustrate the concept. Select

    the Collapse Allbutton so that we can dig into the example deployment sequence starting at a

    high level of detail.

    Figure 39

    Location of Collapse All button

    8.

    The collapsed view shows just the VSALMserver, which means that all deployment tasks will

    occur on just this server. If you look at the Toolbox, you will notice that there is a Serversnode.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    23/76

    This toolbox node shows all servers available to the environment configured for the currently

    selected stage.

    Figure 40

    Deployment sequence showing server

    9.

    Expand the VSALMnode. In summary of the details to follow, the general deployment sequence

    involves removing the existing web site from IIS, backing up the current bits, xcopy deploying

    the new bits from the build, re-creating the web site in IIS, and finally rolling back if there are

    failures.

    Figure 41

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    24/76

    Deployment sequence

    10.

    Expand the Remove Web Sitenode. This action was dragged and dropped onto the deployment

    sequence from the IIStoolbox node. It is configured to remove the FabrikamDevsite from IIS.

    Figure 42

    Remove Web Site node

    11.

    Expand the Copy File or Foldernode. This action is from the Windows OStoolbox node and is

    configured to back up the current web site location to a backup folder.

    Figure 43

    Copy File or Folder node

    12.

    Expand the Call Center Sitenode. Note the puzzle piece icon on the top-left, which indicatesthat it is an instance of a custom component.

    Figure 44

    Call Center Site node

    13.

    Lets look at this component by navigating to Configure Apps | Componentsand then double-

    clickingon the Fabrikam Call Center component.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    25/76

    Figure 45

    Viewing custom component configuration

    14.

    In the Sourcetab, note that the Builds with application option is selected. This means that

    the component will inherit the team project and build definition from the release template. The

    path to the package to deploy is currently set to [Build DropLocation]\_PublishedWebsites\FabrikamFiber.Web.

    Figure 46

    Viewing custom component configuration

    15.

    Select the Deploymenttab.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    26/76

    Figure 47

    Location of Deployment tab

    16.

    This component uses the XCopy Deployertool, which is backed by a script named irxcopy.cmd.

    The Argumentsproperty is setup to copy all deployment source files to the Installation Pathparameter (which is exposed on the release template design surface).

    Figure 48

    Viewing custom component configuration

    17.

    Return to the Fabrikam Call Centerrelease template and expand the Create Web Sitenode.

    This creates the specified site in IIS.

    Figure 49

    Create Web Site node

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    27/76

    18.

    Finally, look at the Rollbacksequence, which restores the backup and re-creates the original

    web site in IIS (if needed).

    Figure 50

    Rollback sequence

    19.

    All stages of this demonstration release template have an identical structure, albeit with

    different parameters.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    28/76

    Figure 51

    Viewing QA stage

    Note: In the likely event that your stages have a similar structure, you can copy and paste

    elements from one stage to another. You can even copy the entire deployment sequence from

    one stage to another. In the event that some servers are not available on the target stage, you

    will be prompted to replace those servers with available ones. Copying an entire deployment

    sequence can be accomplished by right-clicking on a stage node in the Release Template and

    then selecting the option to copy.

    20.

    Before we move on to see a release in action, lets take a peek at the available tools and

    actions. Navigate to Inventory | Tools.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    29/76

    Figure 52Location of Tools tab

    21.

    The current set of configured tools provides the ability to execute command line statements,

    manipulate files and processes, deploy databases and websites, install applications, manage

    Azure virtual machines, and even run automated tests defined in Microsoft Test Manager. Some

    of the tools are backed by scripts, while others are backed by executables. You can easily add in

    your own tools if needed.

    22.

    Select the Actionstab.

    Figure 53

    Location of Actions tab

    23.

    Actions are specific applications of the tools. For example, a number of the defined actions

    perform tasks in IIS using the IIS Deployer tool.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    30/76

    Figure 54

    Viewing available actions

    Note:Starting with Update 3, you can now tag your servers per environment and use those

    tags as part of your deployment sequence. This allows you to specify deployment actions for

    all servers in an environment that are tagged. For example, the following screenshot shows the

    same deployment as was highlighted earlier in the exercise, but with all servers being tagged

    with All tag and select servers with a Debug tag. In the event that more servers are added

    to the environment, the release template itself does not need to be modified.

    Exercise 4: Release Automation Example

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    31/76

    In this exercise, you will configure a Team Foundation Server build for continuous integration, ensure

    that it automatically triggers a release, and then execute/follow that release all the way through the

    development, QA, and production stages.

    1.

    Log in as Brian Keller (VSALM\Brian). All user passwords are P2ssw0rd.

    2.

    Launch Visual Studio 2013from the taskbar and open Team Explorer. You should now beconnected to the FabrikamFiber team project. If you are not automatically connected to the

    FabrikamFiber project, select the Connect to Team Projectsbutton ( ) to do so.

    Figure 55

    Team Explorer Home view

    3.

    Select the Buildstile.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    32/76

    Figure 56

    Location of Builds tile

    4.

    Right-clickon the Nightly Fabrikam (Dev) build definition and select the Edit Build Definition

    option.

    Figure 57

    Editing build definition

    5.

    Select the Triggertab.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    33/76

    Figure 58

    Location of Trigger tab

    6.

    The name of the build implies that the Fabrikam Fiber application is built each night, even

    though it is currently set to be manually triggered. Lets say that the team has decided to go

    with the Continuous Integrationoption, to build on each check-in, so select that option.

    Figure 59

    Selecting Continuous Integration option

    7.

    Select the Processtab.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    34/76

    Figure 60

    Location of Process tab

    8.

    As we pointed out in the previous exercise, a custom build process template needs to be used in

    order for builds to be handed off to Release Management. Note that the

    ReleaseDefaultTemplate.11.1.xamltemplate is selected.

    Figure 61

    Custom build process template

    Note: The Release Management build process template can be found in the

    %ProgramFiles(x86)%\Microsoft Visual Studio 12.0\Release Management\binfolder.

    9.

    As a quick aside, the custom build process template also contains the logic to tokenize your

    configuration files. This logic assumes that in your solution, you have two versions of your

    configuration files. One version is your normal configuration file used during local development,

    and the other is a corresponding file that has the same content, except that instead of having

    local values for your variables, tokens have been put there. The build activity will swap those

    two files before doing the build, so that you end up with the tokenized version of the

    configuration files in the drop location.

    10.

    Here is an example of how to achieve this: Lets say your solution contains a file called

    web.config. You would need to copy that file (and keep them in sync), and name it

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    35/76

    web.config.token. Your web.config file will stay the way it is now (and that will be used when

    you run the app locally). The web.config.token file will contain tokens instead of values.

    Figure 62

    Example of token file

    11.

    Back to our build configuration, scroll down to the Release Managementsection of the build

    process parameters and note that the Release Build parameter is set to True. Both the build

    definition and Release Management need to be configured in order to allow a build to trigger a

    release.

    Figure 63

    Location of Release Build option

    Note: In the case of a nightly build, it may make sense to set the Release Target Stageto be

    something other than production, perhaps a development or QA stage, but for demonstration

    purposes, we will take the release all the way to production.

    12.

    Press Ctrl + Sto save the build definition. Everything should now be in place for a continuous

    integration scenario where a source check in will trigger both a build and a release.

    13.

    In Team ExplorerHome, double-clickon the first FabrikamFiber.CallCenter.slnsolution.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    36/76

    Figure 64

    Loading FabrikamFiber solution

    14.

    Launch Internet Explorerfrom the taskbar and select the FF DEVbutton from the favorites bar

    to load the Fabrikam Fiber site currently deployed to the development environment. Youll have

    to play along with the scenario here, as the QA and Production versions of the site are also on

    the same machine, albeit on different ports.

    Figure 65

    Location of Fabrikam Fiber link (development)

    15.

    To pick a simple but visual change to the site for demonstration purposes, lets say that we need

    to change Fabrikam Fiber Support to Fabrikam Fiber Support v2.0. Back in Visual Studio,

    open_Layout.cshtmlfrom FabrikamFiber.Web | Views | Shared.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    37/76

    Figure 66Location of _Layout.cshtml

    16.

    In_Layout.cshtml, locate the h2 tag that contains the Support text and change it to be

    Support v2.0.

    Figure 67

    Modifying the web site

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    38/76

    17.

    In Team ExplorerPending Changes, select the Check Inbutton. Select Yesif prompted to save

    changes and check in.

    Figure 68

    Checking in change

    18.

    If you quickly open Team ExplorerBuilds, you should see that the check in triggered a build.

    Double-clickon the build.

    Figure 69

    Opening build in progress

    19.

    Wait for the build to finish and then select the View Loglink.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    39/76

    Figure 70

    Location of View Log link

    20.

    If you scroll down through the activity log, you should see the steps that have to do with

    Release Management.

    Figure 71

    Activity log showing steps involving Release Management

    21.

    Launch the Release Managementdesktop client and navigate to Releases | Traffic Overview.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    40/76

    Figure 72

    Loading Release Management traffic overview

    22.

    Note that the Fabrikam Call Centerrelease path now shows that another deployment is in

    process in the development stage. Your numbers may be slightly different that the following

    screenshot.

    Figure 73

    Traffic overview showing release in process

    23.

    Double-clickon the Dev stage for the Fabrikam Call Center release path.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    41/76

    Figure 74

    Loading detailed traffic view for Dev stage

    24.

    Assuming that you have waited long enough for the deployment to complete, you should see

    that the most recent release (top) is currently in the Dev stage waiting for approval.

    Figure 75

    Release history showing release in progress

    25.

    As a refresher, lets take a look at the Dev stageworkflow once again. No need to navigate

    there in the application, just refer to the screenshot below.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    42/76

    Figure 76

    Dev stage workflow configuration

    26.

    As you can see, the acceptance, deployment, and validation steps are all automated while we

    are awaiting explicit approval before moving on to the QA stage. Specifically, the release is

    waiting for Brian Keller to provide approval. Although not configured in this virtual machine,

    Brian would receive an email alerting him about the pending approval.

    27.

    Select theMy Approval Requestslink to view pending approvals.

    Figure 77

    Location of My Approval Requests

    28.

    Double-clickon the pending approval.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    43/76

    Figure 78

    Loading pending approval details

    29.

    Select the View Sequencelink.

    Figure 79

    Location of View Sequence link

    30.

    We can look at the deployment sequence and see all of the specific parameters that were (or

    will be) used for each stage. Note that these ultimately become historical (and read-only) for

    each specific release.

    Figure 80

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    44/76

    Deployment sequence showing parameters

    31.

    Select the View Loglink.

    Figure 81

    Location of View Log link

    32.

    The log shows the details and status for each step of the release process. This shows that the

    deployment was automatically accepted, deployed, and validated for the Dev stage and is

    now waiting for approval. The Deploystep also has additional detailsselect the ellipses

    button in the details column.

    Figure 82

    Location of ellipses button

    Note: You can view future steps as well by selecting the Include Future Steps option at the

    bottom of the log.

    33.

    The deployment log shows details for each action performed. Select the View Loglink for the

    Remove Web Siteaction. Use Notepadif prompted.

    Figure 83

    Viewing action log

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    45/76

    Note: If a specific action fails, the output from the underlying tool used should provide

    debugging information to help determine if there is a problem with the target environment or

    the deployment sequence.

    34.

    This log shows that the FabrikamDev web site was deleted successfully.

    Figure 84

    Viewing successful action log

    35.

    Closethe Notepadwindow and the Deployment Logwindow.

    36.

    Before we approve the release, lets look at the deployed site in Internet Explorer. Select the

    FF DEV link from the favorites bar.

    Figure 85

    Location of FF DEV link

    37.

    Here we can see that Support v2.0 shows up as expected.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    46/76

    Figure 86

    Deployment to the development environment is a success

    38.

    In Release Management, return to My Approval Requests, select the release, and then select

    the Approvebutton.

    Figure 87

    Approving the release to the development stage

    39.

    In the Approval Confirmationwindow, enter a comment such as Dev deployment looks good

    and then select the OKbutton.

    Figure 88

    Adding an approval confirmation comment

    40.

    The deployment will then transition to the QA stage and automatically deploy the web site to

    the configured environment. Refreshthe My Approval Requests view until the release stops for

    QA approval.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    47/76

    Figure 89

    Waiting for QA approval

    41.

    Once the deployment is complete and automatically validated, someone from the QA Team will

    need to approve the release. Brian is a member of the team, so go ahead and load the QA site

    using the FF QA favoritelink in Internet Explorer.

    Figure 90

    Deployment to the QA environment is a success

    42.

    Back in Release Management, navigate to the My Approval Requestsview, select the

    deployment, and then select the Approvebutton.

    Figure 91

    Approving the release to the QA stage

    43.

    In the Approval Confirmationwindow, enter a comment such as QA deployment looks good

    and then select the OKbutton.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    48/76

    Figure 92

    Adding an approval confirmation comment

    44.

    As a refresher, lets take a look at the Prod stage workflow once again. No need to navigate

    there in the application, just refer to the screenshot below. Note that the acceptance step is not

    automated as it was for the previous stages. This means that the assigned approver must

    explicitly sign off on before the actual deployment to production will begin.

    Figure 93

    Prod stage workflow configuration

    45.

    Select the pending approval request in My Approval Requestsand note that Brian has a few

    options to consider besides approval - including reassignment and rejection. Lets go ahead and

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    49/76

    approve the deployment to production since the QA Team signed off on the previous stage.

    Select the Approvebutton.

    Figure 94

    Approve the request to deploy to production

    46.

    In the Approval Confirmationwindow, enter a comment such as Ready for production. Note

    that you can deploy immediately or schedule the deployment for later. Use the default option

    to deploy nowand then select the OKbutton.

    Figure 95

    Approve the request now

    47.

    Go ahead and load the production site using the FF PROD favorite in Internet Explorer. You

    may need to refresh the page a few times before the build isdeployed (displaying Support

    v2.0).

    Figure 96

    Deployment to the production environment is a success

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    50/76

    48.

    The Ops Team now needs to validate the deployment. Select the request and then select the

    Approvebutton.

    Figure 97

    Approving the deployment to production

    49.

    In the SuccessfulDeployment Confirmationwindow, enter a comment such as Ops approved

    and then select the OKbutton. The operations team may have their own suite of tests that they

    run to ensure that everything is running as expected and ready for end-users.

    Figure 98

    Approve the deployment to production

    50.

    Navigate to Releases | Releasesand note that the release has made it to the target stage of

    Prod and has a Status of Released.

    Figure 99

    Build has been released to production

    51.

    There are circumstances where being able to manually trigger the release of a specific build

    using the same process would be useful. For example, lets say that it has been discovered that

    the production site has some scaling issues (that unfortunately werent discovered before the

    previous release made it to production), and we would like the QA team to do some

    comparative testing using their toolset against the QA environment.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    51/76

    52.

    Select the Configure Apps | Release Templatestab, select the Fabrikam Call Centertemplate,

    and then click the New Releasebutton.

    Figure 100

    Location of New button

    53.

    Name the release QA Testing, select the Fabrikam Call Centerrelease template, select a

    target stage of QA(we dont want to go all the way to production), and then select the

    Select link next to the Build field.

    Figure 101

    Manually triggering a release

    54.

    In the Search Buildswindow, select the oldest build.

    Figure 102

    Selecting a build

    55.

    To start the release, select the Startbutton (optional).

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    52/76

    Figure 103

    Location of Start button

    56.

    If you were to follow this release to the target stage using the same process as before, you

    would end up with the desired build deployed to the QA environment.

    57.

    To learn more about Release Management, please visit

    http://www.visualstudio.com/explore/release-management-vs.

    Exercise 5: Release Management Support

    for Azure and DSC (optional)

    Note: This optional exercise requires a Windows Azure subscription. If you have a MSDN subscription,

    you can take advantage of the providedAzure benefits.

    In this exercise, you will walk through the process of connecting Release Management to a Windows

    Azure subscription, defining a release template that deploys Fabrikam Fiber to an Azure virtual machine

    using DSC, and finally triggering a release to Azure. The features shown here are new as of Update 3.

    1.

    Before moving on with this exercise, you will first need to start the Hyper-V Time

    Synchronization Serviceto ensure that the virtual machine date and time match the real world.

    http://www.visualstudio.com/explore/release-management-vshttp://www.visualstudio.com/explore/release-management-vshttp://azure.microsoft.com/en-us/pricing/member-offers/msdn-benefits-b/http://azure.microsoft.com/en-us/pricing/member-offers/msdn-benefits-b/http://azure.microsoft.com/en-us/pricing/member-offers/msdn-benefits-b/http://azure.microsoft.com/en-us/pricing/member-offers/msdn-benefits-b/http://www.visualstudio.com/explore/release-management-vs
  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    53/76

    The easiest way to do this is to execute the EnableVMTimeSync.batfile from c:\util. Right-click

    on the script and select the option to Run as Administrator.

    Figure 104

    Ensuring that virtual machine date and time match host machine

    2.

    In order to configure Release Management to work with your Azure subscription, you will first

    need to download the publish profile. This is easy to do using Windows Azure PowerShell (pre-

    installed on the virtual machine for your convenience). Search for and launch Microsoft Azure

    PowerShellfrom the Start screen.

    Figure 105

    Launching Microsoft Azure PowerShell

    3.

    Type Get-AzurePublishSettingsFile into the Microsoft Azure PowerShell window and then

    press Enter.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    54/76

    4.

    Enter your credentials, select the subscription file that you wish to download (if you have more

    than one subscription), and finally select the Submitbutton to download the publish settings

    file.

    Figure 106

    Downloading publish settings for selected subscription

    Note: Please be aware that the publish settings file contains sensitive information such as an

    encoded management certificate.

    5.

    Savethe publish settings file to a location of your choosing.

    6.

    Open the publish settings file using Notepad. We will copy and paste the needed values from

    here in a few steps.

    7.

    Since you already have a browser logged in with your Microsoft account, type

    manage.windowsazure.cominto the address bar to load the management portal. You are going

    to create a virtual machine and a storage account to use with Release Management later on.

    8.

    Create a new virtual machine from the gallery (click the Newbutton, Compute, Virtual

    Machine, From Galleryoption) with the following options:

    Image: Windows Server 2012 R2 Datacenter

    Version Release Date: use the latest available (default)

    Virtual Machine Name: Web-VM1

    Tier: Standard

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    55/76

    Size: A1

    New User Name: DemoAdmin

    Password:

    Cloud Service: Create a new cloud service

    Cloud Service DNS Name:

    Region:

    Storage Account:

    Availability Set: (None)

    Endpoints: use defaults and add in HTTP (this allows port 80 traffic to be sent to VM)

    For other options, use the defaults and then start the VM creation process. This will

    take a few minutes.

    9.

    Create a new storage account in the same region that you used to house your virtual machine

    (click the Newbutton, Storage, Quick Create) with the following options:

    URL:

    Location/Affinity Group:

    Replication:

    10.

    Create a new SQL database in the same region used to house your virtual machine (click the

    Newbutton, SQL Database, Custom Create) with the following options:

    Name:

    Edition: Web

    Max Size: 1 GB

    Collation:

    Server:

    Note:In the event that you need to create a new server, provide your desired login name and

    credentials, but select the same region as you have been using in previous steps.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    56/76

    11.

    Wait for the virtual machine and storage account to be created and in the Running/Online state

    before moving on.

    12.

    Launch the Release Management clientfrom the taskbar.

    13.

    Select the Administration | Manage Azuretab and then select the Newbutton.

    Figure 107

    Creating connection to Azure subscription

    14.

    For the Name, enter something such as Demo Subscription.

    15.

    For the Subscription ID, copy and paste the value from your publish settings file (do not include

    the quotes).

    16.

    For the Management Certificate Key, copy and paste the value from your publish settings file

    (do not include the quotes).

    17.

    For the Storage Account Key, enter the name of the storage account that you would like

    Release Management to use when uploading bits for deployment.

    18.

    Select the Save & Closebutton.

    Figure 108

    Creating connection to Azure subscription

    19.

    Now we can link to the Azure subscription in order to pull in the virtual machine that we

    created earlier. Select the Configure Paths | Environmentstab and then select the New vNext:

    Azureoption from the drop-down.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    57/76

    Figure 109

    Creating a new Azure environment

    20.

    Select the Link Azure Environmentbutton.

    Figure 110

    Linking Azure Environment

    21.

    In the Azure Environmentswindow, select the subscription that you created earlier.

    Figure 111

    Selecting subscription containing desired environment

    22.

    Select the Azure environment that you created earlier (this is the DNS name of the cloud

    service) and then select the Linkbutton.

    Figure 112

    Selecting desired environment

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    58/76

    23.

    Set the Ownerto be Brian Keller.

    24.

    Select the Link Azure Serversbutton.

    Figure 113

    Linking Azure Servers

    25.

    In the Azure Serverswindow, select the Azure virtual machine that you created earlier and then

    select the Linkbutton. Note that applying some sort of naming scheme here makes it more

    evident that the Azure service and virtual machine are meant for production deployments of a

    web site.

    Figure 114

    Linking to specific servers in Azure

    26.

    Select the Save & Closebutton for the new environment.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    59/76

    Figure 115

    Saving the new environment for use with Release Management

    27.

    Now we can really dig into the deployment experience when working with Azure in ReleaseManagement. In this case, we are going to see how one might deploy a web application to an

    Azure virtual machine that does not have a deployment agent running on it, using a push model

    of deployment and Desired State Configuration script. Select the Configure Paths | vNext

    Release Pathstab and then select the Newbutton.

    Figure 116

    Creating a new release path to Azure

    28.

    For the Name, enter something like Fabrikam Fiber Cloud.

    Figure 117

    Creating a name for release path

    29.

    In the Stagestab, select the Addbutton.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    60/76

    Figure 118

    Defining a stage for release path

    30.

    For demonstration purposes and simplicity, letsjust define a single production stage using the

    new environment running in Azure. For the Stagedrop-down, select the Prod option. For

    Environment, select the environment that you just linked.

    Figure 119

    Defining a new stage

    31.

    For demonstration purposes and simplicity, automateall steps and select the Ops Teamfor

    each step.

    Figure 120

    Defining a new stage

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    61/76

    32.

    Select Save & Closeto save and close the new release path definition.

    33.

    Now you need to define a component that will be used to package up the Fabrikam Fiber

    website build for deployment to Azure. Select Configure Apps | Componentsand then select

    the New vNextbutton.

    Figure 121

    Creating a new component

    34.

    For the Name, use something like Fabrikam Call Center - Cloud.

    35.

    In the Sourcetab, use the default option that states Builds with application and specify the

    path to package to be *Build Drop Location+\_PublishedWebsites\FabrikamFiber.Web.Select

    the Save & Closebutton.

    Figure 122

    Defining a component for the sample website

    36.

    Before we create the release template, lets take a quick peek at some Desired State

    Configuration (DSC) script that was created ahead of time that will do most of the setup and

    configuration work once pushed out to the Azure. Launch Visual Studio 2013from the task bar.

    37.

    Double-click on the first FabrikamFiber.CallCenter.slnsolution from Team Explorer - Home.

    38.

    In Solution Explorer, expand the FabrikamFiber.Webnode and open FFDeploy.ps1from the

    Deploy folder.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    62/76

    Figure 123

    Opening DSC script in Visual Studio

    39.

    This DSC script defines the necessary configuration for the Fabrikam Fiber website in a

    declarative manner. If you scroll down and glance at the configuration sections, you should be

    able to determine what is happening here at a high level. The IIS role is installed (if needed), the

    ASP.NET 4.5 role is installed (if needed), the website bits are copied to the server, the default

    website is stopped, and the Fabrikam Fiber site is created and started. At the very end, the

    configuration is enacted using the specified configuration data.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    63/76

    Figure 124

    DSC script

    Note: DSC is a PowerShell extension that ships with Windows Server 2012 R2 and Windows

    8.1, although you can bring support for DSC down to Windows Server 2008 R2 and Windows 7

    by installing the Windows Management Framework 4.0.

    40.

    Most of the configuration modules used here are built into DSC. However, you can use or create

    custom modules to tackle other needed tasks. Note that a module named xWebAdministration

    is imported at the beginning of the configuration.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    64/76

    Figure 125

    DSC script

    Note: The xWebAdministration module contains a number of resources that can be used for

    configuring IIS, including xWebsite that is used in this script. You can acquire a number of

    different modules for use in DSC scripts from the PowerShell Resource Gallery (currently in

    preview form athttps://msconfiggallery.cloudapp.net).

    41.

    Note that the xWebAdministration module is included in source control within the Deploy

    folder. This folder is deployed with the website, and therefore made available to script that runs

    on the target servers during deployment.

    Figure 126

    xWebAdministration folder deployed with website

    42.

    Now lets take a quick peek at the configuration script by opening FFDeployConfig.ps1. Note

    that although we are looking at this script first, it is actually the first one to run on the server.

    Figure 127

    Insert Caption

    43.

    The first part of this script places the xWebAdministration module in a discoverable location on

    the server. Next, a firewall rule is created to allow traffic in via port 80 if needed. The most

    important part to point out is the definition of $ConfigData(which is referenced when theconfiguration is enacted).

    https://msconfiggallery.cloudapp.net/https://msconfiggallery.cloudapp.net/https://msconfiggallery.cloudapp.net/https://msconfiggallery.cloudapp.net/
  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    65/76

    Figure 128DSC configuration script

    44.

    Open the web.configfile from the root of the FabrikamFiber.Webproject so that we can

    update the connection string.

    Figure 129

    Opening web.config

    45.

    In the Azure management portal, navigate to the dashboard for the database that you created

    earlier and then click on the View SQL Database connection strings link.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    66/76

    Figure 130

    Viewing the connection string for the database

    46.

    Select the connection string shown for ADO.NETand then press Ctrl+C to copy it.

    Figure 131

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    67/76

    Copying connection string for database

    47.

    Switch back to Visual Studio and then paste (Ctrl+V) the connection string at the appropriate

    place for the connection string named FabrikamFiber-Express.

    Figure 132

    Location to place new connection string

    48.

    Locate the part of the connection string with the {your_password_here}placeholder and

    replace it with the real value.

    49.Check inyour changes.

    50.

    Since we already have a Fabrikam Fiber build defined, lets go ahead and make use of that for

    our demonstration purposes. However, to avoid confusion later we should modify it so that a

    new release is not triggered during the build. In Team Explorer - Builds, right-click on the

    Nightly Fabrikam (Dev)build definition and select Edit Build Definition.

    Figure 133

    Editing build definition

    51.

    In the Processtab, change the Release Buildoption to False(see the Release section at the

    bottom). We will manually create a new release later.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    68/76

    Figure 134

    Modifying build definition

    52.

    Press Ctrl+Sto save changes to the build definition.

    53.

    Right-click on the build definition and select Queue New Build.

    54.

    Use the default options for the build by pressing the Queuebutton.

    55.

    Wait for the build to finish and take note of the build number.

    56.

    Return to the Release Managementclient and navigate to the Configure Apps | vNext Release

    Templatestab and select the Newbutton.

    Figure 135

    Creating a new release template

    57.

    For Name, use something like Fabrikam Call Center - Cloud.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    69/76

    58.

    For Release Path, select the release path that you created earlier.

    59.

    Select the build definitionfor the FabrikamFiberproject.

    60.

    Select the Createbutton to create the release template.

    Figure 136

    Creating a new release template

    61.

    In the Toolbox, right-click on the Componentsnode and select Add.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    70/76

    Figure 137

    Linking component to release template

    62.

    Select the component that you created earlier and then select the Link button.

    Figure 138

    Linking component to release template

    63.

    Drag and drop an instance of the Deploy To Azure Environmentaction to the Deployment

    Sequence.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    71/76

    Figure 139

    Adding deployment action to deployment sequence

    64.

    Expand the Deploy To Azure Environmentaction within the Deployment Sequence.

    Figure 140

    Adding deployment action

    65.

    Now it is time to fill in the configuration variables for the Deploy To Azure Environmentaction.

    66.

    Type the configuration variables as shown in the screenshot below, just make sure that your

    ServerName, UserName, Password, and ComponentNamematch the correct values for your

    setup (you can find ServerName and ComponentName specified in the Toolbox).

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    72/76

    Figure 141

    Providing configuration variables

    67.

    Select the Savebutton.

    Figure 142

    Saving the new release template

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    73/76

    68.

    At this point, you should be ready to create a new release to Azure. Select the New Release

    button.

    Figure 143

    Creating a new release

    69.

    In the Propertieswindow, select the most recent build by clicking on the Selectlink.

    Figure 144

    Selecting the build to release

    70.

    Double-clickon the most recent build to select it.

    Figure 145

    Selecting the build to release

    71.

    Select the Startbutton to initiate the build.

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    74/76

    Figure 146

    Starting the release of Fabrikam Fiber to Azure

    72.

    You can monitor the progress of the release in the Release Management client. Note that it will

    take a few minutes for the first release to be deployed to your Azure virtual machine, as the DSC

    script will install IIS, ASP.NET 4.5, and so on if they havent been already (which will be the case

    on a default installation of Windows Sever).

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    75/76

  • 8/10/2019 Embracing Continuous Delivery With Release Management for Visual Studio 2013

    76/76

    Figure 149

    Fabrikam Fiber running in Azure

    To give feedback please write [email protected]

    Copyright 2014 by Microsoft Corporation. All rights reserved.

    mailto:[email protected]:[email protected]:[email protected]:[email protected]