• $230 million• 6 States & DC• Nissan Leaf / Chevy Volt• Approx. 8000 EVs• Over 15,000 EVSE

Page 3: ECOtality ccse 10.04.10

•EV Project in San Diego

•EV Chargers

•1000+ residential Level 2 EV chargers free for EV Project Participants

•1,450 Publicly Available Level 2 EV chargers

•60 Commercial DC Fast Chargers

•Infrastructure Planning – 2010 Jan through Sept

•Installations – November 2010 through June 2011

•Data collection – July 2011 through December 2012

Page 4: ECOtality ccse 10.04.10

•EV Project in San Diego (continued)

•City permitting coordination

•Permit processes

•Requirements

•Installations by professional contractor network managed by ECOtality

Page 5: ECOtality ccse 10.04.10
Page 6: ECOtality ccse 10.04.10
Page 7: ECOtality ccse 10.04.10
Page 8: ECOtality ccse 10.04.10

Charging Network

Page 9: ECOtality ccse 10.04.10
Page 10: ECOtality ccse 10.04.10
Page 11: ECOtality ccse 10.04.10
Page 12: ECOtality ccse 10.04.10
Page 13: ECOtality ccse 10.04.10
Page 14: ECOtality ccse 10.04.10