EconomicDevelopmentServicePlan2015/16TomDobrashian,HeadofEconomicDevelopmentCommunitiesandResourcesName Economic Development Service Plan Version V4 Status Published Signature Date Head of Service approval Tom Dobrashian 09/04/15 Director approval Andrew Blake-Herbert 08/05/15 Cabinet Member approval Cllr Robert Benham (Cabinet Member for Environment) 30/04/15
28
Embed
Economic Development Service Plan 2015/16 · Economic Development Service Plan 2015/16 Tom Dobrashian, Head of Economic Development Communities and Resources Name Economic Development
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Economic Development Service Plan 2015/16 Tom Dobrashian, Head of Economic Development Communities and Resources Name Economic Development Service Plan
Version V4
Status Published
Signature Date
Head of Service approval Tom Dobrashian 09/04/15
Director approval Andrew Blake-Herbert 08/05/15
Cabinet Member approval Cllr Robert Benham (Cabinet Member for Environment) 30/04/15
Page 2 of 28
1 Operational Context Scope of the Service The Economic Development Service consists of two teams delivering a range of initiatives to improve the business base in the borough and the physical environment for the benefit of residents The Projects & Programmes Team is largely responsible for:
Masterplanning and production of appropriate planning frameworks focussing on Romford and Rainham Working with developers to bring forward appropriate and well designed developments in Romford Delivering public realm projects in the borough Working with the GLA to drive economic growth in London Riverside Improving green infrastructure in the borough Establishing a Housing Development Company Achieving Housing Zone status and initiating a programme of growth projects in Rainham
The Business Development Team are the council’s Business Champions and the team is focused on cultivating business in the borough through a range of activities and events. The team are responsible for:
Delivering the Business Growth Strategy Managing the Business Start-Up Programme Attracting inward investment Delivering Skills & Employment initiatives Attracting external funding
There is a shared responsibility of a number of strategic objectives such as improving the economic base in London Riverside. Significant funding through the London Enterprise Panel will enable a number of projects to be delivered over the next two years that will support economic growth priorities, including a major project in Romford to diversify the offer and attract new visitors and retail and leisure businesses to the town centre.
Page 3 of 28
Romford Town Centre Romford attracts 20 million visitors each year; however, the historic street market and adjacent retail areas consisting of independent shops are in need of improvement. To address this we will increase footfall, attract new businesses and visitors by taking forward projects within the town centre to work towards achieving this. We have planned three broad initiatives over the next two years:
Improve Romford Town Centre Management
o Develop an independent town centre partnership o Develop a three year business plan o Review the marketing, promotion and branding of the town o Develop an enhanced programme of events o Improve support for retail businesses
Diversify the offer of Romford
o Gain an interest in vacant or low value retail units to redevelop o Curate pop-up activities to encourage the independent retail sector and creative uses
Revitalise Romford Market
o Undertake a review of Romford Market o Deliver small scale capital works to improve the look and feel of the market o Deliver revenue proposals to attract new traders and visitors to the market
Alongside these LEP funded projects, work will continue to improve the public realm in Romford, supported by funding for Crossrail complementary measures. We will carry on working with Transport for London to agree plans for a new Romford Crossrail Station, including a southern entrance. We will work intensively with private sector developers to bring forward deliverable planning applications and will create proposals for a high quality development on sites owned by the council to bring in capital proceeds to the council from development profits and land receipts. We will work with office owners to revitalise Romford’s Office Quarter to include attracting in at least 10 new occupiers over the next five years. To keep Romford moving we will review parking arrangements and how we can efficiently manage car, pedestrian, bus and cycle access in the town.
Page 4 of 28
Rainham/London Riverside The main focus of our activity going forward into the next year is in the Rainham residential area. Key to our long term vision is securing Housing Zone status to bring forward more than 3,000 new homes in a new garden suburb. We will establish a strong relationship with the developer on the old Somerfield and Dovers Corner sites and work with them on a phasing plan. We will complete a Grip 4 business case for the Beam Park station and produce a delivery plan for the station linked to housing development. Together with the GLA we will produce a programme of how the GLA is taking the Beam Park site forward and establish Havering as a strong influencer. In order to do this a key focus will be to create a business case and thereafter a Business Plan for Havering to invest to deliver homes in this area through a LBH Housing Development Company. Working with the London Riverside BID we will produce an investment plan to transform the economic vitality of that area, to attract and retain value added businesses. Harold Hill We will continue to programme manage the completion of the current capital programme. We will work with our partners, especially Job Centre Plus, to deliver an intensive skills & employment programme to support the unemployed into work and provide residents with the opportunity to improve their skills to enable better employment options. Business Development Economic Development will act as Business Champion within the Council. We will ensure the effective establishment of the Business Portal and clear Service Level agreements, significantly improving business interaction with the council so that Havering will be rated as an excellent place to do business; this will include LBH processes for the Council to procure locally to best value principles. We will lay the foundations for projects to attract EU and other funding bids for skills & jobs - successfully targeting £3m over the next three years - and produce a skills strategy for Havering, enhancing life chances and supporting business growth in the borough. Through the LEP funding we will give sector based support to the construction, social care and retail sector through a range of specific events and initiatives to support business growth and promoting apprenticeships, skills development and employment opportunities. We will also support new and existing businesses through an Incubator Hub, offering affordable accommodation and business support to develop businesses to their next level of growth.
Page 5 of 28
Objectives and Outcomes
1. Ensure Romford is a vibrant economic area securing public and private investment 2. Improve Romford’s retail and leisure offer 3. High quality housing in London Riverside linked to sustainable communities and social infrastructure 4. Improve the economic base in London Riverside 5. Cultivate a strong business base in Havering 6. Attract investment for Havering’s green infrastructure to ensure residents have access to open space and natural heritage and to contribute to
economic development, health and well being 7. Deliver appropriate skills & employment initiatives that support residents to access jobs and meet business needs 8. Support Havering’s District Centres to maintain their vitality and viability 9. Establish a Development Company that will generate significant profit for the council 10. Promote improvements to enhance transport connectivity in the borough focusing on key areas to benefit economic growth 11. Maximise external funding opportunities 12. Promote a shared Economic vision for Havering
Corporate Plan Outcomes Service‐Level Outcomes Team‐Level Outcomes
We want Havering to be clean, with an environment fit for future generations
Increase access to green open space in the borough
Promote Havering’s green infrastructure and its links to health and well being Promote Havering as a visitor destination through investment in Rainham Wildspace and supporting the Thames Chase Trust including developing a Round 2 Heritage Lottery Fund Landscape Partnerships bid
People will be safe in their homes and in the community
Improvement to transport links
High quality designs for Romford, Gidea Park and Harold Wood stations completed
Business Cases established for improved bus services in Romford and Rainham
Funding secured to enhance Romford as a cycling hub Maximise support to residents and businesses through the Skills & Employment strategy to improve access to jobs and training opportunities
Appropriate funding secured to deliver skills & employment initiatives
Bespoke programme of support established for Harold Hill
Initiatives support an increase in skills levels for residents and increased employment opportunities
We want our residents to be proud to Private and public investment in Romford to ensure Completed Development Framework
Page 6 of 28
Corporate Plan Outcomes Service‐Level Outcomes Team‐Level Outcomes
live in Havering vibrancy and an improved retail and leisure offer Delivery of improvements to Romford public realm
Revised Romford Market and Retail Strategy
Business Plan for Romford Town Centre Partnership
Support the development of a vibrant independent and creative offer in Romford
Programme of events delivered in collaboration with town centre partners
High quality housing in London Riverside linked to sustainable communities and social infrastructure
Housing Zone status secured and established
Funding secured for outline design of linear park along the A1306
Funding secured for Beam Park station
A strong economic base in London Riverside
Investment Strategy developed with the GLA and the London Riverside Business Improvement District
Closer working with CEME to ensure wider engagement with havering businesses and expansion of CEME’s offer
Increase in business growth
Sector based approaches established to support business growth
Business Start-Up programme established
Key Accounts to support business growth including skills and recruitment plans
New businesses attracted to the borough
Improved businesses access to superfast broadband
Support Havering’s District Centres to maintain their vitality and viability
Improved town centre performance through increased trade and reduced vacancy rates
Secure funding to deliver projects to support economic development EU funding secured to support employment initiatives
Page 7 of 28
Key Volumetrics and Demand Pressures
Volumetric Previous levels of demand Projected levels of demand
2012/13 2013/14 2014/15 2015/16 2016/17 2017/18
Total Population* 240,157 242,507 244,811 247,159 249,625 252,189
Population (0-4 yrs)* 14,640 14,987 15,322 15,672 15,944 16,102
Population (5-10 yrs)* 16,306 16,929 17,519 18,031 18,538 19,132
Population (11-17 yrs)* 20,907 20,631 20,406 20,316 20,478 20,607
Population (18-24 yrs)* 20,652 20,278 19,975 19,740 19,388 19,316
Population (25-64 yrs)* 123,649 124,867 126,174 127,514 128,944 130,237
Population (65-84 yrs)* 37,608 38,244 38,594 38,860 39,102 39,364
Population (85+ yrs)* 6,394 6,573 6,820 7,025 7,232 7,430
* Source: GLA round borough preferred option projections, 2014 Round Projection ** Source: GLA round SHLAA‐based household projections, 2013 A central role for the Economic Development team is to support the provision of social and physical infrastructure in order to ensure council services meet the needs of Havering residents. Key Challenges and Risks Town centres continue to be at risk of reduced spending and increasing vacancy rates due to changes in retail spending habits as well as competition from larger, out of town business parks. Initiatives from the GLA include funding for High Streets to diversify and enhance the appeal to encourage more local spend are being undertaken. Bidding for that funding is, however, competitive, so the risk is being unsuccessful. We have a focus on establishing town teams to take more responsibility for local retailers (which is best practice) to take more responsibility for their own events. Erosion of commercial base - a key challenge for the borough is the erosion of commercial areas through the change from office to residential designation. Housing Zone status represents an opportunity to deliver a place-shaping development in the south of the borough, the success of this is dependent on continuing support from Members and the public and the delivery of appropriate and well-designed development by the private sector.
Page 8 of 28
Romford development - attracting developers to deliver appropriate schemes continues to be a key challenge in the borough, especially in Romford. Funding - EU funding should be available this year; however, there will be a number of challenges including the resource to bid for, and deliver associated projects, and the challenge of developing and delivering joint bids with other boroughs. Local Authority Spending cuts – the council is expected to save approximately £45m over the next four years and there are challenges to be met and still meet the objectives of the service. Central to this will be the delivery of a revenue generating commercial entity on behalf of the council. Resourcing – Economic Development is a small service with a significant number of projects reliant on key personnel and the use of external resources to deliver our work. Retaining and recruiting staff and securing the correct resources remains a challenge and a risk. Corporate Terms & Conditions review – this could have implications for the service particularly with regard to the potential impact on service delivery, staff morale and retention of staff. Local Safeguarding Statement Economic Development will continue to prioritise the safeguarding of vulnerable adults, in line with relevant legislation. In the context of the Pan London Safeguarding policies and procedures, Safeguarding is a priority for everyone, including partner agencies, and this is managed through the Adults Safeguarding Board. We will continue to respond to National and Local Safeguarding priorities, including CQC inspections, contracting and commissioning arrangements. In particular, Economic Development will:
(i) Where appropriate, ensure that DBS checks are completed for all staff and volunteers working with children and / or vulnerable adults; (ii) Ensure that all new staff are advised of safeguarding issues and how to deal with them during their induction (iii) Proactively deal with any safeguarding issues that arise, including those arising through partnerships with external bodies, in line with relevant
policy, procedures and guidance (iv) Where relevant, fully contribute to serious case reviews (v) Ensure staff are aware of how to deal with safeguarding issues that arise, in a way that is appropriate to the circumstances that arise,
including through the service’s internal communication function; (vi) Identify ‘communications champions’ within the service and the wider directorate, to play a key role in keeping staff informed and
disseminating information on safeguarding issues, as well as other issues; (vii) Ensure that staff are given the opportunity to attend training and briefings as required, and (viii) Responding to requests for information about safeguarding issues, including responses to section 11 audits
Corporate Performance Indicators (reported to CMT/Cabinet)
R1 Number of businesses accessing advice through regeneration initiatives
847 1,017 TBC 700 500 500 CMT/Cabinet ±10%
Proud (Supporting our
community)
R2
Number of potential start-up businesses accessing advice via the Business Start-up Programme (new)
New New New New 25 25 CMT/Cabinet ±10% Proud
(Supporting our community)
R3
Reduce the collective retail and leisure vacancy rate figure for seven town centres by 2% below the national average vacancy rate for town centres. (new)
New New New New National
rate minus 2%
National rate minus
2% CMT/Cabinet ±10%
Proud (Supporting our
community)
Service Performance Indicators (related to Service Objectives/Actions only)
R4 % of economic development projects shown as green/amber (new)
New New New New 80% 80% Service ±10% 12 - Promote a shared
Economic vision for Havering
PERFORMANCE: Finances
Ref. Description 2012/13 Outturn
2013/14 Outturn
2014/15 Outturn
2014/15 Target
2015/16 Target
2016/17 Target
Level of Monitoring
Variable Tolerance (e.g. 5%, 10%)
Link to Corporate Plan or Service Objective
Corporate Health Indicators (included in all Service Plans)
ISS10 Percentage of suppliers paid within 30 days of receipt by Transactional Team by invoice
Corporate Performance Indicators (reported to CMT/Cabinet)
R5 Net external funding (£) secured through regeneration initiatives £3,602,600 £4,233,195 TBC £2,000,000 £2,000,000 £2,000,000 CMT/Cabinet ±10%
Proud (Supporting our
community)
Service Performance Indicators (related to Service Objectives/Actions only)
Please note: there are no Service Performance Indicators for this section
PERFORMANCE: BENCHMARKING
Performance Indicator Havering Target 2015/16 Performance of Comparators
DB34 - Number of working days per FTE lost due to sickness absence 8.5 days Full breakdown restricted by Memorandum of Understanding
Havering ranking according to LAPS (2013/14): 24 out of 24
BVPI 8 - Percentage of invoices paid on time 95% Full breakdown restricted by Memorandum of Understanding Havering ranking according to LAPS (2013/14): 6 out of 14
R1 - Number of businesses accessing advice through regeneration initiatives 500 L B of Barking & Dagenham
371 L B of Redbridge
112
R2 - Number of potential start-up businesses accessing advice via the Business Start-up Programme 25 L B of Barking & Dagenham
54
Page 13 of 28
3 Action Plan
Corporate Objectives PROUD Supporting our community
PS.1 Support local businesses, including start-ups, and promote investment in Havering PS.3 Support the viability and vitality of our town centres PS.4 Regenerate Romford Market to bring in new traders and attract more shoppers PS.5 Support the delivery of Beam Reach railway station and opportunities afforded by Crossrail PS.6 Promote cultural activity in our town centres, focusing on Hornchurch and Romford PS.7 Deliver the new Romford Leisure Centre in 2016/17 PS.8 Establish Rainham as a an attractive new garden suburb
Using our influence
PU.1 Work with partners for vibrant economic growth PU.2 Work with education partners to equip Havering’s young people and adults with the skills needed by local businesses PU.8 Work with partners, including Transport for London and Crossrail, to improve transport links and interchange facilities
Service Objectives
1. Ensure Romford is a vibrant economic area securing public and private investment 2. Improve Romford’s retail and leisure offer 3. High quality housing in London Riverside linked to sustainable communities and social infrastructure 4. Improve the economic base in London Riverside 5. Cultivate a strong business base in Havering 6. Attract investment for Havering’s green infrastructure to ensure residents have access to open space and natural heritage and to
contribute to economic development, health and well being 7. Deliver appropriate skills & employment initiatives that support residents to access jobs and meet business needs 8. Support Havering’s District Centres to maintain their vitality and viability 9. Establish a Development Company that will generate significant profit for the council 10. Promote improvements to enhance transport connectivity in the borough focusing on key areas to benefit economic growth 11. Maximise external funding opportunities 12. Promote a shared Economic vision for Havering
Page 14 of 28
Action Plan
Team Corporate Plan Service Objective Key Action Outcome Dependencies Timescale Equality Implications
Ensure Romford is a vibrant economic area securing public and private investment
Work with Crossrail and Transport for London (TfL) to deliver a high quality Romford Station and associated public realm
Agreed design of high quality Romford Station and associated public realm
TfL, Crossrail, Network Rail, Streetcare, London Buses
March 2016 (TfL complementary measures funding 2015/16 – 2018/19)
04 – Promoting community relations and civic pride Ensure accessibility and inclusivity are at the core of projects aimed at enhancing the public and social realm in Havering and that identified priorities meet the needs of the Borough’s changing demographics Where relevant carry out appropriate consultations or focus groups with individuals and groups with different protected characteristics Ensure relevant projects are subject to individual Equality Impact Assessments
The Development Framework to be taken forward as part of the Local Plan and promoted to private sector investors
Member agreement Appropriate
developments in Romford Attract private sector
funding
Members Regulatory Services August 2016
Develop an approach to improve the historic environment in Romford linked to Romford market
Funding identified to take work forward
Partners identified Market Strategy March 2016
Deliver enhanced public realm in Romford
Delivery of LIP corridors programme
Major Scheme Step 1 Submission to TfL
Enhanced cleansing regime in the town centre
TfL Streetcare
March 2016 September 2015
Develop an action plan for the Office Quarter
Develop joint marketing initiatives
3 Tenant networking events per year
Office Quarter occupiers March 2016
Economic Development
Proud (Supporting our community)
Improve Romford’s retail and leisure offer
Lease or acquire low value or empty units in South Street using GLA LEP and High Streets funding
2 units utilised Pop-up shops used as
outlets for start-up businesses
Negotiating suitable commercial arrangements
March 2016
01 – Understanding the needs of Havering’s diverse communities 06 – Embedding equalities into business as usual Ensure accessibility and inclusivity are at the core of projects
Develop a new strategy for Romford Market
Completion of Market review
Delivery of agreed actions
Romford Market offer is expanded
Wider audience
Asset Management Services June 2016
Page 15 of 28
Team Corporate Plan Service Objective Key Action Outcome Dependencies Timescale Equality Implications
attracted to the Town Centre
New traders
aimed at enhancing the public and social realm in Havering and that identified priorities meet the needs of the Borough’s changing demographics Where relevant carry out appropriate consultations or focus groups with individuals and groups with different protected characteristics Ensure relevant projects are subject to individual Equality Impact Assessments
Review the Romford Town Centre Partnership
New Terms of Reference
Renewed membership to include key businesses
Three year Business Plan
Desk top analysis for a Business Improvement District
Town Centre partners March 2016
Deliver an enhanced programme of events in collaboration with town centre partners
Themed events programme
Specialist markets Christmas Lights
Switch-On
Town Centre partners
March 2016 (LEP funding 2015/16 – 2016/17)
Work with town centre partners to develop a brand for Romford
Market research Revised Marketing Plan New audiences
attracted Economic uplift in terms
of increased footfall and higher spend
Town Centre partners
March 2016 (LEP funding 2015/16 – 2016/17)
Support the development of a vibrant, independent and creative offer in Romford
Work in partnership to deliver a programme of Creative workshops
Start-up businesses use the market as an outlet for their products
Partners: Romford Contemporary Arts Programme, Havering Adult College
March 2016 (LEP funding 2015/16 – 2016/17)
Develop a proposition to attract new restaurants in Romford using a landlord incentive programme
Proposition developed and marketed
Stock availability Interest from restaurant chains / owners
March 2016
Projects and Programmes
Proud (Supporting our community) Safe (Using our
High quality housing in London Riverside linked to sustainable communities and social infrastructure
Complete the A1306 Masterplan and Planning Framework
Framework and public consultation completed
Inclusion in the Local Plan
Local Plan comes forward Member and public support
March 2016
01 – Understanding the needs of Havering’s diverse communities 02 – Improving life chances for all,
Work with developer at Dover’s Corner to ensure a high quality
Planning applications submitted
Developer willing to work with LBH March 2016
Page 16 of 28
Team Corporate Plan Service Objective Key Action Outcome Dependencies Timescale Equality Implications
influence) scheme particularly the most vulnerable 04 – Promoting community relations and civic pride 06 – Embedding equalities into business as usual Ensure accessibility and inclusivity are at the core of projects aimed at enhancing the public and social realm in Havering and that identified priorities meet the needs of the Borough’s changing demographics Where relevant carry out appropriate consultations or focus groups with individuals and groups with different protected characteristics Ensure relevant projects are subject to individual Equality Impact Assessments
Identify appropriate sites for change of use to housing to improve gateways into the areas
Appropriate sites identified
Initiate work to land assemble
Appropriate sites March 2016
Secure Housing Zone status and establish appropriate governance programme
Housing Zone established
Housing Services GLA agrees bid Member approval Resources secured
March 2016
Secure funding and prepare outline design for linear park and A1306 transformation
£200k funding secured Step 1 TfL Major
Scheme outline design completed
TfL London Buses Streetcare L B Barking & Dagenham
September 2015
Secure funds for Beam Park Station and initiate Grip 4 study
LIP funding secured Grip 4 study initiated March 2016
Economic Development
Proud (Supporting our community)
Improve the economic base in London Riverside
Encourage Inward Investment with the GLA and the BID for London Riverside
Marketing Strategy and materials
Update of Inward Investment website
4 New businesses located in London Riverside
Jobs safeguarded
GLA BID
March 2016
01 – Understanding the needs of Havering’s diverse communities 02 – Improving life chances for all, particularly the most
Page 17 of 28
Team Corporate Plan Service Objective Key Action Outcome Dependencies Timescale Equality Implications
Establish a collaborative approach to improve the image and environment of London Riverside
New signage Improved environment
GLA BID Streetcare L B Barking & Dagenham
March 2016
vulnerable 04 – Promoting community relations and civic pride 06 – Embedding equalities into business as usual Where relevant carry out appropriate consultations or focus groups with individuals and groups with different protected characteristics
Establish a Business Case for improved bus services in London Riverside with improved connectivity to adjoining areas
Business Case TfL agree in principle to
new bus services Jobs safeguarded
TfL BID Housing Services
March 2016
Work with the Centre for Engineering & Manufacturing Excellence (CEME) to actively engage with Havering businesses and realise funding for the planned expansion of their Incubator Space
Revised Business Plan Collaborative working
and partnership developed
Businesses supported Improved business
growth Affordable office space
available
CEME March 2016
Create a Business Plan and next steps to establish a strong business base at Salamans Way
Business Plan Cabinet approval for
land assembly Action Plan
GLA Rainham Steel
March 2016
Work with the GLA and CEME to attract light industrial businesses to Beam Reach 6
Action Plan Marketing Plan Timetable for marketing
the site
GLA CEME March 2016
Business Development
Proud (Supporting our community)
Cultivate a strong business base in Havering
Establish an Incubator Hub in Romford
Access to affordable space for businesses
Central base for business support activity
Commercial space refurbished
50 pre-start-ups supported
5 start-ups supported 50 SME’s supported
Suitable premises
March 2016 (LEP funding 2015/16 – 2016/17)
01 – Understanding the needs of Havering’s diverse communities 03 – Remove barriers to access the Council’s services 04 – Promoting
Page 18 of 28
Team Corporate Plan Service Objective Key Action Outcome Dependencies Timescale Equality Implications
30 businesses supported to improve their performance
community relations and civic pride 05 – Develop a workforce that can respond to the needs of all our customers 06 – Embedding equalities into business as usual Where relevant carry out appropriate consultations or focus groups with individuals and groups with different protected characteristics Ensure relevant projects are subject to individual Equality Impact Assessments
Develop an appropriate business support package for start-ups
Access to a range of support and advice
50 potential businesses access advice
10 businesses are established
March 2016
Promote access to finance with the Start Up Loans Company (SULC) and Government Business Growth Service
Raised awareness of sources of financial support for businesses
March 2016
Deliver the 2015 Havering Business Awards
Business Community share best practice
Event delivered to reduced budget
October 2015
Take a sector based approach to business support concentrating on construction, retail, social care, manufacturing and waste
Initial study developed for waste sector and action plan prepared
Develop manufacturing sector approach with partners from the NNDR pool
Enhanced retail support package developed and delivered using LEP funding
Construction Network established supporting 30 businesses
Social Care Network established supporting 20 businesses
Fast Track programme of business support for 10 businesses in each of the construction and social care sectors
Increased number of apprenticeships
Education Housing Services
March 2016 (LEP funding 2015/16 – 2016/17)
Page 19 of 28
Team Corporate Plan Service Objective Key Action Outcome Dependencies Timescale Equality Implications
Training opportunities offered
Support businesses via the key accounts initiative
50 businesses supported
Businesses have a clear contact within the council and improved transparency in level of service
Services within LBH March 2016
Support businesses effectively through the Business Portal
Relevant information available on the website
Clear and consistent customer service offer
Improved performance to support business needs
Other services IT March 2016
Deliver appropriate networking events to support start-ups, existing businesses and specific sectors
Networking events delivered including Leaders event
March 2016
Improve Broadband availability and quality to businesses
Businesses able to access funding for superfast broadband
Broadband infrastructure issues in business locations identified and improvement plans developed
Commercial opportunities identified and business plans developed
March 2016
Undertake appropriate marketing activities and offer 1-2-1 support to attract new businesses into Havering
Inward Investment website updated with current and relevant information
Increased enquiries from London & Partners
Better understanding of Havering ‘s offer
4 Property Agents
March 2016
Page 20 of 28
Team Corporate Plan Service Objective Key Action Outcome Dependencies Timescale Equality Implications
Attract investment for Havering’s green infrastructure to ensure residents have access to open space and natural heritage and to contribute to economic development, health and well being
Support the Thames Chase Trust partnership to submit the Round 2 bid to the Heritage Lottery Fund (HLF) for the ‘Land of the Fanns’ Landscape Partnership Project
Development of the Round 2 bid
Public awareness of and interest in the project increased
Benchmark established of current volunteer activity
Thames Chase Trust March 2016
01 – Understanding the needs of Havering’s diverse communities 02 – Improving life chances for all, particularly the most vulnerable 04 - Promoting community relations and civic pride 06 – Embedding equalities into business as usual Ensure accessibility and inclusivity are at the core of projects aimed at enhancing the public and social realm in Havering and that identified priorities meet the needs of the Borough’s changing demographics Where relevant carry out appropriate consultations or focus groups with individuals and groups with different protected
Plan and develop projects for the European (EU) funding programmes ‘Life’ and ‘Interreg’
1 projects developed £1m applications
submitted March 2016
Identify opportunities for economic growth generated by green infrastructure investment
Completed Green Infrastructure Study including an economic appraisal of green infrastructure
Promotion of Havering as a visitor destination
Promotion of green infrastructure and its links to health and well being
September 2015 Ongoing
Work with the Thames Chase Trust to deliver the Thames Chase Trust Plan
Co-ordinated delivery of projects
Promote the development of Rainham Wildspace
Investment in access to open space and nature
Promotion of Havering as a visitor destination
RSPB Regulatory Services (Veolia S106)
Ongoing
Work with and promote Rainham Hall as a National Trust heritage visitor attraction
Launch event for official re-opening
Events programme October 2015
Page 21 of 28
Team Corporate Plan Service Objective Key Action Outcome Dependencies Timescale Equality Implications
characteristics Ensure relevant projects are subject to individual Equality Impact Assessments
Deliver appropriate skills & employment initiatives that support residents to access jobs and meet business needs
Develop a Skills & Employment Strategy
Clear direction regarding strategic skills & employment activity
Actions from the borough skills appraisal taken forward
Brokerage service explored
Support for businesses to access appropriate skills provision
Identification of suitable resources.
September 2015 March 2016
01 – Understanding the needs of Havering’s diverse communities 02 – Improving life chances for all, particularly the most vulnerable 05 - Develop a workforce that can respond to the needs of all our customers 06 – Embedding equalities into business as usual Where relevant carry out appropriate consultations or focus groups with individuals and groups with different protected characteristics Ensure relevant projects are subject to individual Equality Impact Assessments
Strengthen cross- borough partnerships to develop joint projects
Identification of appropriate funding streams
Apply for EU funding Better understanding of
cross-borough skills needs
March 2016
Deliver the Action Plan for Harold Hill
Bespoke programme of support established
Partnerships developed with local providers
Skills levels improve in Harold Hill
Increased employment activity
Housing Services
September 2015 March 2016
Business Development
Proud (Supporting our community)
Support Havering’s District Centres to maintain their vitality and viability
Enable and facilitate businesses to develop sustainable partnerships such as Town Teams in the borough
New Terms of Reference developed
3 teams established Reduced dependency
on officers and increased contributions
Business/group participation March 2016
01 – Understanding the needs of Havering’s diverse communities 03 – Remove barriers
Page 22 of 28
Team Corporate Plan Service Objective Key Action Outcome Dependencies Timescale Equality Implications
from third parties Improved vitality of town
centres
to access the Council’s services 04 – Promoting community relations and civic pride 06 – Embedding equalities into business as usual Ensure accessibility and inclusivity are at the core of projects aimed at enhancing the public and social realm in Havering and that identified priorities meet the needs of the Borough’s changing demographics Where relevant carry out appropriate consultations or focus groups with individuals and groups with different protected characteristics Ensure relevant projects are subject to individual Equality Impact Assessments
Undertake desktop analysis for the feasibility of a Business Improvement District (BID) in Hornchurch
Feasibility Study initiated March 2016
Monitor the performance of the town centres and take remedial action where necessary
Baseline performance data recorded
Health check questionnaires completed
Vacancy rates monitored
Remedial action taken
Deliver a programme of marketing and promotional activities/initiatives in partnership with businesses and community groups to maximise private sector investment and retail spend
Retail and community groups take ownership of events
Establish a Housing Development Company that will generate a significant profit for the council
Gain Cabinet approval for the company
Approved at Cabinet Housing services June 2015 01 – Understanding
the needs of Havering’s diverse communities 02 – Improving life chances for all, particularly the most
Generate robust Business Plan Company incorporated Housing services October 2015
Ensure organisation is operational including initial procurement of
Financial projections on track to deliver £300k excess cash flow a year
Housing services March 2016
Page 23 of 28
Team Corporate Plan Service Objective Key Action Outcome Dependencies Timescale Equality Implications
private sector partners by year 3 vulnerable 03 – Remove barriers to access the Council’s services 06 – Embedding equalities into business as usual Ensure accessibility and inclusivity are at the core of projects aimed at enhancing the public and social realm in Havering and that identified priorities meet the needs of the Borough’s changing demographics
Identify council owned sites suitable for residential development
Appropriate sites identified Housing services March 2016
Promote improvements to enhance transport connectivity in the borough focusing on key areas to benefit economic growth
Work with TfL to improve bus links into Rainham and Romford
More people accessing public transport
Increased employment opportunities due to better accessibility
TfL
March 2016
01 – Understanding the needs of Havering’s diverse communities 04 – Promoting community relations and civic pride 06 – Embedding equalities into business as usual Ensure accessibility and inclusivity are at the core of projects aimed at enhancing the public and social realm in Havering and that identified priorities meet the needs of the
Secure funding for design of public realm interventions at Romford and Harold Wood Crossrail stations
TfL funding secured Design process initiated
TfL, Crossrail, Network Rail, Streetcare
March 2016 (TfL complementary measures funding 2015/16 – 2018/19)
Secure funding to enhance Romford as a cycling hub
Funding secured More people use cycling
as a mode of transport Enhanced links to and
from Romford town centre
TfL Network Rail March 2016
Work with Development & Transport Planning on wider strategic initiatives including the River Crossing
Influence strategy to promote economic development in Havering
Regulatory Services GLA TfL
March 2016
Page 24 of 28
Team Corporate Plan Service Objective Key Action Outcome Dependencies Timescale Equality Implications
Borough’s changing demographics Where relevant carry out appropriate consultations or focus groups with individuals and groups with different protected characteristics
Economic Development
Proud (Supporting our community)
Maximise external funding opportunities
Monitor GLA funding streams and make appropriate applications
Increased resources for economic initiatives
Increased regional support for Havering
March 2016
01 – Understanding the needs of Havering’s diverse communities 02 – Improving life chances for all, particularly the most vulnerable 04 – Promoting community relations and civic pride 05 - Develop a workforce that can respond to the needs of all our customers 06 – Embedding equalities into business as usual Where relevant carry out appropriate consultations or focus groups with individuals and groups with different protected characteristics Ensure relevant
Review appropriate funding streams (e.g. European Structural & Investment Funds) to support economic development and business growth
EU funding bids developed
Potential projects developed to aid long-term economic objectives including increased employment opportunities and business growth
Collaborative partnerships developed
Increased resources for economic initiatives
March 2016
Page 25 of 28
Team Corporate Plan Service Objective Key Action Outcome Dependencies Timescale Equality Implications
projects are subject to individual Equality Impact Assessments
Economic Development
Proud (Supporting our community & leading by example)
Promote a shared Economic vision for Havering
Develop a stakeholder management plan
Vision is shared with stakeholders
Support from stakeholders
Members LBH Services External stakeholders
March 2016
01 – Understanding the needs of Havering’s diverse communities 02 – Improving life chances for all, particularly the most vulnerable 03 – Remove barriers to access the Council’s services 04 – Promoting community relations and civic pride 05 - Develop a workforce that can respond to the needs of all our customers 06 – Embedding equalities into business as usual
Page 26 of 28
4 Policies and Strategies
Policy / Strategy Expiry Date Status (Keep / Review / Decommission / Develop)
Romford Development framework to replace Urban Strategy developed and agreed TBC Draft report completed
Rainham & Beam Park masterplan and strategy developed (to replace Rainham Compass) TBC Currently in development
Harold Hill Ambitions Programme 2027 (20 year programme) Review January 2016
Business Growth Strategy March 2016 Review 2015/16
Green Infrastructure Study March 2020 Develop April - August 2015
Skills & Employment Strategy March 2017 Develop April – August 2015
Page 27 of 28
5 Risk Register
RISK ASSESSMENT
No. Risk Area Lead Officer Risk Description Link to Service Objective
Likelih
ood
Impa
ct
Risk Rating
‘Traffic light’
1
Failure to gain agreement
HoS Failure to gain agreement on key activities All 1 4 4 A
2 Funding
Management team Reduction in public sector funds Dependency on regional groupings for EU funding
Deliver appropriate skills & employment initiatives that support residents to access jobs and meet business needs Maximise external funding opportunities
3 3 9 A
3 Development sites
Management team Failure to win planning consent for well-designed, appropriate new housing developments in Romford and Rainham
Ensure Romford is a vibrant economic area securing public and private investment High quality housing in London Riverside linked to sustainable communities and social infrastructure Establish a Development Company that will generate significant profit for the council
2 4 8 A
4 Inward Investment
HoS/Management team Failure to gain private sector investment in significant private sector housing schemes
Ensure Romford is a vibrant economic area securing public and private investment High quality housing in London Riverside linked to sustainable
2 4 8 A
Page 28 of 28
RISK ASSESSMENT
No. Risk Area Lead Officer Risk Description Link to Service Objective
Likelih
ood
Impa
ct
Risk Rating
‘Traffic light’
communities and social infrastructure Establish a Development Company that will generate significant profit for the council
5
Stakeholder engagement
BD manager Key businesses in town centres and employment areas leave the borough Majority 1 4 4 G
6
Stakeholder engagement
HoS
Failure to establish effective partnerships with TfL/GLA/LEP/EU to lever in significant external funding
Majority 2 4 8 A
7 Resources HoS Failure to retain and recruit appropriate staff to manage projects Majority 2 4 8 A
Link to Service Risk Register: W:\data01\Reg_Part\Office Management\Service Plan\Risk Register The Service Risk Register will be revised in Quarter 1