Date Daily Total machine W.D/month start stop meter Hrs meter Hrs start 467.30 474.50 7.20 7.20 474.50 482.70 8.20 15.40 482.70 484.23 1.53 1.53 4/10/2014 484.20 486.30 2.10 3.63 11.30 4/23/2014 486.30 490.70 4.40 4/24/2014 490.70 491.00 0.30 4/25/2014 491.00 493.80 2.80 4/26/2014 493.80 496.40 2.60 4/27/2014 496.40 499.00 2.60 4/28/2014 499.00 501.70 2.70 4/29/2014 501.70 506.20 4.50 4/30/2014 506.20 508.80 2.60 5/5/2014 508.80 513.50 4.70 5/6/2014 513.50 520.30 6.80 5/7/2014 520.30 528.30 8.00 5/8/2014 528.30 535.50 7.20 5/9/2014 535.50 542.70 7.20 10.83 9.20 5/10/2014 542.70 548.60 5.90 16.73 9.20 5/11/2014 548.60 551.90 3.30 20.03 12.50 5/12/2014 551.90 558.60 6.70 26.73 8.45 5/13/2014 558.60 562.40 3.80 30.53 8.15 5/16/2014 562.40 567.50 5.10 35.63 10.20 5/17/2014 567.50 574.00 6.50 42.13 8.20 5/18/2014 574.00 581.90 7.90 50.03 8.20 5/19/2014 581.90 589.30 7.40 5/20/2014 589.30 596.80 7.50 26.10 5/22/2014 596.80 597.60 0.80 5/23/2014 597.60 603.70 6.10 5/24/2014 603.70 611.60 7.90 5/25/2014 611.60 618.30 6.70 5/26/2014 618.30 625.10 6.80 5/27/2014 625.10 633.00 7.90 4.70 8.35 5/28/2014 633.00 641.40 8.40 13.10 8.10 5/29/2014 641.40 649.50 8.10 21.20 7.30 5/30/2014 649.50 659.10 9.60 30.80 7.05 5/31/2014 659.10 668.50 9.40 40.20 7.00 6/1/2014 668.50 673.70 5.20 45.40 6.55 6/5/2014 673.70 679.30 5.60 51.00 7.25 6/6/2014 679.30 687.60 8.30 59.30 6.55 Meter Hrs
346

Dredger New RH

Jul 21, 2016

Download

Documents

dgtatg
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Dredger New RH

Date Daily Total machine

W.D/month start stop meter Hrs meter Hrs start

467.30 474.50 7.20 7.20

474.50 482.70 8.20 15.40

482.70 484.23 1.53 1.53

4/10/2014 484.20 486.30 2.10 3.63 11.30

4/23/2014 486.30 490.70 4.40

4/24/2014 490.70 491.00 0.30

4/25/2014 491.00 493.80 2.80

4/26/2014 493.80 496.40 2.60

4/27/2014 496.40 499.00 2.60

4/28/2014 499.00 501.70 2.70

4/29/2014 501.70 506.20 4.50

4/30/2014 506.20 508.80 2.60

5/5/2014 508.80 513.50 4.70

5/6/2014 513.50 520.30 6.80

5/7/2014 520.30 528.30 8.00

5/8/2014 528.30 535.50 7.20

5/9/2014 535.50 542.70 7.20 10.83 9.20

5/10/2014 542.70 548.60 5.90 16.73 9.20

5/11/2014 548.60 551.90 3.30 20.03 12.50

5/12/2014 551.90 558.60 6.70 26.73 8.45

5/13/2014 558.60 562.40 3.80 30.53 8.15

5/16/2014 562.40 567.50 5.10 35.63 10.20

5/17/2014 567.50 574.00 6.50 42.13 8.20

5/18/2014 574.00 581.90 7.90 50.03 8.20

5/19/2014 581.90 589.30 7.40

5/20/2014 589.30 596.80 7.50 26.10

5/22/2014 596.80 597.60 0.80

5/23/2014 597.60 603.70 6.10

5/24/2014 603.70 611.60 7.90

5/25/2014 611.60 618.30 6.70

5/26/2014 618.30 625.10 6.80

5/27/2014 625.10 633.00 7.90 4.70 8.35

5/28/2014 633.00 641.40 8.40 13.10 8.10

5/29/2014 641.40 649.50 8.10 21.20 7.30

5/30/2014 649.50 659.10 9.60 30.80 7.05

5/31/2014 659.10 668.50 9.40 40.20 7.00

6/1/2014 668.50 673.70 5.20 45.40 6.55

6/5/2014 673.70 679.30 5.60 51.00 7.25

6/6/2014 679.30 687.60 8.30 59.30 6.55

Meter Hrs

Page 2: Dredger New RH

6/7/2014 687.60 696.40 8.80 68.10 7.00

6/8/2014 696.40 702.80 6.40

6/9/2014 702.80 707.70 4.90

6/10/2014 707.70 716.40 8.70 76.80 9.55

6/11/2014 716.40 726.60 10.20 87.00 7.20

6/14/2014 726.60 729.20 2.60 89.60 7.00

6/17/2014 729.20 730.10 0.90 90.50 7.00

6/18/2014 730.10 734.80 4.70 95.20 7.15

6/19/2014 734.80 742.80 8.00

6/20/2014 742.80 752.30 9.50 0.80

6/21/2014 752.30 762.30 10.00 105.20 8.45

6/22/2014 762.30 772.60 10.30 115.50 7.15

6/23/2014 772.60 777.70 5.10 120.60 7.30

6/24/2014 777.70 787.80 10.10 130.70 7.30

6/26/2014 789.10 793.00 3.90 134.60 7.25

6/27/2014 793.00 804.20 11.20 145.80 7.15

6/28/2014 804.20 814.90 10.70 156.50 7.00

6/29/2014 814.90 822.70 7.80 164.30 7.00

6/30/2014 822.70 834.00 11.30 175.60 6.50

26 158.90

1 668.50 673.70 5.20 5.20 7.00

2 _

3 _

4 _

5 673.70 679.30 5.60 10.80 7.00

6 679.30 687.60 8.30 19.10 7.15

7 687.60 696.40 8.80 27.90 7.00

8 696.40 702.80 6.40 34.30 7.00

9 702.80 707.70 4.90 39.20 7.00

10 707.70 716.40 8.70 47.90 7.00

11 716.40 726.60 10.20 58.10 6.30

poson poya site shut down

12 _ _ _ _ _

13 726.60 729.20 2.60 60.70 9.20

14 729.20 729.20 0.00 60.70 _

15

16 729.20 730.10 0.90 61.60 17.30

730.10 734.80 4.70 66.30 7.20

734.80 742.80 8.00 74.30 7.30

Page 3: Dredger New RH

742.80 752.30 9.50 83.80 7.15

752.30 762.30 10.00 93.80 6.30

762.30 772.60 10.30 104.10 6.00

772.60 777.70 5.10 109.20 12.40

777.70 787.80 10.10 119.30 6.55

787.80 789.10 1.30 120.60 6.45

789.10 793.00 3.90 124.50 14.30

793.00 804.20 11.20 135.70 6.30

804.20 814.90 10.70 146.40 6.30

814.90 822.70 7.80 154.20 6.45

822.70 834.00 11.30 165.50 6.30

Page 4: Dredger New RH
Page 5: Dredger New RH
Page 6: Dredger New RH
Page 7: Dredger New RH
Page 8: Dredger New RH
Page 9: Dredger New RH
Page 10: Dredger New RH
Page 11: Dredger New RH
Page 12: Dredger New RH
Page 13: Dredger New RH
Page 14: Dredger New RH
Page 15: Dredger New RH
Page 16: Dredger New RH
Page 17: Dredger New RH
Page 18: Dredger New RH
Page 19: Dredger New RH
Page 20: Dredger New RH
Page 21: Dredger New RH

Chainage Product Average

stop from to m3 m3/h

13.30

1830.00

9.40

18.20 0.00 10.00

13.10

18.30

17.00

18.10 0.00 10.00 300.00 7.12

18.00

18.15 -30.00 -20.00 300.00 41.10

18.15 -20.00 -10.00 300.00 35.71

18.25 -10.00 0.00 300.00 37.04

17.45 0.00 10.00

18.30 0.00 10.00

17.00 0.00 10.00

17.45 0.00 10.00

18.00 0.00 10.00 300.00 6.40

Page 22: Dredger New RH

13.15 10.00 20.00

46.90

18.00 20.00 30.00

18.05

17.40

18.05

18.05 300.00 11.07

27.10

17.50 30.00 32.00 62.40 6.24

18.20 32.00 36.00 55.00 5.34

17.05 36.00 40.00

16.45 40.00 44.00

18.10 44.00 49.00 1.83

18.10 48.00 53.00 55.00

18.20 53.00 58.00

18.20 58.00 63.00

17.45 63.00 69.00

15.00 69.00 72.00 90.00 17.31

18.20 72.00 75.00 93.00 16.61

18.30 75.00 79.00 124.00 14.94

18.30 79.00 83.00 124.00 14.09

15.00 83.00 86.00 93.00 14.53

18.30 86.00 89.00 93.00 18.98

18.30 89.00 93.00 124.00 14.25

18.05 93.00 99.00 139.50 13.68

_ _ _ _ _

13.00 _ _ _ _

_ _ _ _ _

18.20 _ _ _ _

18.30 205.00 204.00 7.50 3.33

18.35 205.00 204.00 22.50

Page 23: Dredger New RH

204.00 203.00 30.00

203.00 202.00 30.00 90.00

202.00 201.00 7.50 11.25

18.40 202.00 201.00 27.45

201.00 200.00 30.00

200.00 199.00 33.75

199.00 198.00 34.95 158.70

198.00 197.00 32.55 16.71

18.20 197.00 196.00 31.25

196.00 195.00 32.50

195.00 194.00 30.00

194.00 193.00 32.50 14.62

193.00 192.00 19.95 146.20

19.00 193.00 192.00 20.00

192.00 191.00 41.25

191.00 190.00 41.25

190.00 189.00 38.75

189.00 188.00 40.00

188.00 187.00 41.25 24.51

187.00 186.00 30.00 252.50

18.45 187.00 186.00 15.00

186.00 185.00 38.75 12.75

185.00 184.00 11.25 65.00

18.45 185.00 184.00 37.50

184.00 183.00 45.00

183.00 182.00 55.00 15.59

182.00 181.00 20.00 157.50

8.20 182.00 181.00 37.50 28.85

18.50 181.00 180.00 55.50 19.04

18.75 74.25

18.45 180.00 179.00 37.50

179.00 178.00 53.70

178.00 177.00 53.70

177.00 176.00 49.50 19.10

176.00 175.00 19.50 213.90

18.40 176.00 175.00 37.50

175.00 174.00 57.50

174.00 173.00 57.50 16.82

173.00 172.00 27.50 180.00

17.00 173.00 172.00 30.00

172.00 171.00 57.50 18.59

171.00 170.00 57.50 145.00

18.30 170.00 169.00 57.50

169.00 168.00 57.50

168.00 167.00 57.50 17.04

167.00 166.00 20.00 192.50

Page 24: Dredger New RH
Page 25: Dredger New RH
Page 26: Dredger New RH
Page 27: Dredger New RH
Page 28: Dredger New RH
Page 29: Dredger New RH
Page 30: Dredger New RH
Page 31: Dredger New RH
Page 32: Dredger New RH
Page 33: Dredger New RH
Page 34: Dredger New RH
Page 35: Dredger New RH
Page 36: Dredger New RH
Page 37: Dredger New RH
Page 38: Dredger New RH
Page 39: Dredger New RH
Page 40: Dredger New RH
Page 41: Dredger New RH

Fuel Consumed balance Average

recived (L) stock (L) (L) (L) fuel cons

180.00 25.00 16.34

30.00 14.29

200.00

70.00 9.72

5.00 0.85

45.00 13.64

800.00 40.00 5.97

40.00 10.53

45.00 8.82

70.00 10.77

40.00 5.06

1180.00 410.00 770.00 15.71

70.00 8.86

110.00 13.10

120.00 14.81

115.00 11.98

115.00 12.23

1000.00 90.00 17.31

55.00 9.82

110.00 13.25

Page 42: Dredger New RH

60.00 6.82

80.00 9.20

100.00 9.80

125.00 48.08

120.00 133.33

120.00 25.53

_

10.00 1.05

100.00 10.00

125.00 12.14

105.00 20.59

1000.00 105.00 10.40

105.00 26.92

130.00 11.61

125.00 11.68

150.00 19.23

150.00 13.27

2770.00 2495.00 275.00 15.70

275.00 100.00 175.00 19.23

175.00 110.00 65.00 19.64

1000.00 1065.00 160.00 905.00 19.28

905.00 170.00 735.00 19.32

735.00 120.00 615.00 18.75

615.00 110.00 505.00 22.45

505.00 160.00 345.00 18.39

345.00 220.00 125.00 21.57

_ _ _ _

- 125.00 45.00 80.00 17.31

_ 80.00 0.00 80.00 0.00

1000.00 1080.00 15.00 1065.00 16.67

1065.00 85.00 980.00 18.09

980.00 140.00 840.00 17.50

Page 43: Dredger New RH

980.00 140.00 840.00 17.50

840.00 180.00 660.00 18.95

840.00 180.00 660.00 18.95

660.00 180.00 480.00 18.00

480.00 200.00 280.00 19.42

280.00 120.00 160.00 23.53

1000.00 160.00 240.00 920.00 23.76

920.00 30.00 890.00 23.08

890.00 80.00 810.00 20.51

810.00 220.00 590.00 19.64

590.00 240.00 350.00 22.43

350.00 160.00 190.00 20.51

1000.00 190.00 240.00 950.00 21.24

Page 44: Dredger New RH
Page 45: Dredger New RH
Page 46: Dredger New RH
Page 47: Dredger New RH
Page 48: Dredger New RH
Page 49: Dredger New RH
Page 50: Dredger New RH
Page 51: Dredger New RH
Page 52: Dredger New RH
Page 53: Dredger New RH
Page 54: Dredger New RH
Page 55: Dredger New RH
Page 56: Dredger New RH
Page 57: Dredger New RH
Page 58: Dredger New RH
Page 59: Dredger New RH
Page 60: Dredger New RH
Page 61: Dredger New RH

No of working time No of .

person from to hrs/day(U-T)

6

6

8

8 6.00 21.00 15.00

8 6.00 20.00 14.00

9 7.00 18.00 11.00

9 7.00 19.00 12.00

9 7.00 19.00 12.00

9 7.00 17.00 10.00

9 7.00 18.00 11.00

9 7.00 18.00 11.00

9 7.00 19.00 12.00

9 7.00 19.00 12.00

9 7.00 18.00 11.00

9 7.00 19.00 12.00

9 7.00 18.00 11.00

9 7.00 19.00 12.00

9 7.00 18.00 11.00

9 7.00 20.00 13.00

9 7.00 17.00 10.00

9 8.00 17.00 9.00

9 8.00 17.00 9.00

9 8.00 17.00 9.00

9 8.00 17.00 9.00

9 7.00 18.30 11.50

9 7.00 18.30 11.50

8 7.00 18.30 11.50

8 7.00 18.00 11.00

8 7.00 18.30 11.50

8 7.00 17.30 10.50

8 7.00 18.00 11.00

8 7.00 18.30 11.50

Page 62: Dredger New RH

9 7.00 17.00 10.00

7 7.00 18.30 11.50

8 7.00 18.30 11.50

8 6.30 18.00 11.50

8 6.30 18.30 12.00

8 7.00 18.30 11.00

8 6.30 18.30 12.00

7 7.00 18.00 11.00

8 7.00 19.00 12.00

6 7.00 18.30 11.50

6 7.00 17.30 10.50

6 7.00 18.00 11.00

6 7.00 18.30 11.50

6 7.00 18.30 11.50

6 6.30 19.00 12.50

6 6.30 19.00 12.50

6 6.30 18.30 12.00

5 8.00 17.00 9.00

6 7.00 17.00 10.00

6 7.00 17.00 10.00

4 7.00 17.00 10.00

4 6.30 19.00 12.50

4 7.00 19.00 12.00

4 6.30 19.00 12.50

5 7.00 17.00 10.00

5 6.30 19.00 12.50

5 6.30 18.30 12.00

5 6.00 18.30 12.50

5 6.30 19.00 12.50

6 6.30 17.00 10.50

6 7.00 17.00 10.00

5 6.30 17.00 10.50

5 7.00 19.00 12.00

5 7.00 19.00 12.00

5 7.00 19.00 12.00

Page 63: Dredger New RH

5 7.00 19.00 12.00

5 7.00 19.00 12.00

5 7.00 19.00 12.00

6 6.00 19.00 13.00

6 6.00 19.00 13.00

6 7.00 19.00 12.00

6 7.00 19.30 12.50

6 6.30 17.30 11.00

5 7.00 19.30 12.50

5 6.00 19.30 13.50

5 6.00 19.00 13.00

5 6.30 18.30 12.00

5 6.00 19.00 13.00

Page 64: Dredger New RH
Page 65: Dredger New RH
Page 66: Dredger New RH
Page 67: Dredger New RH
Page 68: Dredger New RH
Page 69: Dredger New RH
Page 70: Dredger New RH
Page 71: Dredger New RH
Page 72: Dredger New RH
Page 73: Dredger New RH
Page 74: Dredger New RH
Page 75: Dredger New RH
Page 76: Dredger New RH
Page 77: Dredger New RH
Page 78: Dredger New RH
Page 79: Dredger New RH
Page 80: Dredger New RH
Page 81: Dredger New RH

Man power

hrs (S*V)

120.00

112.00

99.00

108.00

108.00

90.00

99.00

99.00

108.00

108.00

99.00

108.00

99.00

108.00

99.00

117.00

90.00

81.00

81.00

81.00

81.00

103.50

103.50

92.00

88.00

92.00

84.00

88.00

92.00

Page 82: Dredger New RH

90.00

80.50

92.00

92.00

96.00

88.00

96.00

77.00

96.00

69.00

63.00

66.00

69.00

69.00

75.00

75.00

72.00

45.00

60.00

60.00

40.00

50.00

48.00

50.00

50.00

62.50

60.00

62.50

62.50

63.00

60.00

52.50

60.00

60.00

60.00

Page 83: Dredger New RH

60.00

60.00

60.00

78.00

78.00

72.00

75.00

66.00

62.50

67.50

65.00

60.00

65.00

Page 84: Dredger New RH
Page 85: Dredger New RH
Page 86: Dredger New RH
Page 87: Dredger New RH
Page 88: Dredger New RH
Page 89: Dredger New RH
Page 90: Dredger New RH
Page 91: Dredger New RH
Page 92: Dredger New RH
Page 93: Dredger New RH
Page 94: Dredger New RH
Page 95: Dredger New RH
Page 96: Dredger New RH
Page 97: Dredger New RH
Page 98: Dredger New RH
Page 99: Dredger New RH
Page 100: Dredger New RH
Page 101: Dredger New RH

deffect

Remarks

travelling at kosgoda

tavelling at Kosgoda

dis-assembled the machine. Discharge pippe line 5pieces sent to Ranala WS for newly fabricate.

Machine loaded to the vehicles and sent to Polgolla

All came to Polgolla and Machine parts unloaded and re assembling in progress.

machine installing completed.

Discharge line connecting in progress.

initial start and check leakage of line system.

machine test with start engine. Checked pump discharge pipe line laying

site shut down

"

"

"

"

"

"

"

"

Barrel frame installinging progress for making floaters.

Discharge pipe line installing in progress

pipeline fixing and towing to the dredging position.

dredger travel to location and positioned at +0.0m, engine serviced

shore pipe line preperation by contractorpipeline fixing and leak checking

dredging start location from 0.0 to +10.0m

dredging. During dredging need to clean pump suction and cutter due cloggedwith debris

dredging

dredging replaced a new impeller to dredging pump

machine moved back to 0.0m and re cut after replacing a new impeller to dredgepump

traveled to location +225.0/+235.0m due water spill out by CEB/Mahaweli authority

dredger at +235m positioned and water spillout in progress

dredger at +235m positioned and water spillout in progress

cannel cleaning in progress by contractor

dredger at +235m position and prepared to travel to 0.0m

dredger traveled from +235.0m to -30.0m positioned for dredging. Dredging start from -30.0 to 0.0m

dredging

dredging

dredging filled hy oil 40L to hydraulic tank.

dredging

dredging

dredging replaced a new oil seal to cutter hy motor

dredging/cable re positioned

Page 102: Dredger New RH

dredging port side cable broken and repairs completed

site shut down

"

dredging

dredging discharge line extended with 2nos pipes and floaters.

dredging Hy. Oil filled to hydraulic tank.

dredging

dredging

non-op cable pully removed for repair turnout bronze bushes for 2nos pully

non-op jointswing malfunction cotrol system repair/check replaced new jointswing controler and 3nos breakers

dredging

dredging

dredging

dredging

dredging

dredging

dredging

dredging

dredging

dredging/pipe line finished. Waiting for receive items manjula sent to CBO for collect PVC pipes

Due N/A pipes do not dredging. manjula purchased rubber packing and back. Work staff standby.

water spillout and dam gates open by Mahawely authority. So dredger discharge line disconnected asked by cons staff and maha.authority. LI 1197 came and brought pipes 12nos & those were fitted

since yesterday water spill out and asked by Mahaweli authority and Ranasingha construction staff.

Discharge line secured.6 barrel purchased.and rope coil.

discharge pipe line re-conncted and dredging started

brought 3nos barrels for make floaters and recieved fuel 1000L from site.

Re positioned both side cables and dredging continue. hy oil filled 80L to the hy oil tank.

stbd side cable broken due cutter clogged with wood(kithul) and repaired it. need to extend discharge line for dredging continue.stbd side cable broken due cutter clogged with wood(kithul) and repaired it.

Asked construction staff to prepare pipes and they informed tomorrow can provide an excavator.

purchased 6 empty barrels and made floaters and discharge line extended.(2 pipe pieces)

Port cable position changed dredging cont.

dredging cont.

Poson poyaday

early in the morning observed discharge pipe line broken due last night water spill out and dam gate were opened.From today morning up to evening pipe line

cleared and secued with tightening wire cables.using a JCB machine. Observed some barrels and frae lost even flxible hose damaged.until pipe line take out can not

possible to count the lost numbers

Due to continue spill out water and opening the dam gates can not re-install the discharge pipe line .Hence, by contractor staff decided to dredger move to +235.0

to position and dredging. Therefore machine moved to the +235.0 chainage.

Today tried to pipe line bring near to intake side.only 5 pipes brought cross the river and others couldn’t because of debris covered all pipes. need to disconnect and

hoist using a machine (JCB). contractor staff agreed to supply machine tomorrow morning.

pipe lines removed 14nos and took out. Loosed floater and barrels with 5nos of pipes towed to intake side and secued.

pipe lines connect and machine prepared dredging from intake side.

port cable replaced (75m), because of broken old cable and changed discharge pipe. Dredging started at 1600hrs.

dredging started intake side from +205.0m and during dredging many time removed pump suction and cutter to clean due clogged with stone and wood pieces.

Page 103: Dredger New RH

dredging cont.

dredging cont

Page 104: Dredger New RH
Page 105: Dredger New RH
Page 106: Dredger New RH
Page 107: Dredger New RH
Page 108: Dredger New RH
Page 109: Dredger New RH
Page 110: Dredger New RH
Page 111: Dredger New RH
Page 112: Dredger New RH
Page 113: Dredger New RH
Page 114: Dredger New RH
Page 115: Dredger New RH
Page 116: Dredger New RH
Page 117: Dredger New RH
Page 118: Dredger New RH
Page 119: Dredger New RH
Page 120: Dredger New RH
Page 121: Dredger New RH

dis-assembled the machine. Discharge pippe line 5pieces sent to Ranala WS for newly fabricate.

Machine loaded to the vehicles and sent to Polgolla

All came to Polgolla and Machine parts unloaded and re assembling in progress.

machine test with start engine. Checked pump discharge pipe line laying

Barrel frame installinging progress for making floaters.

pipeline fixing and towing to the dredging position.

dredger travel to location and positioned at +0.0m, engine serviced

shore pipe line preperation by contractorpipeline fixing and leak checking

dredging. During dredging need to clean pump suction and cutter due cloggedwith debris

replaced a new impeller to dredging pump

machine moved back to 0.0m and re cut after replacing a new impeller to dredgepump

traveled to location +225.0/+235.0m due water spill out by CEB/Mahaweli authority

dredger at +235m positioned and water spillout in progress

dredger at +235m positioned and water spillout in progress

dredger at +235m position and prepared to travel to 0.0m

dredger traveled from +235.0m to -30.0m positioned for dredging. Dredging start from -30.0 to 0.0m

filled hy oil 40L to hydraulic tank.

replaced a new oil seal to cutter hy motor

Page 122: Dredger New RH

port side cable broken and repairs completed

discharge line extended with 2nos pipes and floaters.

Hy. Oil filled to hydraulic tank.

cable pully removed for repair turnout bronze bushes for 2nos pully

jointswing malfunction cotrol system repair/check replaced new jointswing controler and 3nos breakers

dredging/pipe line finished. Waiting for receive items manjula sent to CBO for collect PVC pipes

Due N/A pipes do not dredging. manjula purchased rubber packing and back. Work staff standby.

water spillout and dam gates open by Mahawely authority. So dredger discharge line disconnected asked by cons staff and maha.authority. LI 1197 came and brought pipes 12nos & those were fitted

since yesterday water spill out and asked by Mahaweli authority and Ranasingha construction staff.

Discharge line secured.6 barrel purchased.and rope coil.

discharge pipe line re-conncted and dredging started

brought 3nos barrels for make floaters and recieved fuel 1000L from site.

hy oil filled 80L to the hy oil tank.

stbd side cable broken due cutter clogged with wood(kithul) and repaired it.

Asked construction staff to prepare pipes and they informed tomorrow can provide an excavator.

purchased 6 empty barrels and made floaters and discharge line extended.(2 pipe pieces)

early in the morning observed discharge pipe line broken due last night water spill out and dam gate were opened.From today morning up to evening pipe line

cleared and secued with tightening wire cables.using a JCB machine. Observed some barrels and frae lost even flxible hose damaged.until pipe line take out can not

Due to continue spill out water and opening the dam gates can not re-install the discharge pipe line .Hence, by contractor staff decided to dredger move to +235.0

to position and dredging. Therefore machine moved to the +235.0 chainage.

Today tried to pipe line bring near to intake side.only 5 pipes brought cross the river and others couldn’t because of debris covered all pipes. need to disconnect and

hoist using a machine (JCB). contractor staff agreed to supply machine tomorrow morning.

pipe lines removed 14nos and took out. Loosed floater and barrels with 5nos of pipes towed to intake side and secued.

pipe lines connect and machine prepared dredging from intake side.

port cable replaced (75m), because of broken old cable and changed discharge pipe. Dredging started at 1600hrs.

dredging started intake side from +205.0m and during dredging many time removed pump suction and cutter to clean due clogged with stone and wood pieces.

Page 123: Dredger New RH
Page 124: Dredger New RH
Page 125: Dredger New RH
Page 126: Dredger New RH
Page 127: Dredger New RH
Page 128: Dredger New RH
Page 129: Dredger New RH
Page 130: Dredger New RH
Page 131: Dredger New RH
Page 132: Dredger New RH
Page 133: Dredger New RH
Page 134: Dredger New RH
Page 135: Dredger New RH
Page 136: Dredger New RH
Page 137: Dredger New RH
Page 138: Dredger New RH
Page 139: Dredger New RH
Page 140: Dredger New RH
Page 141: Dredger New RH
Page 142: Dredger New RH

water spillout and dam gates open by Mahawely authority. So dredger discharge line disconnected asked by cons staff and maha.authority. LI 1197 came and brought pipes 12nos & those were fitted

Page 143: Dredger New RH
Page 144: Dredger New RH
Page 145: Dredger New RH
Page 146: Dredger New RH
Page 147: Dredger New RH
Page 148: Dredger New RH
Page 149: Dredger New RH
Page 150: Dredger New RH
Page 151: Dredger New RH
Page 152: Dredger New RH
Page 153: Dredger New RH
Page 154: Dredger New RH
Page 155: Dredger New RH
Page 156: Dredger New RH
Page 157: Dredger New RH
Page 158: Dredger New RH
Page 159: Dredger New RH
Page 160: Dredger New RH
Page 161: Dredger New RH
Page 162: Dredger New RH
Page 163: Dredger New RH
Page 164: Dredger New RH
Page 165: Dredger New RH
Page 166: Dredger New RH
Page 167: Dredger New RH
Page 168: Dredger New RH
Page 169: Dredger New RH
Page 170: Dredger New RH
Page 171: Dredger New RH
Page 172: Dredger New RH
Page 173: Dredger New RH
Page 174: Dredger New RH
Page 175: Dredger New RH
Page 176: Dredger New RH
Page 177: Dredger New RH
Page 178: Dredger New RH
Page 179: Dredger New RH
Page 180: Dredger New RH
Page 181: Dredger New RH
Page 182: Dredger New RH
Page 183: Dredger New RH
Page 184: Dredger New RH
Page 185: Dredger New RH
Page 186: Dredger New RH
Page 187: Dredger New RH
Page 188: Dredger New RH
Page 189: Dredger New RH
Page 190: Dredger New RH
Page 191: Dredger New RH
Page 192: Dredger New RH
Page 193: Dredger New RH
Page 194: Dredger New RH
Page 195: Dredger New RH
Page 196: Dredger New RH
Page 197: Dredger New RH
Page 198: Dredger New RH
Page 199: Dredger New RH
Page 200: Dredger New RH
Page 201: Dredger New RH
Page 202: Dredger New RH
Page 203: Dredger New RH
Page 204: Dredger New RH

Date Meter Hrs Daily Total machine Chainage Product Average Fuel

start stop meter Hrs meter Hrs start stop from to m3 m3/h recived (L)

02.04.2014 467.30 474.50 7.20 7.20

03.04.2014 474.50 482.70 8.20 15.40

04.04.2014

05.04.2014

06.04.2014

07.04.2014

08.04.2014

09.04.2014 482.70 484.23 1.53 1.53 180.00

10.04.2014 484.23 486.30 2.07 3.60 11.30 13.30

11.04.2014

12.04.2014

13.04.2014

14.04.2014

15.04.2014

16.04.2014

17.04.2014

18.04.2014

19.04.2014

20.04.2014

21.04.2014 _ 200.00

22.04.2014 _

23.04.2014 486.30 490.70 4.40 8.00 9.20 1830.00

24.04.2014 490.70 491.00 0.30 8.30 9.20 9.40

25.04.2014 491.00 493.80 2.80 11.10 12.50 18.20 0.00 10.00

26.04.2014 493.80 496.40 2.60 13.70 8.45 13.10 800.00

27.04.2014 496.40 499.00 2.60 16.30 8.15 18.30

28.04.2014 499.00 501.70 2.70 19.00 10.20 17.00

29.04.2014 501.70 506.20 4.50 23.50 8.20 18.10 0.00 10.00 300.00 12.77

30.04.2014 506.20 508.80 2.60 26.10 8.20 18.00

month end detail 26.10

01.05.2014

02.05.2014

03.05.2014

04.05.2014

05.05.2014 508.80 513.50 4.70 4.70 8.35 18.15 -30.00 -20.00 300.00 41.10

06.05.2014 513.50 520.30 6.80 11.50 8.10 18.15 -20.00 -10.00 300.00 44.12

07.05.2014 520.30 528.30 8.00 19.50 7.30 18.25 -10.00 0.00 300.00 37.50

08.05.2014 528.30 535.50 7.20 26.70 7.05 17.45 0.00 10.00

09.05.2014 535.50 542.70 7.20 33.90 7.00 18.30 0.00 10.00

10.05.2014 542.70 548.60 5.90 39.80 6.55 17.00 0.00 10.00 1000.00

11.05.2014 548.60 551.90 3.30 43.10 7.25 17.45 0.00 10.00

12.05.2014 551.90 558.60 6.70 49.80 6.55 18.00 0.00 10.00 300.00 8.80

Page 205: Dredger New RH

13.05.2014 558.60 562.40 3.80 53.60 7.00 13.15 10.00 20.00

14.05.2014

15.05.2014 34.10

16.05.2014 562.40 567.50 5.10 58.70 9.55 18.00 20.00 30.00

17.05.2014 567.50 574.00 6.50 65.20 7.20 18.05

18.05.2014 574.00 581.90 7.90 73.10 7.00 17.40

19.05.2014 581.90 589.30 7.40 80.50 7.00 18.05

20.05.2014 589.30 596.80 7.50 88.00 7.15 18.05 300.00 8.72

21.05.2014

22.05.2014 596.80 597.60 0.80 0.80 34.40

23.05.2014 597.60 603.70 6.10 94.10 8.45 17.50 30.00 32.00 62.40 10.23

24.05.2014 603.70 611.60 7.90 102.00 7.15 18.20 32.00 36.00 55.00 6.96

25.05.2014 611.60 618.30 6.70 108.70 7.30 17.05 36.00 40.00

26.05.2014 618.30 625.10 6.80 115.50 7.30 16.45 40.00 44.00 1000.00

27.05.2014 625.10 633.00 7.90 123.40 7.25 18.10 44.00 49.00 1.83

28.05.2014 633.00 641.40 8.40 131.80 7.15 18.10 48.00 53.00 55.00

29.05.2014 641.40 649.50 8.10 139.90 7.00 18.20 53.00 58.00

30.05.2014 649.50 659.10 9.60 149.50 7.00 18.20 58.00 63.00

31.05.2014 659.10 668.50 9.40 158.90 6.50 17.45 63.00 69.00

monthly details 158.90

01.06.2014 668.50 673.70 5.20 5.20 7.00 15.00 69.00 72.00 90.00 17.31

02.06.2014 _

03.06.2014 _

04.06.2014 _

05.06.2014 673.70 679.30 5.60 10.80 7.00 18.20 72.00 75.00 93.00 16.61

06.06.2014 679.30 687.60 8.30 19.10 7.15 18.30 75.00 79.00 124.00 14.94 1000.00

07.06.2014 687.60 696.40 8.80 27.90 7.00 18.30 79.00 83.00 124.00 14.09

08.06.2014 696.40 702.80 6.40 34.30 7.00 15.00 83.00 86.00 93.00 14.53

09.06.2014 702.80 707.70 4.90 39.20 7.00 18.30 86.00 89.00 93.00 18.98

10.06.2014 707.70 716.40 8.70 47.90 7.00 18.30 89.00 93.00 124.00 14.25

11.06.2014 716.40 726.60 10.20 58.10 6.30 18.05 93.00 99.00 139.50 13.68

12.06.2014 poson poya site shut down

13..06.2014 _ _ _ _ _ _ _ _ _ _

14.06.2014 726.60 729.20 2.60 60.70 9.20 13.00 _ _ _ _ -

15.06.2014 729.20 729.20 0.00 60.70 _ _ _ _ _ _ _

16.06.2014

17.06.2014 729.20 730.10 0.90 61.60 17.30 18.20 _ _ _ _ 1000.00

18.06.2014 730.10 734.80 4.70 66.30 7.20 18.30 205.00 204.00 7.50 3.33

19.06.204 734.80 742.80 8.00 74.30 7.30 18.35 205.00 204.00 22.50

Page 206: Dredger New RH

204.00 203.00 30.00

203.00 202.00 30.00 90.00

202.00 201.00 7.50 11.25

20.06.2014 742.80 752.30 9.50 83.80 7.15 18.40 202.00 201.00 27.45

201.00 200.00 30.00

200.00 199.00 33.75

199.00 198.00 34.95 158.70

198.00 197.00 32.55 16.71

21.06.2014 752.30 762.30 10.00 93.80 6.30 18.20 197.00 196.00 31.25

196.00 195.00 32.50

195.00 194.00 30.00

194.00 193.00 32.50 14.62

193.00 192.00 19.95 146.20

22.06.2014 762.30 772.60 10.30 104.10 6.00 19.00 193.00 192.00 20.00

192.00 191.00 41.25

191.00 190.00 41.25

190.00 189.00 38.75

189.00 188.00 40.00

188.00 187.00 41.25 24.51

187.00 186.00 30.00 252.50

23.06.2014 772.60 777.70 5.10 109.20 12.40 18.45 187.00 186.00 15.00

186.00 185.00 38.75 12.75

185.00 184.00 11.25 65.00

24.06.2014 777.70 787.80 10.10 119.30 6.55 18.45 185.00 184.00 37.50

184.00 183.00 45.00

183.00 182.00 55.00 15.59

182.00 181.00 20.00 157.50 1000.00

25.06.2014 787.80 789.10 1.30 120.60 6.45 8.20 182.00 181.00 37.50 28.85

26.06.2014 789.10 793.00 3.90 124.50 14.30 18.50 181.00 180.00 55.50 19.04

18.75 74.25

27.06.2014 793.00 804.20 11.20 135.70 6.30 18.45 180.00 179.00 37.50

179.00 178.00 53.70

178.00 177.00 53.70

177.00 176.00 49.50 19.10

176.00 175.00 19.50 213.90

28.06.2014 804.20 814.90 10.70 146.40 6.30 18.40 176.00 175.00 37.50

175.00 174.00 57.50

174.00 173.00 57.50 16.82

173.00 172.00 27.50 180.00

29.06.2014 814.90 822.70 7.80 154.20 6.45 17.00 173.00 172.00 30.00

172.00 171.00 57.50 18.59

171.00 170.00 57.50 145.00

30.06.21014 822.70 834.00 11.30 165.50 6.30 18.30 170.00 169.00 57.50 1000.00

169.00 168.00 57.50

168.00 167.00 57.50 17.04

167.00 166.00 20.00 192.50

Page 207: Dredger New RH
Page 208: Dredger New RH
Page 209: Dredger New RH
Page 210: Dredger New RH
Page 211: Dredger New RH
Page 212: Dredger New RH
Page 213: Dredger New RH
Page 214: Dredger New RH
Page 215: Dredger New RH
Page 216: Dredger New RH
Page 217: Dredger New RH
Page 218: Dredger New RH
Page 219: Dredger New RH
Page 220: Dredger New RH
Page 221: Dredger New RH
Page 222: Dredger New RH
Page 223: Dredger New RH
Page 224: Dredger New RH

Fuel Consumed balance Average No of working time No of . Man power

stock (L) (L) (L) fuel cons person from to hrs/day(U-T) hrs (S*V)

6

6

8

8 6.00 21.00 15.00 120.00

8 6.00 20.00 14.00 112.00

9 7.00 18.00 11.00 99.00

9 7.00 19.00 12.00 108.00

25.00 16.34 9 7.00 19.00 12.00 108.00

30.00 14.49 9 7.00 17.00 10.00 90.00

9 7.00 18.00 11.00 99.00

9 7.00 18.00 11.00 99.00

9 7.00 19.00 12.00 108.00

70.00 15.91 9 7.00 19.00 12.00 108.00

5.00 16.67 9 7.00 18.00 11.00 99.00

45.00 16.07 9 7.00 19.00 12.00 108.00

40.00 15.38 9 7.00 18.00 11.00 99.00

40.00 15.38 9 7.00 19.00 12.00 108.00

45.00 16.67 9 7.00 18.00 11.00 99.00

70.00 15.56 9 7.00 20.00 13.00 117.00

40.00 15.38 9 7.00 17.00 10.00 90.00

1180.00 410.00 770.00 15.71

9 8.00 17.00 9.00 81.00

9 8.00 17.00 9.00 81.00

9 8.00 17.00 9.00 81.00

9 8.00 17.00 9.00 81.00

70.00 14.89 9 7.00 18.30 11.50 103.50

110.00 16.18 9 7.00 18.30 11.50 103.50

120.00 15.00 8 7.00 18.30 11.50 92.00

115.00 15.97 8 7.00 18.00 11.00 88.00

115.00 15.97 8 7.00 18.30 11.50 92.00

90.00 15.25 8 7.00 17.30 10.50 84.00

55.00 16.67 8 7.00 18.00 11.00 88.00

110.00 16.42 8 7.00 18.30 11.50 92.00

Page 225: Dredger New RH

60.00 15.79 9 7.00 17.00 10.00 90.00

80.00 15.69 7 7.00 18.30 11.50 80.50

100.00 15.38 8 7.00 18.30 11.50 92.00

125.00 15.82 8 6.30 18.00 11.50 92.00

120.00 16.22 8 6.30 18.30 12.00 96.00

120.00 16.00 8 7.00 18.30 11.00 88.00

_ 8 6.30 18.30 12.00 96.00

10.00 12.50 7 7.00 18.00 11.00 77.00

100.00 16.39 8 7.00 19.00 12.00 96.00

125.00 15.82 6 7.00 18.30 11.50 69.00

105.00 15.67 6 7.00 17.30 10.50 63.00

105.00 15.44 6 7.00 18.00 11.00 66.00

105.00 13.29 6 7.00 18.30 11.50 69.00

130.00 15.48 6 7.00 18.30 11.50 69.00

125.00 15.43 6 6.30 19.00 12.50 75.00

150.00 15.63 6 6.30 19.00 12.50 75.00

150.00 15.96 6 6.30 18.30 12.00 72.00

2770.00 2495.00 275.00 15.70

275.00 100.00 175.00 19.23 5 8.00 17.00 9.00 45.00

6 7.00 17.00 10.00 60.00

6 7.00 17.00 10.00 60.00

4 7.00 17.00 10.00 40.00

175.00 110.00 65.00 19.64 4 6.30 19.00 12.50 50.00

1065.00 160.00 905.00 19.28 4 7.00 19.00 12.00 48.00

905.00 170.00 735.00 19.32 4 6.30 19.00 12.50 50.00

735.00 120.00 615.00 18.75 5 7.00 17.00 10.00 50.00

615.00 110.00 505.00 22.45 5 6.30 19.00 12.50 62.50

505.00 160.00 345.00 18.39 5 6.30 18.30 12.00 60.00

345.00 220.00 125.00 21.57 5 6.00 18.30 12.50 62.50

_ _ _ _ 5 6.30 19.00 12.50 62.50

125.00 45.00 80.00 17.31 6 6.30 17.00 10.50 63.00

80.00 0.00 80.00 0.00 6 7.00 17.00 10.00 60.00

5 6.30 17.00 10.50 52.50

1080.00 15.00 1065.00 16.67 5 7.00 19.00 12.00 60.00

1065.00 85.00 980.00 18.09 5 7.00 19.00 12.00 60.00

980.00 140.00 840.00 17.50 5 7.00 19.00 12.00 60.00

Page 226: Dredger New RH

980.00 140.00 840.00 17.50 5 7.00 19.00 12.00 60.00

840.00 180.00 660.00 18.95 5 7.00 19.00 12.00 60.00

840.00 180.00 660.00 18.95 5 7.00 19.00 12.00 60.00

660.00 180.00 480.00 18.00 6 6.00 19.00 13.00 78.00

480.00 200.00 280.00 19.42 6 6.00 19.00 13.00 78.00

280.00 120.00 160.00 23.53 6 7.00 19.00 12.00 72.00

160.00 240.00 920.00 23.76 6 7.00 19.30 12.50 75.00

920.00 30.00 890.00 23.08 6 6.30 17.30 11.00 66.00

890.00 80.00 810.00 20.51 5 7.00 19.30 12.50 62.50

810.00 220.00 590.00 19.64 5 6.00 19.30 13.50 67.50

590.00 240.00 350.00 22.43 5 6.00 19.00 13.00 65.00

350.00 160.00 190.00 20.51 5 6.30 18.30 12.00 60.00

190.00 240.00 950.00 21.24 5 6.00 19.00 13.00 65.00

Page 227: Dredger New RH
Page 228: Dredger New RH
Page 229: Dredger New RH
Page 230: Dredger New RH
Page 231: Dredger New RH
Page 232: Dredger New RH
Page 233: Dredger New RH
Page 234: Dredger New RH
Page 235: Dredger New RH
Page 236: Dredger New RH
Page 237: Dredger New RH
Page 238: Dredger New RH
Page 239: Dredger New RH
Page 240: Dredger New RH
Page 241: Dredger New RH
Page 242: Dredger New RH
Page 243: Dredger New RH
Page 244: Dredger New RH
Page 245: Dredger New RH
Page 246: Dredger New RH
Page 247: Dredger New RH
Page 248: Dredger New RH
Page 249: Dredger New RH
Page 250: Dredger New RH
Page 251: Dredger New RH
Page 252: Dredger New RH
Page 253: Dredger New RH
Page 254: Dredger New RH
Page 255: Dredger New RH
Page 256: Dredger New RH
Page 257: Dredger New RH
Page 258: Dredger New RH
Page 259: Dredger New RH
Page 260: Dredger New RH
Page 261: Dredger New RH
Page 262: Dredger New RH
Page 263: Dredger New RH
Page 264: Dredger New RH

Remarks

travelling at kosgoda

tavelling at Kosgoda

dis-assembled the machine. Discharge pippe line 5pieces sent to Ranala WS for newly fabricate.

Machine loaded to the vehicles and sent to Polgolla

All came to Polgolla and Machine parts unloaded and re assembling in progress.

machine installing completed.

Discharge line connecting in progress.

initial start and check leakage of line system.

machine test with start engine. Checked pump discharge pipe line laying

site shut down

"

"

"

"

"

"

"

"

Barrel frame installinging progress for making floaters.

Discharge pipe line installing in progress

pipeline fixing and towing to the dredging position.

dredger travel to location and positioned at +0.0m, engine serviced

shore pipe line preperation by contractorpipeline fixing and leak checking

dredging start location from 0.0 to +10.0m

dredging. During dredging need to clean pump suction and cutter due cloggedwith debris

dredging

dredging

machine moved back to 0.0m and re cut after replacing a new impeller to dredgepump

traveled to location +225.0/+235.0m due water spill out by CEB/Mahaweli authority

dredger at +235m positioned and water spillout in progress

dredger at +235m positioned and water spillout in progress

cannel cleaning in progress by contractor

dredger at +235m position and prepared to travel to 0.0m

dredger traveled from +235.0m to -30.0m positioned for dredging. Dredging start from -30.0 to 0.0m

dredging

dredging

dredging

dredging

dredging

dredging

dredging/cable re positioned

Page 265: Dredger New RH

dredging

site shut down

"

dredging

dredging

dredging

dredging

dredging

non-op

non-op

dredging

dredging

dredging

dredging

dredging

dredging

dredging

dredging

dredging

dredging/pipe line finished. Waiting for receive items manjula sent to CBO for collect PVC pipes

Due N/A pipes do not dredging. manjula purchased rubber packing and back. Work staff standby.

water spillout and dam gates open by Mahawely authority. So dredger discharge line disconnected asked by cons staff and maha.authority. LI 1197 came and brought pipes 12nos & those were fitted

since yesterday water spill out and asked by Mahaweli authority and Ranasingha construction staff.

Discharge line secured.6 barrel purchased.and rope coil.

discharge pipe line re-conncted and dredging started

brought 3nos barrels for make floaters and recieved fuel 1000L from site.

Re positioned both side cables and dredging continue.

stbd side cable broken due cutter clogged with wood(kithul) and repaired it. need to extend discharge line for dredging continue.

Asked construction staff to prepare pipes and they informed tomorrow can provide an excavator.

purchased 6 empty barrels and made floaters and discharge line extended.(2 pipe pieces)

Port cable position changed dredging cont.

dredging cont.

Poson poyaday

early in the morning observed discharge pipe line broken due last night water spill out and dam gate were opened.From today morning up to evening pipe line

cleared and secued with tightening wire cables.using a JCB machine. Observed some barrels and frae lost even flxible hose damaged.until pipe line take out can not

possible to count the lost numbers

Due to continue spill out water and opening the dam gates can not re-install the discharge pipe line .Hence, by contractor staff decided to dredger move to +235.0

to position and dredging. Therefore machine moved to the +235.0 chainage.

Today tried to pipe line bring near to intake side.only 5 pipes brought cross the river and others couldn’t because of debris covered all pipes. need to disconnect and

hoist using a machine (JCB). contractor staff agreed to supply machine tomorrow morning.

pipe lines removed 14nos and took out. Loosed floater and barrels with 5nos of pipes towed to intake side and secued.

pipe lines connect and machine prepared dredging from intake side.

port cable replaced (75m), because of broken old cable and changed discharge pipe. Dredging started at 1600hrs.

dredging started intake side from +205.0m and during dredging many time removed pump suction and cutter to clean due clogged with stone and wood pieces.

Page 266: Dredger New RH

dredging cont.

dredging cont

Page 267: Dredger New RH
Page 268: Dredger New RH
Page 269: Dredger New RH
Page 270: Dredger New RH
Page 271: Dredger New RH
Page 272: Dredger New RH
Page 273: Dredger New RH
Page 274: Dredger New RH
Page 275: Dredger New RH
Page 276: Dredger New RH
Page 277: Dredger New RH
Page 278: Dredger New RH
Page 279: Dredger New RH
Page 280: Dredger New RH
Page 281: Dredger New RH
Page 282: Dredger New RH
Page 283: Dredger New RH
Page 284: Dredger New RH

deffect

replaced a new impeller to dredging pump

filled hy oil 40L to hydraulic tank.

replaced a new oil seal to cutter hy motor

Page 285: Dredger New RH

port side cable broken and repairs completed

discharge line extended with 2nos pipes and floaters.

Hy. Oil filled to hydraulic tank.

cable pully removed for repair turnout bronze bushes for 2nos pully

jointswing malfunction cotrol system repair/check replaced new jointswing controler and 3nos breakers

water spillout and dam gates open by Mahawely authority. So dredger discharge line disconnected asked by cons staff and maha.authority. LI 1197 came and brought pipes 12nos & those were fitted

hy oil filled 80L to the hy oil tank.

stbd side cable broken due cutter clogged with wood(kithul) and repaired it.

early in the morning observed discharge pipe line broken due last night water spill out and dam gate were opened.From today morning up to evening pipe line

cleared and secued with tightening wire cables.using a JCB machine. Observed some barrels and frae lost even flxible hose damaged.until pipe line take out can not

Due to continue spill out water and opening the dam gates can not re-install the discharge pipe line .Hence, by contractor staff decided to dredger move to +235.0

Today tried to pipe line bring near to intake side.only 5 pipes brought cross the river and others couldn’t because of debris covered all pipes. need to disconnect and

dredging started intake side from +205.0m and during dredging many time removed pump suction and cutter to clean due clogged with stone and wood pieces.

Page 286: Dredger New RH
Page 287: Dredger New RH
Page 288: Dredger New RH
Page 289: Dredger New RH
Page 290: Dredger New RH
Page 291: Dredger New RH
Page 292: Dredger New RH
Page 293: Dredger New RH
Page 294: Dredger New RH
Page 295: Dredger New RH
Page 296: Dredger New RH
Page 297: Dredger New RH
Page 298: Dredger New RH
Page 299: Dredger New RH
Page 300: Dredger New RH
Page 301: Dredger New RH
Page 302: Dredger New RH
Page 303: Dredger New RH
Page 304: Dredger New RH
Page 305: Dredger New RH
Page 306: Dredger New RH
Page 307: Dredger New RH
Page 308: Dredger New RH
Page 309: Dredger New RH
Page 310: Dredger New RH
Page 311: Dredger New RH
Page 312: Dredger New RH
Page 313: Dredger New RH
Page 314: Dredger New RH
Page 315: Dredger New RH
Page 316: Dredger New RH
Page 317: Dredger New RH
Page 318: Dredger New RH
Page 319: Dredger New RH
Page 320: Dredger New RH
Page 321: Dredger New RH
Page 322: Dredger New RH
Page 323: Dredger New RH
Page 324: Dredger New RH
Page 325: Dredger New RH
Page 326: Dredger New RH
Page 327: Dredger New RH
Page 328: Dredger New RH
Page 329: Dredger New RH
Page 330: Dredger New RH
Page 331: Dredger New RH
Page 332: Dredger New RH
Page 333: Dredger New RH
Page 334: Dredger New RH
Page 335: Dredger New RH
Page 336: Dredger New RH
Page 337: Dredger New RH
Page 338: Dredger New RH
Page 339: Dredger New RH
Page 340: Dredger New RH
Page 341: Dredger New RH
Page 342: Dredger New RH
Page 343: Dredger New RH
Page 344: Dredger New RH
Page 345: Dredger New RH
Page 346: Dredger New RH