TEAM FORMATION PROJECT DEFINITION &
TEAM FORMATION
PROJECT DEFINITION &
The DMAIC
Model
Define Control
Measure ImproveAnalyze
Voice of the Customer
Institutionalization
Breakthrough Stage Strategy Phase Objective
Identification Recognize Identify Key Business
Define Issues
Characterization Measure Understand Current
Analyze Performance Levels
Optimization Improve Achieve Breakthrough
Control Improvement
Institutionalization Standardize Transform How Day-to
Integrate Day Business is Conducted
Bre
akth
rou
gh
Str
ate
gy
Bla
ck B
elt
Pro
jects
Define
Control
Improve Analyze
Measure
THE DMAIC ALGORITHM
Define the problem and customerrequirements.Measure defect rates and documentthe process in its current incarnation.
Analyze process data and determinethe capability of the process.
Improve the process and removedefect causes.
Control process performance andensure that defects do not recur.
PROJECT OF :BirdsNestPROJECT OF :BirdsNest
Project on:Project on:
Projects Begin with aDetailed Assessment of Customer
Needs
DEFINE:
A. Identify project CTQs: what the customer thinks is essential.
B. The Team Charter represents the business case for the project.
C. Define and build a process map that relates measurable
internal processes to customer needs.
These will now be addressed in greater detail