  • Design & Construction

    of Underground

    Lake Taps

  • Agenda

    1. Underground components

    2. Shore Shaft

    3. Tunnel

    4. Tap/Intake

    5. Construction Issues

  • Underground Components

    Shore Shaft

    Tunnel

    Tap/Intake

  • Shore Shaft•Design•Construction

  • Shore Shaft•Design•Location•Access

    •Configuration• Size, Shape & Depth• Pump Station•Gate House• Construction

    •Geology• Initial support•Connection to Tunnel•Final Lining

  • Shore Shaft•Construction•Excavation•Drilled•Mechanical Shaft Sinking Machine• Conventional Drill & Blast

    •Lining• Top Down• Bottom Up

  • Tunnel

    •Design•Construction

  • Tunnel•Design•Alignment• Vertical• Horizontal

    •Configuration• Size, Shape & Depth

    •Geology• Initial support•Connection to Tap/Intake•Final Lining

  • Tunnel•Construction•Excavation• Tunnel Boring Machine•Microtunnel Boring Machine• Roadheader• Conventional Drill & Blast

    •Lining• Pipe• Concrete• Segments

  • Tap/ Intake•Design•Construction

  • Tap/ Intake•Design•Wet or Dry•Location• Vertical• Horizontal

    •Configuration• Size, Shape & Depth

    •Geology• Initial support•Structure• Support• Configuration

  • Tap/Intake •Construction

    • Connection• Wet• Dry

    •Marine• Marina• On Water

  • Wet Tap

  • Microtunnel Wet TapPrepare to Breakout

  • Microtunnel Wet TapBreakout

  • Microtunnel Wet TapPreparation to disconnect

  • Microtunnel Wet Tap

  • Microtunnel Wet TapPreparation to remove MTBM

  • Microtunnel Wet TapMTBM Removal

  • Wet TapFinal Positioning of Casing

  • Wet TapPlace Elbow & Trash Rack

  • Norwegian Tap

    •Tunnel to a rock plug•Construct Rock trap•Prepare tunnel for water•Blast rock plug

  • Dry Tap

  • Dry Tap

  • Dry TapExcavation for work slab

  • Dry TapConcrete Slab Construction

  • Dry TapGround Improvement

  • Dry TapLining installation

  • Dry TapShaft Excavation

  • Dry TapLiner Installation

  • Dry TapGrout Liner

  • Dry TapTunnel Arrival

  • Dry TapConnection to Tunnel

  • Dry TapConnection to Tunnel (cont.)

  • Dry TapPlacing elbow in Tunnel

  • Dry TapSetting of Intake

  • Dry TapSetting of Intake (cont.)

  • Construction IssuesAccessMarine worksWeather Environmental

  • QUESTIONS ???

  • Dry Tap