Page 1
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
Name: Mohamed Wahby Morsy Mohamed.
Date of Birth: 15- 9-1966, Alexandria.
Nationality: Egyptian.
Mailing Address: Egypt, 6th October City, District 3,Avenue 3.
P.O. Box 15, Postal Code 12596.
Marital Status: Married, have three daughters.
Education: B. Sc. in Mechanical Engineering,
Faculty of Engineering, Cairo University, June 1989.
Language: Arabic and English, Fluent writing and Reading.
Member of Professional Societies:
- American Welding Society (AWS), member No. (472373).
- Egyptian Engineers Syndicate.
- Egyptian Specifications and Qualification Engineering Society.
- Egyptian Mechanical Engineers Society.
Qualifications:
- API 570 Piping Inspector, Certificate No. (28252).
- API 653 Aboveground Storage Tank Inspector, Certificate No. (27211).
- API 510 Pressure Vessel Inspector, Certification No. (26206).
- AWS Certified Welding Inspector, CWI Certificate No. (00071361).
- ASNT Level II in Magnetic Particle Testing.
- ASNT Level II in Liquid Penetrant Testing.
- ASNT Level II in Ultrasonic Testing.
Page 2
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
- ASNT Level II in Radiography Testing.
- ISO 9000:2000 Auditor / Lead Auditor.
Experience Brief
- I have a total of 21 years experience in oil refinery, petrochemical,
oil and gas industries at Integrity/ inspection carrier, onshore and
offshore.
- From February, 2006 till now I am working for Abu Dhabi Marine
Operating Company’s, ADMA-OPCO, Located in State of United Arab
Emirate, at Zakum field and Umm Shaif field which are located in the central
part of the Arabian Gulf, as direct hireOffshore Site Sr. Integrity Service
Engineer, (OSISE), “28 days on/28 days off” in TOPE Site Facility Integrity
Section. In June, 2011 I have been appointed as Site Integrity Section
Leader, (SISSL) in Umm Shaif field.
- From January, 2003 till January, 2006 I had been worked for
Petrochemical Industrial Co. (PIC), located at Shuaiba Industrial Area in
State of Kuwait, in Inspection and Corrosion Section as a direct hire Sr.
Inspection and Corrosion Engineer.
- From March, 1991 to January, 2003 I had been worked for Cairo Oil
Refining Co. (CORC), one of the biggest refining company in the middle east
located in Egypt, in Inspection and Corrosion Department, I had started my
position as anInspection and Corrosion Engineer and I had promoted to
Quality Control Section Head. In meantime, I had been worked part time at
Egypt private sector as Consultant Inspection Engineer in material selection,
welding, QA/QC, corrosion monitoring, NDT, heat treatment, failure analysis,
training and other inspection activities.
- From December, 1989 to March, 1991 I had been Worked for Organization
for Energy Planning (OEP), Ministry of Petroleum as Energy Management
Engineerfor auditing and evaluating energy consumption in industrial factories
Page 3
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
and steam/gas power plants, reduce energy cost in order to maintain and
improve profitability and I was trained in this branch in Boiler Efficiency
Institute, Auburn University, Alabama, USA for one months.
Employment Record and Professional Experience Details:
-01/02/2006 till nowAbu Dhabi Marine Operating Company’s (ADMA-
OPCO)
My duties and responsibilities as following:
ADMA-OPCO is one of the leading oil production companies at U.A.E. It
produces 550 thousands barrel / day from two major offshore oil fields at
Arabian Gulf and big facility plant at DasIsland.
- Main Challenges, to maintain the plant integrity, availability and reliability,
bearing in mind the age and obsolescence of much of the equipment.
- To manage, supervise and direct the inspection activities to meet plant
integrity and reliability requirements for safe and continued operation.
- Provides advice and assistance to company's divisions regarding facility
integrity, in particular advice on material selection, RBI, remnant life
assessment, QA, fitness for service testing and inspection.
- Develops, implements and follow-up of specific integrity programs bases on
Company's Asset Integrity Management system.
- Ensure appropriate and constant implementation of agreed procedures and
monitor Site Integrity Key Performance Indicators, (KPIs).
- Analysis equipment and plants inspection data at all sites using appropriate
state of the art analytical and statistical tools and techniques.
- Identifies areas of concerns (or negative trends) pertaining to equipment,
units, processes systems, piping systems and provide recommendations for
improvement as appropriate.
Page 4
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
- Disseminates pertinent lessons learnt to concerned plant personnel for
sharing cross field experiences.
- Carry out on-stream condition monitoring of plants and QA/QC of all
maintenance activities to ensure safe and reliable operations.
- Conduct internal, external planned & unplanned inspections on all static
equipments/facilities.
- Lead the registration into MAXIMO of the Identified Systems and allocating
PM’ frequency
- Identify repair / modifications to be carried out and raise necessary requests
in MAXIMO
- Coordinate with NDT group after determining the appropriate NDT methods
applicable to assess the equipment condition.
- Verification and endorsement of reports including NDT report generated by
contracted personnel.
- Issue inspection work sheets with repair procedures and testing requirement
confirming to ADMA-OPCO Engineering Standards, BP Standards &
International Standards and Codes.
- Maintain inspection files; keep records up-to-date on MAXIMO system.
- Identify the type of corrosion/deterioration to the equipment or piping &
initiate appropriate monitoring methods in consultation with Process &
Corrosion Groups.
- Conduct walkthrough survey for identifying external integrity threat locations
(ILT’s) and mark up the same on Isometric Drawing
- Coordinate with all concerned on daily basis and attend Operations,
Maintenance & Engineering (OME) group meetings.
- Anticipate equipment and piping retirements and initiate appropriate steps of
renewal.
Page 5
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
- Develop scope of work for service, contracts such as NDT, abseiling (RAT),
FFS.
- Prepare job lists of shutdown testing and inspection (T&I) requirements for all
equipments and piping circuits and participate to finalize the T&I scope of work
including materials requirements.
- Analyze Inspection reports and initial review of anomalies by the Inspection
Engineer/Plant Inspector.
- Perform Fitness for Purpose evaluations.
- Development of Maintenance Recommendations based on the Fitness for
Purpose evaluation
- Monitor and Report Work pack Status.
- Identify data that is missing to perform a Fitness for Purpose evaluation.
- Use trends, where available, to develop the periodic re-inspection program.
- Liaise with Client personnel to source Drawings, Design Data and Process
Data required to perform Fitness for Purpose evaluations
- Analysis of inspection data and mapping out areas of deterioration on
Company’s facilities.
- Utilization of current data from the System Base Integrity Management
(SBIM) project to focus on critical areas of process piping system for future
inspection.
- Train the local junior inspectors on the job and off the job.
- Work with minimum supervision following all company safety procedures,
standards and regulations
-Carries out other related duties to ensure safe working practices.
- Provide instructions to meet competency based training programs for UAE
nationalization.
Page 6
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
-25/01/2003 till 31/01/2006Petrochemical Industries Co. (PIC)
My duties and responsibilities as following:
- Supervising and following up the on stream and turnaround inspection
procedures and programs of stationary equipment for Ammonia plants (2000
t/d), Urea plants (3150 t/d) as well as salt & chlorine plants equipment such as
columns, heat exchangers, pressure vessels, boilers, waste heat boilers,
heaters, reactors, primary and secondary reformers, high pressure
condensers, strippers, safety valves, ammonia storage tanks, piping, pipe
lines and lifting appliances etc.
- Co-ordinate and following up on inspection and related activities carried out
by specialized independent inspection authorities and surveyors for critical
inspection or for insurance purposes.
- Supervise and controls the activities of inspection engineers and gives
instructions related to critical inspections to be implemented on plants
equipment and to insure that such inspection are applied to recognized codes
of practice.
- Issue and/or approves recommended methods of repair procedures and
Non-destructive testing requirement confirming to Licenser Engineering
Standards, International Codes and Standards -Inspection Work Request
(IWR) - necessary to be implemented on plant equipment has shown
unsatisfactory conditions. Advise on to approve materials, welding procedures,
heat treatment and inspection methods related to repair work and follows up to
ensure they carried out satisfactory.
- Review / prepare welding WPS, PQR and WPQ, heat treatment if any and
NDT procedures for different metals such as carbon steel, cryogenic low alloy
steel, stainless steel, stainless steel (Urea grade) and non ferrous metal as
well as solving problems related to the welding and materials.
- Supervise and direct the surveys and tests related to corrosion engineering
activities and implemented by subordinates.
- Review the metallurgy and designs specifications for modifications and major
projects.
Page 7
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
- Supervise laboratory of metallurgical and replica investigation tests required to
conclude on failure analysis and recommended to change or modify materials
or operating conditions based on investigation results.
- Inspect in site received critical new plant equipment and review related
inspection test certificates for acceptance.
- Follow up, arrangement and coordinating with third part inspection agency for
insurance renewal of insurance items, i.e. boilers, heaters, safety valves and
lifting appliances.
- Provide technical support, advice and direction to subordinates as necessary
in carrying out any highly technical, specialized or critical works involved with
studies projects, troubleshooting, inspection procedures/ methods, etc.
- Responsible for reviewing of quality control / quality assurance programs of
vendors, subcontractors, or other organizations
- Responsible for the supervision of QC/QA and NDE personnel in the conduct
of welding, welding repair, examination, fabrication or construction involving
equipment fabricated by welding.
- During PIC preparation for renewal of ISO 9001 certification (Quality
assurance system for producing fertilizer) I shared in preparing for auditing
implementation quality assurance procedures.
- I am sharing for PHA (Process Hazards Analysis) and safety audits
committees for plants.
- Solve complex problems using innovative application of root cause analysis
and conduct RCFA (Root Cause Failure Analysis) studies in an effort to convert
the nature of maintenance from reactive repairs to proactive/preventive
maintenance and condition monitoring.
- I am sharing for Integrity Audit Assessment for PIC Inspection and Corrosion
Section by an expert agency RWTUVGermany.
- Sound knowledge of international codes/standards as applicable to inspection.
- Maintain and filing technical inspection reports for plant equipment and keep
records up-to-date by using computerized system.
Page 8
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
- Supervising and sharing of preparing turnaround and/or short shutdown
mechanical integrity plan. Job and equipment lists of turnaround, testing and
inspection (T&I) requirements for Ammonia and Urea plants equipment, piping
circuits and safety valves based on RBI (Risk Based Inspection) and remaining
life evaluation, and participate to finalize the T&I scope of work including
materials requirements.
- Anticipate equipment and piping retirements and initiate appropriate steps of
renewal.
- Sharing the engineering department in specifying the technical specifications
of the replacement new equipment or different projects and organize the
inspection plant for this equipment and following up the execution of this plan
with third party inspection authority.
- Using UltraPIPE software to manage plant piping system, static equipment,
safety valves and other Inspection activities as well as store inspection data.
Using Corrosion Monitoring Module of UltraPIPE to calculate corrosion rates,
retirement dates, next inspection dates and generate reports to help prioritize
and schedule thickness inspections.
- As a part of manpower recruiting policy of PIC, I was in board of interview
committee on various occasions representing inspection and corrosion section
to recruit inspection engineers / technicians (direct hire to PIC / through
contractors).
- 30/03/1991 TILL 24/01/2003CAIRO OIL REFINING Co. (CORC)
- Since 29/03/2000 till 24/01/2003 as Quality Control Section Head.
- Since 30/03/1991 till 28/03/2000 as Inspection and Corrosion Engineer.
I had been worked for Cairo Oil Refining company (CORC), in Inspection and
Corrosion Department and I had many duties such as: -
Page 9
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
I- As Inspection and Corrosion Engineer
- Carrying out the inspection activities for distillation, refining, reforming and
isomerization plants equipment such as, columns, heat-exchangers, pressure
vessels, boilers, heaters, reactors, strippers, safety valves & valves, storage
tanks, piping, pipelines, etc. During normal operation, shutdowns and
fabrication new components in view of international technical standards and
specifications of the biggest refinery at Egypt.
- Making plant inspection reports and records for equipment performances, keep records up-to-date.
- Evaluate distillation, refining, reforming and isomerization plants equipment conditions as per-inspection findings and gives the necessary warnings and recommendations with respect to equipment remaining life time, equipment isolation from service, spare ordering, temporary and permanent repairs and modifications.
- Constructing quality control plans for fabrication & erection of petroleum refining units starting from receiving raw materials and passing through non-destructive tests necessary, and at the end making reports and certificates for results.
- Planning inspection procedures, reports for non-destructive test methods applied during fabrication process of refining units.
- Supervises cathodic protection systems of the pipeline and equipment.
- Responsible for preparing welding procedure specifications, procedure qualification records and welders qualification (WPS’s, PQR’s & WPQ’s).
- During CORC preparation for U-Stamp (License for manufacturing the
pressure vessel from American Society of Mechanical Engineers, ASME)
review, I shared as the Sr. Welding Engineer in the steering committee (CORC
already had the license since November, 1994 and renewed two times, 1998
and 2002).
- During CORC preparation for ISO 9001 certification (Quality assurance
system for manufacturing the pressure vessel) I shared in preparing the quality
assurance procedures andwork instructions of inspection and quality control
activates such as welding, heat treatment, NDT, Quality control plan, material
receiving, material tractability and other QA/QC activities (CORC already had
ISO 9001 certification since December, 1997).
Page 10
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
II- As Quality Control Section Head
- Supervise the investigating materials deterioration in view of material failure
analysis and help finding the remedy.
- Review the metallurgy and designs specifications for modifications and major
projects.
- Preparing the Auditing plane and sharing as lead auditor/auditor for auditing
program of CORC quality assurance system.
- Sharing for Designing, preparing and maintain the quality manual which will
include the inspection scope, procedures and work instructions for non
destructive test methods and for various plants equipments such as columns,
heat-exchangers, pressure vessels, boilers, heaters, reactors, strippers, safety
valves, valves, storage tanks, piping and pipelines, etc.,
- Supervise and controls the activities of inspection engineers and gives
instructions related to critical inspection to be implemented on plants equipment
and to insure that such inspection are applied to recognized codes of practice.
- Supervision of preparing clear and concise reports and verify those records of
welding procedures, the welding procedure qualifications, the welder’s
qualifications, welding operators and tack welders qualifications, the control of
welding materials, consumables and the results of examinations are
maintained.
- I had been appointed as member of CORC interview committee representing
inspection and corrosion department to prepare questioner as well as interview
inspection engineers and inspection technicians.
- I had been appointed as member of CORC planning committee for the
requirements of inspection and corrosion department needs of new NDT
equipment and recent devices to improve the department needs.
Codes, Standards and Specifications:
- ASME Sec. I, II (part A, B, C and D), IV, V, VIII and IX Codes and other
sections.
- ASME B 31.1, B31.3, B31.8 and B31G Codes and others.
Page 11
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
- API 510, 570, 653, 1104, 571, 577 and others.
- ASTM, ASM, NACE, DIN, BS, JIS
- ADMA-OPCO specifications and standards.
- British Petroleum, BP, standards.
- UOP standard specifications.
- Agip specifications
- Stimicarbon specifications.
- DOW’s Chemical Co. specifications.
- Chiyoda specifications.
- Foster Wheeler specifications.
- Tecnimont specifications.
- Snamprojeti specifications.
- Holdor Topsoe specifications.
Computer skills and background:
- Windows (95, 98, NT, ME, XP and W7).
- MAXIMO.
- ORACLE.
- Microsoft office (word, power point, Excel, Access and publisher).
- Microsoft Project.
- Microsoft Visio.
- Internet user.
- AutoCAD 2004, AutoCAD 14 and Intergraph Imaginer Technical.
- Lotus Notes, E-mailing system and Achiever Plus.
Page 12
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
- Welding Pro-write (software for WPS, PQR and WPQ according to ASME
Code Sec. IX)
- Ultra Pipe (software for piping remaining thickness calculations).
- Pro-act analysis suite (soft ware for root cause analysis and hypotheses).
- Process Safety Management.
Private Sector Activities:
Contributing in outward private projects withmany inspection and consulting
private sector's companies in EGYPT,as Authorized Plant Inspector and
Engineering/ Inspection Technical Consultant to supervise the integrity/
inspection activities during major shutdown, maintenance, fabrication and
erection of refining units, such as heat exchangers, coolers, pressure vessels,
delayed coking drums, storage tanks, furnaces, heaters, pipelines, columns
and piping by implementing specific codes and standards, for many petroleum,
petrochemical and industrial companies such as:
- GasCool Co.
- Helwan Fertilizer Co.
- Egyptian Maintenance Co.
- NATGAS.
- Egypt Gas.
- Rashid Petroleum Co. IDUKU.
- Burullus Gas Co.
- International Chemical Company ICC.
- East gas Co, through ABB Petroleum Technology s.a.e.
- Khalda Co (SALAM, TAREK and AKIK gas plants) western desert.
- Engineering for the Petroleum & Process Industries (Enppi).
- Suez Oil Processing Co.
Page 13
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
- Agiba Co. (Ras Badran site).
- El- Nasr Petroleum Co.
- Suez Oil Co. (SUCO).
- General Petroleum Co. (Ras Gareb).
- Petrobel Co. (Abu-Rudis site).
- Egyptian Gas Co. (GASCO). - Gulf Petroleum Co. (GUPCO).
- Pipeline Petroleum Co. (PPCO).
- Egyptian Petroleum Research Institute. (EPRI).
Date: 25th July, 2002 till 24th January, 2003
- Client: EASTGAS Co
- Project: EL-ARISH - TABA 36” Pipeline 250 kmto export natural gas
to Jordan kingdom
- Contractor:ABB petroleum technology S.A.E.
- Location:Egypt.
- Post:Authorized QA/QC Engineer MGR. for TABA Site.
- Duties and Responsible as follows:
- Implement of APISTD 1104 welding of pipelines and related facilities.
- Review of quality control plan, welding procedure specifications, procedure
qualification records, welder qualification certifications, nondestructive test
procedures, hydrostatic test procedure.
- Supervise for conducting welding procedure specifications, procedure
qualification records and welder’s qualification (WPS’s, PQR’s & WPQ’s) and
mechanical tests.
- Supervising and managing of various manufacturing activities such as: -
Page 14
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
- Stringing of pipes.
- Welding activities.
- Non-destructive evaluation.
- Wrapping of welds.
- Laying & ditching of pipe line.
- Road crossing.
- Cleaning process and gauging plate test.
- Mechanical works of valve rooms (midpoint area, receiver
terminal area, launcher terminal area).
- Hydrostatic test.
- Daily report preparation and activities progress evaluation.
Date: November-December 2006
- Client: Petrochemical Industries Company at Kuwait
- Project: Major, 2006 annual shutdown, Ammonia and Urea plants.
- Contractor: AL-ARABI for Technology, Kuwait.
- Location:Kuwait.
- Post: Snr. Plant Inspection Engineer.
- Duties and Responsible as follows:
- Conduct internal, external planned & unplanned inspections on all static
equipments, facilities, structures, pressure safety valves and lifting appliances.
- Issue inspection work sheets with repair procedures and testing
requirement confirming to Petrochemical Industries Co. & International
Standards.
- Carry out monitoring of plants and QA/QC of all maintenance activities
to ensure safe and reliable execution.
Page 15
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
- Issue Inspection reports, maintain inspection files and keep records up-
to-date.
Date: April 2008
- Client: Helwan Fertilizer Company at Egypt. Helwan Fertilizer
Company (HFC) awarded the construction contract in 2004 on a turnkey basis
to the German company Uhde GmbH.The new plant has the capability of
producing 1,200 ton of ammonia and 1,925 ton of urea fertilizer per day
- Project: Major, 2008 annual shutdown, Ammonia and Urea plants
- Location: Cairo, Egypt.
- Post: Snr. Plant Inspection Engineer.
- Duties and Responsible as follows:
- Supervise inspection activities during the first shutdown of the plants of
the static equipment to specify weak links after first running of the urea and
ammonia plants for sake of commissioning and feedback results to the main
designer Uhde GmbH.
- Issue Inspection reports, maintain inspection files and keep records up-to-
date.
Date: May 2009
- Client: Helwan Fertilizer Company at Egypt. Helwan Fertilizer
Company (HFC) awarded the construction contract in 2004 on a turnkey basis
to the German company Uhde GmbH.The new plant has the capability of
producing 1,200 ton of ammonia and 1,925 ton of urea fertilizer per day
- Project: Major, 2009 annual shutdown, Ammonia and Urea plants
- Location: Cairo, Egypt.
- Post: Snr. Plant Inspection Engineer.
Page 16
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
- Duties and Responsible as follows:
- Supervise inspection activities during the annual shutdown of the plants
of the static equipment to specify weak links of the urea and ammonia plants
for the sake of ensure mechanical integrity of the static equipment and
feedback results to the company.
- Issue Inspection reports, maintain inspection files and keep records up-to-
date.
Date: October-November 2009
- Client: Homs Refining Company at Syria
- Project: Major, 2009 annual shutdown, Delayed Coking Drums, Unit #11.
- Location: Homs, Syria.
- Post: Snr. Plant Inspection Engineer.
- Duties and Responsible as follows:
- Perform inspection plan of 4Nos. (6.6 m ID X 31.4 m overall length)
delayed coking drums (unit -11). The unit was erected in 1965 at HRC; Syria.
The design capacity of the unit is (3000t/d) or (125t/h) from the residuum
atmospheric distillation.
- This was the first site intrusive inspection of these 4 delayed coking
drums since 1976.
- Intrusive inspection performed forthe delayed coke drums at the HOMS
Refinery site during the period October 16th to November 16th, 2009.
- Prepare short and long termrepair package and proceduresfor fatigue
cracking originates atshell to skirt girth weld.
- Supervise the advanced technique ofLaser and Video Scan done by
CIA Inspection Inc. of Stainless Steel internal cladding of coking drumsto
detect bulging and determines its length, depth and width. This advanced
technique detects the location of internal cracking and cladding damage. It
also provides a baseline scan of the vessels for future comparison.
Page 17
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
- Issue finalinspection reports, maintain inspection files and keep records
up-to-date.
Date: November/ December 2010
- Client: Helwan Fertilizer Company at Egypt. Helwan Fertilizer
Company (HFC) awarded the construction contract in 2004 on a turnkey basis
to the German company Uhde GmbH.The new plant has the capability of
producing 1,200 ton of ammonia and 1,925 ton of urea fertilizer per day
- Project: November/ December, 2010 annual shutdown, Ammonia
and Urea plants
- Location: Cairo, Egypt.
- Post: Snr. Plant Inspection Engineer.
- Duties and Responsible as follows:
- Supervise inspection activities during the annual shutdown of the plants of
the static equipment to specify weak links of the urea and ammonia plants for
the sake of ensure mechanical integrity of the static equipment and feedback
results to the company.
- Issue Inspection reports, maintain inspection files and keep records up-to-
date.
Date: January/ March 2011
- Client: Amrya Petroleum Refinery Company (APRC)
- Project: Phenol Extraction Unit 14 Inspection Phase II& III. APRC
has upgrading of their existing phenol extraction unit ( PEU ) to N-Methyl-2
PYRROLIDONE ( NMP) solvent to increase in RAFFINATE product quality, an
increase in WAXY RAFFINATE, an increase unit feed rate and reduction in
solvent consumption.
- Contractor:Sigma Oil Services Co. through GL-Noble Delton, Egypt.
- Location:Alexandria, Egypt.
- Post: Snr. Plant Inspection Engineer.
Page 18
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
- Duties and Responsible as follows:
- Supervise inspection activities during revamp project of the Phenol
extraction unit.
- Carry out fitness for service assessment and study forthe static
equipment to obtain the equipment accommodate with the NMP solvent and
new design conditions based on the inspection findings.
- Issue inspection reports, maintain inspection files and keep records up-to-
date.
Date: December, 2011
Client: Suez Gulf PowerStation
Contractor: Sigma Oil Services Co.
Project:Yearly thorough visual internal and external inspections on power
boilers unit 1 and 2. Inspection scope includes the:
1- Penthouse header assembly
2- Boiler support structure
3- Deaerator and Feed water tanks
4- Air heater
5- Economiser elements
6- GR A and B Fans
7- Burner wind boxes- Front and rear walls
8- Reheater elements
9- Burners Front wall assembly
10- PSH elements
11- Boiler hopper header assembly and structure
12- Boiler piping supports
13- FD Fans 2A and 2B
14- Blow down vessel
15- Boiler skin casing and insulation
16- Expansion joint seals
17- Sh2 outlet elements
18- Furnace wall tubes
Page 19
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
Training Activities as instructor
In response to the growing need for quality training to support the industrial
communities,I have carried out training courses in API, ASME and Welding
courses for the nominees from several leading Industrial,Oil & Gas, and
refining companies as instructor for:
- API 510, API 570 and API 653 certification courses.
- ASME Sec. V, sec. VIII div.1 and Sec. XI courses.
- ASNT NDT methods certification courses for RT, UT, MT and PT.
- CWI, AWS certification courses.
Training Courses:
* 29 – 06 – 2008 to 30 – 06 - 2008
Lifeboat .Coxswain Course
Emirates Technical and Safety Development Centre, ETSDC.
U.A.E. Abu Dhabi
* 07 – 02 – 2007 to 08 – 02 - 2007
Risk Based Inspection for Oil and Gas Industries.
Bureau veritas and Total, U.A.E. Abu Dhabi.
* 06 – 02 – 2007
An Engineering Concept, anti Corrosion technology (CORROCOAT).
NACE, U.A.E. Section.
* 06 – 02 – 2006 to 08 – 02 - 2006
5th ADCO International Corrosion Conference.
Abu Dhabi Company for Onshore Oil Operations (ADCO), U.A.E, Abu Dhabi
Page 20
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
* 03 – 01 – 2006 to 04 – 01 - 2006
Offshore Survival Course.
Gulf Technical & Safety Training center (L.L.C.), U.A.E, Abu Dhabi
* 02 – 01 – 2006 to 02 – 01 - 2006
Offshore Safety Briefing Course.
Safety & Environmental Protection Division, Abu Dhabi Marine Operating Co.
(ADMA-OPCO)
* 06 – 08 – 2005 to 11 – 08 - 2005
API 570 Piping Inspector Preparatory Course
Integrated Training, Dammam, Kingdom of Saudi Arabia, Course Location
U.A.E, Dubai
* 14 – 04 – 2004 to 05 – 05 - 2004
API 510 Pressure Vessel Inspector Preparatory Course
Integrated Training, Dammam, Kingdom of Saudi Arabia.
* 16 - 09 - 2001 to 20 - 09 - 2001
ISO 9000:2000 Auditor/Lead Auditor Training Course,
Passing the written examination and continuous assessment.
SGS International Certification Services.
* 05 - 08 - 2001 to 07 - 08 – 2001
Internal Quality Audit Course – 94
SGS Group Egypt.
* 06 - 2000
Certified Welding Inspector, CWI
Page 21
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
American Welding Society, AWS
* 03 - 1997
Intermediate English Language Course.
EL-Manar training center.
* 01 – 1997 to 05 - 1997
Managing Quality and Quality Improvement.
American University, Egypt.
* 01 - 1997 to 05 - 1997
Quality Assurance Statistical Techniques.
American University, Egypt.
* 09 - 1996 to 01 - 1997
Quality Assurance Program Auditing.
American University, Egypt.
* 09 - 1996 to 01 - 1997
Quality System Application.
American University, Egypt.
* 10-11-1996 to 14-11-1996
Paints and Coatings Technology from Design, Application and Inspection.
Engineering for the petroleum and process industries (ENPPI).
* 01-06-1996 to 06-06-1996
Heat Treatment.
Suez oil processing co. (training center)
Page 22
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
* 7- 04-1996 to 11-04-1996
Metals & Hydrogen Corrosion Sessions.
Engineering for the petroleum and process industries (ENPPI).
* 13-01-1996 to 20-01-1996
Total Quality Management and International Standards.
Arabic research and management center, Cairo
* 16-12-1995 to 28-12-1995
Radiography Testing, Level II.
Cairo University, Egypt.
* 18-11-1995 to 30-11-1995
Ultrasonic Testing, Level II.
Cairo University, Egypt
* 24-04-1994 to 28-04-1994
Welding Codes and Welding Qualification.
American University, Egypt.
* 25-06-1994 to 30-06-1994
Liquid Penetrant Testing, Level II.
Cairo University, Egypt.
* 11-06-1994 to 16-06-1994
Magnetic Particle Testing, Level II.
Cairo University, Egypt.
* 06-06-1993 to 10-06-1993
Corrosion Monitoring And Control In Industry.
Page 23
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
American University, Egypt.
* 05-1-1992 to 09-1-1992
Failure of Mechanical Engineering Components, Analysis And Prevention.
American University, Egypt.
* 04-01-1991 to 16-02-1991
Energy Management Systems and Techniques.
Boiler Efficiency Institute, Auburn University, Alabama, USA, P.O. Box 2255
AuburnAL36831-2255USA.
Note:
- Please be advised that the necessary supporting documents & experience
certificates shall be presented when ordered, and if you would need more
information, please do not hesitate to contact me at: