Technical Meeting on „Low-grade ore processing” Alkaline heap leaching of low Alkaline heap leaching of low- grade ore in Hungary (1966-1990) M. Csővári MECSEK-ÖKO Zrt., Pécs, Hungary The process was elaborated by: Dr. B. Czegledi, L. Stocker, Dr. J. Egyed, L. Fekete and L. Csikós IAEA sponsored project (1980-85) Vienna, 29-31 March 2010
32

Csovari Heap Leaching

Nov 08, 2014

Download

Documents

Heap leaching
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Csovari Heap Leaching

Technical Meeting on „Low-grade ore processing”

Alkaline heap leaching of lowAlkaline heap leaching of low-grade ore in Hungary (1966-1990)

M. Csővári

MECSEK-ÖKO Zrt., Pécs, Hungary

The process was elaborated by:Dr. B. Czegledi, L. Stocker, Dr. J. Egyed, L. Fekete

and L. CsikósIAEA sponsored project (1980-85)

Vienna, 29-31 March 2010

Page 2: Csovari Heap Leaching

O li f h iOutline of the presentation

P t IPart I1 Practical reasons of using the alkalineheap leaching2 Laboratory and pilot scale experimentsy p prelated to the elaboration of HL 3 Heap leaching practice3 Heap leaching practice

Part IIL b t d Fi ld I ti ti fLaboratory and Field Investigations forHeap Leach Remediation and GroundwaterRestoration

Page 3: Csovari Heap Leaching

1 Justifying the heap leaching

Uranium ore lences in the productive zone

Solid ore grade: U~ 0 12%U 0.12%

After mining (dilution)U 0 06 0 07%U~ 0.06-0.07%

ROMROM

Smaller lenses were scattered throughSmaller lenses were scattered throughthe sandstone unit (productive zone)

Page 4: Csovari Heap Leaching

The original general flow 1 Practical reasons of the heap leaching

g gsheet of the ore preparation

Run-of-mine ore Radiometric control stationU=0,06-0,07%

Waste rock U<100 g/t

Industrial-grade row oreU>230 g/t (~0 07-08%)

(sorting I (by bogie)

U<100 g/t Low-grade ore U=100-230 g/t

U>230 g/t (~0,07-08%)

Crushing, screeningWaste rock GW contamination<50 mm~50%

50-200 mmpile

Radiomeric sorting (four mashinclasses, particle by particle)

RejectU~80-160 g/t, =32%For the mill

Accept, 18%U~0.2%

U~0.1%, =68%

Page 5: Csovari Heap Leaching

Ore characteristics selection of the process

2 Laboratory and pilot scale experiments

Ore characteristics, selection of the processfor mill grade ore and for heap leachingReagent consuming gang minerals: Calcite, dolomite, siderite (CO2~2.8-4%);

Mineralisation: coffinite branerite uranium

( 2 )S (sulphide)~0.1%

Mineralisation: coffinite, branerite, uranium-oxides, secondary minerals

For mill grade ore acid leach has been choosen.For low-grade ore alkaline process was propousedg p p p

(Consumption of H2SO4:~90 kg/tConsumption of Na2CO3: ~5kg/t)

Leaching : 20-25 g/l Na2CO3+5 g/l NaHCO3

Page 6: Csovari Heap Leaching

Column leaching tests with2 Laboratory and pilot scale experiments

1 Leaching tests (most often in columns)1 Leaching tests (most often in columns)Recovery vs crush size and leaching time

-leaching of uncrushed ore from the pile(poor recovery ~15%)

- crush size -5, -30, -50, -70 mm 2 I ti ti f th t li id ti2 Investigations of the catalic oxidation

Cu(II), KMnO4, Cl23 Investigation of the role of microbiological activity in3 Investigation of the role of microbiological activity inthe leaching process (PhD work)4 Investigation of the role of the oxygen

(in N2 atmosphere only10-12% recovery)5 Leachability of ores from different depth, exposed ore

d f h” ( i l i l ff t)and „fresh” ore (mineralogical effect)

Page 7: Csovari Heap Leaching

Th i i

2 Laboratory and pilot scale experiments

The recovery vs grain size

12 th f

%

12 months of leaching, exposedore% ore

mm

P t ti t f l h t i k 1 / kPenetration rate of leachate in rock: 1 mm/week, finely disseminated mineralization

Page 8: Csovari Heap Leaching

Effect of crush size2 Laboratory and pilot scale experiments

Effect of crush size(for couple of crush size)

gU/t

Months

Page 9: Csovari Heap Leaching

R d d f

2 Laboratory and pilot scale experiments

Recovery dependance from ore type

40%

12 months

Page 10: Csovari Heap Leaching

PilotPilot scalescale experimentsexperiments

2 Laboratory and pilot scale experiments

Pilot Pilot scalescale experimentsexperiments(1965)(1965)

Ore grade : 220 g/tOre grade : 220 g/t Height of pile: 5 mF=1720 m2

Recovery in first year:~ 50% (exposed ore) F 1720 m

G=8000 t( p )

Leaching: 20-25 g/l Na2CO32 3

5 g/l HCO3

The assumed recovery over years: ~55-70% (85-110 g/t fromgrade of 160 gU/t )

Page 11: Csovari Heap Leaching

The general flow 1 Practical reasons of the heap leaching

gsheet of the ore preparation with HL

Run-of-mine ore Radiometric control stationU=0,06-0,07%

Waste rock U<100 g/t

Industrial-grade row oreU>230 g/t (~0 07-08%)

(sorting I (by bogie)

U<100 g/t Low-grade ore U=100-230 g/t

U>230 g/t (~0,07-08%)

Crushing, screeningWaste rock

<50 mm~50%

50-200 mmpile

Crushing, <30 mmU~100-170g/t(50-100 mm)

U<100 /t Radiomeric sorting II.particl by particlHeap leaching

U~140 g/t

U<100 g/t(100-200 mm)

RejectU~80-160 g/t, =32%For the mill

Accept, 18%U~0.2%

U~140 g/t

U~0.1%, =68%

Page 12: Csovari Heap Leaching

Pad and liner design development3 Heap leaching practice

Pad and liner design development(expanding pads)

Crushed ore (<30 mm) f hCrushed ore (<30 mm)

Drain from coarse rejects

Arrangement of heaps

L l d il f

Plain site

I II I III

Leveled soil surfaceVelly site

Two PVC plastic foillayers The sheets seamed

II

layers. The sheets seamedwith bitumen

Over-liner material:Wood chips from the mill

Page 13: Csovari Heap Leaching

PlacementPlacement of PVCof PVC lininglining geomembranegeomembrane3 Heap leaching practice

PlacementPlacement of PVC of PVC lininglining geomembranegeomembraneAt the very beginning

1.2 m wide foil strips later on

wider ones were usedwider ones were used

Heap pad lined with foil strips(and steamed with bitumen)( )

Drain from (100-200 mm) rejects)

Wood chips

Page 14: Csovari Heap Leaching

Placement (stacking) of the3 Heap leaching practice

ore on the pad

Some heterogenity in the density and size distribution of oreg y ymost likely took place

Page 15: Csovari Heap Leaching

Principal flow sheet of the waterpmanagement

To the mill300 000 t

H 10 12

1

H=10-12 m

4R Cl+UO (CO )4-=R [UO (CO ) +4Cl-

1- ion-exch.

4R-Cl+UO2(CO3)4 =R4[UO2(CO3) +4Cl

Volume of water ~0 25 m3/t: (20 g/l Na2CO3+ 5 g/l NaHCO3)Volume of water 0.25 m /t: (20 g/l Na2CO3+ 5 g/l NaHCO3) Overbalance : 37 th m3/a, to the mill (12% of precipitate)

Page 16: Csovari Heap Leaching

WaterWater managenetmanagenet contcont..3 Heap leaching practice

At the beginning the heapswere very carefully irrigated just

Later on more solution waspumped and storaged ony y g j

as if sprinkling a fieldp p gthe heaps in small basins

Percolation rate was -5-20 cm/d (swelling)

Page 17: Csovari Heap Leaching

DD f ilf il

3 Heap leaching practice

DamDam failurefailure(HL 1)(HL 1)

Too large basin on the top caused colaption of the dam3App. 3 thousand m3 of process water

has escaped from the heaps

Page 18: Csovari Heap Leaching

HeapHeap LeachingLeaching sitessites3 Heap leaching practice

HeapHeap LeachingLeaching sitessites

Plain-type site Hill-type siteSite N1

Plain-type site ype s e

33 ha

Site N2 ~5 Mt

2.2 MtI II I III

Hill-type site

Page 19: Csovari Heap Leaching

Vi th h (Sit 2)

3 Heap leaching practice

View on the heaps (Site 2)

Site N2

Pad readyfor lining

Page 20: Csovari Heap Leaching

Vi th h (HL2)

3 Heap leaching practice

View on the heaps (HL2)

Site N2

33 ha

~5.2 MtColumnsPad ready

for lining

Page 21: Csovari Heap Leaching

Ion exchange columns3 Heap leaching practice

g

Circulation: 2 3 h 3/d Three separate

underflow pipe

~2-3th m3/d

lines operatedfor segregation

12

of the solutionsfrom heaps of

2 3

different age(for bettersorptionefficiency)Na K CO3

2‐ HCO3‐ Cl‐ SO4

2‐ NO3‐ TDS  U3 3 4 3

g/l mg/l5‐10 0.5‐1 3‐5 3‐5 1‐2 4‐8 0.05‐0.2 15‐25 30‐200

Page 22: Csovari Heap Leaching

Semi-counter current eluation (stripping) 3 Heap leaching practice

of the loaded anion exchangerIon exch.

Loaded resinfrom HL

back to HL

C1 C2 C3

from HL

C1 C2 C3

Water

5g/l Na2CO3 + 80 g/l NaCl U 5 10 /l80 g/l NaCl U~5-10 g/l

To the mill

Page 23: Csovari Heap Leaching

3 Heap leaching practice

Yearly processed low grade ore

180400

120140160

250300350

rade

, g/t

kt

6080100120

150200250 G

r

ssof

ore

,k

0204060

050

100Mas

Ore, kt/a00

Year

Grade, U g/t

F 1985 il l h bl WRYear From 1985 some easily leachable WR has been processed too.

Page 24: Csovari Heap Leaching

Uranium recovery (%)Uranium recovery (%)

60

U t/

a40

50

37 t/

30U in ore

37 t/a

20 U recovered20 t/a

0

10

~48 tU

1966

1968

1970

1972

1974

1976

1978

1980

1982

1984

1986

1988

1990

1992

1994

1996

Page 25: Csovari Heap Leaching

Uranium recovery, g/t

160180

Grade, U g/t

100120140

, gU recovered

From deep

6080

100 From deepmines

Exp. ore

204060

0

966

969

972

975

978

981

984

987

990

1 1 1 1 1 1 1 1 1

Page 26: Csovari Heap Leaching

D dD d ff thth ii

3 Heap leaching practice

DependenceDependence of of thethe uraniumuraniumrecoveryrecovery fromfrom leachingleaching timetime and and oreore typetype

Uranium recovery vs. leaching timeUranium recovery vs. leaching time

6070

%Exposed ore

4 87.75304050

cove

ry, %

Fresh oreU~136 g/t

01020R

ec Recovery 40-50% in 3 years50-64% in 14 years

U 136 g/t

00 20 40 60 80 100 120 140 160 180

MonthsU~64 g/t

Page 27: Csovari Heap Leaching

Data for the economicData for the economicevaluation of the process

Mi iMining: no costCrushing: 2 kWh/tChemicals: NaCl-0.8 kg/t

Na2CO3-5 kg/ t2CO3 g/Ion exch. resin: 0.07 dm3/tHaulage: 2 km distanceHaulage: 2 km distancePumping: ~12 kwh/t (circulation of th l ti )the solution) Payroll: ~1 $/tPad, Sealing: ~0.07 m2/t

Page 28: Csovari Heap Leaching

Ruff cost distribution

Items $/kgUChemicals (NaCl Na CO Ion exch etc )Chemicals (NaCl, Na2CO3, Ion exch.etc.), 

supplementary materials 16Electricity (mainly forElectricity (mainly for

pumping) 20

Payroll 17Payroll 17

Others (service from other comp.) 9

Total 62

Data for 1992 $=75 HUF

Page 29: Csovari Heap Leaching

3 Heap leaching practice

WorkingWorking experienceexperience and and lessonslessons

1 T id l ti f th h (d f il )1 To avoid unequal compaction of the heaps (dam failure)- Sprinkling for some months before filling the basins

on the top of heaps was neededon the top of heaps was needed2 Decreasing of the percolation rate (to 2-3 cm/d)

- Increased clay content and its swelling- Algae population (in summer time) was observed

(CuSO4 addition)3 D i f th i l di f th i h3 Decreasing of the uranium loading of the ion exchanger,

-High TDS (Cl, SO4 in lechates),- Remove of some process water for water balanceRemove of some process water for water balance

(~12% of yearly precipitate)-Separation of water collection systems of the

younger and older heaps

Page 30: Csovari Heap Leaching

ConclusionsConclusions

• Using alkiline haeap leaching app. 50-65% of uranium has been removed from the very low-grade and rather refractory ore (50% from unexposed ore, 64% from exposed ore).

• Technological process became more flexible in respect ore grade, cutt-off grade, mill operation, mining technology, etc.

• Less quantity of uranium was placed into the WRP, therefore the loading of the environment with uranium decreased by one thierd.

• The used liner system proved to be acceptable but very sensitive for ultraviolet light (damages on the dams).

Page 31: Csovari Heap Leaching

ConclusionsConclusions contcont..

It seems that using reusable pad for leaching isIt seems that using reusable pad for leaching is more acceptable from environmental point of view (less soil contamination is expected) Theview (less soil contamination is expected). The expanding pads needed ~7 ha/Mt

Page 32: Csovari Heap Leaching

ThankThank youyou forfor youryour attentionsattentionsThankThank youyou forfor youryour attentionsattentions