Conflict Summary Sheet.xls Item # P&P Sh # Cross Section Sht # Approx. Sta. From Approx. Sta. To Approx. Qty Offset Location Comments Utility Type of Facility 1 State, 2 Utility Not/Reimbursable NDT01 3 X2-X3 503+78. to 504+27. 70 1.5 ft Cut Rt In Right of way Adjust or relocate line for new ditch North Dakota Telephone Fiber Optic Line 2 Not reimbursable NDT02 3 X4-X5 504+95. to 505+43. 50 2.75 ft Cut Rt In Right of way Conflict with existing roadway removal North Dakota Telephone Fiber Optic Line 2 Not reimbursable NDT03 3 X4-X5 505+04. to 505+57. 50 2.75 ft Cut Rt In Right of way Conflict with existing roadway removal North Dakota Telephone Fiber Optic Line 2 Not reimbursable NDT04 3 X4-X5 505+20. to 506+07. 50 2.75 ft Cut Rt In Right of way Conflict with existing roadway removal North Dakota Telephone Fiber Optic Line 2 Not reimbursable NDT05 3 X6 506+77. to 506+77. NA 5.25 ft Fill Crossing New Right of way No Conflict - Under New 79th Ave Roadway North Dakota Telephone (2) Fiber Optic Lines NA NA NDT06 3 X6 507+76. to 507+76. NA 5.25 ft Fill Crossing New Right of way No Conflict - Under New 79th Ave Roadway North Dakota Telephone Fiber Optic Line NA NA NDT07 3 ? 508+04. to 508+04. 25 Cut Lt In Right of way Possible conflict with new culvert North Dakota Telephone Fiber Optic Line 2 Not reimbursable NDT08 4 X9-X10 513+93. to 514+30. 60 3.25 ft Cut Lt In Right of way Adjust or relocate line for new ditch North Dakota Telephone Fiber Optic Line 2 Not reimbursable NDT09 4 X10 514+43. to 514+70. 50 3.25 ft Cut Lt In Right of way Adjust or relocate line for new ditch North Dakota Telephone Fiber Optic Line 2 Not reimbursable NDT10 4 X11 514+90. to 515+34. 50 2 ft Cut Lt In Right of way Adjust or relocate line for new approach elevation North Dakota Telephone Fiber Optic Line 2 Not reimbursable NDT07 4 ? 510+40. to 510+40. ? Cut Lt In Right of way Possible conflict with new culvert North Dakota Telephone Fiber Optic Line 2 Not reimbursable NDT07 4 ? 512+85. to 512+85. ? Cut Rt In Right of way Possible conflict with new culvert North Dakota Telephone Fiber Optic Line 2 Not reimbursable OTP01 3 X6 & X16 507+54. to 507+54. 1 4.25' Fill crossing In Right of way Relocate Pole and Anchors Otter Tail Power Co. Overhead Power Line 2 Not reimbursable NE01 3 X3-X4 504+60. to 504+80. 50 3 ft Cut Rt In Right of way Conflict with existing roadway removal Nodak Electric Buried Electric Line 2 Not reimbursable NE02 3 X4 504+84. to 505+29. 50 3 ft Cut Rt In Right of way Conflict with existing roadway removal Nodak Electric Buried Electric Line 2 Not reimbursable NE03 3 X4 505+17. to 505+17. NA 5 ft Fill Crossing New Right of way No Conflict - Under New 79th Ave Roadway Nodak Electric Buried Electric Line 2 Not reimbursable NE03 3 X5 506+61. to 506+61. NA 5 ft Fill Crossing New Right of way No Conflict - Under New 79th Ave Roadway Nodak Electric Buried Electric Line 2 Not reimbursable NE04 4 ? 512+77. to 512+77. ? Cut Rt In Right of way Possible conflict with new culvert Nodak Electric Buried Electric Line 2 Not reimbursable NE05 4 ? 513+60. to 513+60. ? Cut Rt In Right of way Possible conflict with new culvert Nodak Electric Buried Electric Line 2 Not reimbursable MDU01 3 X3-X5 504+31. to 506+02. 70 3 ft Cut Rt In Right of way Adjust or relocate line for new ditch Montana Dakota Utilities Gas Line 2 Not reimbursable MDU02 3 X4-X5 505+13. to 505+88. 50 3 ft Cut Rt In Right of way Conflict with existing roadway removal Montana Dakota Utilities Gas Line 2 Not reimbursable MDU03 3 X6 507+68. to 507+68. NA 5 ft Fill Crossing New Right of way No Conflict - Under New 79th Ave Roadway Montana Dakota Utilities Gas Line 2 Not reimbursable MDU04 4 X12 515+60. to 515+80. 35 2 ft Cut Rt In Right of way Adjust or relocate line for new ditch Montana Dakota Utilities Gas Line 2 Not reimbursable MDU05 4 ? 513+30. to 513+30. ? Cut Rt In Right of way Possible conflict with new culvert Montana Dakota Utilities Gas Line 2 Not reimbursable RRW01 3 X5-X6 506+31. to 506+31. NA 3 ft Cut Rt In Right of way Possible Conflict with existing roadway removal Ramsey Rural Water Water Line 2 Not reimbursable RRW01 3 ? 507+23. to 507+23. NA Fill Rt New Right of way No conflict anticipated with new culvert Ramsey Rural Water Water Line 2 Not reimbursable Approx. Maximum Cut/Fill
32
Embed
Cross Approx. State, P&P Sh Section Approx. Sta. Approx ...
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Conflict Summary Sheet.xls
Item #P&P Sh
#
Cross Section
Sht #Approx. Sta.
From Approx. Sta. To Approx. Qty Offset Location Comments Utility Type of Facility
1 State,
2 Utility Not/Reimbursable
NDT01 3 X2-X3 503+78. to 504+27. 70 1.5 ft Cut Rt In Right of way Adjust or relocate line for new ditch North Dakota Telephone Fiber Optic Line 2 Not reimbursable
NDT02 3 X4-X5 504+95. to 505+43. 50 2.75 ft Cut Rt In Right of way Conflict with existing roadway removal North Dakota Telephone Fiber Optic Line 2 Not reimbursable
NDT03 3 X4-X5 505+04. to 505+57. 50 2.75 ft Cut Rt In Right of way Conflict with existing roadway removal North Dakota Telephone Fiber Optic Line 2 Not reimbursable
NDT04 3 X4-X5 505+20. to 506+07. 50 2.75 ft Cut Rt In Right of way Conflict with existing roadway removal North Dakota Telephone Fiber Optic Line 2 Not reimbursable
NDT05 3 X6 506+77. to 506+77. NA 5.25 ft Fill Crossing New Right of way No Conflict - Under New 79th Ave Roadway North Dakota Telephone (2) Fiber Optic Lines NA NA
NDT06 3 X6 507+76. to 507+76. NA 5.25 ft Fill Crossing New Right of way No Conflict - Under New 79th Ave Roadway North Dakota Telephone Fiber Optic Line NA NA
NDT07 3 ? 508+04. to 508+04. 25 Cut Lt In Right of way Possible conflict with new culvert North Dakota Telephone Fiber Optic Line 2 Not reimbursable
NDT08 4 X9-X10 513+93. to 514+30. 60 3.25 ft Cut Lt In Right of way Adjust or relocate line for new ditch North Dakota Telephone Fiber Optic Line 2 Not reimbursable
NDT09 4 X10 514+43. to 514+70. 50 3.25 ft Cut Lt In Right of way Adjust or relocate line for new ditch North Dakota Telephone Fiber Optic Line 2 Not reimbursable
NDT10 4 X11 514+90. to 515+34. 50 2 ft Cut Lt In Right of way Adjust or relocate line for new approach elevation North Dakota Telephone Fiber Optic Line 2 Not reimbursable
NDT07 4 ? 510+40. to 510+40. ? Cut Lt In Right of way Possible conflict with new culvert North Dakota Telephone Fiber Optic Line 2 Not reimbursable
NDT07 4 ? 512+85. to 512+85. ? Cut Rt In Right of way Possible conflict with new culvert North Dakota Telephone Fiber Optic Line 2 Not reimbursable
OTP01 3 X6 & X16 507+54. to 507+54. 1 4.25' Fill crossing In Right of way Relocate Pole and Anchors Otter Tail Power Co. Overhead Power Line 2 Not reimbursable
NE01 3 X3-X4 504+60. to 504+80. 50 3 ft Cut Rt In Right of way Conflict with existing roadway removal Nodak Electric Buried Electric Line 2 Not reimbursable
NE02 3 X4 504+84. to 505+29. 50 3 ft Cut Rt In Right of way Conflict with existing roadway removal Nodak Electric Buried Electric Line 2 Not reimbursable
NE03 3 X4 505+17. to 505+17. NA 5 ft Fill Crossing New Right of way No Conflict - Under New 79th Ave Roadway Nodak Electric Buried Electric Line 2 Not reimbursable
NE03 3 X5 506+61. to 506+61. NA 5 ft Fill Crossing New Right of way No Conflict - Under New 79th Ave Roadway Nodak Electric Buried Electric Line 2 Not reimbursable
NE04 4 ? 512+77. to 512+77. ? Cut Rt In Right of way Possible conflict with new culvert Nodak Electric Buried Electric Line 2 Not reimbursable
NE05 4 ? 513+60. to 513+60. ? Cut Rt In Right of way Possible conflict with new culvert Nodak Electric Buried Electric Line 2 Not reimbursable
MDU01 3 X3-X5 504+31. to 506+02. 70 3 ft Cut Rt In Right of way Adjust or relocate line for new ditch Montana Dakota Utilities Gas Line 2 Not reimbursable
MDU02 3 X4-X5 505+13. to 505+88. 50 3 ft Cut Rt In Right of way Conflict with existing roadway removal Montana Dakota Utilities Gas Line 2 Not reimbursable
MDU03 3 X6 507+68. to 507+68. NA 5 ft Fill Crossing New Right of way No Conflict - Under New 79th Ave Roadway Montana Dakota Utilities Gas Line 2 Not reimbursable
MDU04 4 X12 515+60. to 515+80. 35 2 ft Cut Rt In Right of way Adjust or relocate line for new ditch Montana Dakota Utilities Gas Line 2 Not reimbursable
MDU05 4 ? 513+30. to 513+30. ? Cut Rt In Right of way Possible conflict with new culvert Montana Dakota Utilities Gas Line 2 Not reimbursable
RRW01 3 X5-X6 506+31. to 506+31. NA 3 ft Cut Rt In Right of way Possible Conflict with existing roadway removal Ramsey Rural Water Water Line 2 Not reimbursable
RRW01 3 ? 507+23. to 507+23. NA Fill Rt New Right of way No conflict anticipated with new culvert Ramsey Rural Water Water Line 2 Not reimbursable
Approx. Maximum
Cut/Fill
Conflict Summary Sheet.xls
Item #P&P Sh
#
Cross Section
Sht #Approx. Sta.
From Approx. Sta. To Approx. Qty Offset Location Comments Utility Type of Facility
1 State,
2 Utility Not/Reimbursable
Approx. Maximum
Cut/Fill
1 913+00. to 923+00. US 22 923+00. to 933+00. US 23 502+75. to 507+33. 79th Ave NE4 510+75. to 515+82. 79th Ave NE
Contact information for Utility Facilities with or without Conflicts. Utility Company Name and Address Contact Name Phone Number Email
North Dakota Telephone Company - 211 22nd St NW, P.O. Box 180 - Devils Lake, ND 58301 Terry Thompson (701) 662-6482Nodak Electric Coop. Inc. - P.O. Box 13000, Grand Forks, ND 58208-3000 Steven Breidenbach, (701) 746-4461MDU - Gas – Devils Lake, ND Barry Gage, (701) 351-3077MDU - Gas – Devils Lake, ND Scott Volk (701) 739-7275Otter Tail Power Company – P.O. Box 400 – Devils Lake, ND 58301 Wayne Thompson (701) 662-4021 X 702 [email protected] Ramsey Water District P.O. box 1257 Devils lake ND 58301 Nels Halgren (701) 662-5781
1/13/2016 mdockter R:\project\30002265.146\utilities\sheets\060PP_003_79th.dgn8:24:14 AM
purposes.
implementation
construction or
and not for
is preliminary
This document
PRELIMINARY
60
NH-3-002(146)265 3
North end of
79th Ave NE Realignment
1465.96
None
24" X 76’ R
CP (F
air)
923+87 - 1
20’ L
T
(chain: S
CL02)
1466.10
1466.21
E. end POSSIBLE H-WALL or BOX
(Submerged Elev. not confirmed)
12" X 46’ RCP
104+63 - 20’ LT to W end
104+47 - 25’ RT to E end
(Chain: 79TH)
1466.35
None
24" X 76’ R
CP (F
air)
923+23 - 1
4’ L
T to S
W end
(chain: S
CL02)
MD
U
ND TEL
ND T
EL
1466.65
RW
RAMSEY
1466.73
1466.74
1466.79
None
18" X 44’ CSP (Fair)
104+52 - 52’ RT to W end
104+24 - 87’ RT to E end
(Chain: 79TH)
ND T
EL
1466.84
2 R
CES (F
air)
24" X 80’ R
CP (F
air)
923+24 - 1
1’ R
T to N
E end
(chain: S
CL02)
1466.95
Brush
Brush
Util M
kr
ND TE
L
MD
U
ND TEL
Util M
kr
ND TE
L
ND T
EL
NODAK R ELEC
RA
MSEY R
W
NODAK R ELEC
ND T
EL
NO
DAK R E
LEC
ND TEL
ND T
EL
ND T
EL
Gr
FO Tel P
ed
Util M
kr
NODAK R ELEC
Dirt
1469.95
Gr
Util M
kr
Sign P
vt
FO Tel P
ed
ND TEL
Gr
Asp
h2 Sign P
vt
2 F
O Tel va
ults
Util M
kr FO Tel P
ed
Util M
kr
Util M
kr
Gr
WM
V
E Mtr
NO
DA
K R E
LE
C
Util M
kr
NO
DA
K R E
LEC
Sign P
vt
Gr
vaults
2 E
L
ND T
EL
Gr
Dirt
Conc
Gr
NODAK R ELEC
Asph
ND TEL
Gr
MD
U
ND TEL
Asph
Btry b
ox
EL box
locke
r
EL
R E
LEC
NO
DAK
E Mtr
Line E
xst
Switch R
R
Conc
Asp
h
BNSF
MD
U
MDU
Gr
Asph
Conc
Conc
Pvt
Sig
n
BNSF
X-in
g
Tim
ber
Dirt
ND TEL
WMV
Sign P
vt
511
512
510
513 514
515
516
518517
31.8 RT+10.5
at own expenserelocate or adjustutility company to Fiber optic line,Conflict with
yet to be determinedculvert placementPossible Conflict with
yet to be determinedculvert placementPossible Conflict with
at own expenserelocate or adjustutility company to Gas line,Conflict with 5
15
+00
510
+00
920+00
925+00
79th Ave
Pr. Inv.: 1466.38
36.6’ Rt
Pr. Sta.: 512+72
Pr. Inv.: 1466.38
Pr. Sta.: 513+17 - 54.3’ Lt*
+ 0.7500 %
+ 2.1170
% + 0.0000 %
- 2.5055 %
+ 0.1439 %
+ 2.0464 %
+ 1.1701 %
VPI 515+60.00
EL 1,474.10
L = 26.86’
L = 64.00’
EL 1,474.18
VPI 512+19.00VPI 511+04.00
EL 1,474.18
L = 62.18’
VPI 509+75.04
EL 1,472.13
L = 70.00’
EL 1,472.51
VPI 510+25.00
L = 130.00’
EL 1,471.75
VPI 513+16.00
L = 106.32’
EL 1,471.95
VPI 514+55.00
1,4
74.4
1
OCL_79
Pr. CL
OCL_79
Ex. CL
510+00 511+00 512+00 513+00 514+00 515+00
1,466.73
1,471.76
1,472.76
1,466.88
1,468.32
1,473.17
1,472.33
1,473.97
1,474.15
1,472.40
1,471.87
1,472.88
1450
1455
1460
1465
1470
1475
1480
1485
1450
1455
1460
1465
1470
1475
1480
1485
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/13/2016 mdockter R:\project\30002265.146\utilities\sheets\060PP_004_79th.dgn8:30:24 AM
purposes.
implementation
construction or
and not for
is preliminary
This document
PRELIMINARY
60
NH-3-002(146)265 4
North end of
79th Ave NE Realignment
MD
U
ND TEL
ND T
EL
ND T
EL
Brush
Brush
Util M
kr
ND TE
L
Sign
ND TEL
ND T
EL
NODAK R ELEC
MDU
ND T
EL
ND T
EL
Util Mkr
ND TEL
Peds2 FO Tel
R ELECNODAK
NODAK R ELEC
Dirt
El box Abn
Sign P
vt
Asph
2 Sign P
vt
Util M
kr
Sign
Util M
kr
Sign P
vt
Asph
ND TEL
NP
Btry box
EL box
locker
EL
R E
LEC
NO
DA
K
E Mtr
Line E
xst
Switc
h R
R
Asph
BNSF
WMV
Asph
Conc Bariers
BNSF
Conc
Switch RR
ND TEL
Switch RR
Peds2 FO Tel
Util Mkr
X-in
g
Tim
ber
RA
MS
EY C
OU
NT
Y R
UR
AL
MD
U
—
X-ingConc
X-ingTimber
NP
Gr piles
00
00
2020
2020
4040
4040
6060
6060
8080
8080
100100
100100
120
120
140
140
160
160
1470 1470
1480 1480
502+75.00
1470 1470
1480 1480
502+78.87
1470 1470
1480 1480
503+02.27
1475.36
1475.37
1475.36
approximate
fiber optic line
location
approximate
gas line
location
approximate
fiber optic line
location
approximate
gas line
location
approximate
fiber optic line
location
approximate
gas line
location
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility 79th.dgn11:24:45 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 1
79th Ave NE
00
00
2020
2020
4040
4040
6060
6060
8080
8080
100100
100100
120
120
140
140
160
160
1470 1470
1480 1480
503+25.00
1470 1470
1480 1480
503+75.00
1460 1460
1470 1470
1480 1480
503+91.70
1475.23
1474.56
1474.21
approximate
fiber optic line
location
approximate
gas line
location
approximate
fiber optic line
location
approximate
gas line
location
sta 503+94.23
offset 170.35
elevation 1470.76
telephone pedestal
approximate
fiber optic line
location
approximate
gas line
location
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility 79th.dgn11:24:46 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 2
79th Ave NE
00
00
2020
2020
4040
4040
6060
6060
8080
8080
100100
100100
120
120
140
140
160
160
1470 1470
1480 1480
504+15.10
1470 1470
1480 1480
504+20.23
1460 1460
1470 1470
1480 1480
504+73.50
1473.68
1473.58
1472.75
approximate
electric line
location
approximate
fiber optic line
location approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
gas line
location
sta 504+22.87
offset 104.97
approximate
electric line
location
approximate
fiber optic line
locationapproximate
fiber optic line
location
approximate
fiber optic line
location
approximate
gas line
location
sta 504+47.68
offset 141.84
elevation 1470.93
water gate valve
sta 504+65.35
offset 134.88
elevation 1470.30
telephone pedestal
sta 504+70.39
offset 127.47
elevation 1470.95
meter electric or gas or water
sta 504+76.10
offset 101.99
elevation 1471.17
utility anchor
sta 504+71.62
offset 102.81
elevation 1470.81
utility anchor
approximate
electric line
location
approximate
electric line
locationapproximate
electric line
location
approximate
electric line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
gas line
location
approximate
gas line
location
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility 79th.dgn11:24:47 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 3
79th Ave NE
00
00
2020
2020
4040
4040
6060
6060
8080
8080
100100
100100
120
120
140
140
160
160
1460 1460
1470 1470
1480 1480
1490 1490
504+78.73
1470 1470
1480 1480
505+32.00
1470 1470
1480 1480
505+37.13
1472.69
1472.38
1472.38
sta 504+79.43
offset 124.71
elevation 1471.18
power pole
approximate
electric line
location
approximate
electric line
location approximate
electric line
location
approximate
electric line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
gas line
locationapproximate
gas line
location
approximate
electric line
location approximate
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
gas line
location
approximate
gas line
location
approximate
electric line
location
approximate
electric line
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
gas line
location
approximate
gas line
location
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility 79th.dgn11:24:48 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 4
79th Ave NE
00
00
2020
2020
4040
4040
6060
6060
8080
8080
100100
100100
120
120
140
140
160
160
1460 1460
1470 1470
1480 1480
505+64.43
1470 1470
1480 1480
505+75.00
1460 1460
1470 1470
1480 1480
506+25.00
1472.38
1472.38
1472.38
sta 505+68.61
offset 89.39
elevation 1469.82
telephone pedestal
approximate
electric line
location
approximate
fiber optic line
location
approximate
fiber optic line
locationapproximate
gas line
location
approximate
gas line
location
approximate
water line
location
approximate
electric line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
fiber optic line
locationapproximate
gas line
location
approximate
gas line
location
approximate
approximate
electric line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
approximate
water line
location
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility 79th.dgn11:24:48 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 5
79th Ave NE
00
00
2020
2020
4040
4040
6060
6060
8080
8080
100100
100100
120
120
140
140
160
160
1460 1460
1470 1470
1480 1480
506+75.00
1460 1460
1470 1470
1480 1480
506+88.86
1460 1460
1470 1470
1480 1480
507+33.66
1472.38
1472.38
1472.32
approximate
electric line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
gas line
locationapproximate
approximate
electric line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
gas line
location
approximate
sta 507+54.50
offset 29.09
elevation 1467.52
power pole
sta 507+66.69
offset 36.35
elevation 1468.11
utility anchor
sta 507+64.86
offset 38.03
elevation 1467.71
utility anchor
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
gas line
location
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility 79th.dgn11:24:49 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 6
79th Ave NE
00
00
2020
2020
4040
4040
6060
6060
8080
8080
100100
100100
120
120
140
140
160
160
1460 1460
1470 1470
1480 1480
510+75.00
1460 1460
1470 1470
1480 1480
511+70.57
1460 1460
1470 1470
1480 1480
512+11.47
1473.57
1474.18
1474.06
approximate
electric line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
sta 511+41.41
offset -36.37
elevation 1472.67
meter electric or gas or water
approximate
electric line
location
approximate
electric line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
electric line
location
approximate
electric line
locationapproximate
fiber optic line
location
approximate
fiber optic line
location
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility 79th.dgn11:24:50 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 7
79th Ave NE
00
00
2020
2020
4040
4040
6060
6060
8080
8080
100100
100100
120
120
140
140
160
160
1460 1460
1470 1470
1480 1480
512+44.57
1460 1460
1470 1470
1480 1480
512+75.00
1460 1460
1470 1470
1480 1480
513+25.00
1473.53
1472.84
1472.08
approximate
electric line
location
approximate
electric line
locationapproximate
fiber optic line
location
approximate
fiber optic line
location approximate
fiber optic line
locationapproximate
fiber optic line
location
approximate
fiber optic line
location
approximate
gas line
location
approximate
electric line
locationapproximate
electric line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
fiber optic line
location approximate
fiber optic line
location
approximate
gas line
location
approximate
electric line
location
approximate
electric line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
gas line
location
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility 79th.dgn11:24:51 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 8
79th Ave NE
00
00
2020
2020
4040
4040
6060
6060
8080
8080
100100
100100
120
120
140
140
160
160
1460 1460
1470 1470
1480 1480
513+64.28
1460 1460
1470 1470
1480 1480
513+79.88
1460 1460
1470 1470
1480 1480
513+84.36
1471.85
1471.84
1471.85
approximate
electric line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
gas line
location
approximate
fiber optic line
location
approximate
fiber optic line
location approximate
fiber optic line
location
approximate
gas line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
gas line
location
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility 79th.dgn11:24:52 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 9
79th Ave NE
00
00
2020
2020
4040
4040
6060
6060
8080
8080
100100
100100
120
120
140
140
160
160
1460 1460
1470 1470
1480 1480
514+38.28
1460 1460
1470 1470
1480 1480
514+46.16
1460 1460
1470 1470
1480 1480
514+75.00
1472.04
1472.11
1472.46
approximate
fiber optic line
locationapproximate
fiber optic line
location
approximate
fiber optic line
location
approximate
gas line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
fiber optic line
locationapproximate
gas line
location
sta 514+79.61
offset -43.21
elevation 1469.60
telephone pedestal
sta 514+81.83
offset -43.11
elevation 1469.85
telephone pedestal
approximate
fiber optic line
location
approximate
fiber optic line
locationapproximate
gas line
location
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility 79th.dgn11:24:53 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 10
79th Ave NE
00
00
2020
2020
4040
4040
6060
6060
8080
8080
100100
100100
120
120
140
140
160
160
1460 1460
1470 1470
1480 1480
514+96.78
1460 1460
1470 1470
1480 1480
515+07.96
1460 1460
1470 1470
1480 1480
515+32.66
1472.82
1473.03
1473.54
approximate
fiber optic line
location
approximate
gas line
location
approximate
fiber optic line
location
approximate
gas line
location
approximate
fiber optic line
location
approximate
gas line
location
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility 79th.dgn11:24:54 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 11
79th Ave NE
00
00
2020
2020
4040
4040
6060
6060
8080
8080
100100
100100
120
120
140
140
160
160
1470 1470
1480 1480
515+57.52
1460 1460
1470 1470
1480 1480
515+82.22 1474.03
1474.36
approximate
fiber optic line
locationapproximate
gas line
location
sta 517+75.64
offset -31.33
elevation 1473.15
water gate valve
sta 517+26.46
offset -29.76
elevation 1474.04
sta 517+25.86
offset -27.66
elevation 1474.23
telephone fiber optic pedestal
approximate
fiber optic line
location
approximate
gas line
location
approximate
gas line
location
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility 79th.dgn11:24:54 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 12
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility US 2.dgn11:24:56 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 13US 2 Alignment
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility US 2.dgn11:24:57 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 14US 2 Alignment
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility US 2.dgn11:24:58 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 15US 2 Alignment
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility US 2.dgn11:24:59 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 16US 2 Alignment
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility US 2.dgn11:25:00 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 17US 2 Alignment
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility US 2.dgn11:25:00 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 18US 2 Alignment
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility US 2.dgn11:25:01 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 19US 2 Alignment