    APPENDIX D

    PHOTOGRAPHS

  • 8/14/2019 Corps of Engineers Floodway Report Appendix D

    2/29

    1

    APPENDIX D

    Photograph IndexPhoto Description Example: EL series photos (e. g., EL1a is East Levee Embankment, Rated Item 1,Unacceptable or minimally acceptable item a)

    East Levee

    East Levee Embankment

    Photo EL 1 & 3a: Electrical towers were on the landside levee lower slopes between DART & I-35E.Vegetation was growing on and within 50 of the landside toe.

    Photo EL 3b: Approximately 18 bridges crossing over the levee, many with piers in the levee crest orslopes (HWY 183 TYP.).

    Photo EL 3c: Sta. 147+40 had construction stockpile on crest of levee and an unauthorizedencroachment for construction of a jail annex that included a basement adjacent to the landside leveetoe.

    Photo EL 3d: Hampton Bridge Sta. 292+91 had 5-foot void under the landside bridge slope paving.

    Photo EL 3e: Highway 183 Bridge Sta. 546+30 had a void under the pier support beam on the riversidelevee crest.

    Photo EL 3f & EL 6: DART Bridge Sta. 13+50 to 22+00 had bridge piers in the levee crest. DART BridgeSta. 13+50 to 22+00 had erosion around bridge piers on the landside crest of the levee resulting from rainrunoff from the bridge. Filter fabric and 12" stone protection had been placed on the north end of eachpier, but erosion continued causing gullies on the landside levee slopes.

    Photo EL 4 & ELF 3: Stop log gate structure had been compromised by unauthorized removal of the sill.

    East Levee Interior Drainage System

    Photo EID 2: 6 trees were growing in the upper section of a gabion retaining wall on the left side of thechannel to the Turtle Creek Pressure Sewer intake.

    Photo EID 6a: Turtle Creek Pressure Sewer Sta. 194+13 had left discharge channel failing wing walldisplaced 3 inches with piping behind it (5'W x 4'L x 3'D).

    Photo EID 6b: Turtle Creek Pressure Sewer Sta. 194+13 had left discharge channel failing wing walldisplaced 3 inches with erosion behind it (5'W x 4'L x 3'D), and a second 1 inch displaced wall joint with 1inch separation on the same wing wall.

    Photo EID 7a: Drainage chute at right side of trash rack for small (old) Able Pump Station failing.

    Photo EID 7b: Baker Pump Station had erosion (4'W x 35'L) on the slope above the discharge chute,erosion (15'W x 35'L) on the left slope, and erosion (50'W x 80'L) on the right side of the dischargechannel.

    Photo EID 8 & ELF 7: Some seals were out at joints in the floodwall near the DART railroad bridge.

    Photo EID 13a & DBP 21: Dallas Branch Pressure Conduit - gate tower, the bottom of two posts for thehandrail at the left side of the operating deck had completely rusted out.

    Photo EID 13b: Corrosion on flap gate at Hampton Road Pump Station.

    Photo EID 14: Riprap displaced from slopes of discharge chute to the bottom of the channel at NewHampton exposing bedding.

    Flood Damage Reduction Channel

    Photo EFD 1: The abandoned old Santa Fe Railroad Bridge obstructs flow and catches debris.

    Photo EFD 2: Shoaling with established vegetation on the right bank is causing the diversion of thechannel into the levee at Belleview Pressure Conduit.

  • 8/14/2019 Corps of Engineers Floodway Report Appendix D

    3/29

    2

    Photo EFD 4: The discharge channel slopes of Belleview Pressure Conduit had been severely eroded.

    Photo EFD 10: Hampton Pump Station - Riprap displaced from slopes of discharge chute to the bottomof the channel at New Hampton exposing bedding, and slides on the right and left slopes downstream ofthis displaced riprap.

    Able Pump Station

    Photo APS 17: There was a hole (12"W x 24"L) next to the concrete slab where water bubbles upthrough ground above the box conduits from the old pump house during times of high water.

    Turtle Creek Pressure Conduit

    Photo TCP 5: Erosion (6"W x 6'L x 6"D) was found on the right side of the control structure at the TurtleCreek Pressure Conduit.

    West Levee

    West Levee Embankment

    Photo WL 1: Eagle Ford Sluice Sta. 479+72 had trees growing on the landside slope.

    Photo WL3a: Approximately 14 bridges crossing over the levee, many with piers on the levee crest orslopes.

    Photo WL 3b: Sta. 18+90 had power line tower on landside levee toe.

    Photo WL 3c: Sta.466+50 had 8" petroleum line crossing over levee.

    Photo WL 3d: Sta. 18+90 had power line poles on landside levee toe.

    Photo WL 6: Walton Walker Bridge 475+65 had erosion gully next to pier.

    West Levee Interior Drainage

    Photo WID 1a: Eagle Ford Sluice Sta. 479+72 had sediments filling in 60% of the inlet inflow.

    Photo WID 1b: Eagle Ford Sluice Sta. 479+72 had trees growing within levee toe drainage ditch.

    Photo WID 1c: Debris obstructing 50% inlet at Ledbetter Sluice.

    Photo WID 6: Right wing wall at Coombs Creek Pressure Diversion had a 3-inch separated joint withexposed rebar.

    Photo WID 8: Steel brace installed to prevent movement of wing walls at Little Coombs Creek PressureConduit had become disconnected from the right wing wall and had failed.

    Photo WID 13a: Delta Pump Station - Corrosion on trash racks.

    Photo WID 13b: Non-Mechanical trash racks at inlet was bent and had rust at Coombs Creek PressureDiversion.

    Charlie Pump Station

    Photo CPS 5a: The intake structure, pumping equipment and buildings appeared to be in good condition.

    There was an erosion void under the stairs next to the pump house on the west side of the building. Itwas unclear how far back the void goes.

    Delta Pump Station

    Photo DPS 5: Erosion had washed out the soil from under a concrete structure behind the pump house.

    Pavaho Pump Station

    Photo PPS 5: The intakes, pumps and buildings appeared to be in good condition. A large slope failure(20L x 20W) under the drive had left the concrete slab cantilevered at the edge of the drive.

  • 8/14/2019 Corps of Engineers Floodway Report Appendix D

    4/29

    3

    Rochester Levee

    Rochester Levee Embankment

    Photo RL 3: Sta. 121+55 to 130+00 Leaning power poles and anchorages on the levee crest.

    Photo RL 5: Sta.114+00 to 120+00 Guardrail was leaning outward from the levee crest along the top ofthe MSE wall. It appeared that the MSE wall feature is in active failure.

    Photo RL 13: Sta. 188+60 The MSE retaining wall had separated panels of up to 2 inches wide.

    Rochester Levee Interior Drainage

    Photo RID 15: Sta. 89+00 had intake gravity flow structure that had depressions on the gabion slopes onboth sides of the intake caused by erosion of soil material under the gabions next to the wing walls. Theright side had a 2-foot deep gully next to the wing wall (exposed/washing out bedding) and the left sidehad a 18L x 10W area depression on the gabion slope next to the wing wall.

    Rochester Floodwall

    Photo RFW 3a: The ladder was bent on one of the swinging gates for the closure at the roadway and theturnbuckle was jammed between steel attachments such that it cannot easily be manipulated to create a

    tight closure for the gate.

    Photo RFW 3b: The bottom seals on the stop logs for closing the railroad tracks are deformed near theends due to the stop logs being stored with a section of the bottom seals resting on concrete stands.

    CWWTP Levee

    CWWTP Levee Embankment

    Photo CWWTP 3a: Odor control fan poles in the exterior levee slope (north and west side of levee).

    Photo CWWTP 3b: Tower in the landside slope and crest of the north levee.

    Photo CWWTP 3c: Other lines under levee - 84 emergency outfall (120 dia. & 48 dia.), 66 dia. plantoutfall (emergency use), 10x10 main double box culvert outlet, 84 dia. waste water gravity main line,60dia. waste water gravity line, abandoned outfall, and numerous other utilities under levee to be

    identified.

    Photo CWWTP 3d: Excavated pit behind the levee.

    Photo CWWTP 3e: Water tank at toe of levee.

  • 8/14/2019 Corps of Engineers Floodway Report Appendix D

    5/29

    CORPS OF ENGINEERS U.S. ARMY

    Dallas Floodway Periodic Inspection No. 9 Plate D-1

    Photo EL 3b: Approximately 18 bridges crossing over the levee, many with piers in thelevee crest or slopes (HWY 183 TYP.).

    Photo EL 3c: Sta. 147+40 had construction stockpile on crest of levee and anunauthorized encroachment for construction of a jail annex that included a basementadjacent to the landside levee toe.

  • 8/14/2019 Corps of Engineers Floodway Report Appendix D

    6/29

    CORPS OF ENGINEERS U.S. ARMY

    Dallas Floodway Periodic Inspection No. 9 Plate D-2

    Photo EL 3d: Hampton Bridge Sta. 292+91 had 5-foot void under the landside bridgeslope paving.

    Photo EL 3e: Highway 183 Bridge Sta. 546+30 had a void under the pier support beamon the riverside levee crest.

  • 8/14/2019 Corps of Engineers Floodway Report Appendix D

    7/29

    CORPS OF ENGINEERS U.S. ARMY

    Dallas Floodway Periodic Inspection No. 9 Plate D-3

    Photo EL 3f & EL 6: DART Bridge Sta. 13+50 to 22+00 had bridge piers in the leveecrest. DART Bridge Sta. 13+50 to 22+00 had erosion around bridge piers on the landsidecrest of the levee resulting from rain runoff from the bridge. Filter fabric and 12" stoneprotection had been placed on the north end of each pier, but erosion continued causinggullies on the landside levee slopes.

    Photo EID 8 & ELF 7: Some seals were out at joints in the floodwall near the DARTrailroad bridge.

  • 8/14/2019 Corps of Engineers Floodway Report Appendix D

    8/29

    CORPS OF ENGINEERS U.S. ARMY

    Dallas Floodway Periodic Inspection No. 9 Plate D-4

    Photo EL 4 & ELF 3: Stop log gate structure had been compromised by unauthorizedremoval of the sill.

    Photo EL 1 & 3a: Electrical towers were on the landside levee lower slopes betweenDART & I-35E. Vegetation was growing on and within 50 of the landside toe.

  • 8/14/2019 Corps of Engineers Floodway Report Appendix D

    9/29

    CORPS OF ENGINEERS U.S. ARMY

    Dallas Floodway Periodic Inspection No. 9 Plate D-5

    Photo EFD 2: Shoaling with established vegetation on the right bank is causing thediversion of the channel into the levee at Belleview Pressure Conduit.

    Photo EFD 4: The discharge channel slopes of Belleview Pressure Conduit had beenseverely eroded.

  • 8/14/2019 Corps of Engineers Floodway Report Appendix D

    10/29

    CORPS OF ENGINEERS U.S. ARMY

    Dallas Floodway Periodic Inspection No. 9 Plate D-6

    Photo APS 17: There was a hole (12"W x 24"L) next to the concrete slab where waterbubbles up through ground above the box conduits from the old pump house during timesof high water.

    Photo EID 7a: Drainage chute at right side of trash rack for small (old) Able Pump Stationfailing.

  • 8/14/2019 Corps of Engineers Floodway Report Appendix D

    11/29

    CORPS OF ENGINEERS U.S. ARMY

    Dallas Floodway Periodic Inspection No. 9 Plate D-7

    Photo EID 7b: Baker Pump Station had erosion (4'W x 35'L) on the slope above thedischarge chute, erosion (15'W x 35'L) on the left slope and erosion (50'W x 80'L) on theright side of the discharge channel.

    EID 13a & DBP 21: Dallas Branch Pressure Conduit - gate tower, the bottom of two postsfor the handrail at the left side of the operating deck had completely rusted out.

  • 8/14/2019 Corps of Engineers Floodway Report Appendix D

    12/29

    CORPS OF ENGINEERS U.S. ARMY

    Dallas Floodway Periodic Inspection No. 9 Plate D-8

    Photo EID 2: 6 trees were growing in the upper section of a gabion retaining wall on theleft side of the channel to the Turtle Creek Pressure Sewer intake.

    Photo EID 6a: Turtle Creek Pressure Sewer Sta. 194+13 had left discharge channelfailing wing wall displaced 3 inches with piping behind it (5'W x 4'L x 3'D).

  • 8/14/2019 Corps of Engineers Floodway Report Appendix D

    13/29

    CORPS OF ENGINEERS U.S. ARMY

    Dallas Floodway Periodic Inspection No. 9 Plate D-9

    Photo TCP 5: Erosion (6"W x 6'L x 6"D) was found on the right side of the controlstructure at the Turtle Creek Pressure Conduit.

    Photo EID 6b: Turtle Creek Pressure Sewer Sta. 194+13 has left discharge channelfailing wing wall displaced 3 inches with erosion behind it (5'W x 4'L x 3'D), and a second1 inch displaced wall joint with 1 inch separation on the same wing wall.

  • 8/14/2019 Corps of Engineers Floodway Report Appendix D

    14/29

    CORPS OF ENGINEERS U.S. ARMY

    Dallas Floodway Periodic Inspection No. 9 Plate D-10

    Photo EFD 10: Hampton Pump Station - Riprap displaced from slopes of discharge chuteto the bottom of the channel at New Hampton exposing bedding, and slides on the rightand left slopes downstream of this displaced riprap.

    Photo EID 14: Riprap displaced from slopes of discharge chute to the bottom of thechannel at New Hampton exposing bedding.

  • 8/14/2019 Corps of Engineers Floodway Report Appendix D

    15/29

    CORPS OF ENGINEERS U.S. ARMY

    Dallas Floodway Periodic Inspection No. 9 Plate D-11

    Photo EID 13b: Corrosion on flap gate at Hampton Road Pump Station.

    Photo WL 1: Eagle Ford Sluice Sta. 479+72 had trees growing on the landside slope.

  • 8/14/2019 Corps of Engineers Floodway Report Appendix D

    16/29

    CORPS OF ENGINEERS U.S. ARMY

    Dallas Floodway Periodic Inspection No. 9 Plate D-12

    Photo WL3a: Approximately 14 bridges crossing over the levee, many with piers on thelevee crest or slopes.

    Photo WL 3b: Sta. 18+90 had power line tower on landside levee toe.

  • 8/14/2019 Corps of Engineers Floodway Report Appendix D

    17/29

    CORPS OF ENGINEERS U.S. ARMY

    Dallas Floodway Periodic Inspection No. 9 Plate D-13

    Photo WL 3d: Sta. 18+90 had power line poles on landside levee toe.

    Photo WL 3c: Sta.466+50 had 8" petroleum line crossing over levee.

  • 8/14/2019 Corps of Engineers Floodway Report Appendix D

    18/29

    CORPS OF ENGINEERS U.S. ARMY

    Dallas Floodway Periodic Inspection No. 9 Plate D-14

    Photo WID 1b: Eagle Ford Sluice Sta. 479+72 had trees growing within levee toedrainage ditch.

    Photo WL 6: Walton Walker Bridge 475+65 had erosion gully next to pier.

  • 8/14/2019 Corps of Engineers Floodway Report Appendix D

    19/29

    CORPS OF ENGINEERS U.S. ARMY

    Dallas Floodway Periodic Inspection No. 9 Plate D-15

    Photo CPS 5a: The intake structure, pumping equipment and buildings appeared to be ingood condition. There was an erosion void under the stairs next to the pump house on thewest side of the building. It was unclear how far back the void goes.

    Photo DPS 5: Erosion had washed out the soil from under a concrete structure behind thepump house.

  • 8/14/2019 Corps of Engineers Floodway Report Appendix D

    20/29

    CORPS OF ENGINEERS U.S. ARMY

    Dallas Floodway Periodic Inspection No. 9 Plate D-16

    Photo WID 13a: Delta Pump Station - Corrosion on trash racks.

    Photo WID 6: Right wing wall at Coombs Creek Pressure Diversion had a 3-inchseparated joint with exposed rebar.

  • 8/14/2019 Corps of Engineers Floodway Report Appendix D

    21/29

    CORPS OF ENGINEERS U.S. ARMY

    Dallas Floodway Periodic Inspection No. 9 Plate D-17

    Photo WID 13b: Non-Mechanical trash racks at inlet were bent and had rust at CoombsCreek Pressure Diversion.

    Photo WID 8: Steel brace installed to prevent movement of wing walls at Little CoombsCreek Pressure Conduit had become disconnected from the right wing wall and hadfailed.

  • 8/14/2019 Corps of Engineers Floodway Report Appendix D

    22/29

    CORPS OF ENGINEERS U.S. ARMY

    Dallas Floodway Periodic Inspection No. 9 Plate D-18

    Photo PPS 5: The intakes, pumps and buildings appeared to be in good condition. Alarge slope failure (20L x 20W) under the drive had left the concrete slab cantilevered atthe edge of the drive.

    Photo WID 1a: Eagle Ford Sluice Sta. 479+72 had sediments filling in 60% of the inletinflow.

  • 8/14/2019 Corps of Engineers Floodway Report Appendix D

    23/29

    CORPS OF ENGINEERS U.S. ARMY

    Dallas Floodway Periodic Inspection No. 9 Plate D-19

    Photo WID 1c: Debris obstructing 50% inlet at Ledbetter Sluice.

    Photo EFD 1: The abandoned old Santa Fe Railroad Bridge obstructs flow and catchesdebris.

  • 8/14/2019 Corps of Engineers Floodway Report Appendix D

    24/29

    CORPS OF ENGINEERS U.S. ARMY

    Dallas Floodway Periodic Inspection No. 9 Plate D-20

    Photo RL 13: Sta. 188+60 The MSE retaining wall had separated panels of up to 2inches wide.

    Photo RL 5: Sta.114+00 to 120+00 Guardrail was leaning outward from the levee crestalong the top of the MSE wall. It appeared that the MSE wall feature is in active failure.

  • 8/14/2019 Corps of Engineers Floodway Report Appendix D

    25/29

    CORPS OF ENGINEERS U.S. ARMY

    Dallas Floodway Periodic Inspection No. 9 Plate D-21

    Photo RL 3: Sta. 121+55 to 130+00 Leaning power poles and anchorages on the leveecrest.

    Photo RFW 3a: The ladder was bent on one of the swinging gates for the closure at theroadway and the turnbuckle was jammed between steel attachments such that it cannoteasily be manipulated to create a tight closure for the gate.

  • 8/14/2019 Corps of Engineers Floodway Report Appendix D

    26/29

    CORPS OF ENGINEERS U.S. ARMY

    Dallas Floodway Periodic Inspection No. 9 Plate D-22

    Photo RID 15: Sta. 89+00 had intake gravity flow structure that had depressions on thegabion slopes on both sides of the intake caused by erosion of soil material under thegabions next to the wing walls. The right side had a 2-foot deep gully next to the wing wall(exposed/washing out of bedding) and the left side had a 18L x 10W area depression onthe gabion slope next to the wing wall.

    Photo RFW 3b: The bottom seals on the stop logs for closing the railroad tracks aredeformed near the ends due to the stop logs being stored with a section of the bottomseals resting on concrete stands.

  • 8/14/2019 Corps of Engineers Floodway Report Appendix D

    27/29

    CORPS OF ENGINEERS U.S. ARMY

    Dallas Floodway Periodic Inspection No. 9 Plate D-23

    Photo CWWTP 3a: Odor control fan poles in the exterior levee slope (north and west sideof levee).

    Photo CWWTP 3d: Excavated pit behind the levee.

  • 8/14/2019 Corps of Engineers Floodway Report Appendix D

    28/29

    CORPS OF ENGINEERS U.S. ARMY

    Dallas Floodway Periodic Inspection No. 9 Plate D-24

    Photo CWWTP 3b: Tower in the landside slope and crest of the north levee.

    Photo CWWTP 3e: Water tank at toe of levee.

  • 8/14/2019 Corps of Engineers Floodway Report Appendix D

    29/29

    CORPS OF ENGINEERS U.S. ARMY

    Photo CWWTP 3c: Other lines under levee - 84 emergency outfall (120 dia. & 48 dia.),66 dia. plant outfall (emergency use), 10x10 main double box culvert outlet, 84 dia.waste water gravity main line, 60dia. waste water gravity line, abandoned outfall, andnumerous other utilities under levee to be identified.