    Company Profile 0

    TRI VIETSTEEL BUILDINGS CO., LTD

    A TOTAL SOLUTION OF PRE-ENGINEERED BUILDINGS

    www.trivietsteel.com.vn

    COMPANY PROFILE

    2012

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    2/51

    Company Profile 1

    INTRODUCTION 2 - 4

    Letter of Introduction 2 General information 3 Legal capacity 4

    PERSONNEL ORGANIZATION 5 - 8

    Organization structure 5

    Organizational chart 6 List of technical staff 7-8

    DESIGN CAPACITY 9 - 10

    Technical design capacity 9 Design standards 10

    PRODUCTION CAPACITY 11 - 22

    Factory introduce 11 - 13 Production capacity 14 Production process 15 - 22

    CONSTRUCTION CAPACITY 23 27

    The stages of construction 23 - 26 Construction schedule 27 Construction safety 27

    EQUIPMENT MANUFACTURING 28 - 29

    LIST OF TYPICAL PROJECTS TRI VIET STEEL BUILDINGS 30 - 31

    SOME TYPICAL PROJECTS 32 - 48

    PARTNERS OF TRI VIET STEEL BUILDINGS 49

    INDEX

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    3/51

    Company Profile 2

    I. INTRODUCTION

    Let ter of int r oduct ion

    Tri Viet Steel Buildings is a professional company operating in pre-engineered building branch in

    Viet Nam. With the tendency to be a leading supplier of pre-engineered steel structure, not only

    fabricating and supplying steel structure products, but also supplying A total solution of pre-

    engineered buildingsfor the customers with all-in services: Design Production Installation.

    Tri Viet Steel Buildings is always confident and proud of our capability in order to bring the best

    solutions to the customers, meet the capacity with low expenses. In order to meet high technical

    demands of scale projects, Tri Viet Steel Buildings continuosly improves specialized and managed

    capabilities, and applies ISO 9001:2008 quality management system to our company. In addition, our

    company has built up working culture with advantage environment, use talented persons, promote the

    independence and creativeness of each staff with the aim of making our company grow up and develop

    firmly.

    Tri Viet Steel Buildings has pre-engineered steel structure factory with the area of20,000 m2,

    synchronously equiped with production line of automatic machines with design capacity of1,5000 tons /

    month.

    With professional and devoted engineers, we support and supply free the service Consulting,

    supplying design solutions and making quotation to the customers. Although the projects are

    conducting in any phases, we always support and supply the best solutions to you. Contacting with us,

    you are supported rapidly and free.

    Being a leading supplier of pre-engineered steel structure in Viet Nam with the best quality and

    service is Tri Viet Steel Buildings mission. We commit to build and develop our company with the

    quality first and the customers satisfaction is a sole aim.

    Thanks a lots for your attention to Tri Viet Steel Buildings products. We hope to cooperate and

    serve you.

    Best regards,

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    4/51

    Company Profile 3

    GENERAL INFORMATIONName : TRI VIET STEEL BUILDINGS CO.,LTD

    Represented by : Mr Nguyen Phi Thuong Company Director

    Address:

    Head Office & Factory:4B Khanh Binh, Tan Uyen, Binh Duong Province

    Tel : (+84.650) 365.3080

    Fax : (+84.650) 365.3079

    Ho Chi Minh City Office:386/15 Le Van Sy, W. 14, Dist. 3, HCMC

    Tel : (+84.8) 3526.0218

    Fax : (+84.8) 3526.0219

    Email : [email protected]

    Website : www.trivietsteel.com.vn

    Business license : No. 4602001062 by the Department of Planning and Investment

    of Binh Duong province in 2004.

    Tax : 3700570307

    Account Number :040 0101 00 44978 in Maritime Bank Ho Chi Minh Branch

    Main business activities:

    Fabrication, business, installation frame of pre-engineered steel buildings. Fabrication, business mechanics Civil, industrial construction.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    5/51

    Company Profile 4

    LEGAL CAPACITYCertificate of business registration

    Tax registration certificate

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    6/51

    Company Profile 5

    PERSONNEL ORGANIZATION

    ORGANIZATION STRUCTURE Company director

    MrNguyen Phi Thuong

    Head of department functions Factory :MrNguyen Tri Thuc Factory Manager

    Mr U Chee Chow Technical Manager

    Technical Dept. :Mr. Tran Minh Trung-Technical Manager Dept. Project Management : Mr. L Vn Minh Project Management Dept. Material Dept. : Ms. Nguyen Thi Anh Thuyen Material Dept. Accounting Dept. : Mr. Tran Ngoc Thu Account Manager Dept. Sales Dept. : Mr. Vo Quang Vinh Sales Manager Dept. HR Dept. : Ms. Le Thi Hong Van HR Manager Dept. Tender Dept. : Mr. Trinh Phi Tung Tender Manager Dept.

    The staff situation of the company The administrative staff : 30 persons The technical staff : 40 persons Plant Employees : 120 persons Execution of Employees : 50 persons

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    7/51

    Company Profile 6

    ORGANIZATIONAL CHART

    ORGNIZATIONAL CHART OF FACTORY

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    8/51

    Company Profile 7

    LIST OF TECHNICAL STAFFNO. NAME EDUCATION EXPERIENCE PROFESSIONAL POSITION

    1 Nguyen Phi Thuong University 14 Years General Director

    2 Nguyen Tri Thuc University 15 Years Factory Manager

    3 U Chee Chow University 17 Years Factory Technical Manager

    4 Le Van Minh University 9 Years Construct Building

    5 Tran Minh Trung University 8 Years Technical Manager

    6 Trinh Phi Tung University 11 Years Tender Manager

    7 Vo Quang Vinh University 10 Years Sales Manager

    8 Vu Thai Son University 9 Years Project Excutive

    9 Duong Minh Luan University 5 Years Project Excutive

    10 Vu Ba Thang University 5 Years Project Excutive

    11 Nguyen Chau Hoa University 6 Years Construct Building

    12 Luu Van Chau University 6 Years Construct Building

    13 Cao Anh Hung University 5 Years Construct Building

    14 Le Hoang Duy Hung University 6 Years Construct Building

    15 Do Anh Tuan University 5 Years Construct Building

    16 Nguyen Quoc Toan University 9 Years Safety Dept.

    17 Bui Quang Tung College 7 Years Safety Dept.

    18 Tran Anh Duy University 5 Years Production Designer19 Bui Dong Duong University 5 Years Production Designer

    20 Le Nguyen Pin Phuong University 3 Years Production Designer

    21 Nguyen Ngoc Thanh University 3 Years Production Designer

    22 Truong Minh Thuan University 5 Years Architectural Designer

    23 Dang Quang Thuy University 3 Years Architectural Designer

    24 Nguyen Van Thi University 5 Years Contruction Estimater

    25 Huynh Kim Nhat University 3 Years Contruction Estimater

    26 Nguyen Van Phuc University 3 Years Contruction Estimater

    27 Nguyen Trung Nguyen College 9 Years Production Engineer

    28 Nguyen Tien Muoi College 7 Years Production Engineer

    29 Vu Huu Binh University 8 Years Production Engineer

    30 Le Van Duoc College 11 Years Production Engineer

    31 Le Van Vang University 9 Years Production Engineer

    32 Pham Van Binh University 9 Years Production Engineer

    33 Nguyen Van Hung University 8 Years Production Engineer

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    9/51

    Company Profile 8

    NO. NAME EDUCATION EXPERIENCE PROFESSIONAL POSITION

    34 Ha Ninh Giang University 7 Years Maintenance

    35 Tran Thanh Son College 6 Years Maintenance

    36 Tran Duy Tinh College 6 Years Maintenance

    37 Tran Dinh Ha College 6 Years Maintenance

    38 Bui Van Cang University 8 Years Quality Control

    39 Vu Trong Hoang University 8 Years Sales Excutive

    40 Ngo Thi Thanh Nguyen University 8 Years Sales Excutive

    41 Truong Quoc Tuan University 8 Years Sales Excutive

    42 Tran Thi Kieu Nga University 2 Years Sales Excutive

    43 Nguyen Thi Thu University 4 Years Tender officer

    44 Doan Ngoc Tra University 3 Years Tender officer

    45 Nguyen Phan Ha Nhi University 3 Years Tender officer

    46 Nguyen Viet Truong University 3 Years Tender officer

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    10/51

    Company Profile 9

    DESIGN CAPACITY

    TECHNICAL DESIGN CAPACITY Architectural design drawings:

    Provide solutions to design, analyze and guide the investors' optimal choice. After reaching plan,

    complete the design of architecture, structure, materials and intentions expressed in the drawings,

    elevation, section, perspective.

    Design production drawings:Once the design drawings are approved, the structure of the works will be shown on detailed

    drawings and clearly coded numbers.

    Design estimate:Calculate extract the amount, for the tenders, construction, completion, issues arising in volume.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    11/51

    Company Profile 10

    DESIGN STANDARDS INTERNATIONAL STANDARD

    AWS D1.1 Edition 2006 AISC. 2005 American Institute of Steel Constructions MBMA. 2002 Metal Building System Manu Quality Manual

    VIET NAM STANDARD TCXD VN 338 : 2005 - Steel Structures - Design standards TCVN 3223 : 1994 - Welding electrodes for carbon steel and low alloy steel. TCVN 1916 : 1995 - Bolts, screws, nuts and screws implanted. Technical Requirements

    CHECK LAB TPI Third Party Inspection NDT Non-Destructive Testing MPI Magnetic Particle Inspection

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    12/51

    Company Profile 11

    PRODUCTION CAPACITY

    FACTORY INTRODUCE

    A. HUMAN RESOURCES.

    In factory, we are currently working about 150 people, including about 100 production workers and maintenance(including heads), four engineers in charge of production for each project and the rest is protected, accounting,

    personnel indirectly, forklift driver, truck,...

    Production workers are divided into groups according to their functions as: the cut, the accessories, the drill, theshape, the welding, assembly of accessories, the finishing, the rub abrasive cleaning, spraying the ball, the paint, ...

    Each team managed by team leaders and direct executive producer.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    13/51

    Company Profile 12

    B. SAFETY EQUIPMENT . All staff and workers at the plant is equipped with helmets, protective clothing, steel tip shoes, gloves fully under

    the provisions of protection for mechanical engineering.

    Also, depending on the requirements for the specialized groups such as cutting, welding, drilling, painting, ... thatworkers are equipped with facilities like: Black glass and special glass for workers welding in charge welding; glass

    for workers in charge of sanding abrasive cleaning components, spray paint, masks for workers spraying;

    C. PLANT GENERAL ARRANGEMENT.

    The total area is near the campus 20.000m2 plants, of which the production desk is near 13.000m2. The areaaround the dump finished products occupy 3.000m2. Regional offices, cafeterias, parking, storage of supplies and

    accessories are arranged separated from the main production areas to ensure their utility.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    14/51

    Company Profile 13

    The plant is arranged in a closed production lines, facilitate the import of raw materials into areas cut and finishedproduct inventory, including the use by special-use vehicles is 15 meters long meeting.

    Paint area is arranged at the end of production areas, has covered area is 1.500m 2, completed structures will bepainted in the paint shop to dry 1-2 days, then will be carried out beach area warehouse contained and continues

    to be completely dried in the sun, make sure the factory coating layer is completely dry, limiting the scratches andpaint miles.

    All divisions, departments and regional plants are arranged according to synchronization, there is close monitoringin 24/24 of the Division of Protection.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    15/51

    Company Profile 14

    PRODUCTION CAPACITYProduction capacity of the Tri Viet Steel Buildings capacity 1.000

    tons per month, can lift up to 1.500 tons of products per month

    Blasting is used as the standard SA 2.0 or 2.5 depending on design requirements. After spray painting will befinished soon lining paint stick better and to avoid rust.

    Overall production at the factory engineers supervise production and QC staffs cut by drawing shop drawing andsticking by the standards required by the original design documents.

    The design drawings, shop drawing, testing records, production records are being set up and monitoredthroughout the production process. After the end of production, all records are stored and marked by customer

    code to facilitate the management.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    16/51

    Company Profile 15

    PRODUCTION PROCESS

    Checking dimensions, straight

    after cutting

    MATERIALChecking dimensions, specification

    of materials before cutting

    CUTTING

    Checking dimensions, straight

    after assembling

    H-BEAM

    ASSEMBLING

    Checking weld height, quality

    and testing WELDING

    Checking angle, straight,

    plane surfaceSTRAIGHTENING

    Checking after finished weldingFINISH

    WELDING

    Checking cleaning of surfaceSURFACE

    CLEANING & SHOT

    BLASTING

    Checking thickness of paint-coat PAINTING

    CHECK &

    STORAGE

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    17/51

    Company Profile 16

    A.MATERIALS.CHECKING

    NO. MATERIALS SPECIFICATIONSCOPE STANDARD

    1 Steel plate(1.500 x 6.000) mmThickness: (4, 5, 6, 8, 10, 12, 14, 16, 18,

    20,) mm

    Length

    Width

    Thickness

    Tolerance

    0.2mm

    2 Steel coil Thickness: (1.5; 1.8; 2.0; 2.4; 2.5;) mmWidth

    ThicknessAccurate

    3 Sheet coil

    Width: 1.200 mm

    Thickness: (0.35; 0.40; 0.45; 0.48; 0.53;

    0.55) mm

    Width

    ThicknessAccurate

    Figure 1: Steel Coil Figure 2: Steel Plate

    Figure 3: Sheet plate Figure 4: Sheet Coil

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    18/51

    Company Profile 17

    B. CUTTINGCutting follow the detail figure, dimension in approved shop drawings.

    1. Machines: Steel cutting maniche CNC: Equipment system software, the CNC cutting, drawing CSD, with the automatic,

    automatic programming, cutting simulation, cost calculation, cutting steel curved shape.

    CNC Cutting Machine: cutting system with 10 cutting heads are parallel, cut steel with thickness of 18mm, 20mm,24mm,

    Hydraulic Cutting Machine: cutting steel as straight and oplique, maximum thickness is 16mm

    Figure 5: CNC Cutting Machine Figure 6: HYDRAULIC Cutting Machine

    2. Performance: Steel plate is accurately marked following detail drawing. Steel plate is moved to the position to cut by the crane, and only cut after checking the accurate position. Completed products after cutting are piled as predetermined position to prepare for shaped press.3. Checking Demension: length, width are accurate as detail demension of each product after cutting. The edge of steel plate has to be straight, even.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    19/51

    Company Profile 18

    C. ASSEMBLING1. Machines: Vertical Assembling Machine by a hydraulic system presses one flange plate, one web plate welded

    automatically to make building components even and oblique.

    Horizontal Assembling Machine by two hydraulic systems presses 2 flange plate and one web plate weldedautomatically to make structural members even, oblique.

    Figure 7: Hydraulic Assembling Machine Figure 8: Hydraulic Assembling Machine

    2. Performance: Each flange and web are pressed by the crane. After welding to locate a face of flange, structural member is turned up to press and weld the remained flange. The building components are welded with the distance from 300 - 400 mm a position. The shaped building components are gatherd to weld area to prepare for continual weld period.3. Checking: Demension: length, width are accurate as detail demension of each structural member after shaping. The joints of flange and web are straight, flat, even weld line. Flange & web plate are perpendicular and equal together. The touch between flange and web is tight, the gap does not exceed 2mm.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    20/51

    Company Profile 19

    D. WELDING1. Machines: Automatic welding machine: welded to wings anh abdomen, used for sodering the components are to equals

    and oblique.

    Automatic wheel weld machine: cling on the web of building components by magnetic force, permanent magnetand the wheels to weld building components equal, oblique and curved

    Figure 9: Automatic Wheel Welding Machine Figure 10: Automatic Welding Machine

    2. Performance: The building components are welded by automatic weld line. The building components after welding a face are turned up to weld other face until welding 4 faces completely. The welded building components are gatherd to mould area to prepare for straight mould period.3. Checking: Welding line has to be straight, evenly. Weld joints have to tight on the flange and web. Testing the height of weld line as design drawing and as the standards in Vietnam Standard of Steel Structure. The defects, damages must be found and repaired before transfering to next period.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    21/51

    Company Profile 20

    E. STRAIGHTENING1. Machines: Vertical hydraulic mould machine used for vertical building components. Repairing, moulding beam flange is

    deformed after welding.

    Cross hydraulic mould machine used for vertical & curved building components. Repairing, moulding beamflange is deformed after welding.

    Figure 11: Hydraulic Mould Machine

    2. Performance: Building components after continual weld, the flange is deformed because of temperature effect. Using mould machine mould procedure suitably based on curved or straight building components. Building components after moulding are gathered to completing area to complete weld period of sub-details,

    making hole

    3. Checking: The flange plate after moulding has to be straight, flat. Flange & web plate are perpendicular and equal together.

    F. FINISHED WELDING:1. Machines: CO2 gas and wire weld machine: used for welding the small details such as stifferner, pate. Magnetic field driller, hydraulic hole bore machine are used to locate the holes on structural members.2. Performance: Building components after moulding are complted sub-detals such as: stifferner, purlin pate, braced beam, making

    holes of purlins, beam,

    Building components after completion.3. Checking: All details must be installed fully, following dimension and location.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    22/51

    Company Profile 21

    G. SHOT BLASTING AND SURFACE CLEANING:1. Machines: Surface of building components is cleaned by a system of automatic shot blasting. Building components are in and out shot blasting by a automatic roller. Standard of cleaning surface is SA 2.0.

    Figure 12: Cleaning Surface Figure 13: Shot Blasting Machine

    2. Performance: Conducting the welding cinder, cutting cinder by the grinder. After completion, building components will be

    cleaned.

    Building components after grind are gathered to the area of cleaning surface by crane and move to the location ofcleaning surface by the roller.

    Cleaning surface of structural members may be at the same time. The period of cleaning surface must be even, building components have to be cleaned all locations of surface. After cleaning surface, all building components are gathered to painting area to prepare for paiting period.3. Checking: Building components after cleaning surface must be clear, not be rust, Building components after cleaning surface must be paint a primer coat to prevent the oxidation making building

    components surface rust.

    Figure 14: Product After Shot Blasting

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    23/51

    Company Profile 22

    H. PAINTING:1. Machines: Fang bolt steam-engine with the capacity of 50HP provides the steam to all paiting parts. The system of half-automatic paint maching. The machine to test thickness of electrical piant.2. Performance: Building components surface before painting must be dry. Paint each coat and overall paint. After each dried painting coat, testing thickness of paint before painting next coat.3. Checking: Period of waiting dried surface is 6 hours. Thickness of each coat of paint is as design drawing.

    Figure 15: Completed Products

    I. CHECKING AND STORAGE:Building components after completed paint are tested one more before handing over warehouse deparment to

    gather to the storage for delivery to the building site.

    Figure 16: Completed Products

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    24/51

    Company Profile 23

    CONSTRUCTION CAPACITY

    THE STAGES OF CONSTRUCTION1. Receiving and storage of construction materials. The receipt of materials is strictly controlled, to avoid the maximum lack or excess of the materials in the

    construction.

    Preservation of materials ia a very important part to ensure supplies are not warped and scratched paint. Check the materials carefully prior to installation.

    2. Installation of foundation bolts. Tri Viet Steel Buildings to focus investment in equipment to installation of foundation bolts, this is the important

    part directly affecting the deployment and installation the rafter as well as quality of construction.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    25/51

    Company Profile 24

    3. Erection of main frame. As part of the main installation of pre-engineered steel buildings, to the coordination and ensure 100%

    accuracy on right angle, height, plane.

    The equipment such as: Truck cranes, forklifts, meter theodolite, laser projectors,are used throughoutthe installation process.

    The protective equipment safety to ensure the best, especially with the requirements of constructionwork on high.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    26/51

    Company Profile 25

    4. Install roof religious. The erection of the roff religion was conducted after the main frame erection complete and accrurate

    alignment, the bolts, tie bars have been closely tied.

    Roof to be installed and calibration very carefully, for ensure to quality and aesthetic of construction.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    27/51

    Company Profile 26

    5. Install religious wall. With the installation of the same religious roof, but a shorter length of aperture. Requires the good combination about installation of the wall with respect to building concrete.

    6. Complete construction. As the final work to complete the steel buildings, wich requires meticulous checking, precision made

    stages.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    28/51

    Company Profile 27

    CONSTRUCTION SCHEDULE Construction period: The close coordination between divisions, departments to ensure for the period of

    construction works completed.

    The plan to ensure progress: Employee monitoring construction schedule will be updated and reportedregularly, there are plans for additional reserves to ensure the contract schedule.

    CONSTRUCTION SAFETY Safety Department was held with strict regulations on labor safety regulations for workers, have regulations to

    control from production to construction and installation.

    Equipment safety is the maximum investment, operation monitoring occupational safety and always updatedregularly arranged throughout the building works.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    29/51

    Company Profile 28

    EQUIPMENT MANUFACTURING

    The plant facilities and equipment of factory Tri Viet Steel Buildings include the following:

    NO. EQUIPMENT QUATITY

    1 CNC Oxy-Gas Seamless 10 head 1

    2 Machine cut steel plate hydraulic 7.5m 1

    3 Machine cut steel plate hydraulic 2.5M. 1

    4Automatic pressure forming machine and welding steel components

    combined engagement1

    5Automatic vending machines and presses the limits of structural steel

    combination1

    6 Automatic arc welding port 1.000VA sink. 4

    7 Turtle semiautomatic arc welding sink. 10

    8 Gas welding machine welding wire used 500 VA. 20

    9 Straight bending machine auto components. 1

    10 Whip hand edge 2

    11 From drilling 2

    12 CNC beam drill head 1

    13 Steam machine screw 30 and 50 HP. 2

    14 Structure at the 3 tons, 5 tons, 8 tons 12

    15 Beam Cutting machine 1

    16 Punching machine code version.. 2

    17 Butt hole drilling machine. 1

    18 Blasting Machine 1

    19 Hand sanding grinding machines for professional use. 15

    20 Industrial paint spraying machine 6

    21 Paint thickness gauge 1

    22 Electronic Weighing 5 tons 1

    23 Machine 100 tons of furnace 1

    24 Machine unexpected holes 3

    25 Amada Cutting beams 1

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    30/51

    Company Profile 29

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    31/51

    Company Profile 30

    EXPERIENCE THE IMPLEMENTATION OF THE STEEL BUILDINGS

    NO. PROJECTS NAME CUSTOMERAREA

    (M2)

    CONTRACT

    VALUE (VND)YEAR

    1 OMEXEY Funiture Factory TAIWAN 31,920 7,722,922,000 2004

    2 CHEMPACK-VINA Nylon- Factory KOREA 13,125 13,150,000,000 2004

    3 FORMOSA- TAFFETA Factory TAIWAN 19,032 30,900,100,000 2005

    4 GOLDEN FORTUNE Funiture Factory TAIWAN 72,915 17,799,560,000 2005

    5 SON HA Factory VIETNAM 10,350 6,634,000,000 2005

    6 JRD Motor Car Factory MALAYSIA 26,640 9,723,600,000 2005

    7 TOA VIET NAM Paint Factory THAILAND 12,135 2,935,977,000 2005

    8 HANG PHU Funiture Factory TAIWAN 22,229 10,197,000,000 2007

    9 VIET NGU Frozen Processing Factory VIETNAM 3,985 2,402,700,000 2007

    10 WORLDTEC VINA Factory KOREA 26,880 8,457,478,000 2007

    11 TAN THUAN THANH Packing Factory VIETNAM 2,659 5,549,000,000 2007

    12 GOLDEN PACIFIC Factory TAIWAN 9,959 3,866,000,000 2007

    13 DONA STANDARD FOOTWEAR Factory HONGKONG 35,654 13,429,000,000 2007

    14 PHUONG NAM Factory VIETNAM 3,954 7,389,000,000 2007

    15 KINGJIM Factory JAPAN 18,000 8,395,000,000 2007

    16 CONNEEX-AIKO Factory SINGAPORE 11,070 3,949,000,000 2007

    17 MIJU VINA Factory KOREA 5,000 3,620,000,000 2008

    18 CS WIND-TOWER Factory KOREA 17,520 6,576,000,000 2008

    19 UNI PRESIDENT Factory TAIWAN 11,812 5,698,000,000 2008

    20 KIM TIN MDF Factory VIETNAM 15,628 15,750,000,000 2008

    21 MAPLETREE phase 2 Warehouse SINGAPORE 87,247 42,968,000,000 2008

    22 KIRIN ACECOOK Factory JAPAN 14,676 11,000,000,000 2008

    23 HA TIEN Cement Factory VIETNAM 5,500 4,600,000,000 2008

    24 BACH TUYET Factory VIETNAM 10,000 7,342,000,000 2008

    25 LIKSIN Factory VIETNAM 17,600 14,417,000,000 2009

    26 MAPLETREE phase 1 Warehouse SINGAPORE 27,135 15,128,000,000 2009

    27 EVER-METRO Factory KOREA 4,500 2,570,000,000 2009

    28 DONG HOA Factory TAIWAN 7,000 4,680,000,000 2009

    29 HOA PHAT Factory VIETNAM 13,400 8,670,000,000 2009

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    32/51

    Company Profile 31

    30 HUNG CA Factory VIETNAM 10,148 5,644,539,000 2009

    31 DAM PHU MY Port Factory VIETNAM 7,227 6,533,000,000 2009

    32 HA NOI BEER Factory VIETNAM 11,251 9,240,000,000 2009

    33 HUNG VUONG TAY NAM Factory VIETNAM 11,000 11,860,000,000 2009

    34 TINH BIEN Supermaket VIETNAM 9,000 4,650,000,000 2009

    35 TAN MAI Warehouse VIETNAM 7,790 16,900,000,000 2009

    36 AN HUNG TUONG Factory VIETNAM 13,230 12,517,104,600 2010

    37 MASSAN Factory VIETNAM 7.300 21.910.950.409 2010

    38 PTSC VUNG TAU Warehouse VIETNAM 1.300 5.335.705.336 2010

    39 ANG SON CEMENT Factory II VIETNAM 2.100 Tons 53.122.616.000 2010

    40 TAN SON NHAT Airport VIETNAM 200 Tons 7.276.500.000 2010

    41 BUON ME THUOT Airport VIETNAM 600 Tons 19.337.512.400 2010

    42 KIM KHANG Factory VIETNAM 5.616 5.509.900.000 2011

    43 QUYNH QUANG Factory VIETNAM 3.712 2,706,184,372 2011

    44 ICHIBAN Workshop JAPAN 2.800 3,260,000,000 2011

    45 JIMMY FOOD Workshop VIETNAM 12.464 2,635,300,000 2011

    46 AN THINH SG Workshop VIETNAM 3.359 2,572,247,000 2011

    47 PARK CORP Warehouse VIETNAM 21.883 15,864,959,705 2011

    48 FIRST SOLAR Factory USA 116.000 4,711,141,435 2011

    49 DAI DONG TIEN Plastic Factory VIETNAM 7.200 9,260,000,000 2011

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    33/51

    Company Profile 32

    TYPICAL PROJECTSSome typical projects has executed and is executing for 2004 2012:

    Area : 31.920 m2.

    OMEXEY FURNITURE FACTORY Location : Tan Uyen, Binh Duong.

    Area : 18.960 m2

    TAFETA FOMOSA FACTORY Location : Nhon Trach IP, Dong Nai Province.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    34/51

    Company Profile 33

    Area : 13.125 m2

    NYLON CHEMPACK-VINA FACTORY Location : Tam Phuoc IP, Long Thanh, Dong Nai.

    Area : 25.500 m2.

    HIGH POINT WORKSHOP Location : Tan Uyen, Binh Duong.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    35/51

    Company Profile 34

    Area : 15.628 m2

    KIM TIN FACTORY Location : Phuoc Long, Binh Phuoc.

    Area : 26.640 m2

    JRD OTO MANUFACTORY Location: An My, Tuy An, Phu Yen Province.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    36/51

    Company Profile 35

    Area : 114.382 m2.

    MAPLETREE VIETNAM WAREHOUSE Location : VSIP II, Binh Duong.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    37/51

    Company Profile 36

    Area : 14.676 m2.

    KIRIN-ACECOOK FACTORY Location : My Phuoc II IP, Binh Duong.

    Area : 18.000 m2.

    KINGJIM FACTORY Location : My Phuoc III IP, Binh Duong.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    38/51

    Company Profile 37

    TOA PAINT

    VIET NAM FACTORY

    Area : 12.135 m2.

    Location: Tan Dong Hiep A

    IP, Binh Duong Province.

    Area : 17,600 m2.

    LIKSIN PACKAGE WORKSHOP Location : Duc Hoa, Long An.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    39/51

    Company Profile 38

    Area : 13,400 m2.

    HOA PHAT STEEL BINH DUONG FACTORY Location : Song Than IP, Binh Duong Province.

    BACH TUYET PAINT

    FACTORY

    Area : 10.000 m2.Location: Hiep Phuoc IP,

    Nha Be, HCM City.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    40/51

    Company Profile 39

    Area : 10,148 m2.

    HUNG CA COLD STORE - FACTORY Location: Sa Dec, Dong Thap Province.

    Area : 11,812 m2.

    UNI PRESIDENT FACTORY Location : Binh Duong Province.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    41/51

    Company Profile 40

    Area : 11,251 m2.

    HA NOI BEER FACTORY (CARLSBERG BEER) Location : Phu My, Ba Ria - Vung Tau.

    Area : 5.000 m2.

    MIJU VINA FACTORY Location : Nhon Trach IP, Dong Nai Province.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    42/51

    Company Profile 41

    Area : 11,000 m2.

    HUNG VUONG TAY NAM WAREHOUSE Location : Sa Dec, Dong Thap Province.

    Area : 10,350 m2.

    SON HA OFFICE - FACTORY Location : Bien Hoa City, Dong Nai Province.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    43/51

    Company Profile 42

    Area : 7.300 m2.

    MASAN FACTORY Location: Di An, Binh Duong Province.

    TAN SON NHAT AIRPORT Workload : 200 Tons.BILLBOARD & SHELVES Location : Ho Chi Minh City.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    44/51

    Company Profile 43

    Workload : 200 Tons.

    ANG SON II CEMENT FACTORY Location : Van Ninh, Quang Ninh, Quang Binh Province.

    Area: 1.300 m2

    PTSC VUNG TAU WAREHOUSE Location : Vung Tau City.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    45/51

    Company Profile 44

    BUON ME THUOT AIRPORT Workload: 600 Tons

    PASSENGER SHELTERS Location : Buon Me Thuot City, Daklak Province.

    Area: 3.712 m2

    QUYNH QUANG WORKSHOP Location : Ho Chi Minh City.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    46/51

    Company Profile 45

    TAY NINH KUO YUEN

    BATING FACTORY

    Area : 13. 469 m2

    Location : Tay Ninh Province.

    FIRST SOLAR FACTORY

    Area: 116. 000 m2

    Location : Cu Chi, Ho Chi Minh City.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    47/51

    Company Profile 46

    Area : 5.616 m2.

    KIM KHANG STEEL FACTORY Location : Long An Province.

    DAI DONG TIEN

    PLASTIC FACTORY

    Area: 7.200 m2

    Location : Nhon Trach IP, Dong

    Nai Province.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    48/51

    Company Profile 47

    Area : 21.883 m2

    PARK CORP FACTORY Location : Tra Vinh Province

    Area : 3.976 m2.

    MERCEDES BENZ FACTORY Location : Ho Chi Minh City.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    49/51

    Company Profile 48

    Some other projects:

    An Hung Tuong Factory Cargill Workshop Dona Footwear Factory

    Dong Hoa Workshop Trade Center Nam Ky Khoi Nghia Goldens Workshop

    Golden Fotuner Factory Ichiban Workshop Le Merian

    Sunrise City Nguyen Kim Supermarket Phuong Nam Pulp Mills Tower

    Plus Garage Tay Ninh for Lease Workshop Park Corp Tien Giang Tower

    Pepsi Co. Workshop Huada Factory Hung Dong Plastic Factory

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    50/51

    Company Profile 49

    PARTNERS.

  • 7/31/2019 Company Profile - Tri Viet Steel Buildings 2012

    51/51

    Company Profile 50

    TRI VIET STEEL BUILDINGS CO., LTD