AS&E struggled initially with their ENOVIA SmarTeam deployment, but ultimately got the system up and running in production, winning over a number of skeptical users in the process. View this presentation to learn what made the difference for them.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: COE2010 Razorleaf ENOVIA SmarTeam Deployment at AS&E

ENOVIA SmarTeam Deployment at AS&E

Maureen Murphy - AS&E

Jonathan Scott - Razorleaf

Page 2: COE2010 Razorleaf ENOVIA SmarTeam Deployment at AS&E

Agenda

• Introductions• Message• History of PLM at AS&E• AS&E’s PLM objectives• Problems & Solutions• Future of PLM at AS&E• Summary• Q&A

Page 3: COE2010 Razorleaf ENOVIA SmarTeam Deployment at AS&E

American Science & Engineering

• 400 employees in Billerica, MA + worldwide• Founded in 1958• Specialty: Backscatter X-Ray Equipment• Fame: SmartCheck• Customers:

• TSA• DHS• NATO• Confidential

• US Customs• UK Customs• US DNDO

• USN• USAF• USMC

Page 4: COE2010 Razorleaf ENOVIA SmarTeam Deployment at AS&E

Backscatter Technology

Page 5: COE2010 Razorleaf ENOVIA SmarTeam Deployment at AS&E

Backscatter Technology

Page 6: COE2010 Razorleaf ENOVIA SmarTeam Deployment at AS&E

SmartCheck

Page 7: COE2010 Razorleaf ENOVIA SmarTeam Deployment at AS&E

SmartCheck

Page 8: COE2010 Razorleaf ENOVIA SmarTeam Deployment at AS&E

AS&E – Engineering Services Group

• Maureen Murphy• Engineering Services Manager• Deep background in CM

• Bill Abely• CAD Services Manager• Focused on methodology & practices for mechanical design

• Raul Rosa• Principal Business Systems Analyst• CAD and CAD integration specialist, mechanical design focus

• Laura Murphy• Business Systems Analyst• Combined IT/business perspective for non-engineering users

Page 9: COE2010 Razorleaf ENOVIA SmarTeam Deployment at AS&E

Razorleaf

• Consulting & Services Provider (not reseller)• ENOVIA SmarTeam Experts• North America

• Jonathan Scott• Mechanical Engineer from Nuclear Industry• PLM Consultant for ~10 years• BOM / CM Expert• Williamsburg, VA

Page 10: COE2010 Razorleaf ENOVIA SmarTeam Deployment at AS&E

Today’s Message

Page 11: COE2010 Razorleaf ENOVIA SmarTeam Deployment at AS&E

Message

• Never a shortage of technical issues

• AS&E’s biggest issues weren’t technical

• Culture change is hard

Page 12: COE2010 Razorleaf ENOVIA SmarTeam Deployment at AS&E

PLM History at AS&E: pre-2004

CAD PDM ERP

1980’s - - Legacy

1990’s AutoCAD - Fourth Shift

Late 1990’s

Inventor + AutoCAD

network Fourth Shift

1998 SolidWorks network Fourth Shift

2001 SolidWorks PDMWorks Fourth Shift

2004 SolidWorks SmarTeam Fourth Shift

Page 13: COE2010 Razorleaf ENOVIA SmarTeam Deployment at AS&E

PLM History at AS&E: post-2004

• Struggled to deploy ENOVIA SmarTeam (2004-2007)

• ENOVIA SmarTeam in production (2007)

• Replaced Fourth Shift with Oracle Apps (2007-2008)

• Redeployed ENOVIA SmarTeam on PLMDB (2008)

• Light SmarTeam – Oracle integration in place (2008)

• Added Sequence for MES (2008)

• Added 3DVIA Comp. for manufacturing content (2009)

Page 14: COE2010 Razorleaf ENOVIA SmarTeam Deployment at AS&E

PLM Objectives

• Engineering data management

• Multi-disciplinary BOM management

• Automated CM (configuration management)

• Integration with ERP & MES

• Regulatory compliance (ITAR / EAR)

• Move to MBD (away from drawings)

• Supply/design chain management

• Program management

Page 15: COE2010 Razorleaf ENOVIA SmarTeam Deployment at AS&E

Problems & Solutions

• Partner Skills• Partner Experience• Sponsorship• Training• Data Load

Impact Poor User Adoption

Page 16: COE2010 Razorleaf ENOVIA SmarTeam Deployment at AS&E

Problems & Solutions: Partner Skills

• Original partner got out of ENOVIA SmarTeam; services subcontracted to second partner“No we don’t sell it anymore, but we can run your project.”

• Second partner brought inexperienced resources“What is SolidWorks, is it like CATIA?”

• Second partner brought training challenges“I may not speak your language well, but let’s start training.”“I may not know this software module, but let’s start training.”

Page 17: COE2010 Razorleaf ENOVIA SmarTeam Deployment at AS&E

Problems & Solutions: Partner Skills

• Original partner got out of ENOVIA SmarTeam; services subcontracted to second partner“No we don’t sell it anymore, but we can run your project.”

• Second partner brought inexperienced resources“What is SolidWorks, is it like CATIA?”

• Second partner brought training challenges“I may not speak your language well, but let’s start training.”“I may not know this software module, but let’s start training.”

• Solution: Engaged Razorleaf in early 2006• Advice: Select partners carefully

Page 18: COE2010 Razorleaf ENOVIA SmarTeam Deployment at AS&E

Problems & Solutions: Partner Experience

• Followed user demands, against best practices“Sure, name your files however you like, its no big deal.”“So what if its so complicated no one knows how to search?”

• Default settings from installation, unaware of impact“We didn’t know what we didn’t know.”

Page 19: COE2010 Razorleaf ENOVIA SmarTeam Deployment at AS&E

Problems & Solutions: Partner Experience

• Followed user demands, against best practices“Sure, name your files however you like, its no big deal.”“So what if its so complicated no one knows how to search?”

• Default settings from installation, unaware of impact“We didn’t know what we didn’t know.”

• Solution 1: Changed SmarTeam configuration• Solution 2: Redeployed PLMDB• Advice: Select partners carefully

Page 20: COE2010 Razorleaf ENOVIA SmarTeam Deployment at AS&E

Problems & Solutions: Sponsorship

• Reality check – sales is not consulting“The salesperson said we’d be up-and-running by now.”

• Did we pick the wrong software?“We hire smart people, so it must be a software problem”

• I support this initiative, really I do“Please, could you kinda, maybe try the software again?”

Page 21: COE2010 Razorleaf ENOVIA SmarTeam Deployment at AS&E

Problems & Solutions: Sponsorship

• Reality check – sales is not consulting“The salesperson said we’d be up-and-running by now.”

• Did we pick the wrong software?“We hire smart people, so it must be a software problem”

• I support this initiative, really I do“Please, could you kinda, maybe try the software again?”

• Solution: Spoke the truth, even when it hurt• Advice: Get deep management sponsorship

Page 22: COE2010 Razorleaf ENOVIA SmarTeam Deployment at AS&E

Problems & Solutions: Training

• Power users must understand “why”, can’t self-train“Do it this way, because that’s what the manual says.”“Just show me the software, I’ll figure out what to do with it.”

• The data matters (somewhat)“Our assemblies have 5,000 parts, not 5.”

• Training is not optional“I’m busy with a project, I’ll catch up on using PDM later.”

Page 23: COE2010 Razorleaf ENOVIA SmarTeam Deployment at AS&E

Problems & Solutions: Training

• Power users must understand “why”, can’t self-train“Do it this way, because that’s what the manual says.”“Just show me the software, I’ll figure out what to do with it.”

• The data matters (somewhat)“Our assemblies have 5,000 parts, not 5.”

• Training is not optional“I’m busy with a project, I’ll catch up on using PDM later.”

• Solution: Retrained 30+ users• Advice 1: Require training, make it relevant• Advice 2: Have enough rollout support

Page 24: COE2010 Razorleaf ENOVIA SmarTeam Deployment at AS&E

Problems & Solutions: Data Load

• No detailed specification, insufficient planning“Well, you didn’t ask for that.” “I didn’t know they would want to search on that field.”

• Poor reliability and performanceUnpredictable crashes, unable to resume, long run times

• Insufficient validation - consultantMissing records, duplicate records, records without revision

• Insufficient validation - users“Yeah, I kinda looked at the data. It seems OK.”

Page 25: COE2010 Razorleaf ENOVIA SmarTeam Deployment at AS&E

Problems & Solutions: Data Load

• No detailed specification, insufficient planning“Well, you didn’t ask for that.” “I didn’t know they would want to search on that field.”

• Poor reliability and performanceUnpredictable crashes, unable to resume, long run times

• Insufficient validation - consultantMissing records, duplicate records, records without revision

• Insufficient validation - users“Yeah, I kinda looked at the data. It seems OK.”

• Solution: Remediated data through SQL• Advice: Specify and validate data loads (in detail)

Page 26: COE2010 Razorleaf ENOVIA SmarTeam Deployment at AS&E

Status

• Non-CAD users love the system

• CAD user champions are leading the charge and

converting the last remaining holdouts

• Struggling with some technical issues in V5R19

• Overall, users have adopted it - FINALLYFINALLY

Page 27: COE2010 Razorleaf ENOVIA SmarTeam Deployment at AS&E

PLM Future at AS&E

• Creating neutral files for design/supply chain

• Managing transmittals for design/supply chain

• End-to-end 3D managed content

(SolidWorks and 3DVIA Composer both integrated)

• Investigate full BOM management

• More rich PDM-ERP integration

(bi-directionality, BOM structures)

• Investigate program management

Page 28: COE2010 Razorleaf ENOVIA SmarTeam Deployment at AS&E

Summary

• There are always plenty of technical issues

• AS&E’s biggest issues weren’t technical:

• “The data is junk, I can’t trust the system”

• “Training was nice, but that will never work for me”

• “You can’t make me use the system”

• “The system slows me down, I’m faster without it”

• Culture change is the hardest thing about PDM

Page 29: COE2010 Razorleaf ENOVIA SmarTeam Deployment at AS&E

Jonathan Scottwww.Razorleaf.com

[email protected]

330.676.0022 x7133

@JonathanPScott

Maureen Murphywww.AS-E.com

[email protected]

978.262.8874