Central United States Earthquake Consortium Initial Planning Meeting 5 June 2013 Crowne Plaza Hotel Downtown Union Station - Indianapolis, IN
62

Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Aug 08, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Central United States Earthquake Consortium

Initial Planning Meeting 5 June 2013

Crowne Plaza Hotel Downtown Union Station - Indianapolis, IN

Page 2: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Central United States Earthquake Consortium

Welcome Jon Monken, Chairman

Page 3: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

CUSEC Initial Planning Meeting

Agenda

•Exercise Overview •By Day Walkthrough •Regional Shared Situational Awareness Objective •Regional Communications Objective •Regional Transportation Coordination Objective •Private Sector Integration Objective •Resource Allocation Objective •Military Support to Civilian Authorities Objective •PreCAP14 Transportation Workshop •Resource Allocation Discussion •Partners Update •Open Discussion

Page 4: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

CAPSTONE 2014

•Goals and Objectives Review •Differences between Regional and State •Inject routing and responsibilities for communications

Page 5: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

CAPSTONE 2014 Goals • Test the improvements to the states plans

based on the NLE 2011 Exercise

• Improve Regional Response to the NMSZ threat through collaborative solutions

• Form stronger partnerships and relationships at the Regional and National levels

• Solve Real World Problems and Extend the National Dialog (Private Sector and Information Sharing)

Page 6: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

CAPSTONE 2014 Multi-State Objectives

• Regional Communications

• Regional Shared Situational Awareness (User Defined Common Operating Picture V2 )

• Regional Transportation Coordination

• Private Sector Integration

• Resource Allocation Planning

• Military Support to Civilian Authorities

Page 7: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Exercise Conduct 16-20 June 2014

• The Exercise is based on Catastrophic Event impacting all 8 States.

• Damages do not extend beyond the 8 States. • Each day begins and ends with standard Framing Injects

distributed across the Region. • Each day is an advanced continuation of the scenario. • Regional objectives are prioritized in concert with each

State’s objectives. • Regional objective injects will be shared across all 8 states

injected into the State EOC. • Regional and Higher Headquarters responses will be

generated from real work reactions to injects and state response plans.

Page 8: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Exercise Assumptions

• Each state will conduct their own internal exercise using internal resources for exercise administration.

• States will maximize the use of existing materials and concepts from NLE 2011 to maximize efforts, synchronize activities and minimize costs.

• Each states exercise will focus on their own list of learning objectives and remain coordinated with the overall Major Focus Areas each Day.

• CUSEC may look at using a central site to serve as the overall inject manager or white cell for message play into the State EOC, Regional EOC or FEMA Region.

• All other message play will be integrated or executed via real response to the exercise scenario.

• CUSEC will encourage and integrate associate states into the mutual aid/EMAC portion of the exercise.

Page 9: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

CUSEC Planned Inject Metrics

•Percent by day on impact to drive reporting and response •Impact based on MAE Center data by category •Monday – 30% •Tuesday – 60 % •Wednesday – 10% •Phase 1 effort state specific •Phase 2 effort county specific (State Call)

Page 10: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

CUSEC Concept and Objectives Meeting

Overarching Inject Categories •Opening Framing Inject Daily Inject Build by State Building Damage Package 1 Road Infrastructure Package 1 Bridges Package 1 Interstate Package 1 Without Power Package 2 Shelter Requirements Package 2 Hospital & Medical Damage Injuries Package 3 Deaths Package 3 Commodities Request Households w/o Water

•Closing Framing Inject

•Monday – 30% •Tuesday – 60 % •Wednesday – 10%

Page 11: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

White Cell for Multi-State Objectives (P-TAC, Kentucky)

Region 4

National Guard Bureau

Region 5

Region 6

Region 7

EMAC

Associate States

Other Statutory

Authorities

FEMA HQ - NRCC

Inject and Communications Flow

Page 12: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

CAPSTONE -16 May 2014 Day 1 Overview

•Alert Notification, Develop Situational Awareness •Develop U-COP and Full Call Down, Cabinet Meetings •Guard Alert and Mobilization •Prescripted Mutual Aid and EMAC • Initial Framing Injects - 0700/0600 •Package 1 Injects 0800 – 0700 •Package 2 Injects 0900 – 0800 •Package 3 Injects 1100 – 1000 •Unified Common Operating Picture Push 1800 – 1700 •Closing Framing Inject 1900 - 1800 •External Driver Play Per State SOP

Page 13: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

CAPSTONE - 17 May 2014 Day 2 Overview

•Mobilization, Response •SAR, EMAC, Transportation, Building Inspectors •Guard Declare Dual Status Commander •Prescripted Mutual Aid and EMAC/Full EMAC Operations •Building Assessment and Reporting Begins • Initial Framing Injects - 0700/0600 •Package 1 Injects 0800 – 0700 •Package 2 Injects 0900 – 0800 •Package 3 Injects 1100 – 1000 •Unified Common Operating Picture 1800 – 1700 •Closing Framing Inject 1900 - 1800 •External Driver Play Per State SOP

Page 14: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

CAPSTONE - 18 May 2014 Day 3 Overview

•Medical Surge and Evacuation •SAR, EMAC, Trans, Air Space, Building Inspectors •Guard - Request Title 10 Support (State Call) •Full EMAC Operations •Federal Partners In-Flow (Resource Allocation) • Initial Framing Injects - 0700/0600 •Package 1 Injects 0800 – 0700 •Package 2 Injects 0900 – 0800 •Package 3 Injects 1100 – 1000 •Unified Common Operating Picture 1800 – 1700 •Closing Framing Inject 1900 - 1800 •External Driver Play Per State SOP

Page 15: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

CAPSTONE - 19 May 2014 Day 4 Overview

•Mass Care •VOAD, Donations Management •Guard - Coordinate Extended Military Support •Full EMAC Operations •Federal Partners In-Flow (Resource Allocation) • Initial Framing Injects - 0700/0600 •Unified Common Operating Picture 1800 – 1700 •Closing Framing Inject 1900 - 1800 •External Driver Play Per State SOP

Page 16: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

CAPSTONE - 20 May 2014 Day 5 Overview

•Demobilization, Recovery – Catastrophic Housing TTX •Recovery to focus on the Catastrophic Housing Mission • 0800/0700 – In state Catastrophic Housing TTX •1300/1200 – 1500/1400 - Multi-State – Multi-Region VTC

Catastrophic Housing for Evacuees Seminar Solutions, Plans and Questions

Next Steps •Regional Hub Reception Plan (Process, Roles and Responsibilities) •Identify Central Partners for this TTX •Invite and Confirm HUD, State Community Recovery Councils

Page 17: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

15 Minute Break

Page 18: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Situational Awareness and the

Common Operating Picture

Page 19: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Regional Situational Awareness

• Develop and Communicate a Regional Common Operating Picture

• Develop and Display elements of Essential Emergency Management Items to include Emergency Management, Military Forces Status and Health Status that build over time in accordance with the event scenario

Page 20: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Common Operating Picture Database

WebEOC Standard Board Export • State/Element (TN/ESF ##)

• Period

• Actions Taken in the Last Reporting Period

• Action to be Executed in the Next Reporting Period

• Operational Issues

• Deployed Resources - Personnel

• Deployed Resources - Equipment

• Unmet Needs

• Funds Expended to Date

Page 21: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Guard and Military Situation Awareness

• Organization Name (Unique and Descriptive)

• Location (MASS Potential)

• Capability (MASS Potential)

• Mission (Response)

• Area of Operations Boundary (Esri discussion) – Symbology - JTF/WING/DIVISION, BDE, BN, CO, TM

– Green for Army/Blue for Air, White for T10

Page 22: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Regional User Defined Common Operating Picture V2

• Standard and Agreed Upon Tools

• Identified and Agreed Upon Data Elements

• Published Common Operational Report Picture

• 25 Shared Standard Data Lanes (COP Picture)

o 15 - Emergency Management

o 5 - Health and Human Services

o 5 - Military Support

Page 23: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Shared Situational Awareness Discussion

• Tell Stories with Data

• Citizen Stories

• Senior Elected Officials Stories

• Emergency Management and Partners Stories

• Building Assessment Effort and Reporting

• State Geologists Effort and Mission Packaging

Page 24: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

CUSEC Concept and Objectives Meeting

1335 - 1400 Situational Awareness and the COP Building Assessment Effort and Reporting State Geologists Effort and Mission Packaging Building Assessors and Mission Packaging 1400 - 1430 Regional Participation Goals and Objectives 1430 - 1500 Assignments, Next Steps and Due Outs 1500 Conclude

Page 25: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Geo-Spatial Common Operating Picture

• Energy/Power Status

• Utilities

• Roads/Transportation Areas of Concern

• Hospitals/Medical Care Status

• Military HQ Locations

• Evacuation Areas and Evacuation Routes

• Resource Management Locations

• Fuel Locations

• PODS

• Health Issues • Water System Off line

• Shelters

• Private Sector Capabilities (resupply)

Page 26: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Geo-Spatial Common Operating Picture

• Public Health Notifications

• Weather/NWS/NOAA

• USGS Data

• Private Sector Infrastructure (ATM/Banks, Fuel, Retail, Food, Pharmacy)

• Transportation (Ground, Retail, Food, Pharmacy)

• Water (Potable), Infrastructure

• Emergency Services

• Utilities (Power, Gas)

• Fuel Locations

Page 27: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Geo-Spatial Situational Awareness and

Common Operating Picture Discussion

• Other Ideas for Consideration

• Priority of Effort

• Three Stories (Citizens, SEO, Emergency Operations)

• Ownership

• Lanes

• Data Element Identification

• Scrapable Sources

• Timeline June- July Select, Build by October, Training In November

Page 28: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Communications

Page 29: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Regional Communications

• Advancing communications link up on all likely communications paths crossing state boundaries, to the Region

• Coordinated IPAWS test • Establish and Test Communications across the Region

– EOC to EOC – JTF to JTF – County to County – EOC to Region – Region to Region

• Multi-state VTC in support of SEO and POTUS

Page 30: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Communications Inject Flow

• Establish Communications to all elements

• Establish redundant communications

• Establish cross state boundary communications

• Report Communications outage

• Request Communications Support for impacted area

• Report Communications restoration status (success)

• Call down and notification

Page 31: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Transportation Air, Ground, Rail & Waterway

Page 32: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Regional Transportation Ground, Aviation, Rail and Waterway • Injects to report open and closed avenues of

approach and airspace

• Close Major Ground Transportation Avenues

• Open Ground Transportation Avenues to Response Only

• Communicate Air Mobility Operations

• Feed Situational Awareness via ESF-1

Page 33: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Transportation Inject Flow

• Shut down avenues of access to impacted

area (Roadways, Rail, Air, Waterways)

• Request Assessment Teams for bridges

• Report closed rail due to HazMat incident

(train wreck)

• Open transportation networks

Page 34: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Private Sector

Page 35: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Regional Private Sector Integration

• Develop usable solutions to fully integrate for Private Sector capacity and capabilities

• Implement and Test an Access Control Concept • Implement and Test a Vehicle/Convoy

Placarding Solution • Implementation of standard Virtual Business

Emergency Operations Concept • Post Business Centric Situational Awareness

Information • Post Mission support requests

Page 36: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Private Sector Inject Flow

• Establish PS Information Sharing capability

• Request PS Support

• Provide PS update

• Update PS Situation

• Execute Credentialing Pilot

Page 37: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Private Sector Opportunities

• Respond to State Inject Response

• Develop Meaningful Questions Per Day with

Survey Response

• Facilitate Daily PS Teleconference with Survey

Response

• Develop Internal injects in concert with State Play

• Identify who is going to stand up VBEOC

Page 38: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Building Assessment Effort and Reporting

Hazard Assessment State Survey Field Teams

Mission Ready Packaging

Situational Awareness and the

Common Operating Picture

Page 39: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Resource Management Effort

Page 40: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Regional Resource Management

• Published Phased Multi-State Sync Matrix – Planning Goal • Conduct Resource Allocation Workshop II focusing on the

Mutual Aid Support System and Mission Ready Packaging • Conduct Resource Allocation Workshop III with Associate States

and Federal Emergency Support Functions • Integrate State level Mutual Aid • Integrate Emergency Management Assistance Compact

execution (Day 2-4) Mobilization through De-Mobilization • Include Associate States in Exercise Inject Play via real world

request and TTX execution • On a State by State basis - Expand to include JRSOI - reception

and check point execution • Integrate Private Sector response

Page 41: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Resource Management Effort

•Resource Allocation Workshop 2 (November 2013) • FEMA Region Capabilities and Partners Meeting and MRP Training Session •Associate States and Partners MRP Identification •Resource Allocation Workshop 3 (February 2014) Mutual Aid Support System Allocation Session •Updated state NMSZ Catastrophic Response Plan •Requirements, Capabilities and Gaps Identified (by MRP) •Multi-State Mutual Aid MRP Capabilities Effort

Page 42: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Resource Management Inject Flow

• Execution of state prescripted mutual aid

requests (State)

• Execution of the state prescripted EMAC mutual

Aid requests

• Establish and report status of EMAC capabilities

• Used and execution through the EMAC

Operations System of Mutual Requests and

Responses

Page 43: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Military Support to Civilian Authorities

Page 44: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Military Support

Integration • Establish the initial Military Support within each state via

deployment or functional TTX in accordance with the State Response Plan

• Mission Ready Package Critical Guard Elements

• Establish and report the JTF Command

• Identify and Request EMAC Title 32 or SAD Forces

• Request and receive Title 10 support through the Regions

• Request and Integrate State Reserve Forces

Page 45: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Military Support Inject Flow

• Alert and Mobilize the state National Guard and designate the Joint Task Force Commander and report status (contacted and available) (Monday)

• Request Dual Status Commander, Authorization to mobilize Reserve Forces in the state and coordinate local response capabilities and actions at Military Installation in direct support of the local authorities (Tuesday)

• Request Title 32 Status (Tuesday)

• Request Military Forces under EMAC (Tuesday)

• Establish Unified Command Group and request state plan based Title 10 Forces, report (Wednesday)

• Establish LNO capability to all military forces in play (T-10, Deputy Commander) (Wednesday)

• Coordinate reporting via Dual Status Command Channels for mission assigned via state plan and exercise Play (Thursday)

Page 46: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

1 Hour Lunch Break

Page 47: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Pre - CAPSTONE 14 Workshop

Jim Bassham

Page 48: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

15 Minute Break

Page 49: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Resource Management Discussion

Page 50: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Mutual Aid Support System (MASS)

•Lessons Learned from 2010 Resource Allocations Workshop •Prescripted Mission Assignment •Resource Annex from the State Plan •Synchronization Matrix of Capabilities over Time to meet Requirements •Mission ready Package State Mutual Aid Capabilities •Facilitate Mission ready Packaging Targeted Capabilities for EMAC

•Military •First Responders •SAR/USAR •Emergency Management (IMT) •Emergency Management (SEOC) •Emergency Management (EMAC-A-Team)

Page 51: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Mission Ready Package Discussion

•First Responder Teams •Building Inspectors •SAR/USAR •Aviation Lift and Medical Transport •Incident Management Teams •JRSOI Team •Security Elements •Volunteer and Donations Management Team •HAZMAT •EMS Strike Team •Building Assessors Packaging •What Else •Next Steps

Page 52: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Mutual Aid Support System (MASS)

Synchronization Planning Matrix Plan Based Requirements List MRP Requirement 1 MRP Requirement 2 MRP Requirement 3 MRP Requirement 4 MRP Requirement 5 MRP Requirement 6

TIME H +X

MRP 1 MRP 2

MRP X MRP Y GAP

30 Day Planning Timeline 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

EMAC MRP EMAC MRP

ARF MRP

Contract GAP

EMAC MRP

•PLAN •Mission •MRP/Commodity •Requirement •Mission

Page 53: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

CUSEC and Associated State Initial Packaging

for Pre-Scripted Mission Assignments •Military •First Responders •SAR/USAR •Emergency Management (IMT) •Emergency Management (SEOC) •Emergency Management (EMAC-A-Team) •CST •CERF-P Elements •Rotary Wing •Fire Fighting •Special Tactics •Combat Control •HRF Elements •Communications Capabilities (Communication Companies/JISSC) •State Geologist Teams

Page 54: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Resource Allocation Workshops

•State Plan Loads •Create and Document Mutual Aid Solutions •Facilitate EMAC Solutions •Discover and Document Federal Partner Solutions •Discover and Deconflict Contract Solutions •RAW III Lay down and Align the Solutions • Publish the Regional Resource Plan

Page 55: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Regional and Partner Participation Open Discussion

Page 56: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Next Steps and Due Outs

Page 57: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Central United States Earthquake Consortium

Closing Remarks Jon Monken, Chairman

Page 58: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Capstone 2014 Exercise Teleconference Planning Dates

2013 Dates 2014 Dates

• January 7 January 6

• February 25th February 24th

• March 4th and 5th * March 24th

• April 8th April 21st

• May 6th May 19th

• June 17th June 2 June

• July 22nd

• August 26th

• September 23rd

• October 14th

• December 16th

Calls will start at 1400 EST and the GIS/IT Workgroup calls will follow

Page 59: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Projected CUSEC Working Timeline of Events

Projected

Dates

Event

11 -12 Feb 2013 CUSEC Board of Directors Meeting with Regional Administrators

13 Feb 2013 Concept and Objective Meeting – Alabama w/Exercise Officers

4-5 Mar 2013 IT /GIS Situational Awareness Workgroup - Nashville

6 Mar 2013 Pre-Post Mitigation Building Assessment Lane Workshop (ATC 154)

29 Apr-3 May 2013 National Program Manager Meeting

3-4 Jun 2013 CUSEC Board of Directors Meeting - Indiana

5 Jun 2013 CAPSTONE 2014 IPC

6 Jun 2013 CUSEC/CAPSTONE Planning Session (Half Day)

12-15 Aug 2013 CUSEC Board of Directors Meeting with FEMA Leadership –Program Update

21-22 Oct 2013 Regional Transportation Workshop – Nashville SEOC

23 Oct 2013 Regional Communications Workshop – Nashville SEOC

24 Oct 2013 Regional Situational Awareness/COP – GIS – Nashville SEOC

Page 60: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Projected CUSEC Working Timeline of Events Continued

Projected Dates Event

4-7 Nov 2013 Regional and Associated States EMAC Workshop (Pre-RAW/MASS)- Packaging

Little Rock, AR

4 Nov 2013 CUSEC Board of Directors – Program Review Session/Corporate Sponsors

04 Dec 2013 CAPSTONE 2014 MPC (Virtual Meeting)

5 Dec 2013 Pre-Post Mitigation Building Assessment Lane Workshop (ATC 154)

10-11 Feb 2014 CUSEC Board of Directors Meeting with Regional Administrators (MS)

12-13 Feb 2014 Resource Allocation/MASS Workshop III (MS)

4-5 Mar 2014 CAPSTONE 2014 FPC (Virtual)

6-7 Mar 2014 Private Sector CAPSTONE Integration Workshop - IL

6-7 Mar 2014 IT /GIS Situational Awareness Workgroup

19 May 2014 Board Conference Call and Rehearsal of Concept

16-20 Jun 2014 CAPSTONE Multi-Day Regional Exercise

4-8 Aug 2014 CUSEC Board of Directors Meeting and AAR – Meeting with FEMA

Administrator and Key Staff & Program Workshop

Page 61: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

State Exercise Concepts

Page 62: Central United States Earthquake Consortium Initial ... · 6/5/2013  · • Conduct Resource Allocation Workshop III with Associate States and Federal Emergency Support Functions

Questions and Discussion