Business Drivers on Innovation Project of Marcegaglia | Date
Context
Requirements 1
Innovation Roadmap 2
Upgrade to SAP S/4HANA 3
Benefits 4
3 Copyright © Capgemini 2015. All Rights Reserved
Business Drivers on Innovation Project of Marcegaglia | Date
Context
Requirements 1
Innovation Roadmap 2
Upgrade to SAP S/4HANA 3
Benefits 4
4 Copyright © Capgemini 2015. All Rights Reserved
Business Drivers on Innovation Project of Marcegaglia | Date
Requirements
Disegno nuovo modello operativo Necessità di dar seguito alle evoluzioni di processo richiesto dal Management
Aumentare il livello di standardizzazione dei processi e dati Implementare il nuovo modello sfruttando le Best-Practice standard SAP
Armonizzazione soluzione cross-country Semplificare e applicare il modello nelle diverse società del Gruppo
Evoluzione dei sistemi informativi, digitalizzazione Rinnovare e semplificare la mappa applicativa e sistemistica
5 Copyright © Capgemini 2015. All Rights Reserved
Business Drivers on Innovation Project of Marcegaglia | Date
Requirements
Disegno nuovo modello operativo Necessità di dar seguito alle evoluzioni di processo richiesto dal Business Management
Amministrazione Tesoreria Credit Management
Acquisti materiali no-core SCM
BI, Datawarehouse CRM
Organizzazioni Commerciali Order Entry Fatturazione Programmazione Produzione Spedizioni
Aree di Business di intervento Approccio conservativo
Abilitatore di nuove soluzioni all’interno di un programma di miglioramento dei processi e delle soluzioni. I percorsi di miglioramento sono «indipendenti» tra di loro.
6 Copyright © Capgemini 2015. All Rights Reserved
Business Drivers on Innovation Project of Marcegaglia | Date
Requirements
Aumentare il livello di standardizzazione dei processi e dati Implementare il nuovo modello sfruttando le Best-Practices standard SAP
Nel corso degli anni alcune scelte implementative hanno dovuto seguire un percorso «Custom Oriented» in funzione della release SAP R/3 4.0b in essere, allontanandosi dal concetto di «Zero Modification» che vede invece la minimizzazione degli sviluppi Custom, privilegiando l’utilizzo di funzionalità standard SAP.
La release del gestionale SAP ha «veicolato» scelte sia a livello di processo, sia a livello di programmazione ma anche a livello infrastrutturale.
In modo «distruttivo» in alcuni versi, in modo «non-distruttivo» in altri, il progetto in corso vuole lanciare un segnale di ritorno all’adozione delle Best-Practice, ad esempio tramite: Aggiornamento dei sistemi gestionali all’ultima release; Nuova piattaforma di SAP BusinessObjects BI e sistema SAP CRM; Introduzione di una piattaforma EAI (middleware, SAP PO) per la centralizzazione delle interfacce; Utilizzo delle funzionalità standard SAP, ad esempio del verticale Mill (DIMP).
7 Copyright © Capgemini 2015. All Rights Reserved
Business Drivers on Innovation Project of Marcegaglia | Date
Requirements
Armonizzazione soluzione cross-country Semplificare e applicare il modello nelle diverse società del Gruppo
Nel corso degli anni il Gruppo Marcegaglia è cresciuto anche grazie ad alcuni investimenti all’estero in particolare in Brasile, Polonia, Cina, UK, US, Russia, Romania e Turchia Come spesso accade, partendo dal sistema IT core centrale italiano le country estere sono state dotate sin dall’inizio del sistema SAP aziendale anche in release differenti Il progetto in corso vuole anche mettere ordine all’intero parco IT, con l’obiettivo di avere a regime un unico gestionale SAP S/4 HANA centralizzato, la Business-Suite complete basata su SAP HANA.
8 Copyright © Capgemini 2015. All Rights Reserved
Business Drivers on Innovation Project of Marcegaglia | Date
Requirements
Evoluzione dei sistemi informativi Rinnovare e semplificare la mappa applicativa e sistemistica
La mappa applicativa dei sistemi informativi di Marcegaglia evidenzia alcune particolarità:
Release SAP R/3 del gestionale con quasi 3Tb di dati; Diverse installazioni produttive del gestionale SAP, in release differenti, per la gestione delle diverse
società del Gruppo; Interfacciamento tra sistemi complesso, senza l’adozione di un sistema middleware centralizzato; User-Experience limitata (prevalentemente SAP-GUI) che non consente l’utilizzo del sistema
in mobilità (tablet, smartphone); Reporting Commerciale e di Controllo di Gestione da riprogettare; Sistema CRM totalmente «custom» da riprogettare su prodotto specifico di mercato.
9 Copyright © Capgemini 2015. All Rights Reserved
Business Drivers on Innovation Project of Marcegaglia | Date
Context
Requirements 1
Innovation Roadmap 2
Upgrade to SAP S/4HANA 3
Benefits 4
10 Copyright © Capgemini 2015. All Rights Reserved
Business Drivers on Innovation Project of Marcegaglia | Date
Innovation Roadmap Stream Finance and HANA, Re-Engineering Operations, Model extension
Program Key-Point: upgrade with single downtime from SAP R/3 4.0b to SAP S/4HANA
Re-Engineering Accounting Processes, Procurement Materials no-core
SAP CRM on HANA on Marketing & Sales
New-GL, Simple Finance, Simple Logistic
Datawarehouse greenfield implementation SAP BI on HANA; Suite BusinessObjects 4.1 introduction;
BI on SAS, Hyperion dismissed
Simple Finance, Simple Logistic
SAP CRM on HANA
Installation Re-Engineering Business Processes
Upgrade from SAP R/3 to
SAP S/4HANA
SAP BI on HANA
Installation
11 Copyright © Capgemini 2015. All Rights Reserved
Business Drivers on Innovation Project of Marcegaglia | Date
Context
Requirements 1
Innovation Roadmap 2
Upgrade to SAP S/4HANA 3
Benefits 4
12 Copyright © Capgemini 2015. All Rights Reserved
Business Drivers on Innovation Project of Marcegaglia | Date
Upgrade to SAP S/4HANA Capgemini Solution approach for HANA migration
Value Upgrade for HANA
Are we ready to move to HANA ?
System Prerequisite Management
Where do we deploy the Hardware ?
Deployment Options
How do we install the Software ?
Installation Options
How do we upgrade & migrate
our systems to HANA ?
Implementation Options
On going SAP
Landscape
Development Quality
Production
2 4
7
UpgradeProject
Landscape
Dual
Main
tena
nce
1 3
DEV’ QAS’ PRD’
CSB
60
Oracle DB
HANA DB
Oracle DB
HANA DB
Oracle DB
HANA DB
Oracle DB
DEV
Oracle DB
QAS
Oracle DB
PRD
Oracle DB
HANA DB
5 8
13 Copyright © Capgemini 2015. All Rights Reserved
Business Drivers on Innovation Project of Marcegaglia | Date
Upgrade to SAP S/4HANA System Prerequisites Management
As part of the migration offering, Capgemini provides necessary services and tools (Capture) to do the prerequisites management
EP, PI, BW – if used in conjunction with SAP Business Suite, then those SAP Netweaver Hubs have to be upgraded to 7.3 or higher before. See SAP Note 1388258
Not all SAP & 3rd party Add-Ons are currently supported
Check early: Table “CVERS“ and compare against relevant SAP Notes for each SAP application
SAP S/4HANA is based SAP NW AS ABAP >=7.40
Not supporting dual-stack installations.
Dual-stack systems must be split before migrating to HANA
Version Interoperability with SAP NetWeaver Hubs Possible Restrictions Dual-Stack Systems
SAP HANA runs natively on Unicode only
SAP Business Suite 7 i2013 is the recommended minimum release for SAP Suite on HANA
Unicode Minimum Release Levels
14 Copyright © Capgemini 2015. All Rights Reserved
Business Drivers on Innovation Project of Marcegaglia | Date
Upgrade to SAP S/4HANA Deployment and Installation Options
Switching to SAP HANA does not impact application servers or frontends
New SAP HANA DB HW is required, nothing else changes
SAP HANA appliance runs on SUSE Linux (SLES)
See SAP Note 1514966 (SAP HANA: Sizing SAP In-Memory Database)
Sizing for New Installations: See http://service.sap.com/sizing
ABAP sizing reports for Migration to SAP HANA: SAP Business Suite: SAP Note 1872170
Landscape Impact Sizing
Multiple components on one database (MCOD): Deploy white-listed applications together on the same HANA DB
Multiple components on one system (MCOS): Multiple SAP HANA databases
On-premise or SAP Cloud powered by SAP HANA
Scale-up: Increasing size of one server
Scale-out: horizontally by adding servers**
Virtualization
Installation Options Deployment Options
** Scale-Out installations only with restricted availability so far.
15 Copyright © Capgemini 2015. All Rights Reserved
Business Drivers on Innovation Project of Marcegaglia | Date
Upgrade to SAP S/4HANA Upgrade & Migration
Update the software version or Support Package Stack of a SAP NetWeaver-based system to a level supported for the migration
Replacement for SAPehpi, SAPup, SAPJup, JSPM, CEupdateManager, and SolManUp Additional Information: http://service.sap.com/sltoolset Source
SW Ver. Target
SW Ver.
Software Update Manager (SUM)
Migrate a system at the required software level required for SAP HANA Unicode conversion of an existing system as a part of the migration Installation of a new system on SAP HANA. Additional Information: http://service.sap.com/sltoolset Target
SW Ver.
Software Provisioning Manager (SWPM)
Upgrade an existing NetWeaver-based system and migrate to SAP HANA in a single step Preferred toolset for migrating to SAP HANA Additional Information: SAP Note 1799545 – Conditions: using DMO of SUM for SAP BW systems SAP Note 1875197 – Conditions: using DMO of SUM for Business Suite systems
Source SW Ver.
SAP HANA
Target SW Ver.
Database Migration Option of Software Update Manager (DMO of SUM)
SAP HANA
Target SW Ver.
16 Copyright © Capgemini 2015. All Rights Reserved
Business Drivers on Innovation Project of Marcegaglia | Date
Upgrade to SAP S/4HANA Installation, Upgrade & Migration using Capgemini Methodology and Tools (1/2)
Initiation Preparation
Organizational Change Management/Training
Technical Infrastructure Management
Solution Maintenance & Support
Program / Project Management
Project approval from the Business
Prepare & upgrade Dev server
Define the SAP HANA installation technique
Define the archiving scope and plan
Define the disaster recovery and High
availability plan
Create/Validate test scripts/Scenarios
Define the SAP HANA deployment strategy
Finalize the migration option
Check/plan for SAP Add-ons & Legacy systems
Project Charter & Assess dependencies
SAP Assessment & Scope
Inventory of custom objects & Interfaces
Check Solution Manager & other SAP component
Governance model & RACI
Define and agree freeze concept
Build Cutover plan
Secure new hardware/ environment from data
center & Sizing
Define GO/NO GO criteria
Workshop and Know. Trans. For AS-IS
processes
Define/detail scope and project plan
Connectivity & Logical set up
Test Strategy & Planning
Define communication & first announcement
Define & agree budget
Finalize the SAP HANA Hosting strategy
Create HANA awareness
Prepare & upgrade The Sandbox
Perform the Migration step
Check the technical sanity of the system
Adapt the ABAP guidelines based
on HANA
Check/fix SPAU/SPDD
17 Copyright © Capgemini 2015. All Rights Reserved
Business Drivers on Innovation Project of Marcegaglia | Date
Upgrade to SAP S/4HANA Installation, Upgrade & Migration using Capgemini Methodology and Tools (2/2)
Realization Go Live & Support
Organizational Change Management/Training
Technical Infrastructure Management
Solution Maintenance & Support
Program / Project Management
GO Decision from Business
Prepare & upgrade Dev server
Fix all issues
Finalize cut over plan and down time details
Prepare, upgrade & migrate the sandbox for
a mock upgrade
Conduct training (for delta functionality)
Transport TRs from Quality server
Perform technical and functional unit testing
Retrofit Custom dev.
Prepare, upgrade & migrate the DEV server
ABAP code adaptations for HANA compliancy
Check/fix SPAU/SPDD
Fixes & Delta Configuration
Fix the UAT issues
Load and performance test
Conduct User Acceptance Testing
Validate all Interfaces
Prepare, upgrade & migrate the Quality server
Conduct Integration testing
Transport TRs from Dev server
Fix the integration test issues
Prepare UAT plan & scripts
Prepare, upgrade & migrate the PRD server
Validate & Sign off PRD system
Go Live
Post Go Live support
Sign off SAP Upgrade project
Transport TRs from Quality server
Final Preparation
18 Copyright © Capgemini 2015. All Rights Reserved
Business Drivers on Innovation Project of Marcegaglia | Date
Upgrade to SAP S/4HANA Different starting points
Fiori
SAP ERP
SAP HANA
UPDATES – New functionality via EHP
TECHNICAL - InMemory Excution
ANALYTICAL - RealTime with HanaLive
OPERATIONAL - Process Optimization
SIMPLIFIC – Landscape & Processes
Innovation – Perfect Entreprise sFIN sLOG sERP …
Suite on Hana (SoH)
Fiori
SAP ERP
SAP HANA
UPDATES – New functionality via EHP
TECHNICAL - InMemory Excution
ANALYTICAL - RealTime with HanaLive
OPERATIONAL - Process Optimization
SIMPLIFICATION - Landscape
Suite on anyDB
Fiori
SAP ERP
Any DB
UPDATES – New functionality via EHP
19 Copyright © Capgemini 2015. All Rights Reserved
Business Drivers on Innovation Project of Marcegaglia | Date
Upgrade to SAP S/4HANA Different starting points
Customer running SAP ECC
< ECC 6.0 EhP7
Implement Simple Finance Add-On
DB Migration to HANA Platform
Upgrade to ECC 6.0 EhP 7
1
2
3
Customer running SAP ECC 6.0 EhP7
Implement Simple Finance Add-on
DB Migration to HANA Platform
1
2
Customer running SAP ECC
6.0 EhP7 on HANA
Implement Simple Finance,
Simple Logistics, Add-on
1
20 Copyright © Capgemini 2015. All Rights Reserved
Business Drivers on Innovation Project of Marcegaglia | Date
More than 1.300 end-users More than 2.500 custom objects Starting from release SAP R/3 Unicode, EhP: DB Migration Option (DMO) SAP FIORI, Screen Personas SAP Simple Finance SAP BI on HANA SAP CRM on HANA SAP Solution Manager
Upgrade to SAP S/4HANA Business Drivers on Marcegaglia
SOURCE SAP R/3 4.0b
TARGET SAP ERP on HANA
Pur preservando le aree non soggette ad evoluzioni applicative immediate, il nuovo sistema upgradato consentirà di:
Gestire dati transazionali ed analitici in modo più semplice;
Aprirsi nativamente al web e al mobile per semplificare o esternalizzare alcuni processi;
Attivare i nuovi moduli standard SAP disponibili solo su tecnologia SAP HANA;
Abilitare diversi fattori di innovazione all’interno del gestionale SAP;
Abilitare una User-Experience moderna;
Superare i limiti tecnologici degli attuali sistemi.
ACCELERATE
SIMPLIFY
INNOVATE
In-Memory Computing Traditional
Application
Database
21 Copyright © Capgemini 2015. All Rights Reserved
Business Drivers on Innovation Project of Marcegaglia | Date
Upgrade to SAP S/4HANA Marcegaglia use-case: technical tasks
Appl.Servers
SAP HANA db (o.s. SUSE)
R/3 4.0
ERP on HANA
ERP 6.0 on SQL
ERP 6.07 on SQL
P01
P1N P1N
P1N P1N
P1N
P1N
22 Copyright © Capgemini 2015. All Rights Reserved
Business Drivers on Innovation Project of Marcegaglia | Date
Upgrade to SAP S/4HANA Marcegaglia use-case: functional tasks
Solution Manager
1
System Landscape Test Management Training Authorization
Profiles
ABAP 1
Adjustment standard objects enhancements
Adjustment custom objects (interface, batch-input, others)
HANA Optimization
Customizing 1
Delta Customizing Obsolete transaction Functional
Enhancements
23 Copyright © Capgemini 2015. All Rights Reserved
Business Drivers on Innovation Project of Marcegaglia | Date
Upgrade to SAP S/4HANA Marcegaglia use-case: HANA Optimization
ABAP/4 Optimization, on traditional programming language, managed by different tasks: Mandatory: DB-Hints, ORDER-BY, Pool-Table Non-Mandatory: SELECT *, index, WHERE clausole
Statistical records (STAD) ABAP Trace Tool (SAT) SQL Trace (ST05) SQL Monitor (SQLM) ABAP Test Cockpit (ATC) SAP Code Inspector (SCI) SQL Performance Tuning (SWLT)
New SAP HANA native applications, UI HTML5, Native SQL-Script on SAP HANA executed in-memory and triggered from stack-ABAP Netweaver.
Application Server
SAP Netweaver 7.4
SAP HANA
SAP HANA XS SAP Fiori App Content
24 Copyright © Capgemini 2015. All Rights Reserved
Business Drivers on Innovation Project of Marcegaglia | Date
Upgrade to SAP S/4HANA Marcegaglia use-case: first results
SAP HANA ~ 650Gb
MS SQL ~ 3Tb
Optimized for traditional-DB Response Faster
100% 75% 22% 3%
In-Memory Computing Traditional
Application
Database
25 Copyright © Capgemini 2015. All Rights Reserved
Business Drivers on Innovation Project of Marcegaglia | Date
Upgrade to SAP S/4HANA Marcegaglia use-case: Target Landscape
S/4 S/4 S/4
Landscape AS-IS SAP R/3 4.0b 3Tb MS-SQL 2000, 32bit
MCOS-MCOD 512Gb
DEV QUA PRD
Landscape TO-BE SAP S/4HANA Appliance 2Tb
Landscape SAP BI on HANA Appliance 512Gb
Landscape TO-BE SAP CRM on HANA Appliance 512Gb
P01 T01 D01
BI BI BI
CRM CRM CRM
26 Copyright © Capgemini 2015. All Rights Reserved
Business Drivers on Innovation Project of Marcegaglia | Date
Context
Requirements 1
Innovation Roadmap 2
Upgrade to SAP S/4HANA 3
Benefits 4
27 Copyright © Capgemini 2015. All Rights Reserved
Business Drivers on Innovation Project of Marcegaglia | Date
Benefits
Business Suite on HANA SAP S/4HANA, BI, CRM on HANA
User Experience SAP Fiori, Screen Personas, Multi-Device, Multi-Interaction
Pronti per nuove future evoluzioni Business-Suite pronta ad accogliere ulteriori evoluzioni e trasformazioni
Digital Transformation in corso Al passo con i tempi in ottica trasformazione
28 Copyright © Capgemini 2015. All Rights Reserved
Business Drivers on Innovation Project of Marcegaglia | Date
Benefits
Business Suite on HANA SAP S/4HANA, BI, CRM on HANA
SAP HANA Platform
SAP S/4HANA SAP BI SAP CRM
Other SAP Systems Third-Party Applications Custom Applications
29 Copyright © Capgemini 2015. All Rights Reserved
Business Drivers on Innovation Project of Marcegaglia | Date
Benefits
https://www.youtube.com/watch?v=jFY_911ShWA
https://fioriappslibrary.hana.ondemand.com/sap/fix/externalViewer
User Experience SAP Fiori, Screen Personas, Multi-Device, Multi-Interaction
30 Copyright © Capgemini 2015. All Rights Reserved
Business Drivers on Innovation Project of Marcegaglia | Date
Benefits
No thanks! We are too
busy
Are you too busy
to improve ?
Digital Transformation in corso Al passo con i tempi in ottica trasformazione
31 Copyright © Capgemini 2015. All Rights Reserved
Business Drivers on Innovation Project of Marcegaglia | Date
Contacts
SAP S/4HANA installation available on Capgemini Cloud for a Demo
Marco Campi Chief Information Officer Marcegaglia S.p.A. [email protected]
https://it.linkedin.com/pub/dir/Marco/Campi
Gianluca Simeone Managing Consulting Capgemini Italy [email protected] https://it.linkedin.com/in/gsimeone @extgisi
www.capgemini.com
The information contained in this presentation is proprietary. © 2015 Capgemini. All rights reserved. Rightshore® is a trademark belonging to Capgemini.
Capgemini Attualmente con 180.000 dipendenti in più di 40 paesi nel mondo, Capgemini è uno dei principali fornitori mondiali di servizi di consulenza, information technology e outsourcing. Nel 2014 il Gruppo Capgemini ha registrato ricavi per 10,573 miliardi di euro. Con i propri clienti Capgemini progetta e realizza specifiche soluzioni di business, tecnologiche e digitali, per soddisfare le loro esigenze di innovazione e competitività. L’organizzazione profondamente multiculturale contraddistingue da sempre il Gruppo Capgemini, che utilizza un approccio di lavoro unico e distintivo – la Collaborative Business Experience™ – e un modello globale di produzione distribuita denominato Rightshore®. Per maggiori dettagli: www.it.capgemini.com Rightshore® è un marchio appartenente a Capgemini