Page 1: Building Enclosure Commissioning (BECx): Practical Project Implementation.
Page 2: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Building Enclosure Commissioning (BECx):Practical Project Implementation

Page 3: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Objectives

Intro to BECx, importance and benefits

Similarities between BECx & typical Cx, industry standards and code mandates

Implementation of BECx

Lessons Learned

Page 4: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Outline

Code & Standard SynergyRegional Priorities Why BECxCx Process

DesignConstructionTurnover

Lessons Learned Q&A

Page 5: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Cx Process

Guideline / Standard – Optional Implementation – Code Mandate

Page 6: Building Enclosure Commissioning (BECx): Practical Project Implementation.

LEED Mandates

*As of December 2011

Legislation, executive orders, resolutions, ordinances, policies, and incentives.

442 Localities (45 states)

34State 14

Fed.

? Numerous public school jurisdictions and institutions of Higher Education.

Page 7: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Code Adoption of MEP Cx

= CALGreen= IGCC Statewide= IGCC Local Governments* As of February 2013

Page 8: Building Enclosure Commissioning (BECx): Practical Project Implementation.

BECx Process

NIBS Guideline 3 – 2012

ASTM E2813 – 12

LEEDv4.0

ASHRAE Guideline 0

Guideline / Standard – Optional Implementation – Code Mandate

Page 9: Building Enclosure Commissioning (BECx): Practical Project Implementation.

ASHRAE Guideline 0

“The Commissioning Process is a quality-oriented process for achieving, verifying, and documenting that the performance of facilities, systems, and assemblies meets defined objectives and criteria.”

Page 10: Building Enclosure Commissioning (BECx): Practical Project Implementation.

NIBS Guideline 3-2012

“Commissioning the enclosure differs from commissioning other building systems … The enclosure is designed and field assembled from numerous materials with varying properties. These materials are manufactured by different companies… assembled …by many different tradespeople, working for different contractors … in all possible weather conditions with the intention of meeting well defined performance criteria.”

Page 11: Building Enclosure Commissioning (BECx): Practical Project Implementation.

ASTM E2813-12Standard Practice for Building Enclosure Commissioning

“BECx is a process that begins with the establishment of the (OPR) and endeavors to ensure that the exterior enclosure … meet or exceed the expectations of the Owner ... A fundamental understanding of … ASHRAE Guideline 0 and NIBS Guideline 3 is recommended for optimal use and application of this practice.”

Page 12: Building Enclosure Commissioning (BECx): Practical Project Implementation.

USGBC LEEDv4.0

Certified - 25%Silver - 43%Gold - 54%Platinum - 84%Overall - 46%

Energy & Atmosphere Credit 3

Option 1 (3-4 points) – Enhanced Systems Cx

AND/OR

Option 2 (2 points) - Envelope Cx

Page 13: Building Enclosure Commissioning (BECx): Practical Project Implementation.

“Commissioning of the building envelope can identify areas of concern related to air infiltration and leakage, moisture diffusion, surface condensation, and rain water entry – all issues that can negatively impact the building's energy performance and indoor environmental quality”

Why?

Page 14: Building Enclosure Commissioning (BECx): Practical Project Implementation.

White = heat loss

Why?

Page 15: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Why?

ICE

Page 16: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Full of Water

Why?

Page 17: Building Enclosure Commissioning (BECx): Practical Project Implementation.
Page 18: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Courtesy of Atlas Roofing; www.greenzone.com

Page 19: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Cx Process

Page 20: Building Enclosure Commissioning (BECx): Practical Project Implementation.

OPR/ BOD/ Cx Plan• MEP items that are also specific to enclosure:

Interior and exterior temperature, humidity, insulation, wall R-values, window U factor, SHGC, warranties.

• Are the requirements concrete or abstract? • Are the requirements enforceable? • Glazing parameters (amount, views)• Air leakage • Annual Rainfall• Architect plays bigger role• Enclosure Testing

Page 21: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Specifications

01 91 13 General Cx Requirements• Project Team Responsibilities• Testing Requirements

Mockup Vs. In-PlaceAir and Water infiltrationThermal PerformanceMaterial Performance Properties

Page 22: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Design Reviews

Review For:• Integrity and Continuity of:

Air BarrierVapor BarrierThermal Resistance PlaneMoisture Resistance Plane

• Constructability• Other OPR items

Page 23: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Design Review Design Reviews

Page 24: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Design Reviews

Page 25: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Submittal Reviews

Page 26: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Pre-Functional Checklists

Page 27: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Site Observations

Page 28: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Site Observations

Page 29: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Site Observations

Page 30: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Functional Performance Testing

Page 31: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Functional Performance Testing

Page 32: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Functional Performance Testing

Page 33: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Functional Performance Testing

Page 34: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Functional Performance Testing

Page 35: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Functional Performance Testing

Page 36: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Functional Performance Testing

Page 37: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Functional Performance Testing

Page 38: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Functional Performance Testing

Page 39: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Functional Performance Testing

Page 40: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Functional Performance Testing

Page 41: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Turnover

• O&M Manual Review: Sealants, roofing, glazing

• Re-Commissioning not as robust• Maintenance of Enclosure Systems • Training • Warranty Review

Page 42: Building Enclosure Commissioning (BECx): Practical Project Implementation.

Lessons Learned

• Scheduling• Tracking• Coordination• Lack of Participation• Lack of Authority• Design team being tied to schedule

Page 43: Building Enclosure Commissioning (BECx): Practical Project Implementation.

That’s All Folks…Brian Davie, AIA LEED AP | Senior Sustainability ManagerFarnsworth Group, Inc.200 West College Ave., Suite 301 | Normal, IL 61761p 309.663.8436, ext. 207 | f 309.663.8862 | c 309.706.9508 www.f-w.com | www.greennavigation.com

Joshua Hickman, LEED AP BD+C, CxT | Sustainability Technical ManagerFarnsworth Group, Inc.9431 Haven Ave., Suite 117 | Rancho Cucamonga, CA 91730c 310.893.9787 www.f-w.com | www.greennavigation.com