BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoral coordination of Early Childhood Development interventions
35

BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

Aug 25, 2018

Download

Documents

HoàngNhi
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

BUILDING BLOCKS AND STUMBLING BLOCKS

1

for inter-sectoral coordination ofEarly Childhood Development interventions

Page 2: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

WHY A comprehensive approach to ECD?

Page 3: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

DEVELOPMENTAL NEEDS OF THE CHILD

Child

Biological

Psychological

Social

Cultural

Source: Silva, V. 2012

Page 4: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

DEVELOPMENTAL NEEDS OF THE CHILD

Child

Biological

Psychological

Social

Cultural

• They vary according to children’s age.

• Some have more weight than others at different points in time (developmental stages).

• They are intimately related.

• Need to be satisfied simultaneously.

• Go beyond the child itself

Source: Silva, V. 2012

Page 5: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

5

CHILD OBSERVABLE CHARACTERISTICS

CONTEXT CHARACTERSITICS

1. Nutrition

2. Physical dev.

3. Bonding

4. Psychomotor dev.

5. Emotional dev.

1. Household

socioeconomic

level

2. Parents

educational level

3. Family environment

4. Work environment

5. Community

environment

Child

biological

psychological

social

cultural

DEVELOPMENTAL NEEDS OF THE CHILD

Source: Silva, V. 2012

Page 6: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

What is usually seen in public policies?

6

Page 7: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral
Page 8: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

PROBABLY… Every child has the support of some program, but none has support for everything he or she needs.

Page 9: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral
Page 10: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

10

Co

mp

reh

en

sive

N

atio

nal

Po

licy

Cro

ss S

ecto

ral

Go

vern

ing

Bo

dy

Rea

listi

c a

nd

fin

anci

ally

su

stai

nab

le

Stra

tegi

c P

lan

Qu

alit

y st

and

ard

s an

d c

om

plia

nce

Co

mp

reh

ensi

ve a

nd

ro

bu

st

re

fere

nce

, mo

nit

ori

ng

and

eva

luat

ion

s sy

ste

ms

ECD

ch

amp

ion

s an

d

loca

l lev

el b

uy-

in

COMPREHENSIVE ECD SYSTEM

Scope, Coverage, and Equity of Programs

Page 11: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

CASE STUDIES

Page 12: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

JAMAICA CASE

Cross-sectoral/political strategy development, and challenges to implementation

12

Page 13: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

CROSS SECTORAL GOVERNING BODY

13

• ECC board composition

• Credibility and legitimacy

• Leadership

Page 14: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

STRATEGIC PLAN

• Results-based Plan

• Cross-sector, but Sector-specific

• Corresponding Budgets

Page 15: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

MONITORING AND EVALUATION

• Robust sector-specific monitoring systems

• Unambiguous indicators

• Integrated system

Page 16: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

WHAT THE ECC TRIED TO SOLVE

• Lack of Accountability

• Lack of Incentives

• Unpredictable Financing

Page 17: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

FINANCE ARRANGEMENTS: SWAp

MoF MoE

MoH

MoLSS

WB

Page 18: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

FINANCE ARRANGEMENTS

• Disbursement amounts: Depend on achieving DLTs (May 2009: 7 DLTs * 180K = 1.26 M)

• Disbursements subject to:– Proof that milestones are

adequately budgeted– Budget execution rate is

70% or above

• Leads to steadier flow of funds and focus on achieving results

Graph here

0

2

4

6

8

10

12

14

16

Y00 Y01 Y02 Y03 Y04 Y05 Y06 Y07

Page 19: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

BUILDING BLOCKS

• The Early Childhood Commission

• The National Strategic Plan

• The Monitoring & Evaluation

• The Finance Arrangements

19

Page 20: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

STUMBLING BLOCKS

• Lack of sectoral ownership?

• Too ambitious?

• Too complex?

• Capacity constraints?

20

Page 21: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

BOLIVIA CASE

Think Cross-Sectoral. Act Local.

21December 2012

Page 22: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

DECENTRALIZED ECD COORDINATION

• CentralInterest from the

top, but not in the line Ministries

• Department

Coordination committees

established for HD sector, comparing

needs assessments and funding priorities

• Municipal Much interest in coordinating actual delivery of services –

through third-party providers

Page 23: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

ALTERNATIVE ENTRY POINT FOR ECD INVESTMENTS

• Productivity and labor market participation for young women

Page 24: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

CROSS-SECTORAL TEAM WORK IN LCSHD

ECD Municipal Program

Team building

Research

Project design

Page 25: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

BUILDING BLOCKS

• Team trust

• Management support

• Field support

• Client interest

• Decentralized arrangements

Page 26: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

STUMBLING BLOCKS

• Low incentives for cross-sectoral work

• Unclear link to broader initiative

• Lack of national level champion

Page 27: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

HONDURAS CASE

Low-hanging fruit: building on a sectoral intervention –health/nutrition – to incorporate some early stimulation, and achieve proverbial synergies

27

Page 28: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

COMMUNITY-BASED NUTRITION PROGRAM

• AIN-C with long program history (1990s)

• Based on community volunteers for:

28

Growth monitoring Parent counseling Referral to health services

Page 29: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

ECD MAINSTREAMING

• Pilot AIN-C + early stimulation 2009-2012

• ADDS:

29

Dev. assessment applied to child

Counseling on early stimulation

Home visits for children with greater dev. needs

Page 30: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

RESULTS

30

• Increase in attainment of “expected” development level

• Decrease in problems with fine or gross motor skills, communication and language, emotional and cognitive skills

Page 31: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

• Commitment from strategic stakeholders• Financial resources availability• Building on existing intervention• Strong implementing agency in the field

31

BUILDING BLOCKS

Page 32: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

32

STUMBLING BLOCKS

• Lack of buy-in from national level• Pilot and single sector program• Lack of funds to support scale-up and advocacy

Page 33: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

EVERYTHING I EVER NEEDED TO KNOW ABOUT WORKING ACROSS SECTORS

I LEARNED IN KINDERGARTEN

33

• Budget, credit

• AttentionShare everything /

Play fair

• Personal relationships

• Partnerships

When you go out into the world, watch out

for traffic, hold hands, and stick together

• Resources: linking to existing programs, TFs...

Be creative

WITHIN THE BANK

Page 34: BUILDING BLOCKS AND STUMBLING BLOCKS - … · BUILDING BLOCKS AND STUMBLING BLOCKS 1 for inter-sectoralcoordination of ... HONDURAS CASE Low-hanging fruit: building on a sectoral

34

EVERYTHING I EVER NEEDED TO KNOW ABOUT WORKING ACROSS SECTORS

I LEARNED IN KINDERGARTEN

WITHIN CLIENT COUNTRIES

• Leaders

• Champions, not just at the top

Make friends

• Sectoral ownership

• Buy in at the line ministry level

Don’t take things that