Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.

Dec 14, 2015

Download

Documents

Elfreda Tyler
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.
Page 2: Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.

Brief on the UCG ProjectThe project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block V in Tharparker, Sindh commenced on the first release of funds on 28th April, 2010. To date $ 9.22 million have been released and the allocation for the project during PSDP 2011-2012 is $ 2.4 million.

With the availability of $ 9.22 million, the first gasifier, civil works totaling 67000 sq. ft., electrical works, water supply etc have been completed. Almost all major equipment for first gasifier has arrived except low pressure compressors (which are essential part of the process). Due to earthquake and Tsunami in Japan, M/S Hitachi has delayed the supply of compressors by five months till September 2011. However, high pressure compressors ( start up) have arrived at site.

The first of the gasifiers has been completed with over 36000 ft of drilling and 18000 ft of steel casing. The remaining gasifiers will be constructed and their equipment / power turbines will be ordered with further availability of funds.

First test burn is expected in September 2011. Total gas produced will be connected to the power turbines to generate electricity.

Page 3: Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.

S. No.

Description Date Status

1 Land Acquisition 2 – 7 - 2010 Acquired about 27 acres 2 Residential Colony 17 – 7 - 2010 95 % complete ( 39,312 sq. ft )3 Technical Plant,

workshop, stores, laboratory, compressor station, power station, control room and admin block.

1 – 11 - 2010

65 % complete ( 27,756 sq. ft. )

Generation of 100 M Watts through underground coal gasification

Total project cost US $ = 115.6 million ( Rs. 9883.6 million)

Total funds received US $ = 9.2 million ( Rs. 789.6 million)

Funds allocated in PSDP 2011 – 2012 US $ = 8.1 million ( Rs. 700 million)

Date of first release of fund & commencement of the project = 28 April, 2010

Project Milestone1.CIVIL WORK

Page 4: Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.

S. No. Description Date Status

1 Air compressor ( process)

15 – 8 – 2010 Expected delivery

( 15 – 1 – 2011 )

Not delivered order cancelled.

2 Air compressor (process) Order placed with the second lowest bidder(Hitachi) after negotiation at the lowest cost on 18th Feb., 2011.

Expected date of delivery was promised for third week of April 2011.

These machines have been delayed by the manufacturers due to the earthquake and tsunami in Japan.

3. Air compressor (start-up) Ordered on 15th Dec. 2010

Delivery was promised for 15th April,2011.

These machines were initially delayed due to modifications for our hot conditions at Thar. They have now arrived and their initial testing at Karachi has been completed. The performance is as per specifications. High pressure compressors have been handed over to the project on 10th August.

4. Diesel Generators 15 -08 - 2010 Expected delivery ( 15 – 12 – 2010 )

Delivered

5 Workshop equipment 15 -08 - 2010 Expected delivery ( 15 – 12 – 2010 )

80 % delivered

6 Steel pipes for casing and surface piping with fittings

15 - 07 - 2010 Expected delivery ( 15 – 12 – 2010 )

Delivered.

7 Control instrumentation, gas analyzer, industrial computer etc.

25 – 11 - 2010 Expected delivery ( 1 – 4 – 2011 )

Has arrived at Karachi.

8 Air conditioners 15 -08 - 2010 Expected delivery ( 15 – 12 – 2010 )

delivered

•Main Machinery ( All purchases under Sindh PPRA rules )

Page 5: Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.

S. No.

Description Date Status

1 Drilling 15 – 8 – 2010 ( Expected delivery ( 15 – 6 – 2011 )

99 % completeTotal wells Drilled 36 Nos.Total drilling with 8 inch bit 17118 ft.Total reaming with 11 inch bit 1470 ft Total reaming with 15 inch bit 17118 ft.Total coring accomplished 653 ft Total accumulative drilling 36365 ft

2 Casing 15 – 8 – 2010 ( Expected delivery ( 15 – 6 – 2011 )

99 % complete Total number of pipes lowered=18000 ft

900 Nos. 20 ft each

3 Cementation and sealing

15 – 8 – 2010 ( Expected delivery ( 15 – 6 – 2011 )

99 % complete Total number of cement bags consumed = 1272 No.

•Construction of First Gasifier 99% Complete(Second gasifier will commence on the availability of funds)

Page 6: Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.
Page 7: Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.
Page 8: Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.
Page 9: Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.
Page 10: Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.

COLONY

Page 11: Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.

Drilling Rigs

Page 12: Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.

Drilling Rigs in Operation

Page 13: Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.

Drilling and Casing of Gas Wells

Page 14: Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.
Page 15: Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.

Diesel Generators

Page 16: Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.

Surface Piping

Page 17: Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.
Page 18: Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.

Well Head

Page 19: Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.
Page 20: Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.
Page 21: Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.
Page 22: Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.
Page 23: Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.
Page 24: Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.
Page 25: Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.