REKAPITULASI DAFTAR KUANTITAS DAN HARGA Owner Estimate (OE) Satuan Kerja : Pengembangan Kinerja Pengelolaan Pekerjaan : Optimalisasi Sistem SPAM PDAM Kab Lokasi Pekerjaan : Kabupaten Solok Nomor Paket : PKPAM - 06 (Enam) Tahun Anggaran : 2013 (APBN Murni) No Uraian A REHAB IPA KAPASITAS 20 L/DET B PENGADAAN PIPA JARINGAN TRANSMISI & DISRIBUSI UTAMA ( HDPE OD 225 mm, HDPE OD 160 mm ) D PEMASANGAN PIPA JARINGAN TRANSMISI & DISRIBUSI UTAMA ( HDPE OD 225 mm, HDPE OD 160 mm ) C PENGADAAN WATER METER INDUK E PEMASANGAN WATER METER INDUK F PEMBUATAN JEMBATAN PIPA GIP ND 200 mm & ND 150 mm TOTAL P P N 10 % JUMLAH TOTAL PEMBULATAN TERBILANG : ÈÈÈÈÈÈÈÈ.., Ditetapkan/Disyahkan Oleh: Dihitung Ol KEPALA SATUAN KERJA PT/CV/Fa. È PKPAM SUMBAR Ir. INDRA JULIRAF, MMP ÈÈÈÈÈÈÈÈÈÈÈ NIP. 110054784
79
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: BOQ PKPAM 06

REKAPITULASIDAFTAR KUANTITAS DAN HARGA

Owner Estimate (OE)Satuan Kerja : Pengembangan Kinerja Pengelolaan Air Minum Sumatera BaratPekerjaan : Optimalisasi Sistem SPAM PDAM Kabupaten SolokLokasi Pekerjaan : Kabupaten SolokNomor Paket : PKPAM - 06 (Enam)Tahun Anggaran : 2013 (APBN Murni)No Uraian

A REHAB IPA KAPASITAS 20 L/DET

B PENGADAAN PIPA JARINGAN TRANSMISI & DISRIBUSI UTAMA( HDPE OD 225 mm, HDPE OD 160 mm )

D PEMASANGAN PIPA JARINGAN TRANSMISI & DISRIBUSI UTAMA( HDPE OD 225 mm, HDPE OD 160 mm )

C PENGADAAN WATER METER INDUK

E PEMASANGAN WATER METER INDUK

F PEMBUATAN JEMBATAN PIPA GIP ND 200 mm & ND 150 mm

TOTALP P N 10 %JUMLAH TOTALPEMBULATANTERBILANG :

ÈÈÈÈÈÈÈÈ.., ÈÈÈÈÈÈÈÈ.. 2012

Ditetapkan/Disyahkan Oleh: Dihitung Oleh :KEPALA SATUAN KERJA PT/CV/Fa. ÈÈÈÈÈÈÈÈÈ..PKPAM SUMBAR

Ir. INDRA JULIRAF, MMP ÈÈÈÈÈÈÈÈÈÈÈÈÈNIP. 110054784

Page 2: BOQ PKPAM 06

DAFTAR KUANTITAS DAN HARGA

Pengembangan Kinerja Pengelolaan Air Minum Sumatera BaratOptimalisasi Sistem SPAM PDAM Kabupaten Solok

Jumlah Harga(Rp)

-

PENGADAAN PIPA JARINGAN TRANSMISI & DISRIBUSI UTAMA -

PEMASANGAN PIPA JARINGAN TRANSMISI & DISRIBUSI UTAMA -

-

-

PEMBUATAN JEMBATAN PIPA GIP ND 200 mm & ND 150 mm -

----

ÈÈÈÈÈÈÈÈ.., ÈÈÈÈÈÈÈÈ.. 2012

Dihitung Oleh :PT/CV/Fa. ÈÈÈÈÈÈÈÈÈ..

ÈÈÈÈÈÈÈÈÈÈÈÈÈJabatan

Page 3: BOQ PKPAM 06

DAFTAR KUANTITAS DAN HARGASatuan Kerja : Pengembangan Kinerja Pengelolaan Air Minum Sumatera BaratPekerjaan : Optimalisasi Sistem SPAM PDAM Kabupaten SolokLokasi Pekerjaan : Kabupaten SolokNomor Paket : PKPAM - 06 (Enam)Tahun Anggaran : 2013 (APBN Murni)No Uraian Pekerjaan

A LOKASI : ALAHAN PANJANGREHAB IPA KAPASITAS 10 L/DET

I PEKERJAAN PENDAHULUAN1 Pembersihan lapangan2 Transportasi Material (Lansir) dengan tenaga manusia dari

gudang penyimpanan kelokasi pekerjaanJumlah Sub Total I

II PEKERJAAN REHAB IPA1 Pembongkaran Tube Setler 2 Pembongkaran Perpipaan dan gate valve yang rusak3 Pembongkaran media filtrasi4 Pembuatan dan pemasangan tube Setler yang baru5 Penggantian pipa dan Acc :

- Pipa Penguras GIP ND 100 mm- Pipa Over flow GIP ND 100 mm- Buterfly valve CI ND 100 mm

6 Pabrikasi dan pemasangan penggantian perpipaan7 Pengadaan media filter :

- Pasir silika ES Ø 0,5 mm- Gravel filteES Ø 1,2 - 5 mm- Gravel filteES Ø 5 - 12 mm- Gravel filteES Ø 12 - 25 mm- Gravel filteES Ø 25 - 35 mm

8 Perbaikan saluran pembuang uk 40 x 60 cm9 Bangunan Atap IPA terbuat dari rangka baja dan atap

dari spandekJumlah Sub Total II

III PEKERJAAN FINISHING1 Pengecatan dinding IPA dengan cat besi

Jumlah Sub Total IIIJUMLAH TOTAL ( I+II+III )

Page 4: BOQ PKPAM 06

DAFTAR KUANTITAS DAN HARGAPengembangan Kinerja Pengelolaan Air Minum Sumatera BaratOptimalisasi Sistem SPAM PDAM Kabupaten Solok

Satuan Kuantitas Harga SatuaHarga Pekerjaan(Rp) (Rp)

M2 96 - -

Ls 1 - --

Ls 1 - -Ls 1 - -Ls 1 - -M2 16 - -

M 12 - -M 12 - -Unit 8 - -Ls 1 - -

M3 4.9 - -M3 2.2 - -M3 2.2 - -M3 2.2 - -M3 2.73 - -M' 30 - -Unit 1 - -

-

M2 172 - ---

Page 5: BOQ PKPAM 06

DAFTAR KUANTITAS DAN HARGA

Satuan Kerj : Pengembangan Kinerja Pengelolaan Air Minum Sumatera BaratPekerjaan : Optimalisasi Sistem SPAM PDAM Kabupaten SolokLokasi Peke : Kabupaten SolokNomor Pake: PKPAM - 06 (Enam)Tahun Angg: 2013 (APBN Murni)No Uraian Pekerjaan

A PENGADAAN PIPA JARINGAN TRANSMISI & DISRIBUSI UTAMA( HDPE OD 225 mm, HDPE OD 160 mm )

I PENGADAAN PIPA 1 Pengadaan pipa HDPE PE 100, (S-8, SDR 17, PN-10)

SNI 06-4829-2005 standar 6,12 m' per batang- Pipa HDPE OD 225 mm- Pipa HDPE OD 160 mm

2 Pengadaan Pipa GIP (tanpa ulir)SNI 07-0039-1987 standar 6 m' per batang - Pipa GIP ND 250 mm (Selubung Crossing)- Pipa GIP ND 200 mm (Selubung Crossing)Jumlah Sub Total I

II PENGADAAN ACCESSORIES1 Bend HDPE

0- HDPE OD 225 mm x 90

0- HDPE OD 160 mm x 90

2 Stub Flange HDPE- HDPE OD 225 mm - HDPE OD 160 mm

3 Tee Flange GIP - ND 200 x 150 mm- ND 150 x 100 mm

4 Bend Flange GIP 0

- GIP ND 200 mm x 22.50

- GIP ND 150 mm x 22.55 Gate Valce CI

- ND 200 mm- ND 150 mm- ND 100 mm

6 Box Street CI- ND 200 mm- ND 150 mm- ND 100 mm

7 Flange Ring Las GIP - ND 200 mm (hole 12)- ND 150 mm (hole 8)

Page 6: BOQ PKPAM 06

8 Flange Socket PVC - PVC OD 225 mm - PVC OD 160 mm

9 Giboult Joint CI - ND 200 mm - ND 150 mm

10 Flange Buntu GIP- GIP ND 200 mm (hole 12)

Page 7: BOQ PKPAM 06

DAFTAR KUANTITAS DAN HARGA

Pengembangan Kinerja Pengelolaan Air Minum Sumatera BaratOptimalisasi Sistem SPAM PDAM Kabupaten Solok

Satuan Kuantitas Harga SatuaHarga Pekerjaan(Rp) (Rp)

PENGADAAN PIPA JARINGAN TRANSMISI & DISRIBUSI UTAMA

Meter 2,043 - -Meter 1,350 - -

Meter 36 - -Meter 24 - -

-

Unit 6 - -

Unit 6 - -

Unit 2 - -Unit 2 - -

Unit 2 - -Unit 3 - -

Unit 3 - -

Unit 5 - -

Unit 2 - -Unit 2 - -Unit 2 - -

Unit 2 - -Unit 2 - -Unit 2 - -

Unit 12 - -Unit 8 - -

Page 8: BOQ PKPAM 06

Unit 2 - -Unit 2 - -

Unit 2 - -Unit 2 - -

Unit 1 - -

Page 9: BOQ PKPAM 06

No Uraian Pekerjaan Satuan

- GIP ND 150 mm (hole 8) Unit11 Packing pipa

- ND 200 mm Unit- ND 150 mm Unit- ND 100 mm Unit

12 Mur Baut + Ring- ND 5/8\" Unit

13 Bahan Ventil (Air Valve)- Clamp Sadle GIP ND 225 x 25 mm (1\") Unit- Air Valve CI ND 25 mm (1\") Unit- Pipa GIP ND 25 mm (1\") Meter- Socket GIP ND 25 mm (1\") Unit- Double Nipple GIP ND 25 mm (1\") UnitJumlah Sub Total IIJUMLAH TOTAL ( I + II )

Page 10: BOQ PKPAM 06

Kuantitas Harga SatuaHarga Pekerjaan(Rp) (Rp)

1 - -

6 - -1 - -4 - -

112 - -

2 - -2 - -1 - -2 - -2 - -

--

Page 11: BOQ PKPAM 06

DAFTAR KUANTITAS DAN HARGA

Satuan Kerj : Pengembangan Kinerja Pengelolaan Air Minum Sumatera BaratPekerjaan : Optimalisasi Sistem SPAM PDAM Kabupaten SolokLokasi Peke : Kabupaten SolokNomor Pake: PKPAM - 06 (Enam)Tahun Angg: 2013 (APBN Murni)No Uraian Pekerjaan

PEMASANGAN PIPA JARINGAN TRANSMISI & DISRIBUSI UTAMA( HDPE OD 225 mm, HDPE OD 160 mm )

I PEKERJAAN TANAH1 Galian TANAH BIASA untuk pemasangan pipa :

- Pipa HDPE OD 225 mm- Pipa HDPE OD 160 mm

2 Urugan pasir pelindung pipa :- Pipa HDPE OD 225 mm- Pipa HDPE OD 160 mm

3 Urugan dan pemadatan galian pipa dengan materialbekas galian yang bersih, tidak mengandung humus,kotoran dan batuan (pipa PAKAI pasir pelindung) :- Pipa HDPE OD 225 mm- Pipa HDPE OD 160 mm

4 Pembongkaran aspal hotmix termasuk crossing :- Untuk Pipa OD 225 mm (uk. 0,50 x m)- Untuk Pipa OD 160 mm (uk. 0,45 x m)

5 Pembongkaran lantai beton- Untuk Pipa OD 225 mm (uk. 0,50 x m)- Untuk Pipa OD 160 mm (uk. 0,45 x m)

6 Perbaikan kembali aspal hotmix7 Perbaikan lantai beton 1 : 2 : 3, tebal 7 cm

Jumlah Sub Total III PEMASANGAN PIPA1 Transport pipa dari Gudang penyimpanan ke lokasi

pemasangan :- Pipa HDPE OD 225 mm (8\")- Pipa HDPE OD 160 mm (6\")

2 Pemasangan pipa lengkap accessories :- Pipa HDPE OD 225 mm (dengan Bult Fusion Welding)- Pipa HDPE OD 160 mm (dengan Bult Fusion Welding)- Pipa GIP ND 250 mm (untuk selubung crossing)- Pipa GIP ND 200 mm (untuk selubung crossing)

3 Pemasangan fitting (bend, gibolt joint, klem sadle, dll) :- GIP ND 200 mm- GIP ND 150 mm- HDPE OD 225 mm- HDPE OD 160 mm- PVC OD 225 mm

Page 12: BOQ PKPAM 06

- PVC OD 160 mm4 Pemasangan Gate Valve lengkap dengan box street

- CI ND 200 mm- CI ND 150 mm- CI ND 100 mm

5 Pemasangan Air Valve (Ventil) lengkap bak pengamanpada jalur pipa - Air Valve CI ND 25 mm (1\")

6 Pembuatan block penahan dari beton tanpa tulangan1 : 2 : 3 untuk bend, tee, gate valve, dll

7 Pengetesan dan pencucian pipa :- Pipa HDPE OD 225 mm(Tes Tekanan)- Pipa HDPE OD 160 mm(Tes Tekanan)

8 Pekerjaan koneksi ke pipa ExistingJumlah Sub Total IIJUMLAH TOTAL ( I + II )

Page 13: BOQ PKPAM 06

DAFTAR KUANTITAS DAN HARGA

Pengembangan Kinerja Pengelolaan Air Minum Sumatera BaratOptimalisasi Sistem SPAM PDAM Kabupaten Solok

Satuan Kuantitas Harga SatuaHarga Pekerjaan(Rp) (Rp)

PEMASANGAN PIPA JARINGAN TRANSMISI & DISRIBUSI UTAMA

Meter 2,043 - -Meter 1,350 - -

Meter 2,043 - -Meter 1,350 - -

Meter 2,043 - -Meter 1,350 - -

M2 18 - -M2 16.2 - -

M2 13.5 - -M2 12.15 - -M2 34.2 - -M3 1.8 - -

-

Ls 1 - -Ls - - -

Meter 2,043 - -Meter 1,350 - -Meter 36 - -Meter 24 - -

Unit 3 - -Unit 2 - -Unit 10 - -Unit 10 - -Unit 2 - -

Page 14: BOQ PKPAM 06

Unit 2 - -

Unit 2 - -Unit 2 - -Unit 2 - -

Unit 2 - -

M3 2.85 - -

Meter 2,043 - -Meter 1,350 - -Unit 4 - -

--

Page 15: BOQ PKPAM 06

DAFTAR KUANTITAS DAN HARGA

Satuan Kerja : Pengembangan Kinerja Pengelolaan Air Minum Sumatera BaratPekerjaan : Optimalisasi Sistem SPAM PDAM Kabupaten SolokLokasi Pekerjaan : Kabupaten SolokNomor Paket : PKPAM - 06 (Enam)Tahun Anggaran : 2013 (APBN Murni)No Uraian Pekerjaan

PENGADAAN WATER METER INDUK I PENGADAAN WATER METER INDUK & ACCESSORIES :1 Pengadaan Water Meter Induk, dengan SNI 05-2547-1991;

SNI 05-2418-1991 :- Water Meter DN 200 (Lokasi : Kayu Aro &Surian)- Water Meter DN 150 (Lokasi : Alahan Panjang)- Water Meter DN 100 (Lokasi : Bukit Sile & Singkarak)

2 Pengadaan Pipa GIP (tanpa ulir) SNI 07-0039-1987 :- Pipa GIP ND 200 mm (Medium B) SNI 07-0039-1987- Pipa GIP ND 150 mm (Medium B) SNI 07-0039-1987- Pipa GIP ND 100 mm (Medium B) SNI 07-0039-1987

3 All Flange Tee GIP- GIP ND 200 x 200 mm- GIP ND 150 x 150 mm- GIP ND 100 x 100 mm

4 Bend Flange GIP0

- GIP ND 200 mm x 900

- GIP ND 150 mm x 900

- GIP ND 100 mm x 905 Gate Valve Ductile

- Dct ND 200 mm- Dct ND 150 mm- Dct ND 100 mm

6 Gibolt Joint CI- CI ND 200 mm- CI ND 150 mm- CI ND 100 mm

7 Flange Ring (Las) GIP- GIP ND 200 mm (12 lubang)- GIP ND 150 mm (8 lubang)- GIP ND 100 mm (8 lubang)

8 Packing Karet- ND 200 mm- ND 150 mm- ND 100 mm

9 Mur Baut- Untuk Pipa ND 150 mm : ND 5/8\"

Page 16: BOQ PKPAM 06

JUMLAH

Page 17: BOQ PKPAM 06

DAFTAR KUANTITAS DAN HARGA

Pengembangan Kinerja Pengelolaan Air Minum Sumatera BaratOptimalisasi Sistem SPAM PDAM Kabupaten Solok

Satuan Kuantitas Harga SatuaHarga Pekerjaan(Rp) (Rp)

(Lokasi : Kayu Aro &Surian) Unit 3 - -(Lokasi : Alahan Panjang) Unit 2 - -(Lokasi : Bukit Sile & Singkarak) Unit 3 - -

- Pipa GIP ND 200 mm (Medium B) SNI 07-0039-1987 Meter 6 - -- Pipa GIP ND 150 mm (Medium B) SNI 07-0039-1987 Meter 4 - -- Pipa GIP ND 100 mm (Medium B) SNI 07-0039-1987 Meter 6 - -

Unit 6 - -Unit 4 - -Unit 6 - -

Unit 6 - -

Unit 4 - -

Unit 6 - -

Unit 9 - -Unit 6 - -Unit 9 - -

Unit 12 - -Unit 8 - -Unit 12 - -

Unit 18 - -Unit 12 - -Unit 18 - -

Unit 36 - -Unit 24 - -Unit 36 - -

Unit 456 - -

Page 18: BOQ PKPAM 06

-

Page 19: BOQ PKPAM 06

DAFTAR KUANTITAS DAN HARGA

Satuan Kerja : Pengembangan Kinerja Pengelolaan Air Minum Sumatera BaratPekerjaan : Optimalisasi Sistem SPAM PDAM Kabupaten SolokLokasi Pekerjaan : Kabupaten SolokNomor Paket : PKPAM - 06 (Enam)Tahun Anggaran : 2013 (APBN Murni)No Uraian Pekerjaan

A WATER METER INDUKND 200 mm = 3,00 UnitI PEKERJAAN RUANG WATER METER

1 Galian tanah berbatu2 Urugan pasir dibawah lantai3 Lantai Beton 1 : 2 : 3 (K 175)4 Pasangan batu kali 1 : 45 Plesteran 1 : 4 tebal 15 mm6 Urugan bekas galian7 Pembuatan Tutup R. W. Meter dari plat baja :

- Baja plat tebal 1.2 mm- Baja Siku L 40.40.4- C NP 10- Pegangan dengan besi beton DN 16 mm, 4 Unit- Engsel Besar- Kunci gembok- Angker DN 16, panjang 30 cm

8 Mengecat permukaan baja dengan cat besi9 Mengecat permukaan tembok yg terbuka dengan cat minyak

II PEMASANGAN WATER METER1 Transport Water Meter dan Accessories dari Gudang

penyimpanan ke lokasi pemasangan, dengan tenaga manusia :- ND 200 mm = Pake

2 Upah pemasangan Water Meter dan pabrikasi/pengelasanperpipaan dan accessoriesnya- ND 200 mm

3 Pembuatan block penahan dari beton tanpa tulangan1 : 2 : 3 (K 175) untuk bend, tee, gate valve, dan water met

4 Pengadaan Pipa PVC, klas S.12,5- OD 63 mm (untuk drain Ruang Meter)

5 Pemasangan Pipa PVC- OD 63 mm (untuk drain Ruang Meter)JUMLAH ( A ) untuk : 1 UnitJUMLAH 3 UNIT = ( A3

B WATER METER INDUKND 150 mm = 2,00 UnitI PEKERJAAN RUANG WATER METER

1 Galian tanah berbatu2 Urugan pasir dibawah lantai3 Lantai Beton 1 : 2 : 3 (K 175)4 Pasangan batu kali 1 : 45 Plesteran 1 : 4 tebal 15 mm

Page 20: BOQ PKPAM 06

6 Urugan bekas galian7 Pembuatan Tutup R. W. Meter dari plat baja :

- Baja plat tebal 1.2 mm- Baja Siku L 40.40.4- C NP 10- Pegangan dengan besi beton DN 16 mm, 4 Unit- Engsel Besar- Kunci gembok- Angker DN 16, panjang 30 cm

Page 21: BOQ PKPAM 06

DAFTAR KUANTITAS DAN HARGA

: Pengembangan Kinerja Pengelolaan Air Minum Sumatera Barat: Optimalisasi Sistem SPAM PDAM Kabupaten Solok

Satuan Kuantitas Harga SatuaHarga Pekerjaan(Rp) (Rp)

M3 16.41 - -M3 .2 - -M3 .4 - -M3 4.66 - -M2 21.27 - -M3 2.54 - -

Kg 29.25 - -Kg 55.18 - -Kg 33.5 - -

Pegangan dengan besi beton DN 16 mm, 4 Unit Kg 3 - -Unit 6 - -Bh 1 - -Unit 6 - -M2 10.52 - -

Mengecat permukaan tembok yg terbuka dengan cat minyakM2 3.09 - -

Transport Water Meter dan Accessories dari Gudangpenyimpanan ke lokasi pemasangan, dengan tenaga manusia :

1 Ls 1 - -Upah pemasangan Water Meter dan pabrikasi/pengelasan

Unit 1 - -Pembuatan block penahan dari beton tanpa tulangan1 : 2 : 3 (K 175) untuk bend, tee, gate valve, dan water met M3 2 - -

OD 63 mm (untuk drain Ruang Meter) Meter 12 - -

OD 63 mm (untuk drain Ruang Meter) Meter 12 - ---

M3 9.56 - -M3 .12 - -M3 .23 - -M3 3.01 - -M2 15.08 - -

Page 22: BOQ PKPAM 06

M3 1.5 - -

Kg 18.35 - -Kg 43.56 - -Kg 27.14 - -

Pegangan dengan besi beton DN 16 mm, 4 Unit Kg 3 - -Unit 6 - -Bh 1 - -Unit 6 - -

Page 23: BOQ PKPAM 06

8 Mengecat permukaan baja dengan cat besi9 Mengecat permukaan tembok yg terbuka dengan cat minyakII PEMASANGAN WATER METER1 Transport Water Meter dan Accessories dari Gudang

penyimpanan ke lokasi pemasangan, dengan tenaga manusia :- ND 150 mm = Pake 1

2 Upah pemasangan Water Meter dan pabrikasi/pengelasanperpipaan dan accessoriesnya- ND 150 mm

3 Pembuatan block penahan dari beton tanpa tulangan1 : 2 : 3 (K 175) untuk bend, tee, gate valve, dan water met

4 Pengadaan Pipa PVC, klas S.12,5- OD 63 mm (untuk drain Ruang Meter)

5 Pemasangan Pipa PVC- OD 63 mm (untuk drain Ruang Meter)

JUMLAH ( B ) untuk : 1 UnitJUMLAH 2 UNIT = ( B2

C WATER METER INDUKND 100 mm = 3,00 UnitI PEKERJAAN RUANG WATER METER1 Galian tanah berbatu2 Urugan pasir dibawah lantai3 Lantai Beton 1 : 2 : 3 (K 175)4 Pasangan batu kali 1 : 45 Plesteran 1 : 4 tebal 15 mm6 Urugan bekas galian7 Pembuatan Tutup R. W. Meter dari plat baja :

- Baja plat tebal 1.2 mm- Baja Siku L 40.40.4- C NP 10- Pegangan dengan besi beton DN 16 mm, 4 Unit- Engsel Besar- Kunci gembok- Angker DN 16, panjang 30 cm

8 Mengecat permukaan baja dengan cat besi9 Mengecat permukaan tembok yg terbuka dengan cat minyakII PEMASANGAN WATER METER1 Transport Water Meter dan Accessories dari Gudang

penyimpanan ke lokasi pemasangan, dengan tenaga manusia :- ND 100 mm = Pake 1

2 Upah pemasangan Water Meter dan pabrikasi/pengelasanperpipaan dan accessoriesnya- ND 100 mm

3 Pembuatan block penahan dari beton tanpa tulangan1 : 2 : 3 (K 175) untuk bend, tee, gate valve, dan water met

4 Pengadaan Pipa PVC, klas S.12,5- OD 63 mm (untuk drain Ruang Meter)

5 Pemasangan Pipa PVC

Page 24: BOQ PKPAM 06

- OD 63 mm (untuk drain Ruang Meter)JUMLAH ( C ) untuk : 1 UnitJUMLAH 3 UNIT = ( C3TOTAL JUMLAH ( A + B + C )

Page 25: BOQ PKPAM 06

M2 6.6 - -M2 2.46 - -

penyimpanan ke lokasi pemasangan, dengan tenaga manusia :Ls 1 - -

Unit 1 - -

M3 1.2 - -

Meter 12 - -

Meter 12 - -

--

M3 6.33 - -M3 .07 - -M3 .14 - -M3 2.52 - -M2 10.64 - -M3 1.29 - -

Kg 12.51 - -Kg 35.82 - -Kg 22.9 - -Kg 3 - -Unit 6 - -Bh 1 - -Unit 6 - -M2 4.5 - -M2 2.04 - -

penyimpanan ke lokasi pemasangan, dengan tenaga manusia :Ls 1 - -

Unit 1 - -

M3 .8 - -

Meter 12 - -

Page 26: BOQ PKPAM 06

Meter 12 - ----

Page 27: BOQ PKPAM 06

DAFTAR KUANTITAS DAN HARGA

Satuan Kerj : Pengembangan Kinerja Pengelolaan Air Minum Sumatera BaratPekerjaan : Optimalisasi SPAM Kawasan Khusus Talamau Kabupaten Pasaman BaratLokasi Peke : IKK Talamau Kabupaten Pasaman BaratNomor Pake: 38 (tiga puluh delapan)Tahun Angg: 2012 (APBN Murni)No Uraian Pekerjaan

D PEKERJAAN JEMBATAN PIPA GIP ND 200 MM

D.1 JEMBATAN PIPA GIP DN 200 mm, BENTANG 10 M, (1 Unit) lengkap dengan WOI PEKERJAAN PIPA DAN ACCESSORIES1 Pengadaan Pipa GIP Klas Medium B (tanpa ulir)

SNI 07-0039-1987 standar 6 m' per batang - Pipa GIP ND 200 mm (8\")- Pipa GIP ND 150 mm (6\")

2 All Flange Tee GIP- GIP DN 200 x 150 mm

3 Bend Flange GIP0

- ND 200 mm x 450

- ND 150 mm x 904 Gate Valve CI

- ND 200 mm - ND 150 mm

5 Box Street CI - ND 200 mm - ND 150 mm

6 Stub Flange HDPE- HDPE OD 225 mm

7 Flange Ring Las - ND 200 mm (hole 12)- ND 150 mm (hole 8)

8 Packing Pipa- ND 200 mm - ND 150 mm

9 Mur Baut + Ring- ND 5/8\"

10 Bahan Ventil & Accessories :- Air Valve (Ventil) CI ND 2\"- Flange Spigot GI ND 50 mm- Packing ND 50 mm - Mur Baut ND 1/2\"Jumlah Sub Total I

II PEMASANGAN PIPA JEMBATAN1 Pemasangan pipa lengkap accessories :

- GIP ND 200 mm

Page 28: BOQ PKPAM 06

- GIP ND 150 mm 2 Pemasangan fitting (bend, gibolt joint, klem sadle, dll) :

- GIP ND 200 mm - GIP ND 150 mm

3 Tiang Penyangga Pipa (Single) untuk GIP ND 200 mm -Tinggi 3 Mit4 Pemasangan Ventil (Air Valve) pada pipa jembatan :

- CI ND 50 mm5 Test pengaliran dan pencucian pipa :

- GIP ND 200 mm - GIP ND 150 mm

6 Pengecatan Pipa Expose seluruh bidang pipa & accJumlah Sub Total IIJUMLAH TOTAL ( I + II )

Page 29: BOQ PKPAM 06

DAFTAR KUANTITAS DAN HARGA

Pengembangan Kinerja Pengelolaan Air Minum Sumatera BaratOptimalisasi SPAM Kawasan Khusus Talamau Kabupaten Pasaman BaratIKK Talamau Kabupaten Pasaman Barat

Satuan Kuantitas Harga Satuan Harga Pekerjaan ( RP ) ( RP )

JEMBATAN PIPA GIP DN 200 mm, BENTANG 10 M, (1 Unit) lengkap dengan WO

Meter 13 - -Meter 3 - -

Unit 1 - -

Unit 4 - -

Unit 1 - -

Unit 1 - -Unit 1 - -

Unit 1 - -Unit 1 - -

Unit 2 - -

Unit 8 - -Unit 1 - -

Unit 11 - -Unit 3 - -

Unit 112 - -

Unit 1 - -Unit 1 - -Unit 1 - -Unit 6 - -

-

Meter 13 - -

Page 30: BOQ PKPAM 06

Meter 3 - -

Unit 4 - -Unit 1 - -

Tiang Penyangga Pipa (Single) untuk GIP ND 200 mm -Tinggi 3 Mit Un 2 - -

Unit 2 - -

Meter 13 - -Meter 3 - -M2 9.58 - -

--

Page 31: BOQ PKPAM 06

No Uraian Pekerjaan

D.2 JEMBATAN PIPA GIP DN 150 mm, BENTANG 10 M, (1 Unit) lengkap dengan WOI PEKERJAAN PIPA DAN ACCESSORIES1 Pengadaan Pipa GIP Klas Medium B (tanpa ulir)

SNI 07-0039-1987 standar 6 m' per batang - Pipa GIP ND 150 mm (6\")- Pipa GIP ND 100 mm (4\")

2 All Flange Tee GIP- GIP DN 150 x 100 mm

3 Bend Flange GIP0

- ND 150 mm x 450

- ND 100 mm x 904 Gate Valve CI

- ND 150 mm - ND 100 mm

5 Box Street CI - ND 150 mm - ND 100 mm

6 Stub Flange HDPE- HDPE OD 160 mm

7 Flange Ring Las - ND 150 mm (hole 8)- ND 100 mm (hole 8)

8 Packing Pipa- ND 150 mm - ND 100 mm

9 Mur Baut + Ring- ND 5/8\"

10 Bahan Ventil & Accessories :- Air Valve (Ventil) CI ND 2\"- Flange Spigot GI ND 50 mm- Packing ND 50 mm - Mur Baut ND 1/2\"Jumlah Sub Total I

II PEMASANGAN PIPA JEMBATAN1 Pemasangan pipa lengkap accessories :

- GIP ND 150 mm - GIP ND 100 mm

2 Pemasangan fitting (bend, gibolt joint, klem sadle, dll) :- GIP ND 150 mm - GIP ND 100 mm

3 Tiang Penyangga Pipa (Single) untuk GIP ND 150 mm -Tinggi 4 Pemasangan Ventil (Air Valve) pada pipa jembatan :

- CI ND 50 mm5 Test pengaliran dan pencucian pipa :

- GIP ND 150 mm

Page 32: BOQ PKPAM 06

- GIP ND 100 mm 6 Pengecatan Pipa Expose seluruh bidang pipa & acc

Jumlah Sub Total IIJUMLAH TOTAL ( I + II ) TOTAL JUMLAH ( D.I + D.II )

Page 33: BOQ PKPAM 06

Satuan Kuantitas Harga Satuan Harga Pekerjaan ( RP ) ( RP )

JEMBATAN PIPA GIP DN 150 mm, BENTANG 10 M, (1 Unit) lengkap dengan WO

Meter 13 - -Meter 3 - -

Unit 1 - -

Unit 4 - -

Unit 1 - -

Unit 1 - -Unit 1 - -

Unit 1 - -Unit 1 - -

Unit 2 - -

Unit 8 - -Unit 1 - -

Unit 11 - -Unit 3 - -

Unit 112 - -

Unit 1 - -Unit 1 - -Unit 1 - -Unit 6 - -

-

Meter 13 - -Meter 3 - -

Unit 4 - -Unit 1 - -Un 2 - -

Unit 2 - -

Meter 13 - -

Page 34: BOQ PKPAM 06

Meter 3 - -M2 7.07 - -

---

Page 35: BOQ PKPAM 06

DAFTAR HARGA SATUAN UPAH DAN BAHAN

Satuan Kerja : Pengembangan Kinerja Pengelolaan Air Minum Sumatera BaratPekerjaan : Optimalisasi Sistem SPAM PDAM Kabupaten SolokNomor Paket : PKPAM - 06 (Enam)Tahun Anggaran : 2013 (APBN Murni)No. U r a i a n

A UPAH1 Pekerja2 Mandor3 Tukang Pipa4 Tukang Batu5 Tukang Kayu6 Tukang Besi7 Tukang Las8 Tukang Cat9 Tukang Anyam10 Tukang Las PE11 Kepala Tukang12 Mekanik13 Operator AlatB BAHAN1 Batu Bata Merah2 Batu Kali Bulat Utuh3 Batu Pecah Tangan 15/204 Kerikil Beton5 Kerikil Beton (Bobot isi 1350 Kg/m3)6 Pasir Beton7 Pasir Beton (Bobot isi 1400 Kg/m3)8 Pasir Pasang9 Pasir Urug10 Tanah Urug11 Timbunan Sirtu12 Water Stop lebar 20 cm (Rubber)13 Semen Portland (50 Kg/zak)14 Semen Warna15 Cat Besi16 Cat Minyak17 Cat Tembok18 Cat Water Profing19 Cat Dasar20 Dempul21 Residu22 Meni Kayu23 Plamur Kayu24 Plamur Tembok25 Minyak Bekisting

Page 36: BOQ PKPAM 06

26 Amplas27 Kuas28 Engsel Biasa29 Engsel Besar30 Engsel lokal31 Engsel Peluru Nylon32 Engsel kupu-kupu33 Engsel Angin34 Spring Knip35 Grendel 6\"36 Grendel 4\"37 Kunci Tanam Antik38 Kunci gembok39 Kait Angin

Page 37: BOQ PKPAM 06

DAFTAR HARGA SATUAN UPAH DAN BAHAN

: Pengembangan Kinerja Pengelolaan Air Minum Sumatera Barat: Optimalisasi Sistem SPAM PDAM Kabupaten Solok

Satuan Harga Sat Keterangan(Rp)

hariharihariharihariharihariharihariharihariharihari

BuahM3M3M3KgM3KgM3M3M3M3M'KgKgKgKgKgKgKgKgKgKgKgKgLiter

Page 38: BOQ PKPAM 06

LembarBhUnitUnitUnitUnitUnitUnitUnitUnitUnitUnitUnitUnit

Page 39: BOQ PKPAM 06

No. U r a i a n Satuan

40 Door Closer Unit41 Door holder Unit42 Kunci Selot Unit43 Kaca polos tebal 5 mm M244 Paku Biasa 1/2\" - 1\" Kg45 Paku Biasa 2\" - 5\" Kg46 Paku Plafond Triplek Kg47 Paku Atap Asbes Kg48 Paku Sekrup 1 cm - 2.5 cm Bh49 Paku Pancing 60 x 230 Kg50 Mur baut DN 22 mm x 40 cm Unit51 Mur baut DN 7/8\" x 4\" (as katrol) Unit52 Mur baut DN 20 mm x 4\" Unit53 Mur baut DN 5/8\" x 10\" Unit54 Mur baut DN 5/8\" x 6\" Unit55 Mur baut DN 1/2\" x 2\" Unit56 Mur baut DN 8 mm x 3\" Unit57 Baut + Ring DN 1/2\" Unit58 Angker baut DN 12 x 15 cm Unit59 Angker baut & Mur DN 22 mm panjang 30 cm Unit60 Angker baut & Mur DN 16 mm panjang 30 cm Unit61 Angker baut & Mur DN 12 mm panjang 20 cm Unit62 Besi Beton Kg63 Baja Profil Kg64 Plat Baja Kg65 Kawat Ikat Beton Kg66 Kawat Beronjong (digalvano DN 4 mm) Kg67 Kawat Las Kg68 Kawat Las Bh69 Kawat Kasa # 1 cm M270 Plat Spandek Lembar71 Atap Spandek Lembar72 Kayu Banio (Papan) Kelas I M373 Kayu Banio (Balok) Kelas I M374 Kayu Marsawa (Papan) Kelas II M375 Kayu Marsawa (Balok) Kelas II M376 Kayu Merantih (Papan) Kelas III M377 Kayu Merantih (Balok) Kelas III M378 Kayu Bekisting (Papan) Kelas IV M379 Kayu Bekisting (Balok) Kelas IV M380 Formtie/penjaga jarak bekisting/spacer Buah81 Kayu Dolken DN 8 - 10 cm / 4 m (Tiang Pancang)Batang82 Kayu Profil 1/3 Meter83 Kayu Lis 1/2 Meter84 Tripleks 4 mm Lembar85 Tripleks 9 mm Lembar86 Lem Kayu Liter

Page 40: BOQ PKPAM 06

87 Aspal Kg88 Aspal Hotmix Ton89 S o l a r Liter90 Pelumas Liter91 I j u k Kg92 Sewa Mesin test pipa Hari93 Sewa Mesin test pipa Jam94 Sewa Mesin Las Jam95 Sewa Bult Fusion Welding Jam96 Air (Untuk pengetesan pipa) M397 Air (Untuk pengecoran beton) 1000 Kg/m3 Liter98 Pagar BRC standar 2,4 x 1,2 m Unit99 Klem Pagar BRC Unit

ÈÈÈÈÈÈÈÈ.., ÈÈÈÈÈÈÈÈ.. 2012

Page 41: BOQ PKPAM 06

Harga Sat Keterangan(Rp)

Page 42: BOQ PKPAM 06

ÈÈÈÈÈÈÈÈ.., ÈÈÈÈÈÈÈÈ.. 2012

Page 43: BOQ PKPAM 06

No. U r a i a n Satuan

Dihitung Oleh :PT/CV/Fa. ÈÈÈÈÈÈÈÈÈ..

ÈÈÈÈÈÈÈÈÈÈÈÈÈ

Page 44: BOQ PKPAM 06

Harga Satuan Keterangan(Rp)

Dihitung Oleh :PT/CV/Fa. ÈÈÈÈÈÈÈÈÈ..

ÈÈÈÈÈÈÈÈÈÈÈÈÈJabatan

Page 45: BOQ PKPAM 06

DAFTAR HARGA SATUAN PEKERJAANSatuan Kerj : Pengembangan Kinerja Pengelolaan Air Minum Sumatera BaratPekerjaan : Optimalisasi Sistem SPAM PDAM Kabupaten SolokNomor Pake: PKPAM - 06 (Enam)Tahun Angg: 2013 (APBN Murni)No. Uraian Pekerjaan

1 PEKERJAAN PERSIAPAN1 Membersihkan Lapangan dan perataan2 Pengukuran dan pemasangan bowplank

2 PEKERJAAN TANAH3 Galian TANAH BIASA sedalam 1 meter4 Galian TANAH KERAS sedalam 1 meter5 Galian TANAH BERBATU sedalam 1 meter6 Mengurug Kembali7 Urugan Pasir8 Pemasangan lapisan Ijuk tebal 10 cm9 Urugan Sirtu padat (untuk peninggian lantai bangunan)10 Membongkar lantai beton dan aspal hotmix

3 PEKERJAAN PONDASI11 Pasang pondasi BATU BELAH, 1 PC : 4 PP12 Pasang pondasi BATU KOSONG13 Pas. Batu Bronjong (dgn kawat Digalvano 4 mm)

4 PEKERJAAN DINDING14 Pasangan BATA MERAH (5 x 11 x 22) tebal 1/2 bata, 1 PC : 2 PP15 Pasangan BATA MERAH (5 x 11 x 22) tebal 1/2 bata, 1 PC : 4 PP

5 PEKERJAAN PLESTERAN16 Plesteran 1 Pc : 2 PP, tebal 15 mm17 Plesteran 1 Pc : 4 PP, tebal 15 mm18 Plesteran 1 PC : 2 PP, tebal 20 mm19 Plesteran 1 PC : 4 PP, tebal 20 mm20 Finishing Siar pasangan Batu kali adukan 1 PC : 2 PP

6 PEKERJAAN KAYU21 Membuat dan memasang Kusen Pintu dan Kusen Jendela, Kayu kelas II22 Membuat dan memasang Pintu Panel, Kayu kelas II 23 Membuat dan memasang Pintu dan Jendela Kaca, Kayu kelas II 24 Membuat dan memasang Pintu dan Jendela Jalusi, Kayu kelas II 25 Memasang konstruksi kuda-kuda konvensional, kayu kelas II bentang 6 m26 Memasang konstruksi kuda-kuda expose, kayu kelas I27 Memasang konstruksi gordeng, kayu kelas II28 Memasang rangka langit-langit (60 x 60 cm), kayu kelas III29 Memasang List plank ukuran (3 x 20 cm), kayu kelas II30 Memasang kawat Kasa # 1 cm

7 PEKERJAAN BETON31 Membuat Lantai Kerja Beton Mutu f'c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,32 Membuat Beton Mutu f'c = 9,8 MPa (K 125), slump (12 + 2) cm, w/c = 0,78

Page 46: BOQ PKPAM 06

33 Membuat Beton Mutu f'c = 14,5 MPa (K 175), slump (12 + 2) cm, w/c = 0,6634 Membuat Beton Mutu f'c = 19,3 MPa (K 225), slump (12 + 2) cm, w/c = 0,5835 Memasang PVC Water Stop lebar 20 cm36 Pembesian dengan besi polos atau berulir37 Pasang Bekisting untuk pondasi38 Pasang Bekisting untuk Sloof39 Pasang Bekisting untuk Kolom40 Pasang Bekisting untuk Balok41 Pasang Bekisting untuk Pelat Lantai/Atap beton42 Pasang Bekisting untuk Dinding

Page 47: BOQ PKPAM 06

DAFTAR HARGA SATUAN PEKERJAAN: Pengembangan Kinerja Pengelolaan Air Minum Sumatera Barat

Satuan Hara Satuan( Rp. )

1 M2 -1 M' -

1 M3 -1 M3 -1 M3 -1 M3 -1 M3 -1 M2 -1 M3 -1 M2 -

1 M3 -1 M3 -1 M3 -

14 Pasangan BATA MERAH (5 x 11 x 22) tebal 1/2 bata, 1 PC : 2 PP 1 M2 -15 Pasangan BATA MERAH (5 x 11 x 22) tebal 1/2 bata, 1 PC : 4 PP 1 M2 -

1 M2 -1 M2 -1 M2 -1 M2 -1 M2 -

21 Membuat dan memasang Kusen Pintu dan Kusen Jendela, Kayu kelas II 1 M3 -1 M2 -

23 Membuat dan memasang Pintu dan Jendela Kaca, Kayu kelas II 1 M2 -24 Membuat dan memasang Pintu dan Jendela Jalusi, Kayu kelas II 1 M2 -25 Memasang konstruksi kuda-kuda konvensional, kayu kelas II bentang 6 m 1 M3 -

1 M3 -1 M3 -

28 Memasang rangka langit-langit (60 x 60 cm), kayu kelas III 1 M2 -1 M' -1 M2 -

31 Membuat Lantai Kerja Beton Mutu f'c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0, 1 M3 -32 Membuat Beton Mutu f'c = 9,8 MPa (K 125), slump (12 + 2) cm, w/c = 0,78 1 M3 -

Page 48: BOQ PKPAM 06

33 Membuat Beton Mutu f'c = 14,5 MPa (K 175), slump (12 + 2) cm, w/c = 0,66 1 M3 -34 Membuat Beton Mutu f'c = 19,3 MPa (K 225), slump (12 + 2) cm, w/c = 0,58 1 M3 -

1 M' -1 Kg -1 M2 -1 M2 -1 M2 -1 M2 -1 M2 -1 M2 -

Page 49: BOQ PKPAM 06

No. Uraian Pekerjaan

43 Pasang Bekisting untuk Dinding Tahap Atas (Asumsi 2 x pakai)44 Membuat SLOOF beton bertulang (200 Kg besi + Bekisting)45 Membuat BALOK beton bertulang (200 Kg besi + Bekisting)46 Membuat KOLOM PRAKSTIS beton bertulang (11 x 11 cm)47 Membuat RING BALOK beton bertulang (10 x 15 cm)48 Membuat DINDING beton bertulang (150 Kg besi + Bekisting)8 PEKERJAAN BESI dan ALUMINIUM49 Mengerjakan baja IWF atau Besi profil 50 Mengerjakan pengelasan dengan las listrik9 PEKERJAAN KUNCI dan KACA51 Memasang kunci tanam antik52 Memasang engsel kupu-kupu53 Memasang kait angin54 Memasang kaca, tebal 5 mm dan atau kaca bouven light10 PEKERJAAN PENGECATAN55 Mengecat bidang kayu baru : (1 lapis plamir, 1 lapis cat dasar,

2 lapis cat penutup)56 Mengecat bidang tembok baru dengan Cat Tembok :

(1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)57 Mengecat bidang tembok baru dengan Cat Minyak :

(1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)58 Mengecat permukaan baja dengan cat besi59 Mengecat bidang tembok baru dengan Cat water profing, (2 lapis)16 PEKERJAAN PIPA60 Galian TANAH BIASA untuk pemasangan pipa

- Pipa HDPE OD 200 mm- Pipa HDPE OD 160 mm- Pipa HDPE OD 110 mm- Pipa HDPE OD 90 mm- Pipa HDPE OD 63 mm

61 Galian TANAH KERAS untuk pemasangan pipa- Pipa HDPE OD 200 mm- Pipa HDPE OD 160 mm- Pipa HDPE OD 110 mm- Pipa HDPE OD 90 mm- Pipa HDPE OD 63 mm

62 Galian TANAH BERBATU untuk pemasangan pipa- Pipa HDPE OD 200 mm- Pipa HDPE OD 160 mm- Pipa HDPE OD 110 mm- Pipa HDPE OD 90 mm- Pipa HDPE OD 63 mm

63 Urugan Pasir pelindung pipa- Pipa HDPE OD 200 mm- Pipa HDPE OD 160 mm

Page 50: BOQ PKPAM 06

- Pipa HDPE OD 110 mm- Pipa HDPE OD 90 mm- Pipa HDPE OD 63 mm

64 Urugan dan Pemadatan pipa dgn Material bekas galian (DIATAS PASIR PELINDUNG)- Pipa HDPE OD 200 mm- Pipa HDPE OD 160 mm- Pipa HDPE OD 110 mm- Pipa HDPE OD 90 mm- Pipa HDPE OD 63 mm

Page 51: BOQ PKPAM 06

Satuan Hara Satuan( Rp. )

1 M2 -1 M3 -1 M3 -1 M3 -1 M3 -1 M3 -

1 Kg -1 Cm -

1 Unit -1 Unit -1 Unit -1 M2 -

1 M2 -

1 M2 -

1 M2 -

1 M2 -1 M2 -

M' -M' -M' -M' -M' -

M' -M' -M' -M' -M' -

M' -M' -M' -M' -M' -

M' -M' -

Page 52: BOQ PKPAM 06

M' -M' -M' -

64 Urugan dan Pemadatan pipa dgn Material bekas galian (DIATAS PASIR PELINDUNG)M' -M' -M' -M' -M' -

Page 53: BOQ PKPAM 06

No. Uraian Pekerjaan

65 Urugan dan Pemadatan Pipa dgn Material bekas galian (TANPA PASIR PELINDUNG)- Pipa HDPE OD 200 mm- Pipa HDPE OD 160 mm- Pipa HDPE OD 110 mm- Pipa HDPE OD 90 mm- Pipa HDPE OD 63 mm66 Pemasangan Pipa HDPE :- Pipa HDPE OD 200 mm- Pipa HDPE OD 160 mm- Pipa HDPE OD 110 mm- Pipa HDPE OD 90 mm- Pipa HDPE OD 63 mm67 Pemasangan Pipa PVC :- PVC OD 200 mm- PVC OD 160 mm- PVC OD 110 mm- PVC OD 90 mm- PVC OD 63 mm68 Pemasangan Pipa GIP : (lengkap flange, mur baut, packing & las)- GI DN 250 mm- GI DN 200 mm- GI DN 150 mm` - GI DN 100 mm- GI DN 75 mm- GI DN 50 mm69 Pemasangan Gate Valve CI- CI ND 250 mm- CI ND 200 mm- CI ND 150 mm- CI ND 100 mm- CI DN 75 mm- CI DN 50 mm70 Pemasangan (TEE) HDPE- HDPE OD 200 mm- HDPE OD 160 mm- HDPE OD 110 mm- HDPE OD 90 mm- HDPE OD 63 mm71 Pemasangan (BEND / REDUCER) HDPE- HDPE OD 200 mm- HDPE OD 160 mm- HDPE OD 110 mm- HDPE OD 90 mm- HDPE OD 63 mm72 Pemasangan Fitting PVC

Page 54: BOQ PKPAM 06

(Tee, Bend, Reducer, F. Spigot/F.Socket, Dop, Gibolt Joint)- PVC OD 200 mm- PVC OD 160 mm- PVC OD 110 mm- PVC OD 90 mm- PVC OD 63 mm73 Pemasangan Fitting GI (Tee, Bend, Reducer, dll)- GI DN 200 mm- GI DN 150 mm- GI DN 100 mm

Page 55: BOQ PKPAM 06

Satuan Hara Satuan( Rp. )

65 Urugan dan Pemadatan Pipa dgn Material bekas galian (TANPA PASIR PELINDUNG)M' -M' -M' -M' -M' -

M' -M' -M' -M' -M' -

M' -M' -M' -M' -M' -

M' -M' -M' -M' -M' -M' -

Unit -Unit -Unit -Unit -Unit -Unit -

Unit -Unit -Unit -Unit -Unit -

Unit -Unit -Unit -Unit -Unit -

Page 56: BOQ PKPAM 06

Unit -Unit -Unit -Unit -Unit -

Unit -Unit -Unit -

Page 57: BOQ PKPAM 06

No. Uraian Pekerjaan

- GI DN 75 mm- GI DN 50 mm

74 Pengetesan dan Pencucian Pipa ( TEKANAN ) :- Pipa OD 200 mm- Pipa OD 160 mm- Pipa OD 110 mm- Pipa OD 90 mm- Pipa OD 63 mm

75 Pengetesan dan Pencucian Pipa ( ALIRAN ) :- Pipa ND 200 mm- Pipa ND 150 mm- Pipa ND 100 mm- Pipa ND 75 mm- Pipa ND 50 mm

76 Saluran Bata Merah 1 : 4 (Uk. 60 x 60 cm)77 Saluran Bata Merah 1 : 4 (Uk. 40 x 60 cm)78 Pembuatan Anak Tangga besi ND 16 mm79 Ventilasi udara pipa GI ND 75 mm80 Tutup Manhole 80 x 80 cm81 Tutup Manhole 110 x 110 cm82 Pagar BRC (Lengkap Tiang dan pondasi )83 Pintu Gerbang BRC, Lebar 4,00 M ( 2 daun )84 Pintu Gerbang BRC, Lebar 1,00 M ( 2 daun )85 Pintu Gerbang BRC, Lebar 1,00 M ( 1 daun )86 Air Valve ND 50 mm (Lengkap box pengaman) pd jalur 87 Air Valve ND 25 mm (Lengkap box pengaman) pd jalur 87 Dudukan Pipa Expose GIP ND 200 mm (Type A)88 Dudukan Pipa Expose GIP ND 150 mm (Type A)89 Dudukan Pipa Expose GIP ND 100 mm (Type A)90 Dudukan Pipa Expose GIP ND 75 mm (Type A)91 Tiang Penyangga (Single) untuk Pipa GIP DN 200 mm - Tinggi 2 m92 Tiang Penyangga Pipa (Single) untuk GIP DN 150 mm - Tinggi 2 M93 Tiang Penyangga Pipa (Single) untuk GIP DN 100 mm - Tinggi 2 M94 Dudukan dan penggantung pipa jembatan95 Matahari pengaman pipa jembatan

Page 58: BOQ PKPAM 06

Satuan Hara Satuan( Rp. )

Unit -Unit -

M' -M' -M' -M' -M' -

M' -M' -M' -M' -M' -1 M' -1 M' -Bh -Unit -Unit -Unit -M' -Unit -Unit -Unit -Unit -Unit -Unit -Unit -Unit -Unit -Unit -Unit -Unit -Unit -Unit -

ÈÈÈÈÈÈÈÈ.., ÈÈÈÈÈÈÈÈ.. 2012Dihitung Oleh :PT/CV/Fa. ÈÈÈÈÈÈÈÈÈ..

ÈÈÈÈÈÈÈÈÈÈÈÈÈJabatan

Page 59: BOQ PKPAM 06

DAFTAR HARGA SATUAN PIPA DAN ACCESSORIESSatuan Kerja : Pengembangan Kinerja Pengelolaan Air Minum Sumatera BaratPekerjaan : Optimalisasi Sistem SPAM PDAM Kabupaten SolokNomor Paket : PKPAM - 06 (Enam)Tahun Anggaran : 2013 (APBN Murni)No.

PIPA GIP (GALVANISED IRON PIPE), HDPE dan PVC

I PIPA GIP ( GALVANISED IRON PIPE )* SNI 07-0039-1987 Klas Medium B

( Tanpa Ulir )

* SNI 07-0039-1987 Klas Medium B( Tanpa Ulir )

* Pipa GI (klas Light)

II PIPA HDPE * Pipa HDPE PE-100 PN 10, SDR 17

SNI 06-4829-2005

III PIPA PVC * Pipa PVC Klas S-12,5 (RRJ)

SNI 06-0084-2002

* Pipa PVC Klas S-10 ( SCJ )SNI 06-0084-2002

III ACCESSORIES PIPA GIP* All Flange Tee GIP* All Flange Tee GIP

Page 60: BOQ PKPAM 06

* All Flange Tee GIP* All Flange Tee GIP* All Flange Tee GIP* All Flange Tee GIP* All Flange Tee GIP* All Flange Tee GIP* All Flange Tee GIP

0* Bend Flange GIP 90

0* Bend Flange GIP 90

0* Bend Flange GIP 90

0* Bend Flange GIP 90

0* Bend Flange GIP 90

Page 61: BOQ PKPAM 06

DAFTAR HARGA SATUAN PIPA DAN ACCESSORIES: Pengembangan Kinerja Pengelolaan Air Minum Sumatera Barat: Optimalisasi Sistem SPAM PDAM Kabupaten Solok

U r a i a n Satuan Harga Sat Ket.(Rp)

ND 300 mm ( 12\" ) MeterND 250 mm ( 10\" ) MeterND 200 mm ( 8\" ) MeterND 150 mm ( 6\" ) MeterND 100 mm ( 4\" ) MeterND 75 mm ( 3\" ) MeterND 50 mm ( 2\" ) MeterND 40 mm ( 1,5\" ) MeterND 25 mm ( 1\" ) MeterND 20 mm ( 3/4\" ) MeterND 15 mm ( 1/2\" ) MeterND 150 mm ( 6\" ) MeterND 100 mm ( 4\" ) MeterND 75 mm ( 3\" ) MeterND 50 mm ( 2\" ) Meter

OD 315 mm ( 12\" ) MeterOD 250 mm ( 10\" ) MeterOD 225 mm ( 8\" ) MeterOD 160 mm ( 6\" ) MeterOD 110 mm ( 4\" ) MeterOD 90 mm ( 3\" ) Meter

OD 315 mm ( 12\" ) MeterOD 250 mm ( 10\" ) MeterOD 225 mm ( 8\" ) MeterOD 160 mm ( 6\" ) MeterOD 110 mm ( 4\" ) MeterOD 90 mm ( 3\" ) MeterOD 63 mm ( 2\" ) MeterOD 50 mm ( 1,5\" ) MeterOD 32 mm ( 1\" ) MeterOD 25 mm ( 3/4\" ) MeterOD 20 mm ( 1/2\" ) Meter

ND 250 x 250 mm UnitND 250 x 200 mm Unit

Page 62: BOQ PKPAM 06

ND 250 x 150 mm UnitND 200 x 200 mm UnitND 200 x 150 mm UnitND 150 x 150 mm UnitND 150 x 100 mm UnitND 100 x 100 mm UnitND 100 x 75 mm Unit

ND 300 mm Unit

ND 250 mm Unit

ND 200 mm Unit

ND 150 mm Unit

ND 100 mm Unit

Page 63: BOQ PKPAM 06

No. U r a i a n

0* Bend Flange GIP 90 ND 75 mm

0* Bend Flange GIP 90 ND 50 mm

0* Bend Flange GIP 45 ND 300 mm

0* Bend Flange GIP 45 ND 250 mm

0* Bend Flange GIP 45 ND 200 mm

0* Bend Flange GIP 45 ND 150 mm

0* Bend Flange GIP 45 ND 100 mm

0* Bend Flange GIP 45 ND 75 mm

0* Bend Flange GIP 45 ND 50 mm

0* Bend Flange GIP 22,5 ND 300 mm

0* Bend Flange GIP 22,5 ND 250 mm

0* Bend Flange GIP 22,5 ND 200 mm

0* Bend Flange GIP 22,5 ND 150 mm

0* Bend Flange GIP 22,5 ND 100 mm

0* Bend Flange GIP 11,25 ND 300 mm

0* Bend Flange GIP 11,25 ND 250 mm

0* Bend Flange GIP 11,25 ND 200 mm

0* Bend Flange GIP 11,25 ND 150 mm

0* Bend Flange GIP 11,25 ND 100 mm* Reducer Flange GIP ND 250 x 200 mm* Reducer Flange GIP ND 250 x 150 mm* Reducer Flange GIP ND 200 x 150 mm* Reducer Flange GIP ND 200 x 100 mm* Reducer Flange GIP ND 150 x 100 mm* Reducer Flange GIP ND 100 x 75 mm* Reducer Flange GIP ND 100 x 50 mm

Page 64: BOQ PKPAM 06

* Reducer Flange GIP ND 75 x 50 mm* Flange Ring (las) GIP ND 250 mm* Flange Ring (las) GIP ND 200 mm* Flange Ring (las) GIP ND 150 mm* Flange Ring (las) GIP ND 100 mm* Flange Ring (las) GIP ND 75 mm* Flange Ring (las) GIP ND 50 mm* Packing Pipa ND 300 mm* Packing Pipa ND 250 mm* Packing Pipa ND 200 mm* Packing Pipa ND 150 mm* Packing Pipa ND 100 mm* Packing Pipa ND 75 mm* Packing Pipa ND 50 mm* Mur Baut ND 22 mm x 4\" (7/8\")* Mur Baut ND 5/8\" x 3\"* Mur Baut ND 1/2\" x 3\"* Flange Buntu GI ND 250 mm* Flange Buntu GI ND 200 mm* Flange Buntu GI ND 150 mm* Flange Buntu GI ND 100 mm* Flange Buntu GI ND 75 mm* Flange Buntu GI ND 50 mm* Flange Spigot GIP ND 250 mm* Flange Spigot GIP ND 200 mm* Flange Spigot GIP ND 150 mm* Flange Spigot GIP ND 100 mm* Flange Spigot GIP ND 75 mm* Flange Spigot GIP ND 50 mm

Page 65: BOQ PKPAM 06

Satuan Harga Sat Ket.(Rp)

Unit

Unit

Unit

Unit

Unit

Unit

Unit

Unit

Unit

Unit

Unit

Unit

Unit

Unit

Unit

Unit

Unit

Unit

UnitUnitUnitUnitUnitUnitUnitUnit

Page 66: BOQ PKPAM 06

Unit(hole 12) Unit(hole 12) Unit(hole 8) Unit(hole 8) Unit(hole 6) Unit(hole 4) Unit

UnitUnitUnitUnitUnitUnitUnitUnitUnitUnit

(hole 12) Unit(hole 12) Unit(hole 8) Unit(hole 8) Unit(hole 6) Unit(hole 4) Unit

UnitUnitUnitUnitUnitUnit

Page 67: BOQ PKPAM 06

No. U r a i a n Satuan

* Flexible Joint, 10 K ND 250 mm Unit* Flexible Joint, 10 K ND 200 mm Unit* Flexible Joint, 10 K ND 150 mm Unit* Flexible Joint, 10 K ND 100 mm Unit* Flexible Joint, 10 K ND 75 mm Unit* Flexible Joint, 10 K ND 50 mm Unit* Gate Valve (Ductile) ND 300 mm Unit* Gate Valve (Ductile) ND 250 mm Unit* Gate Valve (Ductile) ND 200 mm Unit* Gate Valve (Ductile) ND 150 mm Unit* Gate Valve (Ductile) ND 100 mm Unit* Gate Valve (Ductile) ND 75 mm Unit* Gate Valve (Ductile) ND 50 mm Unit* Box Street CI ND 300 mm Unit* Box Street CI ND 250 mm Unit* Box Street CI ND 200 mm Unit* Box Street CI ND 150 mm Unit* Box Street CI ND 100 mm Unit* Box Street CI ND 75 mm Unit

ND 50 mm Unit* Check Valve CI ND 250 mm Unit* Check Valve CI ND 200 mm Unit* Check Valve CI ND 150 mm Unit* Check Valve CI ND 100 mm Unit* Foot Valve (Klep) & StraiND 250 mm Unit* Foot Valve (Klep) & StraiND 200 mm Unit* Foot Valve (Klep) & StraiND 150 mm Unit* Foot Valve (Klep) & StraiND 100 mm Unit* Gibolt Joint CI ND 250 mm Unit* Gibolt Joint CI ND 200 mm Unit* Gibolt Joint CI ND 150 mm Unit* Gibolt Joint CI ND 100 mm Unit* Gibolt Joint CI ND 75 mm Unit* Gibolt Joint CI ND 50 mm Unit* Water Meter, CI ND 250 mm Unit* Water Meter, CI ND 200 mm Unit* Water Meter, CI ND 150 mm Unit* Water Meter, CI ND 100 mm Unit* Water Meter, CI ND 75 mm Unit* Water Meter, CI ND 50 mm Unit* Water Meter, Brass ND 40 mm Unit* Water Meter, Brass ND 25 mm Unit* Water Meter, Brass ND 20 mm Unit* Water Meter, Brass ND 15 mm Unit* Wall Pipe GIP ND 250 mm - 0.60 m' (FlUnit

Page 68: BOQ PKPAM 06

* Wall Pipe GIP ND 250 mm - 0.60 m' (FlUnit* Wall Pipe GIP ND 200 mm - 0.60 m' (FlUnit* Wall Pipe GIP ND 200 mm - 0.60 m' (FlUnit* Wall Pipe GIP ND 150 mm - 0.60 m' (FlUnit* Wall Pipe GIP ND 150 mm - 0.60 m' (FlUnit* Wall Pipe GIP ND 100 mm - 0.60 m' (FlUnit* Wall Pipe GIP ND 100 mm - 0.60 m' (FlUnit* Wall Pipe GIP ND 75 mm - 0.60 m' (FlUnit* Wall Pipe GIP ND 75 mm - 0.60 m' (FlUnit* Wall Pipe GIP ND 100 mm - 0.40 m' (FlUnit* Wall Pipe GIP ND 100 mm - 0.20 m' (FlUnit* Pipa Screen (lengkap lu GIP ND 300 mm Unit

Page 69: BOQ PKPAM 06

Harga Satuan Ket.(Rp)

Page 70: BOQ PKPAM 06

No. U r a i a n

* Pipa Screen (lengkap lu GIP ND 250 mm* Pipa Screen (lengkap lu GIP ND 200 mm* Pipa Screen (lengkap lu GIP ND 150 mm* Ventil Udara (Air Valve) ND 100 mm (4\") Flange* Ventil Udara (Air Valve) ND 75 mm (2\") Flange* Ventil Udara (Air Valve) ND 50 mm (2\") Flange* Ventil Udara (Air Valve) ND 25 mm (1\") Drat* Clamp Sadle GIP ND 300 x 100 mm* Clamp Sadle GIP ND 300 x 50 mm* Clamp Sadle GIP ND 250 x 50 mm* Clamp Sadle GIP ND 200 x 50 mm* Clamp Sadle GIP ND 200 x 25 mm* Clamp Sadle GIP ND 150 x 50 mm* Clamp Sadle GIP ND 150 x 25 mm* Clamp Sadle GIP ND 100 x 25 mm* Clamp Sadle GIP ND 75 x 25 mm* Tee Drat GI ND 75 x 75 mm* Cap/dop GI ND 50 mm (2\")

ND 40 mm (1,5\")

* Knie GIP ND 75 mm* Knie GIP ND 50 mm* Knie GIP ND 25 mm (1\")* Knie GIP ND 20 mm (3/4\")* Knie GIP ND 18 mm (1/2\")* Socket GIP ND 25 mm (1\")

ND 20 mm (3/4\")ND 18 mm (1/2\")

* Double Nipple GIP ND 25 mm (1\")ND 20 mm (3/4\")ND 18 mm (1/2\")

* Stop Kran Brass ND 25 mm (1\")ND 20 mm (3/4\")ND 18 mm (1/2\")

* Ball Valve ND 18 mm (1/2\")* Float (Pelampung) ND 20 mm (3/4\")

* Tangki HU (Vibreglass) 2 M3

IV ACCESSORIES PIPA HDPE* Equal Tee Segmented H OD 250 x 250 mm* Equal Tee Segmented H OD 225 x 225 mm* Equal Tee Segmented H OD 160 x 160 mm* Equal Tee Segmented H OD 110 x 110 mm

Page 71: BOQ PKPAM 06

* Equal Tee Segmented H OD 90 x 90 mm* Equal Tee Segmented H OD 63 x 63 mm* Unequal Tee SegmentedOD 225 x 160 mm * Unequal Tee SegmentedOD 225 x 110 mm * Unequal Tee SegmentedOD 160 x 110 mm * Unequal Tee SegmentedOD 160 x 90 mm * Unequal Tee SegmentedOD 110 x 90 mm * Unequal Tee SegmentedOD 110 x 63 mm

Page 72: BOQ PKPAM 06

Satuan Harga Satuan Ket.(Rp)

UnitUnitUnitUnitUnitUnitUnitUnitUnitUnitUnitUnitUnitUnitUnitUnitUnitUnitUnit

UnitUnitUnitUnitUnitUnitUnitUnitUnitUnitUnitUnitUnitUnit

UnitUnit

Unit

UnitUnitUnitUnit

Page 73: BOQ PKPAM 06

UnitUnitUnitUnitUnitUnitUnitUnit

Page 74: BOQ PKPAM 06

No. U r a i a n

* Unequal Tee Segmented HDPE OD 90 x 63 mm 0

* Bend HDPE 90 OD0

* Bend HDPE 90 OD0

* Bend HDPE 90 OD0

* Bend HDPE 90 OD0

* Bend HDPE 90 OD0

* Bend HDPE 45 OD0

* Bend HDPE 45 OD0

* Bend HDPE 45 OD0

* Bend HDPE 45 OD0

* Bend HDPE 45 OD0 0 0

* Bend HDPE 11.25 /22.5 / & 30 OD0 0 0

* Bend HDPE 11.25 /22.5 / & 30 OD0 0 0

* Bend HDPE 11.25 /22.5 / & 30 OD0 0 0

* Bend HDPE 11.25 /22.5 / & 30 OD0 0 0

* Bend HDPE 11.25 /22.5 / & 30 OD0 0 0

* Bend HDPE 11.25 /22.5 / & 30 OD* Reducer HDPE OD 225 x 160 mm* Reducer HDPE OD 225 x 110 mm* Reducer HDPE OD 160 x 110 mm* Reducer HDPE OD 160 x 90 mm* Reducer HDPE OD 160 x 63 mm* Reducer HDPE OD 110 x 90 mm* Reducer HDPE OD 110 x 63 mm* Reducer HDPE OD 90 x 63 mm* Stub flange HDPE OD* Stub flange HDPE OD* Stub flange HDPE OD* Stub flange HDPE OD

Page 75: BOQ PKPAM 06

* Stub flange HDPE OD* End Cap HDPE OD* End Cap HDPE OD* End Cap HDPE OD* End Cap HDPE OD* End Cap HDPE OD

V ACCESSORIES PIPA PVC* All Socket Tee (RR) PVC OD 225 x 225 mm* All Socket Tee (RR) PVC OD 225 x 160 mm* All Socket Tee (RR) PVC OD 225 x 110 mm* All Socket Tee (RR) PVC OD 160 x 160 mm* All Socket Tee (RR) PVC OD 160 x 110 mm* All Socket Tee (RR) PVC OD 160 x 90 mm* All Socket Tee (RR) PVC OD 110 x 110 mm

0* Long Bend (Sc/Sp) PVC 90 OD

0* Long Bend (Sc/Sp) PVC 90 OD

0* Long Bend (Sc/Sp) PVC 90 OD

0* Long Bend (Sc/Sp) PVC 90 OD

0* Long Bend (Sc/Sp) PVC 45 OD

0* Long Bend (Sc/Sp) PVC 45 OD

0* Long Bend (Sc/Sp) PVC 45 OD

0* Long Bend (Sc/Sp) PVC 45 OD

0* Long Bend (Sc/Sp) PVC 22,5 OD

0* Long Bend (Sc/Sp) PVC 22,5 OD

0* Long Bend (Sc/Sp) PVC 22,5 OD

0* Long Bend (Sc/Sp) PVC 22,5 OD

Page 76: BOQ PKPAM 06

Satuan Harga Sat Ket.(Rp)

OD 90 x 63 mm Unit

225 mm Unit

160 mm Unit

110 mm Unit

90 mm Unit

63 mm Unit

225 mm Unit

160 mm Unit

110 mm Unit

90 mm Unit

63 mm Unit

250 mm Unit

225 mm Unit

160 mm Unit

110 mm Unit

90 mm Unit

63 mm UnitOD 225 x 160 mm UnitOD 225 x 110 mm UnitOD 160 x 110 mm UnitOD 160 x 90 mm UnitOD 160 x 63 mm UnitOD 110 x 90 mm UnitOD 110 x 63 mm UnitOD 90 x 63 mm Unit

225 mm Unit160 mm Unit110 mm Unit90 mm Unit

Page 77: BOQ PKPAM 06

63 mm Unit225 mm Unit160 mm Unit110 mm Unit90 mm Unit63 mm Unit

OD 225 x 225 mm UnitOD 225 x 160 mm UnitOD 225 x 110 mm UnitOD 160 x 160 mm UnitOD 160 x 110 mm UnitOD 160 x 90 mm UnitOD 110 x 110 mm Unit

225 mm Unit

160 mm Unit

110 mm Unit

90 mm Unit

225 mm Unit

160 mm Unit

110 mm Unit

90 mm Unit

225 mm Unit

160 mm Unit

110 mm Unit

90 mm Unit

Page 78: BOQ PKPAM 06

No. U r a i a n Satuan

0* Long Bend (Sc/Sp) PVC OD 225 mm Unit

0* Long Bend (Sc/Sp) PVC OD 160 mm Unit

0* Long Bend (Sc/Sp) PVC OD 110 mm Unit

0* Long Bend (Sc/Sp) PVC OD 90 mm Unit* Reducer PVC OD 225 x 160 mm Unit* Reducer PVC OD 225 x 110 mm Unit* Reducer PVC OD 160 x 110 mm Unit* Reducer PVC OD 160 x 90 mm Unit* Reducer PVC OD 110 x 90 mm Unit* Flange Spigot PVC OD 225 mm Unit* Flange Spigot PVC OD 160 mm Unit* Flange Spigot PVC OD 110 mm Unit* Flange Spigot PVC OD 90 mm Unit* Flange Socket PVC (RRJ)OD 225 mm Unit* Flange Socket PVC (RRJ)OD 160 mm Unit* Flange Socket PVC (RRJ)OD 110 mm Unit* Flange Socket PVC (RRJ)OD 90 mm Unit* Repairing Socket PVC (ROD 225 mm Unit

OD 160 mm UnitOD 110 mm UnitOD 90 mm Unit

* Dop PVC (RRJ) OD 225 mm Unit* Dop PVC (RRJ) OD 160 mm Unit* Dop PVC (RRJ) OD 110 mm Unit* Dop PVC (RRJ) OD 90 mm Unit

ÈÈÈÈÈÈÈÈ.., ÈÈÈÈÈÈÈÈ.. 2012

PT/CV/Fa. ÈÈÈÈÈÈÈÈÈ..

Page 79: BOQ PKPAM 06

Harga Satuan Ket.(Rp)

ÈÈÈÈÈÈÈÈ.., ÈÈÈÈÈÈÈÈ.. 2012Dihitung Oleh :

PT/CV/Fa. ÈÈÈÈÈÈÈÈÈ..ÈÈÈÈÈÈÈÈÈÈÈÈÈJabatan