Top Banner
Bologna, 6 giugno 2005 Riunione ALMA extragalattica Strumentazione sub-mm/mm Strumentazione sub-mm/mm pre-ALMA pre-ALMA APEX APEX SCUBA & SCUBA-2 SCUBA & SCUBA-2 IRAM IRAM SMA SMA CSO CSO OVRO, BIMA OVRO, BIMA CARMA CARMA NMA NMA
16

Bologna, 6 giugno 2005Riunione ALMA extragalattica Strumentazione sub-mm/mm pre-ALMA APEX APEX SCUBA & SCUBA-2 SCUBA & SCUBA-2 IRAM IRAM SMA SMA CSO CSO.

Mar 27, 2015

Download

Documents

Joshua Burgess
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Bologna, 6 giugno 2005Riunione ALMA extragalattica Strumentazione sub-mm/mm pre-ALMA APEX APEX SCUBA & SCUBA-2 SCUBA & SCUBA-2 IRAM IRAM SMA SMA CSO CSO.

Bologna, 6 giugno 2005 Riunione ALMA extragalattica

Strumentazione sub-mm/mm Strumentazione sub-mm/mm pre-ALMA pre-ALMA

APEXAPEX

SCUBA & SCUBA-2SCUBA & SCUBA-2

IRAMIRAM

SMASMA

CSOCSO

OVRO, BIMA OVRO, BIMA CARMA CARMA

NMANMA

Page 2: Bologna, 6 giugno 2005Riunione ALMA extragalattica Strumentazione sub-mm/mm pre-ALMA APEX APEX SCUBA & SCUBA-2 SCUBA & SCUBA-2 IRAM IRAM SMA SMA CSO CSO.

Bologna, 6 giugno 2005 Riunione ALMA extragalattica

APEXAPEX:: AAtacama tacama PPathfinder athfinder EXEXperimentperiment

Location: Llano de Chajnantor(Chile, 5000 m)

Antenna modifiedcopy of US ALMA prototype

MPIfR=50%Onsala Sp. Obs=23%ESO=27%

PI: Karl MentenPS: Peter Schilke

12 m diameter12 m diameter 300-1500 300-1500 μμm=m=230-1200 GHz230-1200 GHz

Page 3: Bologna, 6 giugno 2005Riunione ALMA extragalattica Strumentazione sub-mm/mm pre-ALMA APEX APEX SCUBA & SCUBA-2 SCUBA & SCUBA-2 IRAM IRAM SMA SMA CSO CSO.

Bologna, 6 giugno 2005 Riunione ALMA extragalattica

InstrumentsInstruments

Heterodyne receivers:

1. 230 GHz (1.3 mm)+340 GHz (0.9 mm) receivers (from SEST)2. 460 GHz (650 micron) 16-pixel CHAMP array (from CSO)3. 810 GHz (370 micron) receiver (from JCMT)4. Upgrade of CHAMP/dual receiver: 650 and 810 GHz (next) 5. Experimental receivers above 1 THz (next)

Bolometers arrays:

1. LABOCA (LArge BOlometer CAmera): 870 micron (345 GHz) 295 channels beam size=18 arcsec FOV=11.4 arcmin scanning and jiggling required for fully sampled maps2. 350 micron (850 GHz) array: 37-channel bolometer (next)3. 2 mm (150 GHz) array: 3oo channel bol. for SZ (next)

Page 4: Bologna, 6 giugno 2005Riunione ALMA extragalattica Strumentazione sub-mm/mm pre-ALMA APEX APEX SCUBA & SCUBA-2 SCUBA & SCUBA-2 IRAM IRAM SMA SMA CSO CSO.

Bologna, 6 giugno 2005 Riunione ALMA extragalattica

Summary of the first generation Summary of the first generation facility instrumentsfacility instruments

ReceiverReceiverFrequencyFrequency

(GHz/mm)(GHz/mm)ElementsElements NotesNotes

APEX-1a 210-275 Q1 2004

APEX-1b 210-275 Q3 2004

APEX-2b 275-370 Q3 2004

APEX-3b 375-500 Q3 2004

APEX-T2 1240-1400 TBD

LABOCA 0.8 300 Q2 2004

350 μm 0.37 37 Q2 2004

Page 5: Bologna, 6 giugno 2005Riunione ALMA extragalattica Strumentazione sub-mm/mm pre-ALMA APEX APEX SCUBA & SCUBA-2 SCUBA & SCUBA-2 IRAM IRAM SMA SMA CSO CSO.

Bologna, 6 giugno 2005 Riunione ALMA extragalattica

Observing TimeObserving Time

Consortium: The Astronomical Institute at the University of Bochum (AIRUB), the European Southern Observatory (ESO) and the Onsala Space Observatory (OSO) and the Max-Planck-Institut für Radioastronomie (MPIfR) 10% observing time for Chilean astronomers

Page 6: Bologna, 6 giugno 2005Riunione ALMA extragalattica Strumentazione sub-mm/mm pre-ALMA APEX APEX SCUBA & SCUBA-2 SCUBA & SCUBA-2 IRAM IRAM SMA SMA CSO CSO.

Bologna, 6 giugno 2005 Riunione ALMA extragalattica

SCUBA: SCUBA: thethe S Sub-mm ub-mm CCommon-ommon-UUser ser BBolometer olometer AArrayrray

15-m diameter telescope (Mauna Kea, Hawaii, 4092 m)

INSTRUMENTSSub-mm bolometers: Simultaneous observations at 850 μm (353 GHz, 37 bolometers) and 450 μm (670 GHz, 91 bolometers) Diameter f.o.v.=2.3 arcmin, beam=15-7 arcsec; cooled at 100 mK UK, Canada, and The Netherlands collaboration, ~5-10% observing time to international programs.

Spectral line receivers: 3 receivers: A3: 230 GHz – B3: 345 GHz – W: 460 and 690 GHz

Heterodyne polarimeter: all frequencies. Next: ROVER (2-3 mm window)

Page 7: Bologna, 6 giugno 2005Riunione ALMA extragalattica Strumentazione sub-mm/mm pre-ALMA APEX APEX SCUBA & SCUBA-2 SCUBA & SCUBA-2 IRAM IRAM SMA SMA CSO CSO.

Bologna, 6 giugno 2005 Riunione ALMA extragalattica

The The SCUBA-2SCUBA-2 project project

SCUBA-2: Transition Edge Sensor arrays: two dc-coupled, monolithic, filled arrays with a total of 10240 bolometers Two focal-plane units each unit has 4 sub-arrays with 40x32 elements Observing bands: 850 μm and 450 μm F.O.V.=50 arcmin sq.=12xSCUBA Sensitivity: a factor ~2-3 better than SCUBA 1000 times faster than SCUBA to reach the same S/N for maps (fully sampled image in just one pointing) Cooled at 120 mK limited by the sky background photon noise

Delivered to the JCMT in Delivered to the JCMT in Feb. 2006Feb. 2006 (2 sub-arrays) and completed in (2 sub-arrays) and completed inNov. 2006Nov. 2006 (all sub-arrays) (all sub-arrays)

Page 8: Bologna, 6 giugno 2005Riunione ALMA extragalattica Strumentazione sub-mm/mm pre-ALMA APEX APEX SCUBA & SCUBA-2 SCUBA & SCUBA-2 IRAM IRAM SMA SMA CSO CSO.

Bologna, 6 giugno 2005 Riunione ALMA extragalattica

SCUBA-2 focal planeSCUBA-2 focal plane

Page 9: Bologna, 6 giugno 2005Riunione ALMA extragalattica Strumentazione sub-mm/mm pre-ALMA APEX APEX SCUBA & SCUBA-2 SCUBA & SCUBA-2 IRAM IRAM SMA SMA CSO CSO.

Bologna, 6 giugno 2005 Riunione ALMA extragalattica

IRAM: IIRAM: Institut de nstitut de RRadio adio AAstronomie stronomie MMillimetriqueillimetrique

French-German-Spanish collaboration Two observatories Two observatories 1. 30-m single-dish telescope on Pico Veleta (2850 m, Spain) 2. 6-antenna (15 m each) interferometer on the Plateau de Bure (2550 m, France)

1. 30-m Telescope1. 30-m TelescopeBolometer systems: MAMBO I: 1.2mm, beam=11 arcsec, 37 pixels MAMBO II: 1.2mm, beam=11 arcsec, 117 pixelsplus receivers in the range 80-272 GHz

2. PdBI 2. PdBI Receiver at 1.3 mm (205-250 GHz), resolution~0.5 arcsec, f.o.v.=20” Receiver at 3 mm (81-115 GHz)

Page 10: Bologna, 6 giugno 2005Riunione ALMA extragalattica Strumentazione sub-mm/mm pre-ALMA APEX APEX SCUBA & SCUBA-2 SCUBA & SCUBA-2 IRAM IRAM SMA SMA CSO CSO.

Bologna, 6 giugno 2005 Riunione ALMA extragalattica

SMA: SSMA: Sub-ub-MMillimeter illimeter AArrayrray

Smithsonian Astrophysical Observatory + Academia Sinica of Astronomy and Astrophysics collaboration

8 x 6-m antenna interferometer on Mauna Kea (~4000m, Hawaii), baseline as long as 500 m, ≈180-900 GHz band

2 simultaneous receivers/elementReceiver bands: 230, 345, 460, 690, and 850 GHz

Page 11: Bologna, 6 giugno 2005Riunione ALMA extragalattica Strumentazione sub-mm/mm pre-ALMA APEX APEX SCUBA & SCUBA-2 SCUBA & SCUBA-2 IRAM IRAM SMA SMA CSO CSO.

Bologna, 6 giugno 2005 Riunione ALMA extragalattica

CSO: CCSO: Caltech altech SSubmillimeter ubmillimeter OObservatorybservatory

10.4-m diameter telescope (Mauna Kea, Hawaii)

INSTRUMENTS

Bolometer systems: BOLOCAM: 115 working pixels, f.o.v.=8 arcmin (circular), beam size=30 arcsec (1.1 mm) and 60 arcsec (2.1 mm) SHARC II: 12x32 array of bolometers at 350-450 μm f.o.v.=1.0x2.5 arcmin sq., beam~8.5 arcsec (350 μm) COMPLEMENTARY TO SCUBA

Heterodyne receivers: 230, 345,490, and 665 GHz

Page 12: Bologna, 6 giugno 2005Riunione ALMA extragalattica Strumentazione sub-mm/mm pre-ALMA APEX APEX SCUBA & SCUBA-2 SCUBA & SCUBA-2 IRAM IRAM SMA SMA CSO CSO.

Bologna, 6 giugno 2005 Riunione ALMA extragalattica

OVRO: OOVRO: Owenswens V Valleyalley R Radioadio OObservatorybservatory

Caltech / National Science Foundation

6 x 10.4-m antenna interferometer (California, ~1200 m)

Beam-width=65” at 100 GHzReceiver bands: 86-116 GHz (3 mm) and 210-270 GHz (1 mm)

Page 13: Bologna, 6 giugno 2005Riunione ALMA extragalattica Strumentazione sub-mm/mm pre-ALMA APEX APEX SCUBA & SCUBA-2 SCUBA & SCUBA-2 IRAM IRAM SMA SMA CSO CSO.

Bologna, 6 giugno 2005 Riunione ALMA extragalattica

BIMA: BBIMA: Berkeley erkeley IIllinois llinois MMaryland aryland AAssociationssociation

OVRO and BIMA have now ceased operations CARMACARMA

10 x 6.1-m antenna interferometer

Page 14: Bologna, 6 giugno 2005Riunione ALMA extragalattica Strumentazione sub-mm/mm pre-ALMA APEX APEX SCUBA & SCUBA-2 SCUBA & SCUBA-2 IRAM IRAM SMA SMA CSO CSO.

Bologna, 6 giugno 2005 Riunione ALMA extragalattica

CARMA: CCARMA: Combined ombined AArray for rray for RResearch in esearch in MMillimeter-wave illimeter-wave

AAstronomystronomyCARMA=OVRO+BIMA on a site in Eastern California (~3000 m a.s.l.)NSF + Universities

SPECIFICATIONS

ARRAY: 15 antennas (6 x 10.4 m + 9 x 6.1 m), 772 m2 , 0.5 arcsec res. at 230 GHzRECEIVERS: 115, 230, and 345 GHz

Fully operational: end of 2005?

Page 15: Bologna, 6 giugno 2005Riunione ALMA extragalattica Strumentazione sub-mm/mm pre-ALMA APEX APEX SCUBA & SCUBA-2 SCUBA & SCUBA-2 IRAM IRAM SMA SMA CSO CSO.

Bologna, 6 giugno 2005 Riunione ALMA extragalattica

NMA: NNMA: Nobeyama obeyama MMillimeter illimeter AArrayrray

ARRAY: 6 x 10m antennas BANDS: 3 mm (85-116 GHz), 2 mm (126-152 GHz), and 1 mm (213-237 GHz)resolution down to 1 arcsec

NMA plus the 45 m single-dish telescope RAINBOW RAINBOW (f.o.v.=20 arcsec at 3 mm)

10 m sub-mm ASTE

Page 16: Bologna, 6 giugno 2005Riunione ALMA extragalattica Strumentazione sub-mm/mm pre-ALMA APEX APEX SCUBA & SCUBA-2 SCUBA & SCUBA-2 IRAM IRAM SMA SMA CSO CSO.

Bologna, 6 giugno 2005 Riunione ALMA extragalattica

if you have questions…if you have questions…