Top Banner
BENGALURU TRAFFIC POLICE
42

BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Apr 24, 2018

Download

Documents

vuongkhanh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

BENGALURU TRAFFIC POLICE

Page 2: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

SOME FACTS ABOUT BENGALURU CITY TRAFFIC

11,000 Kms of road.

44,000 intersections.

353 signalized intersections.

500 manned intersections.

193 One-ways roads

Police Personnel deployed based on need in more than

1000 intersections.

62.11 lakh vehicles.

Everyday 2000-2500 new vehicles being registered.

No. of BMTC Buses 6,400.

BTP has strength of 3090 Officers/Men

Page 3: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Growth of vehicles

Sl.

No. Year

No. of Vehicles

(In thousands)

1 2001 1566.1

2 2004 2157.5

3 2007 3106.6

4 2010 3686.3

5 2011 4060.0

6 2012 4476.0

7 2013 4920.0

8 2014 5392.9

9 2015 5949.8

10 2016

(As on 31-05-

2016)

6211.2 0

1000

2000

3000

4000

5000

6000

2001 2004 2007 2010 2011 2012 2013 2014 2015

Growth of vehicles

Page 4: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Strength of Traffic Police as on 30-11-2015

Rank Sanctioned

Strength

Actual

Strength Vacancy

DCP 4 3 1

ACP 9 8 1

PI 48 46 2

PSI 275 174 101

ASI 333 256 77

HC 867 848 19

PC 2058 1755 303

TOTAL 3594 3090 504

Page 5: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

VEHICLES REGISTERED IN INDIAN METROPOLITAN CITIES

Sl.

No.

Metropolitan

City

No. of

Vehicles

Registered (in lakhs)

Traffic Police

Strength

Traffic Police

per 10000

vehicles

1 Delhi 85.00 5936 6.98

2 Bengaluru 62.11 3090 4.97

3 Chennai 44.57 4182 9.38

4 Ahmedabad 31.98 3472 10.86

5 Kolkata 28.09 6013 21.40

6 Mumbai 23.33 3380 14.49

7 Hyderabad 23.27 1186 5.10

8 Lucknow 20.21 738 3.65

9 Gurgaon 2.07 353 17.01

Page 6: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Road Accidents in Bengaluru City

Sl.

No. Year Road Accidents Killed Injured

1 2002 9856 820 7577

2 2003 10505 883 7980

3 2004 9101 903 6921

4 2005 7578 836 5899

5 2006 7561 915 6048

6 2007 8426 981 6591

7 2008 7772 892 6150

8 2009 6875 761 5668

9 2010 6483 858 5343

10 2011 6024 762 4976

11 2012 5502 760 4471

12 2013 5230 771 4289

13 2014 5004 737 4096

14 2015 4828 740 4047

15 2016 (As on 30-06-2016)

2502 397 2073

Page 7: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Road Accidents in Bengaluru City

0

2000

4000

6000

8000

10000

12000

2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Road Accidents

0

200

400

600

800

1000

1200

2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Killed

Page 8: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Road users killed in Bengaluru City

Sl. No.

Particulars 2010 2011 2012 2013 2014 2015 2016 (As

on 30-06-2016)

1 Pedestrians 400 367 358 382 331 338 165

2 Cyclist 20 21 18 19 17 14 5

3 Two-Wheelers 342 292 310 309 332 328 175

4 Others 96 77 69 61 57 60 52

Total 858 757 755 771 737 740 397

338

14

328

60

Page 9: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Sl. No.

Year Cases registered

through Blackberry

Cases registered through

Automation Enforcement

Total

1 2007 1340056 47008 1387064

2 2008 1784590 178352 1962942

3 2009 2310479 203160 2513639

4 2010 2999303 200612 3199915

5 2011 3177992 164592 3342584

6 2012 3505344 1624715 5130059

7 2013 3652285 1696185 5348470

8 2014 4516130 2826945 7343075

9 2015 4456509 3066052 7522561

10 2016 (As on

30-06-2016) 1985935 2418050 4403985

Cases Registered under Motor Vehicles Act

Page 10: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Sl. No.

Year M.V.Act K.P.Act Towing Charges

Automation Fine Amount

Total Fine Amount

1 2006 1884.34 3.03 177.51 62.45 2127.34 2 2007 1820.18 2.58 107.76 60.58 1991.12 3 2008 2527.72 3.88 217.31 201.23 2950.14 4 2009 3218.89 7.05 243.64 291.65 3761.25 5 2010 4253.99 8.38 251.82 241.67 4755.86 6 2011 4530.31 8.70 251.49 266.09 5056.61 7 2012 5061.46 8.26 133.70 181.74 5385.17 8 2013 5385.85 10.40 144.10 157.35 5697.72 9 2014 6299.99 8.58 167.72 115.89 6592.19

10 2015 6674.38 2.72 192.54 173.15 7044.38 11 2016 2941.51 0.34 64.44 121.10 3127.40

Fine Amount Collected (in lakhs)

0.00

1000.00

2000.00

3000.00

4000.00

5000.00

6000.00

7000.00

8000.00

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Total Fine Amount Collected

In L

akh

s

Page 11: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Suspension of Driving Licenses

Year Driving Licenses

Sent for

Suspension

2012 4587

2013 5559

2014 16194

2015 20213

2016 9386

Page 12: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Important Traffic Violations

Sl. No

. Type of Violations 2011 2012 2013 2014 2015 2016

1 Over Speeding 71400 119894 100432 118264 125527 55299

2 Drunken Driving 61923 60973 61709 55138 62576 23434

3 Black Film 0 78282 64083 60171 32643 9737

4 Wrong Parking 696699 1491071 199501

0 1833703 2112985

119288

3

5 Using Mobile

Phones 132367 207490 128370 290705 270151 111058

6 Seat Belts 1760 256754 216176 401106 320396 130513

7 Without Helmet 320456 752525 821575 1667248 1770890 877125

Page 13: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Classification of Cases Sl.

No. Violations 2011 2012 2013 2014 2015 2016

1 BMTC Buses 13875 46964 38310 29173 54242 24601

2 KSRTC Buses 235 139 96 59 516 194

3 Auto Rickshaws 441792 601012 687911 815507 780702 337218

4 Trucks 1087091 1133848 1177417 1478704 1361576 234773

5 Car / Jeeps 586067 1346736 1267557 1545167 1487864 723186

6 Two Wheelers 1125053 1901768 2129329 3427354 3740578 2651232

Page 14: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Transparency in enforcement of traffic rules

Substantial compliance of Traffic laws and

rules.

Reduction in road accidents.

Enhanced punishment for repeat violations.

Suspension of Driving Licenses.

Impact of B-TRAC

Page 15: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Transparency in enforcement of traffic rules

Impact of B-TRAC

Sl. No.

Year No. of Cases

registered

Total Fine amount

Rs. In Crores

1 2007 1444098 19.91

2 2008 2079071 29.51

3 2009 2640286 37.62

4 2010 3333112 47.56

5 2011 4790841 50.56

6 2012 5204800 53.85

7 2013 5432812 56.98

8 2014 7436284 65.92

9 2015 7626671 70.44

10 2016 4437807 31.27

Page 16: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Impact of B-TRAC Transparency in enforcement of traffic rules

Rs.

in c

rore

s

0

2000000

4000000

6000000

8000000

2007 2008 2009 2010 2011 2012 2013 2014 2015

No. of Cases registered

0

20

40

60

80

2007 2008 2009 2010 2011 2012 2013 2014 2015

Total Fine amount

Page 17: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Automated Traffic Enforcement Cases

Impact of B-TRAC

Sl. No. Year No. of Cases

1 2007 47008

2 2008 178352

3 2009 203160

4 2010 200612

5 2011 164592

6 2012 1624715

7 2013 1696185

8 2014 2826945

9 2015 3066052

10 2016 2418050

Page 18: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

YEAR Total Accidents Killed Injured

2007 8426 981 6591

2008 7772 892 6150

2009 6875 761 5668

2010 6483 858 5343

2011 6024 762 4976

2012 5502 760 4471

2013 5230 771 4289

2014 5004 737 4096

2015 4828 740 4047

Impact of B-TRAC Reduction in Road Accidents

Page 19: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Impact of B-TRAC Reduction in Road Accidents

0

2000

4000

6000

8000

10000

2007 2008 2009 2010 2011 2012 2013 2014 2015

Road Accidents

0

200

400

600

800

1000

1200

2007 2008 2009 2010 2011 2012 2013 2014 2015

Fatalities

Page 20: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

1. Population boom due to economic growth

2. Phenomenal growth in vehicular traffic

3. Slow growth in transport infrastructure

4. Poor Urban Traffic Planning

5. Lack of adequate Public Transport

6. Zero parking infrastructure and unregulated parking

7. Indiscipline among road users

leading to – a) Traffic congestion and bottlenecks

b) Increased journey time

c) Air and noise pollution

BENGALURU CITY IS EXPERIENCING:

Page 21: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Congestion on important areas

1. Ramanamaharshi Road - Mekhri Circle to Windsor Manor junction

2. Hudson Circle area

3. Silk Board junction to Jayadeva flyover

4. Bannerghatta Road between Dairy Circle to Sagar Hospital

5. K.R.Puram – Benniganahalli to Mahadevapura flyover

6. Old Madras Road – Double Road to Big Bazaar

7. Hebbal Flyover

8. White Field area

9. Outer Ring Road – BEL to FTS Circle

10. Outer Ring Road – Mahadevapura to Iblur

11. Mysuru Road

Page 22: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Recent Measures to de-congest Traffic

Implemented New Traffic Circulation plans on the following roads / area;

1. New Traffic Circulation Plan on Hosur – Sarjapur Road

2. Implemented New Traffic Circulation plan at Manyatha Tech Park on ORR

3. Implemented New Traffic Circulation plan at K.R.Puram area

4. New Traffic Circulation Plan at Benniganhalli area

5. New Traffic Circulation Plan around Bellandur area

6. Implemented New Traffic Circulation Plan at Whitefield area.

Page 23: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Recent Measures to de-congest Traffic

7. Allowed to ply BMTC buses through Russell Market road to ease traffic on Cunningham Road

8. Synchronisation of Signal Lights on important corridors

9. Intensive drives against Drag Racing and Wheeling

10. Citizen’s Traffic Forum Meeting revived

11. Safe Routes to Schools

12. Road Safety Training programmes for all School bus / van drivers

13. Introduction of new “Public-Eye” Mobile App

Page 24: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Recent Measures to de-congest Traffic

14. Initiated booking of cases under Sec. 283 IPC against Road and Footpath hawkers

15. Initiated booking of cases against Jay-walkers to

reduce road accident fatalities 16. Introduced Pre-paid Auto stands at 13 important

places 17. Strict Enforcement of Traffic Rules on all Tender

SURE roads 18. Compulsory Training for Traffic offenders 19. Open Street Concept

Page 25: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

1. Wear Safety Helmet Campaign

2. Campaign to promote

Carpooling

3. Campaign Against the use of

Mobile Phones while driving

4. Campaign to promote Lane

Discipline

5. Campaign Against Drunken

Driving

EFFECTIVE ROAD SAFETY CAMPAIGNS

Page 26: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Augmentation of Traffic Police

Sl. No. Augmentation of Traffic Police Strength

1

04 new Traffic Police Stations

a) Mahadevapura TR.PS

b) K.G. Halli TR.PS

c) Basaveshwaranagar TR.PS

d) J.P.Nagar TR.PS

2

02 new Traffic Sub divisions

a) Indiranagar Traffic Sub division

b) Vijayanagar Traffic Sub division

3 Creation of separate traffic strength for TMC

ACP – 01, PI – 02,PSI-06,HC-15,PC-60

Page 27: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Approval of B-TRAC – 2 Project

• 100 Surveillance Cameras

• 10 Enforcement Cameras

• 20 Gantries

• New PDA’s to replace Blackberry devices

• Body Cameras

• SIM based Cameras - PPP

Page 28: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

SUPPORT REQUIRED

• Additional Manpower for Traffic – Traffic Police Assistants Project

• Ban on movement of Trucks on city roads during day time

• Ban on movement of Tractors and Trailers

• Ban on Stage Carriage buses within Outer Ring Road

Page 29: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

SHORT TERM MEASURES

• Staggering of work timings of IT Companies

• Promoting Public Transport

• Carpooling

• Traffic Gating at Outskirts

Page 30: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Signal-Free Corridors Required

• Old Madras Road – Trinity Circle to K.R.Puram Railway Station and up to Hope Form Junction

• Old Airport Road – ASC Center to Varthur Kodi

• Sharjapura Road – St. John Hospital to Dommasandra Junction

• Outer Ring Road from HSR Layout 4th Sector to Jayadeva Flyover and upto Rajalakshmi Kalyan Mantap.

• R. V. Road, J.C. Road and Kempegowda Road from South-End Circle to Rajajinagar Entrance

• Hosur-Lashkar Road from St. John Hospital to Vellara Junction, continuing on to Museum Road and St. Marks Road.

Page 31: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Bruhat Bengaluru Mahanagara Palike

Road Marking and Curb painting

Restoration of Basement for parking

Implementation of Comprehensive Parking Policy

Restoration of roads in Whitefield

Development of link roads in Whitefield area

Establishment of Private bus terminals

Multi-level car park facility in CBD

Page 32: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Implementation of K.R. Puram to Silk Board Traffic Intervention Plan

Restoration of Service Road on ORR Priority Intervention at BTM Layout ORR

Early completion of ROB at Jalahalli ORR

Widening of Hebbal Flyover

Peripheral Ring Road (PRR)

Bangalore Development Authority

Page 33: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

B M T C

Shifting of 122 Bus stops / shelters located

near intersections.

Training of Drivers to stop at bus stops only

Procurement of additional cranes.

Mobile Workshop at Marathhalli and

K.R.Puram

Additional buses after 9.00pm

Page 34: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Commuter Rail service on existing rail lines

Recommended Routes

1. City Railway station to Whitefield via Contonment,

Bangalore east and Byappanahalli

2. City Railway station to Chikkabanavara via Malleswaram

and Yeshwanthpura.

3. Yeshwantha pura to Yelahanka via Hebbal.

4. Yeshwanthapura to Chandapura via Banasawadi

5. City Railway station to Bidadi via Nayandanahalli,

University and Kengeri.

SOUTH WESTERN RAILWAY

Integrated Public Transport Network and System

Page 35: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

1) Procedural Changes for Transfer of vehicles.

2) Automatic suspension/ cancellation of driving licence

for 03 traffic violations

3) Issue of Annual Fitness Certificate should be linked

with automation enforcement.

4) Seizure of Transport Vehicles plying without permit

5) Ban on private bus permits till establishment of

private bus terminals.

Transport Department

Page 36: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Sl. No

Corridor Details Approx. Cost Project(

Inclusive of land

Acquisition and Corridor

Improvement) Rs. In Crores

Amount required

for the Year 2012-

13 (Rs. In Crores)

Amount

required for

the Year

2013-14 (Rs. In Crores)

1 Dr|| Rajkumar Road ( From Okalipuram to Soap

Factory) - Vivekanada College Junction and Corridor

Improvements.

44.80 25.00 19.80

2 Outer Ring Road( From Mysore Road to Central Silk

Board) – KEB Junction, Food World Junction, Dr.

Muttu Raj Road Junction, Dollars Colony junction,

Bannerughatta Road Junction and Corridor

Improvements.

190.00 116.00 74.00

3 Hosur Road (Cetral Silk Board to Vellara Junction) –

Grade separator at Audugodi Junction, Forum

Junction, Marigowda Junction and Sarjapura Road

Junction and Corridor Improvements.

100.00 72.00 28.00

4 Old Airport Road (From Vellara Junction to Verthur

Kodi Junction Via Marathahalli Kundalahalli) – Grade

separator at kundalahalli Junction, Suranjadas Road

Junctiona and Wind Tunnel Junction and Corridor

Improvements.

135.25 96.00 39.25

5 From Mekhri Circle to Hope Farm Junction (Via

Halasuru Lake Junction, Old Madras Junction, K R

Puram, Whitefield Road) – Grade separator at Hope

Farm Junction, Hoodi Junction and HP Junction and

Corridor Improvements.

147.95 117 30.95

Total 618.00 426.00 192.00

I) Development of Signal Free Corridors

Bruhat Bengaluru Mahanagara Palike

Page 37: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Sl. No

Road Stretch Approx.

length in Kms

Approx.

Project Cost

(Rs. In

Crores)

Amount

required for the

Year 2012-13

(Rs. In Crores)

1 Development of 45 Roads in CBD under Tender SURE

73.05 200.00 200.00

II) Development of Roads under Tender SURE

Bruhat Bengaluru Mahanagara Palike

Page 38: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Sl.

No Project Details Approx. Cost

Project

(Rs. In Crores)

Amount required

for the Year 2012-

13 (Rs. In Crores)

Amount

required for

the Year

2013-14 (Rs.

In Crores)

1 Grade Seaparator at Malleshwaram

Maramma Junction

20.00 10.00 10.00

2 Underpass at Magadi Road and

Basaveshwaranagar Junction

30.00 15.00 15.00

3 Grade Seaparator at Rajajinagar 10th

Cross and West of Chord Road

30.00 20.00 10.00

4 Road Divider at Rajajinagar Chord

Road near Basaveshwara Main

Road, Manjunathnagar 1st Main

Road and Manjunathnagar 8th Main

Road and Shivnagar Main Road

58.00 25.00 33.00

5 At Shivananda Circle (Steel Fly

Over)

57.00 15.00 42.00

Total 195.00 85.00 110.00

III) Construction of Grade Separators

Bruhat Bengaluru Mahanagara Palike

Page 39: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Sl.

No Location Approx.

Cost (Rs. In Crores)

1 Gandhinagar- near Freedom park (Under ground car

parking)

56.00

2 Gandhinagar – Multilevel car parking 15.00

3 a) In front of Koaramagala Forum car parking (Surface

parking)

1.85

b) In front of Hosmat hospital car parking (Surface parking) 0.67

4 Near Vijayanagar Metro Station - Multilevel car parking 5.70

5 Near Shivaji nagar Russel market - Multilevel car parking 20.00

6 BBMP Head Office – Automated Car Parking 30.00

7 Infront of Yeshwanthapura Transport Office - Multilevel car

parking

20.00

8 Old Airport Road at Murgeshpalya - Multilevel car parking 25.00

9 Near Bannappa Park Multilevel car parking 25.78

Total 200.00

IV) Construction of Multi Level Car Parking

Bruhat Bengaluru Mahanagara Palike

Page 40: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

I) Development of Signal Free Corridors

Corridor

Name of the Corridor Total Length

of Corridor in Km

Est. Cost Rs. In crore

1 Agara Lake (ORR) to Sirsi Circle via Lalbagh Fort Road

14.00 -

2 City Centre to BHEL via Sirsi Circle 4.00 -

3 Yeshwanthpur Industrial Area to Hebbal (NH-4 to NH-7)

6.50

4 Cubbon Road to ORR via Kamaraj Road, Buddha Vihar Road, Hennur Road

7.00

5 Elevated Road from Hennur Link (Anil Kumble Circle) to Mysore Road

6 Elevated Road from Tumkur Road to BRV Grounds

7 Road over Storm Water Drain from Mysore Road (Gali Anjaneya temple) to Rajajinagar link Road junction (near Sujatha Theatre

Bangalore Development Authority

Page 41: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

Corridor Name of the Corridor Total

Length of Corridor

Agency Est. Cost

8 Elevated Road from High Grounds Police Station to Hebbal

- BDA

Co

st yet to b

e estimated

9 Elevated Corridor from Cubbon Road to Outer Ring Road

- BDA

10 Elevated Corridor from Rajarajeshwari nagar to Jnanabharathi (Bangalore University)

- BDA

11 Road over storm water drain from KH.Road to Inner Ring Road near Sony World Junction

- BDA

12 2.5 Kms Elevated road between BEL circle to Goragunte Palya on Tumkur Road.

2.5 Kms BDA

II) Development of Signal Free Corridors

Bangalore Development Authority

Page 42: BENGALURU TRAFFIC POLICE - Indian Institute of …cistup.iisc.ac.in/pdf/wp23rdjuly2016/3_CiSTUP Workshop_Hithendra...Charges Automation Fine Amount Total Fine Amount 1 2006 1884.34

• Thanks.