EMV Chip Card Forum Chole Casber TMG Product Manager April 2015
Aug 16, 2015
EMV Chip Card Forum
Chole CasberTMG Product Manager
April 2015
Agenda
• Industry Update
• Common and Global AIDs Explained
• Project Overview
• Plastics Update
EMV Forum DownloadAnaheim, CA – March 9-12
– BOA Debit Plans/Current Status• Debit EMV issuance in October 2014• Natural reissuance + lost/stolen accounts, no mass reissue to meet liability shift• Less than 1% of transactions are EMV, 99% of those are signature
– Merchant Adoption• 60% not ready by liability shift• Only over half of merchants ready by end of 2016
– Delay in US Common AID– Costs in infrastructure to support debit EMV– Contactless not currently available that is Durbin compliant– Challenges in not having contactless debit EMV available.
» Not palatable for merchant adoption.
Debit AIDs Explained– Application Identifier (AID)• Global• US
– AID Selection at POS• Terminal reads for AID
availability• Choice made by the terminal
automatically to select an AID based on priority as indicated by the issuer’s CVM
AcquirerBIN Merchant PriorityX XX XX XX X
5
CVM: PIN/NO CVM
Transaction Complete
AIDGlobal US
1. Terminal identifies if card is international or domestic.
2. Terminal selects appropriate AID – opens application
3. CVM: Secure Handshake Between Card & Terminal. Terminal receives BIN info from app & creates ARQC.
4. ARQC and BIN Info sent to acquirer. Routing selected
5. Transaction routed to appropriate network
6. Network facilitates A-V-A & generates ARPC
7. ARPC sent to Terminal- transaction complete
BIN Routing
Routing
Network Authentication (ARQC) Verification (CVM) Authorization ($)
ARPC Terminal1
2
3
4
5
6
7
AID
Application
Project Overview
• Every project is unique• 6-12 Months
• Debit EMV prep process• TMG is ready with EMV
Implementation detail request is
completedProject Controller conducts scoping analysis
Scope and addendum are
combined/created
Updated scope and addendum sent to CBE for execution by the client
Project is Scheduled
Plastics Update• Order submission process
• Front and back artworks submitted in .EPS format
• Industry standard procurement timelines• 12-20 Weeks
• Vendor relationship acquisitions• Instant issuance likely not available until early 2016