Top Banner
APAN-JP Report August 28, 2002 Shigeki Goto
17

APAN-JP Report August 28, 2002 Shigeki Goto. APAN Topology.

Jan 01, 2016

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: APAN-JP Report August 28, 2002 Shigeki Goto. APAN Topology.

APAN-JP Report

August 28, 2002

Shigeki Goto

Page 2: APAN-JP Report August 28, 2002 Shigeki Goto. APAN Topology.

APAN Topology

Page 3: APAN-JP Report August 28, 2002 Shigeki Goto. APAN Topology.

TCP Throughput

Page 4: APAN-JP Report August 28, 2002 Shigeki Goto. APAN Topology.

APAN-JP Update & Plan– 2002.3 APAN-TW link: 155Mbps (new)– .5 IPv4/IPv6 Dual Stack operation (APAN-TW)– TransPAC-northern link down (Teleglobe)– .6 Philippines link: 1.5 Mbps (upgrade)– TransPAC-northern link recovered (KDDI)– .7 IPv4/IPv6 Dual Stack operation (TransPAC)– IETF in Yokohama– .8 Post-TransPAC Link Owner (MPHPT/CRL)

– .9 GbE link to Tsukuba WAN– .12 GbE link to Korea (New APII/Genkai)

Page 5: APAN-JP Report August 28, 2002 Shigeki Goto. APAN Topology.

APII / Genkai Research Network

EuropeEurope

NorthNorthAmericaAmerica

Fukuoka

TokyoBusan

Taejeon

Seoul

Existing 8M bps APII link

Page 6: APAN-JP Report August 28, 2002 Shigeki Goto. APAN Topology.

APII / Genkai Network ConfigurationAugust 27, 2002

JuniperM10

SINET

Tokyo XPBusan XP

600MATM

2.4 GbpsSONET

600MATM

Kyushu & Yamaguchi

DATAX uZ2.4G-GEB

2 x GbE

ATOMIS5

ATOMIS7

600MATM (DF)17km

JGN

JuniperM10

600MATM

Genkai JuniperM10GbE (DF)

L2

L2

GbE (DF)

Genkai XP (Meinohama)

GbE

Kyushu & Yamaguchi(QGPOP)

Existing

CRL

e!

Tenjin(NTT Com)

GenkaiKyushu U

GbE

APII/GenkaiServers

e!Servers

GbE

GbE

cisco

150M ATM(Backup)

JGN

GbE

150M ATMGbE

ATOMIS 7

Page 7: APAN-JP Report August 28, 2002 Shigeki Goto. APAN Topology.

SOI Asia site

Myanmar

ThailandLaos

Page 8: APAN-JP Report August 28, 2002 Shigeki Goto. APAN Topology.

Site Setup Status

Myanmar

Thailand

Laos

Page 9: APAN-JP Report August 28, 2002 Shigeki Goto. APAN Topology.

IF Coaxial Cable

UDLR Receiver

LAN

JCSAT-3 C-Band C-7 transponder

L-Band (950 - 1450MHz)

Terrestrial Internet

AC power supply

SOI Server

Provided by SOI Asia Project

Prepared by Institution

SOI Asia Site Configuration

SOI Clients

Receive Router

CampusLAN

CampusLAN

Page 10: APAN-JP Report August 28, 2002 Shigeki Goto. APAN Topology.

Partners

CU

NUOLUCSY

Brawijaya

UNSRATAYF

UNHAS

AIT IOIT

ITB

Page 11: APAN-JP Report August 28, 2002 Shigeki Goto. APAN Topology.

Brawijaya University,Indonesia

Hasanuddin University,Indonesia

Sam Ratulangi University,Indonesia

Laos National University,Laos

University of ComputerStudies, Yangon, Myanmar

Asian Youth Fellowship,Malaysia

Asian Institute of Technology, Thailand

Chulalonkorn University,Thailand

SO

I-AS

IA P

artners Satellite

Antenna

SO

I-AS

IA P

artners Satellite

Antenna

SO

I-AS

IA P

artners Satellite

Antenna

SO

I-AS

IA P

artners Satellite

Antenna

Institute of InformationTechnology,Vietnam

Page 12: APAN-JP Report August 28, 2002 Shigeki Goto. APAN Topology.

Asia Broadband Committees

• Strategic Committee– hosted by the Minister of “PTT”– will decide the guideline– Chair: Jiro Ushio (Ushio Electric Co., Ltd.)

• Planning Committee– hosted by the Chief Engineer of “PTT”– will make the plan based on the guideline by the Strateg

ic Committee– Chair: Shigeki Goto (Waseda Univ.)

*PTT: Ministry of Public Management, Home Affairs, Post and Telecommunications

Page 13: APAN-JP Report August 28, 2002 Shigeki Goto. APAN Topology.

Joint Efforts

• Japanese government will play the key roles for IT deployments in Asia, but should be widely collaborated by– Joint planning with leaders in other countries– Wide range participants including government,

private sectors and NPO– Expanding Intra-regional communications

Page 14: APAN-JP Report August 28, 2002 Shigeki Goto. APAN Topology.

Proposals are requested

• The deadline is Aug. 28, 2002

• Format:– Project name:– Target date/year:– History & Status:– Action plan:

Page 15: APAN-JP Report August 28, 2002 Shigeki Goto. APAN Topology.

Schedules

• July 22: 1st Strategic/Planning meeting

• Aug. 28: Deadline of the Proposal

• Sep. 11: 2nd Planning Committee

• Oct? Interim Report

• Nov?

• Dec? Final Report

• Jan: IT Summit?

Page 16: APAN-JP Report August 28, 2002 Shigeki Goto. APAN Topology.

Members from APAN• Strategic Committee

– Shigeki Goto (JP)

– Jun Murai (JP)

– Yong-Jin Park (KR)

– Sureswaran Ramadass (MY)

– Royol Chitradon (TH)

– L.W.C.Wong (SG)

• Planning Committee– Shigeki Goto (JP)

– Kazunori Konishi (JP)

– Yong-Jin Park (KR)

Page 17: APAN-JP Report August 28, 2002 Shigeki Goto. APAN Topology.

Meetings

• 2002.10.4-5 APII/Genkai Meeting in Oita

• 2003.1.22-24 APAN & PRAGMA in Fukuoka

• 3. Global Grid Forum 7 in Tokyo