DEVELOPING OF URBAN TRANSPORTS IN ALGERIA IN RECENTS YEARS RÉPUBLIQUE ALGÉRIENNE DÉMOCRATIQUE ET POPULAIRE MINISTÈRE DES TRANSPORTS ENTREPRISE MÉTRO D’ALGER METROS TRAMWAYS Car cables Car cables
Jun 19, 2015
DEVELOPING OF URBAN TRANSPORTS
IN ALGERIA IN RECENTS YEARS
RÉPUBLIQUE ALGÉRIENNE DÉMOCRATIQUE ET POPULAIRE
MINISTÈRE DES TRANSPORTS
ENTREPRISE MÉTRO D’ALGER
METROS TRAMWAYS Car cables Car cables
introduction
RÉPUBLIQUE ALGÉRIENNE DÉMOCRATIQUE ET POPULAIRE MINISTÈRE DES TRANSPORTS ENTREPRISE MÉTRO D’ALGER
The Transport Sector in Algeria is in perpetual development, in particular to address the need for public transport, and address the problems of road congestion due to changes in the fleet, the Department of Transportation has completed the extension and modernization of urban transport across the country. Thus, the Algerian state spent over € than 10 billions euros for development of guided transport in Algeria over the past 10 years.
- total length of metro lines planned : 70 km over 2 cities - total length of tram lines planned : 184 km over 9 cities - total lines of cables cars planned :21 projects over 10 cities
ALGIERS SUBWAY COMPANY
RÉPUBLIQUE ALGÉRIENNE DÉMOCRATIQUE ET POPULAIRE MINISTÈRE DES TRANSPORTS ENTREPRISE MÉTRO D’ALGER
The Operating Company and realization of urban railway called "Algiers Metro," EPA / SPA, was founded in 1984, in his capacity as delegated project of the Ministry of Transport. It ensures the implementation of various urban transport projects such as the Metro, Tram and the cable cars across the country.
In order to ensure better management of tasks assigned to it, the Company has established a structure for monitoring and management of the achievements of all its projects in partnership with its subsidiary, the Office of studies urban Transport BETUR in the development of design and engineering for urban transport.
METROS PROJECTS
RÉPUBLIQUE ALGÉRIENNE DÉMOCRATIQUE ET POPULAIRE MINISTÈRE DES TRANSPORTS ENTREPRISE MÉTRO D’ALGER
RÉPUBLIQUE ALGÉRIENNE DÉMOCRATIQUE ET POPULAIRE MINISTÈRE DES TRANSPORTS ENTREPRISE MÉTRO D’ALGER
NETWORK SUBWAY AN TRAM PROGRAMMED IN ALGIERS LINE Nn°1 on OPERATION SINCE 2011 1 ALGIERS SUBWAY PATH: Emir Abdelkader - Hai El Badr LENGTH: 9 Km [10 stations] Operating hours: 5:00 am ~ 11:00 p.m. pm (headway 3minuites)? Extensions under construction Extension A: 1.69 Km → Emir Abdelkader ~ Martys Square Extension B: 3,99Km Hai El Badr → ~ El Harrach Centre Extension C: 3,70Km Hai El Badr → ~ Ain Naadja 2 LOT 1: 9.4 Km → El Harrach Centre ~ Bab Ezzouar ~ International Airport Algiers LOT 2: 6.00 Km → Ain Naadja ~ Baraki Lines on study LOT 3: 8.00 Km → Des Martyrs ~ Bab El Oued? ~ Chevalley LOT 3 Extensions: 14.00 Km → Chevalley Delly Brahim ~ ~? Ouled Fayet Cheraga ~ ~ ~ El Achou Draria
Ligne 1
Extension HEB - El Harrach
Extension TGP - Place des martyrs
Extension HEB Ain Naâdja
EXTENSION AIN NADJAA - BARAKI
EXTENSION EL HARRACH - BAB – EZZOUAR – AEROPORT HOUARI BOUMEDIENE
EXTENSION PLACE DES MARTYRS – BAB EL OUED - CHEVALLEY
2011: 9km,10 stations 2015:13 km,13stations
2017:18 km ,18 stations 2020:40 km,37 stations 2025:54km,55 stattions
.
ALGIERS SUBWAY NETWORK
ALGIERS METRO
The Algiers Metro extends in its first phase from south east part to the center of algiers(hai El Badr ) to the main post office on a length of 9.5 km and serving a total of ten (10) stations: HEB -CMS-CAM-UFA-JES-HAM-AID KBK-May-TGP-all the stations are under ground execpt the terminus station(hai el badr) wich is at grade level
It basically has 14 air conditionned trains of 6 wagons from wich 11 trains rally, daily from 5 am to 11pm ,10 stations seven days at a rhythm of a train every 3 minutes at peak hours and a train every 5 minutes at normal hours, 02 trains kept for maintenance and 01 as a reserve train. In 26 months of operation, the line 1 Algiers Metro attendance reached 50 millions passengers.
• CHARACTERISTICS OF THE TUNNEL Double track tunnel - Tunnel Depth: 12 to 15 meters - Opening diameters of 8.80 to 9.40 meters - Distance between rail: 1435mm - The railway conventional, with a third rail to supply the rolling stock.
9
equipment of the full system in the tunnel: Railway signaling Radio stations, The emergency phones with emergency switches, The electric power networks, Facilities ventilation equipment, Dry column.
10
CHARACTERISTICS OF THE SYSTEM
station depth: 13-23 m - Length of the station: 115 m - Width of the station: 23 m - Width of the quay: 4 m - - All stations are equipped with escalators with the exception of the station Hai El Badr (at grade station) -
11
CHARACTERISTICS OF THE STATIONS
• Length of the train: 108.5 Width M car: 2.80 M Capacity trains: 1,200 Transport Capacity: 21,000 Voyageur / Time / Direction Number of trains for line 1: 14 trains Number of cars per train: 06 air-conditioned coaches Frequency: 200 Seconds Maximum speed: 70 km / h Commercial speed: 30 Km / h Manufacturer: Spanish Society CAF
ROLLING STOCK CARACTERISTICS
12
Composed of two items:
PCC : Centralized Control Station, from which there is centralization of all information pertaining to the smooth functioning of the Metro.
The CCO provides control, monitoring and traffic management of all trains on the line,
HVB: High Voltage, provides power to the entire line into electrical energy
CENTRAL COMMAND OPERATION BUILDING
13
The maintenance workshop Bachdjarrah erected on an area of 18 hectares, consists of infrastructure to ensure all activities related to the maintenance of rolling stock building-a major revision to the trains -a building for small daily review. -The Parking garages for trains. -a building for the ongoing maintenance of the trains. -The Station situated at the building is designed to control trains during technical tests at the test track and also control the movement of trains at all the complex maintenance
WORK SHOP MAINTENANCE
14
Ligne 1
Extension HEB - El Harrach
Extension TGP - Place des martyrs
Extension HEB Ain Naâdja
EXTENSION AIN NADJAA - BARAKI
EXTENSION EL HARRACH - BAB – EZZOUAR – AEROPORT HOUARI BOUMEDIENE
EXTENSION PLACE DES MARTYRS – BAB EL OUED - CHEVALLEY
The Metro network for the city of Algiers total -to 2017, 18 km of lines and 19 stations.
- 2020, 40 km of lines and 39 stations
ALGIERS SUBWAY NET WORK 2020
EXTENSION B HAI EL BADR EL HARRACH
• 4,0 km, 4 stations
• On operation : May 2015
EXTENSION C HAI EL BADR- AIN NAADJA
• 3,6km,3 stations
• On operation: January 2017
EXTENSION A TAFOURAH-MARTYRS SQUARE
• 1,6km,2 stations
• On operation: January 2017
EXTENSION B1 EL HARRACH -AEROPORT
• 9,5 KM, 10 stations
• On operation: January 2020
RÉPUBLIQUE ALGÉRIENNE DÉMOCRATIQUE ET POPULAIRE MINISTÈRE DES TRANSPORTS ENTREPRISE MÉTRO D’ALGER
EXTENSION EL HARRACH – BAB EZZOUAR - Aéroport HOUARI.BOUMEDIENE
09.5 KM de linéaire;
10 stations
09 puits de ventilation
STATION HACEN BADI STATION RABIA TAHER
STATION SMAIL YAFCEH
STATION CENTRE D AFFAIRE
STATION AEROPORT
STATION UNIVERSITE HOUARI BOUMEDIENNE
STATION POLE UNIVERSITAIRE
STATION BAULIEU
STATION OUED SMAR
RÉPUBLIQUE ALGÉRIENNE DÉMOCRATIQUE ET POPULAIRE MINISTÈRE DES TRANSPORTS ENTREPRISE MÉTRO D’ALGER
EXTENSION EL HARRACH – BAB EZZOUAR - Aéroport HOUARI.BOUMEDIENE
VUE SUR LA SALLE DES BILLETS
EXTENSION C1 AIN NAADJA -BARAKI
• 6KM,107stations
• On operation: January 2020
BARAKI
RÉPUBLIQUE ALGÉRIENNE DÉMOCRATIQUE ET POPULAIRE MINISTÈRE DES TRANSPORTS ENTREPRISE MÉTRO D’ALGER
EXTENSION AIN NAADJA - BARAKI
STATION MOHAMED BOUDIAF
STATION AIN NAADJA GARE
STATION FUTUR PARC URBAIN
STATION MOHAMED BELARBI STATION LE JARDIN
STATION CITÉ 2004
06 KM de linéaire;
05 stations souterraines et 01
station en viaduc
05 puits de ventilation
Viaduc
ORAN METRO PROJECT
RÉPUBLIQUE ALGÉRIENNE DÉMOCRATIQUE ET POPULAIRE MINISTÈRE DES TRANSPORTS ENTREPRISE MÉTRO D’ALGER
Métro d’Oran
Phase 1
Phase 3 Phase 2
Phase 4
12,8 km
4,6 km 1,7 km
8 km
TOTAL PHASES 1, 2 ET 3:
19,66 km / 20 stations
Network of metro and tram in ORAN
TRAMWAYS IN OPERATION
RÉPUBLIQUE ALGÉRIENNE DÉMOCRATIQUE ET POPULAIRE MINISTÈRE DES TRANSPORTS ENTREPRISE MÉTRO D’ALGER
ALGIERS 23 Km, 38 stations, 41 trains
ORAN 18,7 km , 28 stations, 30 trains
CONSTANTINE 9 km, 10 stations, 27 trains
TRAMWAYS UNDER CONSTRUCTION
17,8 km, 26 stations, 30 trains
Sidi Bel Abbes Tram Ouargla Tram
12,6 km, 23 stations, 23 trains
14,2 km, 24 stations, 25 trains
Mostaganem Tram
22,2 km, 37 stations, 39 trains
Sétif Tram
Annaba Tram
21,8 km, 34 stations, 56 trains 13 km, 13 stations, 24 train
Constantine Tram
TRAMWAYS UNDER CONSTRUCTION
NEWS PROJECTS IN TENDER PROCESS
15 km, 24 stations, 36 trains
Batna Tram Oran Tram Ext. A,B,C
21,1 km, 29 stations, 17 trains
8,6 km, 12 stations, 11 trains
Oran Tram Extention D
4,3 km, 6 stations, 7 trains
Alger Ext. Ruisseau - BMR
TRAMWAYS PROJECTS
FEASABILITY STUDY
RÉPUBLIQUE ALGÉRIENNE DÉMOCRATIQUE ET POPULAIRE MINISTÈRE DES TRANSPORTS ENTREPRISE MÉTRO D’ALGER
Tramway de Béchar - Longueur : 13 Km, Nombre de stations : 23
Tramway de Bejaïa - Longueur : 9,7 Km, Nombre de stations : 19
Tramway de Blida
Tramway de Tlemcen
Tramway de Alger Ouest
Tramway de Biskra
- Longueur: 21,5 Km, Nombre de stations: 33
- Longueur :11 Km, Nombre de stations : 18
- Feasabilty study in progress
- Feasability study in progress
Tramway de TEBESSA feasabilty study in progress
Tramway de DJELFA
RÉPUBLIQUE ALGÉRIENNE DÉMOCRATIQUE ET POPULAIRE MINISTÈRE DES TRANSPORTS ENTREPRISE MÉTRO D’ALGER
CABLE CARS PROJECTS
RÉPUBLIQUE ALGÉRIENNE DÉMOCRATIQUE ET POPULAIRE MINISTÈRE DES TRANSPORTS ENTREPRISE MÉTRO D’ALGER
CABLES CARS ON OPERATION
RÉPUBLIQUE ALGÉRIENNE DÉMOCRATIQUE ET POPULAIRE MINISTÈRE DES TRANSPORTS ENTREPRISE MÉTRO D’ALGER
CONSTANTINE On operation since June 2008
TLEMCEN On operation since Fébruary 2009
SKIKDA On operation since july 2009
ALGIERS oued koriche bouzareah on operation since september 2014
RÉPUBLIQUE ALGÉRIENNE DÉMOCRATIQUE ET POPULAIRE MINISTÈRE DES TRANSPORTS ENTREPRISE MÉTRO D’ALGER
Téléphérique El Madania renoved in 2008
Téléphérique Notre Dame d’Afrique renoved in 2009
Téléphérique Mémorial Renoved in 2009
Téléphérique Palais de la Culture Renoved in 2010
RÉPUBLIQUE ALGÉRIENNE DÉMOCRATIQUE ET POPULAIRE MINISTÈRE DES TRANSPORTS ENTREPRISE MÉTRO D’ALGER
Télécabine de BLIDA Rénové en Juin 2009
Télécabine de Annaba Rénové en Février 2008
RÉPUBLIQUE ALGÉRIENNE DÉMOCRATIQUE ET POPULAIRE MINISTÈRE DES TRANSPORTS ENTREPRISE MÉTRO D’ALGER
PROJECT IN PROGRESS
TIZI OUZOU CABLE CAR: 5,5 km ,78 car,2400passengers /h
PROJECTS AWARDED:
CONSTANTINE 2 PROJECTS :3,1km an 2,87 km
BENI SAF :7,2 km
BEJAIA: 2 km
ORAN :2,4km
/
RÉPUBLIQUE ALGÉRIENNE DÉMOCRATIQUE ET POPULAIRE MINISTÈRE DES TRANSPORTS
ENTREPRISE MÉTRO D’ALGER
Thank you for your attention