Top Banner
Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary Deliver Double the Value in Half the Time 2V = .5T David Hawks @austinagile
35
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Agile Velocity - Deliver double the value in half the time

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

Deliver Double the Value in Half the Time

2V = .5T

David Hawks @austinagile

Page 2: Agile Velocity - Deliver double the value in half the time

David Hawks Agile Velocity

Agile Coach [email protected]

Role

Name

Company

Please fill out card as follows & pass to frontYears of Agile Experience (if any)

10 yrs

Email Address(If you would like a copy of the slides & to receive periodic information about agile)

Page 3: Agile Velocity - Deliver double the value in half the time

David Hawks

CEO of Agile VelocityAgile Trainer and Coach

@austinagile

austinagile.com (blog)

[email protected]

Deliver Innovative Products Faster

Page 4: Agile Velocity - Deliver double the value in half the time

Let’s assume we can get 100% of the value in

100% of the time today. 1V = 1T

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

By learning can we get Double the Value in

Half the Time? 2V = .5T

Page 5: Agile Velocity - Deliver double the value in half the time

45%$

19%$

16%$

13%$7%$

Never$Rarely$Some5mes$O8en$Always$

Feature/function usage in the software industry

From: A Standish Group study

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

What causes us to build features which are rarely or never used?

Page 6: Agile Velocity - Deliver double the value in half the time

Problem #1 We make tough decisions

too early and lock them in

Image Credit: http://i.qkme.me/3unlv7.jpg

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

Page 7: Agile Velocity - Deliver double the value in half the time

Smartest Point??Dumbest Point

Accelerate Learning

Defer Decisions to the last Responsible Moment

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

xz

Page 8: Agile Velocity - Deliver double the value in half the time

Effective Communication

Exercise

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

Page 9: Agile Velocity - Deliver double the value in half the time

Problem #2 The team doesn’t have a Shared Understanding of their purpose

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

Page 10: Agile Velocity - Deliver double the value in half the time

We want to Shift the Process from a Requirements Delivery Process…

False Assumptions: 1. The customer knows what he wants  2. The developers know how to build it  3. Nothing will change along the way

10

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

Page 11: Agile Velocity - Deliver double the value in half the time

…To a Requirements Discovery Process

Reality: 1. The customer discovers what he wants 2. The developers discover how to build it 3. Many things change along the way 11

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

Page 12: Agile Velocity - Deliver double the value in half the time

User Story Mapping

Technique to Learn about Customer Needs

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

Page 13: Agile Velocity - Deliver double the value in half the time

A  sample  story  map:  E-­‐commerce  site

Search  by  keyword View  description  

&  photo

Filter  by  price

Pay  by  credit  card

Select  item  for  purchase

Enter  shipping  info

Filter  by  brand

Decreasin

g  priority

Clear  search  criteria

MVP  1  above  this  line

Search  products

Shopping  cart

Create  account

Pay  &    Ship

Compare  products

Detailed  product  specs

Read  product  reviews

Facebook  for  login

Search  by  SKU

Persist  payment  info

Zoom  on  photos

Product-­‐  specific  filters Side  by  side  

comparison

Pay  by  PayPal

Update  profile

Order    status

View  open  orders

Confirm  payment  &  shipping  info

Remove  from  cart

Estimate  total  w/  tax  shipping

Modify  item  quantity

Select  multiple  items  for  purchase

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

Page 14: Agile Velocity - Deliver double the value in half the time

Problem #3 Long/ No Feedback or Validation Cycles

http://www.skinit.com/assets/catalog/jumbo_shot/jumbo_shot57479340.jpg

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

Page 15: Agile Velocity - Deliver double the value in half the time

Lean Startup/ Lean UX

Validated Learning

BuildLearn

Measure

Minimize time thru the loop

1) What do we need to learn?

2) How can we measure it?

3) What is the simplest thing to build to measure it?

(MVP)

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

Page 16: Agile Velocity - Deliver double the value in half the time

Assume the team was working in value order, when would you release this product? What would be the benefit of releasing early?

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

45%$

19%$

16%$

13%$7%$

Never$Rarely$Some5mes$O8en$Always$

Page 17: Agile Velocity - Deliver double the value in half the time

If we don’t waste time:

• Building the wrong features • Building low value features • Over-engineering features (due

to lack of clarity)

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

We Could Deliver 80% of the Value in 20% of the time

.8V = .2T or

2V = .5T

Page 18: Agile Velocity - Deliver double the value in half the time

What keeps us from delivering products faster?

http://www.captivations.com.au/wp-content/uploads/2013/03/Fast-delivery.jpg

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

Page 19: Agile Velocity - Deliver double the value in half the time

Problem #4 Drowning in a Sea of Opportunity

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

Page 20: Agile Velocity - Deliver double the value in half the time

Working on many items in parallel

Working on items one at a

time

Lots of WIP slows things down

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

10 20 30 40

Page 21: Agile Velocity - Deliver double the value in half the time

Little’s Law

WIPThroughput = Avg. Cycle

Time

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

Page 22: Agile Velocity - Deliver double the value in half the time

Problem #5 Not Getting to Done

Image Credit: http://files.smashingmagazine.com/wallpapers/april-13/images/its_not_done_until_it_ships__15.png

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

Page 23: Agile Velocity - Deliver double the value in half the time

Illusion of Progress

Requirements

Design

Development

Test

Release

80%

done??

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

Page 24: Agile Velocity - Deliver double the value in half the time

Working Software is your primary Measure of Progress

Requirements

Design

Development

Sprint 1

Test

Requirements

Design

Development

Sprint 2

Test

Requirements

Design

Development

Sprint 3

Test

Requirements

Design

Development

Sprint 4

Test

Potentially Shippable Product Increment

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

Page 25: Agile Velocity - Deliver double the value in half the time

Sprint 1 Sprint 2 Sprint 3 Sprint 4 Hardening

20 Points 20 Points 20 Points 20 Points

}8 Weeks

1 2 3 4 Hardening }8 Weeks

}2 Weeks }2 Weeks }2 Weeks }2 Weeks}2 Weeks

Done = Feature Complete and Feature Tested *But defects were deferred to the end

The Plan: 10 Weeks to Deliver 80 Points

Reality: 16 Weeks to Deliver 80 Points (10 Points per 2 Weeks)

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

Page 26: Agile Velocity - Deliver double the value in half the time

Done = Feature Complete, Feature Tested, and defects fixed

Go Slow to Go Fast!

Sprint 1 Sprint 2 Sprint 3 Sprint 4

}2 Weeks

15 Points 15 Points 15 Points 15 Points

}2 Weeks }2 Weeks }2 Weeks

Sprint 5

}2 Weeks

15 Points

We Delivered 75 Points in 10 Weeks 15 Points per 2 weeks

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

Page 27: Agile Velocity - Deliver double the value in half the time

Working on many items in

parallel

Working on items in value

order

Highe

st V

alue

Impact of Change

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

Page 28: Agile Velocity - Deliver double the value in half the time

Solution Stop Starting, Start Finishing

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

Page 29: Agile Velocity - Deliver double the value in half the time

Problem #6 Everything is Important

Image Credit: http://d.wildapricot.net/images/newsblog/bigstock-important-very-high-priority-i-46052392.jpg?sfvrsn=0

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

Page 30: Agile Velocity - Deliver double the value in half the time

How we Normally Assign Work

Project 1

Project 2

Project 3

Carter

Alex

James

Camryn

Janet

Will

All High Priority

How does Alex decide what to work on next?

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

Page 31: Agile Velocity - Deliver double the value in half the time

How we should prioritize work in Agile

Project 1

Project 2

Project 3

Carter

Alex

James

Camryn

Janet

WillAgile Team

Prioritized Team Backlog

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

Page 32: Agile Velocity - Deliver double the value in half the time

If we don’t lose focus working:

• On too many items at once (without getting them to Done)

• In silos instead of swarming • On low value things first

http://www.skinit.com/assets/catalog/jumbo_shot/jumbo_shot57479340.jpg

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

We Could Deliver 100% of the Value in 25% of the time

V = .25T or

2V = .5T

Page 33: Agile Velocity - Deliver double the value in half the time

What can you change so your product can deliver value faster?

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary

Page 34: Agile Velocity - Deliver double the value in half the time

Resistance and Chaos

Integration and Practice

New Status Quo

Status Quo

Satir Change Model - J Curve

Page 35: Agile Velocity - Deliver double the value in half the time

We are here to help:Monthly Training Workshops - Certification (CSM, CSPO), Kanban, Product Planning, etc.

Private Training - Customized Training for your team or leadership

Assessment - We will review your current level of agility and provide recommendations on improvements

Transformational Coaching - We will guide your teams and leadership through an Agile Transformation

Player-Coach - We can provide a Coach to embed on your team to help them work through challenges. ScrumMaster or Technical team member.

Staffing - We can help you find the best Agile Talent to recruit to your team.

Copyright @ 2014 Agile Velocity, LLC All Rights Reserved. Agile Velocity Proprietary