Procedures for Approving Aftermarket Diesel Particulate Filters (DPF) For 2007 - 2009 Model Year HDE Procedures for Approving Aftermarket Diesel Particulate Filters (DPF) For 2007 - 2009 Model Year HDE Public Workshop August 10, 2015 California Environmental Protection Agency OF Air Resources Board
43

Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Jul 21, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Procedures for Approving Aftermarket Diesel Particulate Filters (DPF) For 2007 - 2009 Model Year HDE

Procedures for Approving Aftermarket Diesel Particulate Filters (DPF) For 2007 - 2009 Model Year HDE

Public Workshop

August 10, 2015

California Environmental Protection Agency

OF Air Resources Board

Page 2: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Purpose Purpose

Establish a procedure for evaluation and approval of non-OEM aftermarket DPF (AMP)

Procedure ensures: • DPF is functional with real and durable emission

reductions • DPF is compatible and fully integrated with the engine

(i.e., does not impact engine durability or functionality) Procedure solely for 2007-2009 MY engines

certified with DPFs

22

Page 3: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Overview Overview

Background Regulation Adoption Status Proposed Regulation Language Proposed Evaluation Procedure Questions and Open Discussion

33

Page 4: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Existing Programs Replacement Parts

Definition - 13 CCR 1900 (b)(23) “…is functionally

Existing Programs Replacement Parts

identical to the original equipment part in all respects which in any way affect emissions (including durability)…”

Testing and specifications equivalent to OEM certification

Must be able to provide sufficient information to show that product meets these requirements (13 CCR 2221 and 2224) 44

Page 5: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Modified Parts -DPFs Proposed Regulation

Not identical in all respects to certified

Modified Parts -DPFs Proposed Regulation

emissions control component

Existing procedures deemed inadequate for evaluating certain emission critical parts like DOCs, DPFs, etc.

Separate evaluation procedure and approval path needed for aftermarket DPFs

55

Page 6: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Regulation Adoption Status Regulation Adoption Status

Public workshops – Dec 4th, April 7th, and August 10th

Board date delayed late 2015 to early 2016 Significant comments received on April 7th Proposed Test Procedure

(TP) Significant comments received on June 9th mail-out (relaxation to the

April 7th TP)

Currently meeting with individual stakeholders • Requesting data on concerns raised • Researching bond requirements

Page 7: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Comments Received Comments Received

Proposal too costly and overly burdensome • June 9th mail-out provided concepts for reducing testing

and administrative requirements June 9th revisions

• TP not robust and will result in incompatibilities between the OEM engine and AMP DPF

• DPF technical specifications are different across OEM 2007-2009 engine platforms

• Staff requesting data from stakeholders

77

Page 8: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Comments Received (continued)

Comments Received continued

Procedure may be applied to 2010 and newer engines • Procedure cannot be applied to SCRs, DOCs, and DPFs

for 2010 and newer MY engines • Different testing procedure would required for 2010+

Does not account for running changes within an engine family • Requesting data and other information

Concern that some companies may abandon products or be financially unable to support products if issues • Bond proposal

88

Page 9: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

-

Summary of Revisions

9

# Items Draft Procedure (April 7, 2015)

Mail out Revisions (June 9, 2015)

New Revisions (August 10, 2015)

1 Emission Control Groups ~40 6 7 2 Laboratory aging hours 500 300 300 3 OEM part laboratory aging Required Not required Not required but degreening is

required 4 OEM part emission testing Required Not required Required after degreening

5 NO2 Emission or soot accumulation

Not required Not required Required

6 Product warranty 5 years /150,000 miles

2 years /unlimited miles

2 years /unlimited miles

7 Installation warranty 5 years /150,000 miles

2 years /unlimited miles

2 years /unlimited miles

8 Authorized installer Required Not required Not required 9 Reporting for the installer Required Not required Not required 10 Swapping Not allowed Allowed Allowed 11 Bond Not required Required Required

Cost per ECG reduction % 41.8% 34.8%-39.5%

Approx. testing cost (total) $8,432,000 $693,500 896,000

Total cost reduction % 91.7% 89.3%

Summary of Revisions

Approx. testing cost per ECG $210,000 $123,000 $127,000-137,000

Page 10: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Proposed Regulation Language

Proposed Regulation Language

10 10

Page 11: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

13 CCR 2222(k) 13 CCR 2222(k) Proposed regulation language includes:

• Exempt aftermarket DPF the prohibitions of California Vehicle Code sections 27156 and 38391 through ARB’s evaluation procedure

• Prohibitions of any used, remanufactured, refurbished, recycled, or salvaged DPF in California

• Definitions of a new aftermarket DPF, OEM DPF, and used DPF

11 11

Page 12: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Proposed Aftermarket DPF Test Procedure

Proposed Aftermarket DPF Test Procedure

12 12

Page 13: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Procedure’s Major Elements Procedure's Major Elements

Applicability Application process Testing

• Emissions • Field demonstrations

Warranties Other requirements

13 13

Page 14: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Applicability Applicability

Market-ready new aftermarket DPFs intended as modified parts

2007-2009 MY on-road heavy-duty diesel engines certified with DPFs

NOT for the following: • DPFs covered under verification provisions • OEM replacement DPFs • Used DPFs • 2010+ DPFs; DOCs or SCRs • Metal DPFs 14 14

Page 15: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Application Process Application Process

15 15

Page 16: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

ARB reviews in detail if final application meets

all requirements ?

ARB sends “incomplete” letter

to request more information within 45 days

Application includes all ARB required information?

ARB sends “approval test plan” letter to applicant

ARB issues EO within 60 days

Yes

Applicant responds within 60 days & 3

times

ARB sends “termination” letter to manufacturer

Applicant needs to wait for 60 days for re-submission

No

ARB asks for more information within 45 days

Applicant responds within 60 days Yes No

Yes

No

Yes

No

Yes No

Applicant conducts all required testing and submits final application

Applicant submits preliminary application

16

Application ProcessApplication Process

16

Page 17: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Preliminary Application Preliminary Application Defined emission control group (ECG). Limit 1 per

application. Contact persons/phones/emails/addresses Complete information on the OEM DPF and

aftermarket DPF Detailed test plan (all required tests, test facilities,

fleet/vehicles/engines, equipment/instruments, etc.) Bond information Statement of compliance Detailed application format - see draft procedure17 17

Page 18: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Final Application Final Application

Testing reports and results Testing data and QA/QC data Third-party statements and letters Signed statement of compliance letter Owner’s manual /installation manual Warranty Information Sample scale drawings of labels Proof of bond and maintaining bond Other supporting information

18 18

Page 19: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Emission Control Group Emission Control Group

Proposed definition: • Single OEM or emission control configuration • An ECG must only include a single aftermarket DPF

Based upon: • Review of OEM certifications • Consultation with stakeholders • Differences between OEM design principles • Effects on the engine must be considered

19 19

Page 20: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

New ECG Concept New ECG Concept

ECG# Representative OEM Manufacturer or Emission Control Configuration

Testing Requirements

1 Cummins Full testing required2

2 Detroit Diesel Corporation Full testing required2

3 International/Navistar Full testing required2

4 Volvo/Mack Full testing required2

5 Caterpillar Full testing required2

6 Uncatalyzed DPF + Burner Full testing required3

7 General Motors/Isuzu/Mitsubishi See note4

20 20

See draft procedure for footnote explanations

Page 21: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Testing Testing

21 21

Page 22: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Testing Goals Testing Goals

Device-equipped engine is compliant with the original certification • Account for infrequent regeneration adjustment factors

(IRAFs) • AECDs

Ensure the device is durable Compatibility with the engine

• No fault, EMD, ECU impacts, etc. • No effect on engine function or normal operations

22 22

Page 23: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Testing Sequence Testing Sequence

Lab Aging (300 hrs)

(T, BP, RPM, Photos)

AMP

Emission Testing

(FTP, 1cold +3 hot)

Lab Degreening (25 hrs)

(T, BP, Regen.)

AMP

AMP

OEM

AMP

OEM

Emission Testing

(FTP, 1cold +3 hot)

Field Testing

(500 hrs)

AMP (200 hrs)

AMP (200 hrs)

(T, BP, RPM, Photos, 3rd Party Letter, etc.)

100

AMP

Emission Testing

(FTP, 1cold +3 hot)

AMP

23 23

Page 24: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Laboratory Degreening Protocol Laboratory Degreening Protocol

Use emission test engine Use hot start FTP or SET test cycles 25 hours for OEM and AMP each Record T ( DPF inlet and DPF bed), BP, RPM,

Torque, and regeneration events Multi-point temperature measurement

requirement

24 24

Page 25: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Laboratory Aging Protocol Mode # Description Parameters Specification

1 2007 ramped-modal cycle Engine Speed & Torque

Time Duration

Code of Federal Regulations, Title 40, part 86, Subpart N 40 minutes

2 2007 ramped-modal cycle Engine Speed & Torque

Time Duration

Code of Federal Regulations, Title 40, part 86, Subpart N 40 minutes

3 Ramped temperature1 Target Temperature (DPF Inlet) Engine Speed & Torque

Time Duration

620oC ±20 oC 2007 ramped-modal cycle Mode A100 2 minutes

4 Active Regeneration Target Temperature (DPF Bed) Engine Speed & Torque

Time Duration

700oC ±50 oC 2007 ramped-modal cycle Mode A100 40 minutes

5 Cooling down2 Target Temperature

Operation

Engine Speed & Torque

Back to 2007 ramped-modal cycle Mode A100 exhaust temperature

Shut off supplemental fuel supply

2007 ramped-modal cycle Mode A100

25

Laboratory Aging Protocol

25

Page 26: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Laboratory Aging Protocol Continued

Laboratory Aging Protocol Continued

Multipoint temperature measurement requirement

A50% 100 0 25%I O.0.0-0-0-

-9-

A Radial Inlet Outlet Outlet

1-in Bed

Figure 1 Temperature sensor locations for DPF aging

Effective aging time concept • The temperature difference between DPF inlet and inside of DPF • Aging time is a function of aging temperature as defined by the

Arrhenius equation • Use multipoint temperature data to achieve targeted effective aging time

2626

Page 27: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Laboratory Aging Protocol Chemical Aging

Laboratory Aging Protocol Chemical Aging

Lubricant oil exposure requirement • Use observed field average oil consumption to estimate

oil exposure target for 100,000 miles • Use 300 hours aging period to estimate the aging oil

consumption • Oil satisfies OEM specifications (e.g., CJ-4). • Oil consumption acceleration options to achieve target oil

consumption • Method (e.g. “drain and weigh” every 24 hours or use

AVL 406 Oil Consumption Meter) to track actual oil consumption during aging process

27 27

Page 28: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Emission Testing Requirements Emission Testing Requirements

Engine must be representative of the emission control group

FTP heavy-duty transient cycle 1 cold start plus 3 hot starts Emissions testing during regeneration of a soot

loaded filter Other testing as necessary (e.g., CFR 1065,

Subpart L for semi-volatile organic compounds, dioxins)

Detailed requirements in draft procedure 28 28

Page 29: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Proposed Acceptance Criteria Lab degreened OEM vs. Lab degreened AMP OEM NMHC, NOx (or NMHC + NOx), CO

• Must be at or below certification EO emission levels

Proposed Acceptance Criteria Lab degreened OEM vs. Lab degreened AMP

• NOx shall not exceed 10% of certification level AMP NMHC, NOx (or NMHC + NOx), CO, PM

• Must meet certification emission standards • AMP NO2 shall be within 15% of OEM

AMP average backpressure and temperature • Within 10% of OEM

No EMD fault or warning codes

29 29

Page 30: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Proposed Acceptance Criteria Lab degreened AMP vs. Lab Aged AMP Proposed Acceptance Criteria Lab degreened AMP vs. Lab Aged AMP

AMP NMHC, NOx (or NMHC + NOx), CO, PM • Must meet certification emission standards • NOx shall not exceed 10% of certification level

Aged AMP • NO2 shall be within 15% of degreened AMP Average backpressure and temperature within 10% of

degreened AMP No EMD fault or warning codes

30 30

Page 31: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Proposed Acceptance Criteria Lab aged AMP vs. Field Aged AMP

Proposed Acceptance Criteria Lab aged AMP vs. Field Aged AMP

AMP NMHC, NOx (or NMHC + NOx), CO, PM • Must meet certification emission standards • NOx shall not exceed 10% of certification level

Field aged AMP • NO2 shall be within 20% of lab aged AMP • Average temperature within 10% of lab aged AMP • Average BP within 20% of lab aged AMP

No EMD fault or warning codes

31 31

Page 32: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Compatibility Field Trials

Independent datalogger requirements (<10 sec

CompatibilityField Trials

-

intervals) • Timestamp • Engine RPM • Temperature • Backpressure

All ECU codes Third party letters Photographs of the device

32 32

Page 33: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Field Trial Requirements Field Trial Requirements

During the field trial the device must not: • Cause EMD error/fault codes or ECU interference • Require maintenance or cleaning • Damage engine or cause it to exceed manufacturer

limits • Interfere with the vehicle’s normal functions • Have emissions exceeding certified standards • Have component failures or lose physical integrity • Show inappropriate regeneration patterns

Vehicle must not experience failure of other emission control components 33 33

Page 34: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Other Requirements Other Requirements

34 34

Page 35: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Bond Requirement Bond Requirement

Why Does AMP Manufacturer Need A Bond • Ensure adequate protection for the end user • Accountability for product recall or other issues

What Are Required? • Proof of having a bond prior to awarding certification • No exemptions – everybody treated equally • Standard required base amount of $500,000

Increased annually based on total sales

• Bond shall satisfy any administrative settlement agreement, administrative final order, or judicial judgment against the applicant/manufacturer

35 35

Page 36: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Warranty Warranty

Product Warranty • 2 years, unlimited mileage

Installation Warranty • 2 years, unlimited mileage

Consistent with other aftermarket part warranties

36 36

Page 37: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Recordkeeping Recordkeeping Manufacturers/applicants maintain information on:

• Valid end user contact information • Description of vehicles and engines on which the units are installed • Date of purchase/installation • Hours/miles on engine at time of installation • Reason DPF was replaced • Vehicle assessment prior to installation • Device serial number

Must maintain records for 4 years from date of installation, or no less than one year beyond the warranty period, which ever is longer

37 37

Page 38: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Vehicle Pre-Installation Assessment

Manufacturers/applicants must ensure the following

Vehicle Pre-Installation

Assessment

are met: • Appropriate vehicle/engine • Engine and DOC are in proper state of maintenance • No engine error codes, etc. • Vehicle is in original OEM exhaust aftertreatment

configuration • Aftermarket part is installed in same location and

orientation as OEM part with no change to other OEM components

• Original DPF is out of warranty • Enough training for installer 38 38

Page 39: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Labeling Labeling

Legible, visible, durable EO number issued by ARB Unique serial number Name, address, phone number of manufacturer Part number Date (month/year) of manufacture Directional flow arrow Other information such as filter “birth weight” to help

the end user clean their filter 39 39

Page 40: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Swapping Policy Swapping Policy

Temporary - for DPF cleaning only Within common ownership fleet ARB approval of swapping policy with conditions Applicant must be preapproved Same size/model, and same flange type/muffler as

original AMP DPF Other information such as installation instruction,

warranty issue and recordkeeping

40 40

Page 41: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Additional Requirements Additional Requirements

Prohibit resale of used DPF Recall process if:

• Catastrophic failures / safety issues • Enforcement action • Parts fail QC • Part causes engine issues or other parts to fail on the engine • High warranty claims, and/or operation failure issues

Audit testing • Testing or inspection of new or in-use units • ARB can require a manufacture to provide a device for inspection and

testing

41 41

Page 42: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Contact Info Contact Info

Dr. Yong Yu, P.E. Shawn Daley, Manager (626) 450-6109 (626) 575-6972 [email protected] [email protected]

Draft regulation language - CCR 2222 (k) and draft evaluation procedure: http://www.arb.ca.gov/diesel/mod-part/mod-part.htm

42 142

Page 43: Aftermarket DPF Evaluation Procedure staff presentation on ... · Regulation Adoption Status . Regulation Adoption Status Public workshops – Dec 4. th, April 7. th, and August 10.

Questions/Comments

43

Questions/Comments

43