8307 Shaffer Parkway Suite 200 Littleton, Colorado 80127 303-933-2700 Office www.maxsonengineering.com Addendum Narrative – Final Bid Addendum-01 PROJECT INFORMATION Project Name: Buffalo Mountain – Pump Station Project #: 18010 Attention: Shellie Duplan Date: 2/4/19 DRAWING REVISIONS Drawing # Summary of Addendum E4 Added keynote to include main breaker power monitor. E8 Revised keynote 2 to increase conduit sizes. E9 Added conduit and keynotes for mast antenna and security system. M2 Updated TCM to include owner controls comments for additional points. M4 Added temperature sensor to upper and lower levels. END OF ADDENDUM
6

Addendum Narrative – Final Bid Addendum-01 · addendum narrative – final bid addendum-01 project information project ... digital inputdigital outputanalog inputanalog outputtemperaturerel.

Jul 21, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Addendum Narrative – Final Bid Addendum-01 · addendum narrative – final bid addendum-01 project information project ... digital inputdigital outputanalog inputanalog outputtemperaturerel.

8307 Shaffer ParkwaySuite 200Littleton, Colorado 80127

303-933-2700 Officewww.maxsonengineering.com

Addendum Narrative – Final Bid Addendum-01

PROJECT INFORMATION

Project Name: Buffalo Mountain – Pump Station Project #: 18010

Attention: Shellie Duplan Date: 2/4/19

DRAWING REVISIONS

Drawing # Summary of Addendum

E4 Added keynote to include main breaker power monitor.

E8 Revised keynote 2 to increase conduit sizes.

E9 Added conduit and keynotes for mast antenna and security system.

M2 Updated TCM to include owner controls comments for additional points.

M4 Added temperature sensor to upper and lower levels.

END OF ADDENDUM

Page 2: Addendum Narrative – Final Bid Addendum-01 · addendum narrative – final bid addendum-01 project information project ... digital inputdigital outputanalog inputanalog outputtemperaturerel.

MECHANICAL SPECIFICATIONSTEMPERATURE CONTROL MATRIX

POINTS LIST:

POINT TYPE ANALOG IND. ALARM

TREN

D

SHO

W O

N G

RAPH

IC

NOTES

DIG

ITAL

INPU

T

DIG

ITAL

OUT

PUT

AN

ALO

G IN

PUT

AN

ALO

G O

UTPU

T

TEM

PERA

TURE

REL.

HUM

IDITY

POSI

TION

/SPE

ED

PRES

SURE

STA

TUS

HIG

H

LOW

MA

INTE

NA

NC

E

CRI

TICA

L

WATER PUMPS (P-1 THRU 4) RE: CIVIL

START/STOP X X

STATUS ON/OFF X X X X CURRENT SWITCH

VFD SPEED CONTROL X X X X VIA BAS INTERFACE

VFD FAULT X X X VIA BAS INTERFACE

(2) HIGH LEVEL ALARM X X X X SIGNAL FROM TANK LEVEL CONTROLER

(2) LOW LEVEL ALARM / LOW WATER CUT OFSWITCH FOR PUMPS X X X X SIGNAL FROM TANK LEVEL CONTROLER

PUMP ON & OFF LEVEL CONTROL X X X X SIGNAL FROM TANK LEVEL CONTROLER

FLOW METER X X X X SIGNAL FROM FLOW METER CONTROLER,LOGS TO BAS, RE: CIVL

UNIT HEATER (TYPICAL OF EACH UNIT)

CURRENT SPACE TEMPERATURE X X X X X

FAN START/STOP X X

FAN STATUS ON/OFF X X X X CURRENT SWITCH

SUMP PUMP (SP-1 & 2)

STATUS ON/OFF X X X X SIGNAL FROM SEWAGE EJECTOR CONTROLPANEL

HIGH LEVEL ALARM X X X X SIGNAL FROM SEWAGE EJECTOR CONTROLPANEL

PUMP FAILURE X X X SIGNAL FROM SEWAGE EJECTOR CONTROLPANEL

LIGHTING CONTROL

3-PHASE POWER MONITORING X X X RE: ELECTRICAL

EXTERIOR LIGHTING X X X

PHOTOCELL INPUT X X

PHOTOCELL CONTROL OUTPUT X X

GENERAL BUILDING POINTS

TEMPERATURE (INTERNAL AMBIENT) X X X X X X X MONITOR HIGH AND LOW TEMPERATUREWITH NOTIFICATION

WATER STORAGE TANK ACCESS HATCH (OPEN /CLOSED) X X X X X X

MAN DOOR & OVERHEAD DOOR(OPEN / CLOSED) X X X X X X

MOISTURE SENSOR X X X X X X

GENERAL NOTES:

1. QUANTITY AND TYPE OF CONTROL POINTS LISTED ARE MINIMUM. TCC SHALL VERIFY REQUIRED QUANTITY, TYPE, AND FUNCTION OF CONTROL POINTS PRIOR TO BID AND ADJUST ACCORDING TO SEQUENCEOF OPERATION AND EQUIPMENT FOR A COMPLETE FUNCTIONING SYSTEM.

2. CONTROL POINTS INDICATED FOR EQUIPMENT ARE TYPICAL FOR EACH TYPE OF EQUIPMENT. CONTRACTOR SHALL REFER TO DRAWINGS FOR QUANTITIES.

3. REFER TO SEQUENCE OF OPERATION FOR SOFTWARE ALARMS.

GENERAL PROJECT REQUIREMENTS

1. THE CONTRACTOR, AND ANY SUB-CONTRACTORS, PERMITTED TO BID THIS PROJECT AND PERFORM WORK SHALL BEPRE-APPROVED BY THE OWNER.

2. PROVIDE ALL MATERIALS, EQUIPMENT, AND LABOR AS SPECIFIED AND SHOWN ON THE DRAWINGS TO MAKE THESYSTEMS COMPLETE AND FUNCTIONAL.

3. THE CONTRACTOR SHALL PAY FOR ALL PERMITS, FEES, TAXES, AND TESTING AS REQUIRED BY THE LOCAL CODEAUTHORITIES AND AS REQUIRED TO COMPLETE THIS PROJECT. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOROBTAINING THE REQUIRED BUILDING DEPARTMENT PERMIT(S) PRIOR TO THE START OF CONSTRUCTION.

4. ALL BIDS SHALL INCLUDE ALL COSTS ASSOCIATED WITH THE PURCHASE AND DELIVERY OF NEW EQUIPMENT TO THEJOB SITE IN TIME TO MEET ALL DEADLINES. REPORT, PRIOR TO BID, ANY DELIVERY PROBLEMS WHICH MIGHT PREVENTTIMELY COMPLETION OF THIS PROJECT.

5. THE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NOT SHOW OR REFLECT ALL OFFSETS AND FITTINGS.PROVIDE ADDITIONAL OFFSETS AND FITTINGS AS REQUIRED TO MAKE THE INSTALLATION COMPLETE ANDFUNCTIONAL. DO NOT SCALE DRAWINGS FOR EXACT DIMENSIONS.

6. CONTRACTOR SHALL BE HELD RESPONSIBLE FOR VERIFICATION OF EXISTING JOB CONDITIONS PRIOR TO BID. NOADDITIONAL COSTS SHALL BE AWARDED TO THE SUCCESSFUL CONTRACTOR OR HIS SUB-CONTRACTORS, AFTER BIDSHAVE BEEN SUBMITTED AND CONTRACTS AWARDED FOR FAILURE TO VERIFY EXISTING JOB CONDITIONS.DISCREPANCIES BETWEEN ACTUAL FIELD CONDITIONS AND CONTRACT DOCUMENTS SHALL BE BROUGHT TO THEENGINEER'S ATTENTION FOR ALTERNATIVE METHODS OF INSTALLATION THREE (3) DAYS MINIMUM PRIOR TO BIDDINGTHIS JOB.

7. COORDINATE ALL WORK WITH OTHER TRADES AND STRUCTURE. COORDINATE INSTALLATION OF ALL SYSTEMS TO FITWITHIN THE SPACE ALLOCATED. INSTALL EQUIPMENT AND COMPONENTS SO THEY ARE ACCESSIBLE FORMAINTENANCE.

8. PREPARE AND SUBMIT TO THE ENGINEER EQUIPMENT SUBMITTALS AND SHOP DRAWINGS IN ELECTRONIC FORMATFOR REVIEW. THE FILE(S) SHALL BE IN PORTABLE DOCUMENT FORMAT (PDF) FORMAT, OCR (OPTICAL CHARACTERRECOGNITION) SEARCHABLE, AND BOOKMARKED FOR EACH PRODUCT BEING SUBMITTED. DO NOT PURCHASEANY MATERIALS OR EQUIPMENT PRIOR TO RECEIVING RETURNED SUBMITTALS THAT HAVE BEEN REVIEWED BY THEENGINEER. VERIFY AND COORDINATE SCOPE OF WORK WITH ALL OTHER TRADES PRIOR TO SUBMITTING SUBMITTALSOR PROCEEDING WITH ANY WORK.

9. ALL MATERIALS, EQUIPMENT, AND INSTALLATION SHALL COMPLY WITH OWNER STANDARDS, LOCAL BUILDINGCODE, FIRE DEPARTMENT REQUIREMENTS, IBC, IMC, IPC, IFC, NFPA, UL, ASTM, AND ASHRAE GUIDELINES ANDSTANDARDS.

10. COORDINATE ANY SHUTDOWNS OR INTERRUPTION OF UTILITIES WITH OWNER PRIOR TO STARTING ANY WORK.

11. VERIFY FINAL LOCATIONS FOR ROUGH-INS WITH FIELD MEASUREMENTS AND WITH THE REQUIREMENTS OF THEACTUAL EQUIPMENT TO BE CONNECTED.

12. ANY CONFLICTS DISCOVERED AFTER WORK HAS STARTED, NOT PREVIOUSLY BEING APPARENT AND NECESSITATINGREVISIONS TO CONTRACT DOCUMENTS, SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER FOR REVIEW ANDAPPROVAL OF ALTERNATIVE METHODS OF INSTALLATION.

13. THE CONTRACTOR SHALL CONTACT THE ENGINEER 48 HOURS PRIOR TO SUBSTANTIAL COMPLETION OFCONSTRUCTION OR INSTALLATION OF CEILING TILE, TO SCHEDULE AN ABOVE-CEILING OBSERVATION.

14. CONTRACTOR SHALL REVIEW ELECTRICAL POWER REQUIREMENTS FOR ALL MECHANICAL EQUIPMENT PRIOR TOORDERING. SUBMIT ONE COPY OF EQUIPMENT SUBMITTALS TO ELECTRICAL CONTRACTOR FOR COORDINATION.

15. ALL EQUIPMENT REQUIRING ACCESS AND MAINTENANCE (E.G. VALVES, DAMPERS, CONTROLS, ETC.) SHALL BEACCESSIBLE. THE CONTRACTOR SHALL PROVIDE ACCESS PANELS AS REQUIRED TO FACILITATE MAINTENANCE,REPAIR, AND ADJUSTMENT OF ANY CONCEALED EQUIPMENT. COORDINATE ALL LOCATIONS OF ANY REQUIREDACCESS PANELS WITH ARCHITECT PRIOR TO STARTING WORK.

16. PREPARE AND SUBMIT TO THE ENGINEER AN ELECTRONIC FILE OF THE OPERATION AND MAINTENANCE MANUAL(S)AT THE COMPLETION OF THE PROJECT INCLUDING RECORD DRAWINGS OF THE TEMPERATURE CONTROLSINSTALLATION. INCLUDE EMERGENCY SERVICE PHONE NUMBERS, WARRANTY INFORMATION, SPARE PARTS LISTS,MAINTENANCE AND TROUBLE-SHOOTING INSTRUCTIONS FOR ALL MECHANICAL EQUIPMENT. THE FILE SHALL BE INPORTABLE DOCUMENT FORMAT (PDF) FORMAT AS ONE DOCUMENT, OCR (OPTICAL CHARACTER RECOGNITION)SEARCHABLE, AND BOOKMARKED FOR EACH PRODUCT.

17. THE ENTIRE PROJECT SHALL BE WARRANTED FREE OF ALL DEFECTS FOR ONE (1) YEAR, STARTING FROM THE DATE OFACCEPTANCE FROM THE OWNER INCLUDING ALL LABOR, TRAVEL EXPENSES, PARTS AND MATERIAL. THECONTRACTOR SHALL SUBMIT A WARRANTY LETTER WITH DATE OF WARRANTY COMMENCEMENT AT CONCLUSIONOF PROJECT.

TEMPERATURE CONTROLS

1. MECHANICAL CONTRACTOR SHALL EMPLOY THE SERVICES OF A TEMPERATURE CONTROLS CONTRACTOR FOR ALLTEMPERATURE CONTROLS WORK. PER BUFFALO MOUNTAIN METRO DISTRICT, THE CONTROLS CONTRACTOR SHALLBE AMWEST CONTROL INC.

2. TEMPERATURE CONTROLS CONTRACTOR SHALL PROVIDE ALL NEW TEMPERATURE CONTROLS FOR AREA OF WORK.

3. TEMPERATURE CONTROLS COMPONENTS SHALL BE AS MANUFACTURED BY JOHNSON CONTROLS OR APPROVEDEQUAL.

4. TEMPERATURE CONTROLS CONTRACTOR SHALL PROVIDE ALL WIRING ASSOCIATED WITH THE AUTOMATICTEMPERATURE CONTROL SYSTEM, INCLUDING 120V FOR CONTROL PANELS, CONTROL VALVES, AND CONTROLDAMPERS. ELECTRICAL WIRING SHOWN ON ELECTRICAL DRAWINGS SHALL BE PERFORMED BY ELECTRICALCONTRACTOR. SUBMIT CONTROL DIAGRAMS TO ENGINEER FOR REVIEW. TEMPERATURE CONTROLS CONTRACTORSHALL PROVIDE ANY PROGRAMMING NECESSARY FOR A FULLY FUNCTIONAL DDC SYSTEM.

1

MMAXSONENGINEERING

303-933-2700

Project #

maxsonengineering.com

18010

X:\2

018

Proj

ects

\180

10 -

Buf

falo

Mou

ntai

n - P

ump

Stat

ion\

Pack

age

2 - P

ump

Stat

ion\

1801

0 - M

2 M

echa

nica

l Spe

cific

atio

ns.d

wg,

M2,

2/4

/201

9 7:

20:2

8 PM

, Aho

pkin

s

02/04/2019

Page 3: Addendum Narrative – Final Bid Addendum-01 · addendum narrative – final bid addendum-01 project information project ... digital inputdigital outputanalog inputanalog outputtemperaturerel.

T

T

EUH-3

EUH-4

SUMP PUMPCONTROLPANEL, RE CIVIL

VFD

VFD

VFD

VFD

P-3

P-4P-2

P-1

S

12

WALL MOUNTED HEATING ONLY THERMOSTAT, 48" AFF.

WALL MOUNTED SPACE TEMPERATURE SENSOR.

GENERAL NOTES1. REFER TO SHEET M1 FOR GENERAL NOTES.

KEY NOTES1

21

T T

EUH-1EUH-2

1 1

P-3RE: CIVIL

P-4RE: CIVIL

P-1RE: CIVIL

P-2RE: CIVIL

SP-1 & 2RE: CIVIL

S 12

MMAXSONENGINEERING

303-933-2700

Project #

maxsonengineering.com

18010

PUMP HOUSE 1ST FLOOR MECHANCAL PLAN2N

1/4" = 1'-0"

40 2 8 16

PUMP HOUSE BASEMENT MECHANICAL PLAN1N

1/4" = 1'-0"

40 2 8 16

X:\2

018

Proj

ects

\180

10 -

Buf

falo

Mou

ntai

n - P

ump

Stat

ion\

Pack

age

2 - P

ump

Stat

ion\

1801

0 - M

4 Pu

mp

Hou

se M

echa

nica

l Pla

ns.d

wg,

M4,

2/4

/201

9 7:

20:3

4 PM

, Aho

pkin

s

02/04/2019

Page 4: Addendum Narrative – Final Bid Addendum-01 · addendum narrative – final bid addendum-01 project information project ... digital inputdigital outputanalog inputanalog outputtemperaturerel.

02/04/2019

Page 5: Addendum Narrative – Final Bid Addendum-01 · addendum narrative – final bid addendum-01 project information project ... digital inputdigital outputanalog inputanalog outputtemperaturerel.

GraphData

J

UTILITYTRANSFORMER

1

2

J

1

2 43

3

MDB-1

TEMP. GENERATORCONNECTION

CUSTOMERDISCONNECTSWITCH

CT CABINETAND METER 3

RS:5PART

R2:5PART

WP

WP

MOUNT RECEPTACLE NEAR HATCH OPENING.

PROVIDE (2) 1-1/2" CONDUITS, EMPTY WITH PULLSTRING, FROM HATCHDOOR TO SECURITY CONTROL PANEL IN PUMP HOUSE. COORDINATE FINALCONDUIT TERMINATION LOCATION WITH CONTROLS CONTRACTOR.

PROVIDE BARE TINNED COPPER GROUND LOOP AROUND FOUNDATIONOF PUMP HOUSE. RE: E4 FOR FURTHER INFORMATION.

PROVIDE IN-GRADE GROUND TEST WELL.

GENERAL NOTES1. REFER TO SHEET E1 FOR GENERAL NOTES.

KEY NOTES1

2

3

4

1

MMAXSONENGINEERING

303-933-2700

Project #

maxsonengineering.com

18010

ELECTRICAL SITE PLAN1N

1" = 10'-0"

100 5 20 40

X:\2

018

Proj

ects

\180

10 -

Buf

falo

Mou

ntai

n - P

ump

Stat

ion\

Pack

age

2 - P

ump

Stat

ion\

1801

0 - E

8 El

ectri

cal S

ite P

lan.

dwg,

E8,

2/4

/201

9 7:

20:4

3 PM

, Aho

pkin

s

02/04/2019

Page 6: Addendum Narrative – Final Bid Addendum-01 · addendum narrative – final bid addendum-01 project information project ... digital inputdigital outputanalog inputanalog outputtemperaturerel.

CONTRACTOR SHALL COORDINATE FINAL CONTROL PANEL LOCATIONWITH SUMP PUMP VENDOR.

CONNECTION FOR CONTROL VALVES AND FLOWMETERS. COORDINATEFINAL CONNECTION REQUIREMENTS WITH VENDORS PRIOR TOINSTALLATION.

PROVIDE 2" SLEEVE THROUGH ROOF FOR MAST ANTENNA. PRIOR TOINSTALLATION, DETERMINE FINAL MAST LOCATION RE: STRUCTURAL.PROVIDE THREADED END CAPS ON SLEEVE.

PROVIDE (1) 1" CONDUIT FROM PANEL R1 AND (1) 1" CONDUIT FROMSECURITY CONTROL PANEL, EACH EMPTY WITH PULLSTRING TO OH DOORLOCATION. PROVIDE PLASTIC END BUSHINGS ON CONDUITS.

GENERAL NOTES1. REFER TO SHEET E2 & E3 FOR GENERAL NOTES.

KEY NOTES1

2

3

4

1

EUH-3

EUH-4

WP/GFCI

WP/GFCI

SP-1 & SP-2CONTROL PANELRE: CIVIL

R1:3PART

R1:3PART

H1

T-R1

R1 H2

T-R2

R2

1V

FDV

FD

VFD

VFD

P-3

P-4 P-2

P-1

4

31

1

EUH-1 EUH-2WP/GFCI

WP/GFCI

WP/GFCI

WP/GFCI

SP-1 & 2RE: CIVIL

R1:1PART

R2:1PART

R2:1PART

R1:1PART

J

2

R2:7(PART)

J

2

R2:7(PART) J

2

R2:9(PART)

J

2

R2:9(PART)

P-3DISC

P-4DISC

P-1DISC

P-2DISC

2 2 2 2

P-3RE: CIVIL

P-4RE: CIVIL

P-1RE: CIVIL

P-2RE: CIVIL

MMAXSONENGINEERING

303-933-2700

Project #

maxsonengineering.com

18010

PUMP HOUSE 1ST FLOOR POWER & SYSTEMS PLAN2N

1/4" = 1'-0"

40 2 8 16

PUMP HOUSE BASEMENT POWER & SYSTEMS PLAN1N

1/4" = 1'-0"

40 2 8 16

X:\2

018

Proj

ects

\180

10 -

Buf

falo

Mou

ntai

n - P

ump

Stat

ion\

Pack

age

2 - P

ump

Stat

ion\

1801

0 - E

9 Pu

mp

Hou

se P

ower

& S

yste

ms P

lans

.dw

g, E

9, 2

/4/2

019

7:20

:48

PM, A

hopk

ins

02/04/2019