Addendum Wenck Associates, Inc. | 7000 Yellowtail Rd, Ste 230 | Cheyenne, WY 82009 Toll Free 800-472-2232 Main 307-634-7848 Email [email protected] Web wenck.com -- Addendum #2 BOARD OF PUBLIC UTILITIES CITY OF CHEYENNE, WYOMING SHERARD HYDROELECTRIC GENERATION FACILITY 2020WPI01-B2 January 20, 2021 NOTICE: This Addendum forms a part of the Specifications and Contract Documents for the Sherard Hydroelectric Generation Facility Project 2020WPI01-B2 (Documents) and modifies the original Documents dated December 2020. Prospective Bidders must acknowledge receipt of this Addendum in the space provided within the Documents. Failure to do so may subject the Prospective Bidders to disqualification. This Addendum consists of twenty-four (24) pages with three (3) attachments. THE FOLLOWING CHANGES ARE MADE TO THE SPECIFICATIONS AND CONTRACT DOCUMENTS: SECTION 13850 – FIRE ALARM AND CONTROL SYSTEM: Add the attached specification Section 13850 – Fire Alarm and Control System in its entirety to the specifications and Contract Documents. STATE REVOLVING FUND SPECIAL CONDITIONS: Remove the Davis-Bacon Act Wage Determinations “General Decision Number: WY20200023 08/14/2020” in its entirety and replace with the updated Davis-Bacon Act Wage Determinations “General Decision Number: WY20210023 01/01/2021” attached to this Addendum. THE FOLLOWING CHANGES ARE MADE TO THE PLAN SHEETS: Remove Sheet E9 and replace with the attached revised drawing (Sheet E9, Revision 4). CLARIFICATION TO QUESTIONS AND ADDITIONAL INFORMATION: Listed below is clarifications to questions received, and additional information. Question #1: Drawing Sheets I2 and I3 show fire alarm devices and a fire alarm control panel. Is there a specification for this system?
24

Addendum · 2021. 1. 20. · Addendum #2 January 20, 2021 4 Y:\1-Technical\2831 BOPU\06 Sherard Hydropower\Bidding\Powerhouse and Installation\Re-Bid\Addendum\Addendum 2\Addendum

Jan 29, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • Addendum

    Wenck Associates, Inc. | 7000 Yellowtail Rd, Ste 230 | Cheyenne, WY 82009

    Toll Free 800-472-2232 Main 307-634-7848 Email [email protected] Web wenck.com

    --

    Addendum #2

    BOARD OF PUBLIC UTILITIES CITY OF CHEYENNE, WYOMING

    SHERARD HYDROELECTRIC GENERATION FACILITY

    2020WPI01-B2

    January 20, 2021

    NOTICE:

    This Addendum forms a part of the Specifications and Contract Documents for the Sherard

    Hydroelectric Generation Facility Project 2020WPI01-B2 (Documents) and modifies the

    original Documents dated December 2020. Prospective Bidders must acknowledge receipt of

    this Addendum in the space provided within the Documents. Failure to do so may subject the

    Prospective Bidders to disqualification. This Addendum consists of twenty-four (24) pages

    with three (3) attachments.

    THE FOLLOWING CHANGES ARE MADE TO THE SPECIFICATIONS AND CONTRACT

    DOCUMENTS:

    SECTION 13850 – FIRE ALARM AND CONTROL SYSTEM:

    Add the attached specification Section 13850 – Fire Alarm and Control System in its

    entirety to the specifications and Contract Documents.

    STATE REVOLVING FUND SPECIAL CONDITIONS:

    Remove the Davis-Bacon Act Wage Determinations “General Decision Number:

    WY20200023 08/14/2020” in its entirety and replace with the updated Davis-Bacon

    Act Wage Determinations “General Decision Number: WY20210023 01/01/2021”

    attached to this Addendum.

    THE FOLLOWING CHANGES ARE MADE TO THE PLAN SHEETS:

    Remove Sheet E9 and replace with the attached revised drawing (Sheet E9, Revision

    4).

    CLARIFICATION TO QUESTIONS AND ADDITIONAL INFORMATION:

    Listed below is clarifications to questions received, and additional information.

    Question #1: Drawing Sheets I2 and I3 show fire alarm devices and a fire alarm

    control panel. Is there a specification for this system?

  • Sherard Hydroelectric Generation Facility Project Addendum #2 January 20, 2021

    2

    Y:\1-Technical\2831 BOPU\06 Sherard Hydropower\Bidding\Powerhouse and Installation\Re-Bid\Addendum\Addendum 2\Addendum #2_1-20-2021.docx

    Response: See specification Section 13850 – Fire Alarm and Control System

    attached to this Addendum.

    Question #2: Is Flexion XL Single Ply Copolymer-Alloy Membrane Roofing, “Flexion

    XL”, manufactured by Conklin Company Inc. an approved equal PVC

    roof membrane?

    Response: Flexion XL Single Ply Membrane manufactured by Conklin Company

    Inc. is an approved PVC roof membrane as long as this product

    complies with the Specifications and Drawings.

    Question #3: On drawing Sheet E1 R3 it shows the proposed precast concrete trench

    cable tray that runs from the new hydro building to the existing WTP

    electrical room. Would an alternate of an approved duct bank with PVC

    conduit with spare conduits encased in concrete be allowed for the

    project instead of the precast concrete trench?

    Response: While a concrete encased conduit is allowable per NEC and is a

    standard type of installation, the details of the duct bank are

    dependent on several factors (depth, conduit type, concrete thickness,

    thermal performance, etc.) and could be a value engineering option.

    The precast concrete trench cable tray was selected for reduced depth

    requirements to avoid interference with other utilities. Concrete

    encased duct bank in lieu of concrete trench cable tray is not allowed

    as a substitution for bidding. The Owner may consider a value

    engineering proposal after award.

    Question #4: In the pre-bid meeting, it was mentioned that electronic bids are

    acceptable, but the bonding documents will need to be mailed. Is this

    correct?

    Response: See Article 15 of the Instructions to Bidders. A hard copy of the

    complete bid (including bonds) with original signatures is still required

    if submitted electronically and should be postmarked on or before the

    Bid Opening date. Please note, Bidder is responsible for verifying

    receipt of the bid.

    Question #5: How many iFix nodes will need programmed?

    Response: There is only one node to program. The water treatment plant iFix

    SCADA system server only needs programed once. All nodes receive

    information from the server. Also, see specification Section 11200 –

    Owner Supplied Equipment for a list of Hydro PLC tags that will need

    to be programed in the existing Water Treatment Plant iFix SCADA

    system.

    Question #6: Ethernet communications to devices will be through Modbus TCP. Is

    the existing SCADA PLC setup for Modbus TCP? Is the Hydro PLC setup

    for Modbus TCP?

  • Sherard Hydroelectric Generation Facility Project Addendum #2 January 20, 2021

    3

    Y:\1-Technical\2831 BOPU\06 Sherard Hydropower\Bidding\Powerhouse and Installation\Re-Bid\Addendum\Addendum 2\Addendum #2_1-20-2021.docx

    Response: The BOPU is currently using ABR I/O Driver and OPC Client Driver to

    communicate with existing PLC’s in BOPU’ system. Bidders can use

    either system when configuring communication setup. See

    specification Section 11200 – Owner Supplied Equipment for details on

    the Hydro PLC setup.

    Question #7: Drawing Sheet I1 Note 13 says Contractor is responsible for any

    communication expansion/conversion components. How much space is

    there currently in the existing ethernet switch for rj45 and sc fiber

    connections? Is there room in the existing cabinet for the extra patch

    panels and a new switch?

    Response: Note 13 on Sheet I1 is for hard wired physical signals and are not

    intended to be transmitted over the existing WTP SCADA system to the

    Hydro Control Panel. That said, there are a lot of spare rj45 spaces

    available in the existing ethernet switch. Contractor will need to

    provide a wire fiber converter which will connect to the existing rj45

    switch. Yes, there is room in the existing cabinet for the extra patch

    panels and new switch. A 19-inch rack system is currently installed.

    See specification Section 16760.

    Question #8: Specification Section 02960 requires joint coating repair at all field

    weld joints. Per specification Section 01042 there is a limited time to

    perform tie-ins. The recommended cure time for the specified

    polyurethane may exceed the required water treatment plant

    shutdown times.

    Response: TNEMEC FC22 may be used as a fast cure joint repair coating. This

    product is NSF-61 certified. This product under the right conditions

    can be returned to service in 16 hours. Joints may need to be repaired

    during the second plant shut down. Prep and application of this

    product shall be in accordance with the manufacturer

    recommendations.

    Question #9: Is there any temporary electrical service needed for circuits in the

    concrete encased duct bank re-route at the 48” tailrace pipe (low

    pressure valve vault) tie-in area?

    Response: The existing concrete encased electrical and control duct banks at the

    48” tailrace pipe (low pressure valve vault) tie-in area shown on Sheet

    C8 and C10 are empty except for 2-#8, 1-#8 GRD conductors which

    supply power to the luminaires near the proposed powerhouse. These

    luminaires do not require temporary service while the duct bank is

    being removed and re-routed. Replace the 2-#8 CU, 1-#8 GRD,

    XHHW-2 conductors and splice in the existing electrical manholes. The

    duct bank length between the existing electrical manholes with the

    proposed duct bank re-route is approximately 260-feet.

    Question #10: Have the existing utilities around the proposed electric service

    entrance intercept manholes been located?

  • Sherard Hydroelectric Generation Facility Project Addendum #2 January 20, 2021

    4

    Y:\1-Technical\2831 BOPU\06 Sherard Hydropower\Bidding\Powerhouse and Installation\Re-Bid\Addendum\Addendum 2\Addendum #2_1-20-2021.docx

    Response: The existing electric utility service concrete encased duct bank and the

    12” fire water line in the vicinity of the proposed duct intercept

    manholes have been potholed. Sheet E9 is replaced by this addendum

    and shows the approximate locations and dimensions of these two

    items. In addition, the proposed precast intercept manholes LMH-3

    and LMH-4 have been revised.

    Question #10: Can you please confirm that sales tax is to be included in the Bid?

    Response: Yes, sales tax is to be included with the Bid.

    Question #11: Is there a list of approved/preferred integrators and prime

    contractors?

    Response: No, there is not a list of approved/preferred contractors. See

    previously distributed planholders list and pre-bid meeting attendee

    list for a list of those who have received Bid Documents.

    Question #12: Is there a cutoff date for questions?

    Response: Questions received less than seven days prior to Bid opening may not

    be answered. The last day to issue Addenda will be seven days prior to

    Bid opening. Only questions answered by Addenda will be binding. See

    Instruction to Bidders for more details.

    Question #13: What is the height of the existing building that where shoring is

    required near the 48” tailrace pipe tie-in (low pressure valve vault)?

    Response: The building height is 26’-8” at this location from finished grade to top

    of wall. The existing water treatment plant foundation as shown on

    Sheet C10 is drawn to scale per record drawings of the water

    treatment plant.

    Question #14: Note 6 on drawings E5 and E6 says that the contractor is responsible

    for power, control, and signal wiring, conduit, and electrical equipment

    connections between owner supplied equipment components and

    instrumentation. Where is this additional wiring shown or defined?

    Response: See specification Section 11200 - Owner Supplied Equipment including

    its Technical Appendix A and the Drawings. You might find Sheets E5,

    E6, E7, I1, I2, and I3 helpful.

    Question #15: Should all electrical work not included on drawings E0.2, E0.4, E1,

    E8, and E9 be included in the base bid price?

    Response: Only the items identified by Keynote #1 on Sheets E1 and E8 are to be

    included in Add Alternate #1. The rest of the Work on Sheets E1 and

    E8 is to be included in the base bid. The Work on Sheets E0.2, E0.4,

    and E9 is to be included in Add Alternate #1. The rest of the electrical

  • Sherard Hydroelectric Generation Facility Project Addendum #2 January 20, 2021

    5

    Y:\1-Technical\2831 BOPU\06 Sherard Hydropower\Bidding\Powerhouse and Installation\Re-Bid\Addendum\Addendum 2\Addendum #2_1-20-2021.docx

    Work not stated here is to be included in the base bid. See

    specification Section 01025.

    Question #16: Who provides the electrical coordination study?

    Response: This will be provided by the Owner.

    Question #17: Are butt splices and shrink tubes acceptable for the feeder splices

    shown on drawing E0.4?

    Response: Yes, splices may be made in accordance with NEC 110.14(B).

    Question #18: Is the electrical contractor required to provide third party testing for

    any of the owner supplied equipment?

    Response: Yes, see specification Section 16010 3.05 D. This includes the hydro

    generator and the hydro switchgear (SWGR 8002) including the station

    service breaker.

    Question #19: Is schedule 40 PVC conduit acceptable for the concrete encased

    ductbanks shown on drawing E0.4?

    Response: Yes, Schedule 40 Rigid PVC is acceptable in concrete encased

    ductbanks.

    Question #20: Specification 16400 1.2D.2 calls to provide a complete building

    lightning protection system. Is there a lightning protection

    specification?

    Response: See specification Section 16400 2.04.

    Addendum Number 2

    _____________________

    Skylor Wade, PE

  • 13850-1

    SECTION 13850

    FIRE ALARM AND CONTROL SYSTEM

    PART 1 - GENERAL

    1.1 RELATED DOCUMENTS

    A. Drawings and general provisions of the Contract, including General and Supplementary

    Conditions and Division 01 Specification Sections, apply to this Section.

    1.2 SUMMARY

    A. Section includes:

    1. Fire-alarm control unit.

    2. System smoke detectors.

    3. Carbon monoxide detectors.

    4. Heat detectors.

    5. Notification appliances.

    6. Addressable interface device.

    1.3 ACTION SUBMITTALS

    A. Product Data: For each type of product indicated, including furnished options and accessories.

    B. Shop Drawings: For fire-alarm system.

    1. Comply with recommendations and requirements in the "Documentation" section of the

    "Fundamentals" chapter in NFPA 72.

    2. Include plans, elevations, sections, details, and attachments to other work.

    3. Include details of equipment assemblies. Indicate dimensions, weights, loads, required

    clearances, method of field assembly, components, and locations. Indicate conductor

    sizes, indicate termination locations and requirements, and distinguish between

    factory and field wiring.

    4. Detail assembly and support requirements.

    5. Include voltage drop calculations for notification-appliance circuits.

    6. Include battery-size calculations.

    7. Include input/output matrix.

    8. Include statement from manufacturer that all equipment and components have been

    tested as a system and meet all requirements in this Specification and in NFPA 72.

    9. Include performance parameters and installation details for each detector.

    10. Include floor plans to indicate final outlet locations showing address of each addressable

    device. Show size and route of cable and conduits and point-to-point wiring diagrams.

    C. General Submittal Requirements:

    1. Shop Drawings shall be prepared by persons with the following qualifications:

  • 13850-2

    a. Trained by manufacturer in fire-alarm system design.

    b. NICET-certified, fire-alarm technician; Level III minimum.

    D. Delegated-Design Submittal: For notification appliances and smoke and heat detectors, in

    addition to submittals listed above, indicate compliance with performance requirements and

    design criteria, including analysis data signed and sealed by the qualified Wyoming licensed

    professional engineer responsible for their preparation.

    1. Drawings showing the location of each notification appliance and smoke and heat

    detector, ratings of each, and installation details as needed to comply with listing

    conditions of the device.

    2. Design Calculations: Calculate requirements for selecting the spacing and sensitivity of

    detection, complying with NFPA 72. Calculate spacing and intensities for strobe signals

    and sound-pressure levels for audible appliances.

    3. Indicate audible appliances required to produce square wave signal per NFPA 72.

    1.4 INFORMATIONAL SUBMITTALS

    A. Qualification Data: For Installer.

    B. Seismic Qualification Certificates: For fire-alarm control unit, accessories, and components,

    from manufacturer.

    C. Field quality-control reports.

    D. Sample warranty.

    1.5 CLOSEOUT SUBMITTALS

    A. Operation and Maintenance Data: For fire-alarm systems and components to include in

    emergency, operation, and maintenance manuals.

    1. Include the following:

    a. Comply with the "Records" section of the "Inspection, Testing and Maintenance"

    chapter in NFPA 72.

    b. Provide "Fire Alarm and Emergency Communications System Record of

    Completion Documents" according to the "Completion Documents" Article in the

    "Documentation" section of the "Fundamentals" chapter in NFPA 72.

    c. Complete wiring diagrams showing connections between all devices and

    equipment.

    d. Riser diagram.

    e. Record copy of site-specific software.

    f. Provide "Inspection and Testing Form" according to the "Inspection, Testing and

    Maintenance" chapter in NFPA 72, and include the following:

    1) Equipment tested.

  • 13850-3

    2) Frequency of testing of installed components.

    3) Frequency of inspection of installed components.

    4) Requirements and recommendations related to results of maintenance.

    5) Manufacturer's user training manuals.

    g. Manufacturer's required maintenance related to system warranty requirements.

    h. Abbreviated operating instructions for mounting at fire-alarm control unit and

    each annunciator unit.

    B. Software and Firmware Operational Documentation:

    1. Software operating and upgrade manuals.

    2. Program Software Backup: On USB drive complete with data files.

    3. Device address list.

    4. Printout of software application and graphic screens.

    1.6 QUALITY ASSURANCE

    A. Installer Qualifications: Personnel shall be trained by manufacturer for installation of units

    required for this Project.

    B. Installer Qualifications: Installation shall be by personnel certified by NICET as fire-alarm

    Level II technician.

    C. NFPA Certification: Obtain certification according to NFPA 72 by a UL-listed alarm company.

    1.7 WARRANTY

    A. Special Warranty: Manufacturer agrees to repair or replace fire-alarm system equipment and

    components that fail in materials or workmanship within specified warranty period.

    1. Warranty Extent: All equipment and components.

    2. Warranty Period: Two years from date of Substantial Completion.

    PART 2 - PRODUCTS

    2.1 SYSTEM DESCRIPTION

    A. Source Limitations for Fire-Alarm System and Components: Components shall be compatible

    with, and operate as an extension of, existing system. Provide system manufacturer's

    certification that all components provided have been tested as, and will operate as, a system.

    B. Fire alarm and control system shall be in accordance with NFPA 72.

    C. Noncoded, UL-certified addressable system, with multiplexed signal transmission and

    horn/strobe evacuation.

  • 13850-4

    D. Smoke detector, heat detector, and carbon monoxide detector shall be combined into one unit

    were applicable and shall be in accordance NFPA 72.

    E. Automatic sensitivity control of smoke detectors.

    F. All components provided shall be listed for use with the selected system.

    G. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by

    a qualified testing agency, and marked for intended location and application.

    2.2 SYSTEMS OPERATIONAL DESCRIPTION

    A. Fire-alarm signal initiation shall be by one or more of the following devices:

    1. Heat detectors.

    2. Smoke detectors.

    3. Carbon monoxide detectors.

    B. Fire-alarm signal shall initiate the following actions:

    1. Continuously operate alarm notification appliances.

    2. Identify alarm and specific initiating device at fire-alarm control unit.

    3. Transmit an alarm signal to the Hydro Control Panel.

    4. Open the Hydro Generator Breaker.

    5. Record events in the system memory.

    C. Supervisory signal initiation shall be by one or more of the following devices and actions:

    1. Loss of communication with Hydro Control Panel.

    D. System trouble signal initiation shall be by one or more of the following devices and actions:

    1. Open circuits, shorts, and grounds in designated circuits.

    2. Opening, tampering with, or removing alarm-initiating and supervisory signal-initiating

    devices.

    3. Loss of communication with any addressable sensor, input module, relay, control

    module, or remote annunciator.

    4. Loss of primary power at fire-alarm control unit.

    5. Ground or a single break in internal circuits of fire-alarm control unit.

    6. Abnormal ac voltage at fire-alarm control unit.

    7. Break in standby battery circuitry.

    8. Failure of battery charging.

    9. Abnormal position of any switch at fire-alarm control unit or annunciator.

    E. System Supervisory Signal Actions:

    1. Initiate notification appliances.

    2. Identify specific device initiating the event at fire-alarm control unit.

  • 13850-5

    2.3 PERFORMANCE REQUIREMENTS

    A. Seismic Performance: Fire-alarm control unit and raceways shall withstand the effects of

    earthquake motions determined according to ASCE/SEI 7.

    1. The term "withstand" means "the unit will remain in place without separation of any

    parts from the device when subjected to the seismic forces specified and the unit will

    be fully operational after the seismic event."

    2.4 FIRE-ALARM CONTROL UNIT

    A. Manufacturers: Subject to compliance with requirements, provide products by the following:

    1. Bosch Security Systems.

    2. Faraday.

    3. Fike Corporation.

    4. Fire-Lite Alarms.

    5. GAMEWELL.

    6. GE UTC Fire & Security; A United Technologies Company.

    7. Keltron Corporation.

    8. Mircom Technologies, Ltd.

    9. Notifier.

    10. Siemens Industry, Inc.; Fire Safety Division.

    11. Silent Knight.

    12. Simplex.

    13. Autocall.

    14. Kidde.

    15. Approved equal.

    B. General Requirements for Fire-Alarm Control Unit:

    1. Field-programmable, microprocessor-based, modular, power-limited design with

    electronic modules, complying with UL 864.

    2. Addressable Initiation Device Circuits: The FACP shall indicate which communication

    zones have been silenced and shall provide selective silencing of alarm notification

    appliance by building communication zone.

    3. Addressable Control Circuits for Operation of Notification Appliances and Mechanical

    Equipment: The FACP shall be listed for releasing service.

    C. Alphanumeric Display and System Controls: Arranged for interface between human operator

    at fire-alarm control unit and addressable system components including annunciation and

    supervision. Display alarm, supervisory, and component status messages and the

    programming and control menu.

    1. Annunciator and Display: color LED touchscreen type, 4.3-inch diagonal, minimum.

    2. Keypad: Arranged to permit entry and execution of programming, display, and control

    commands.

  • 13850-6

    D. Initiating-Device, Notification-Appliance, and Signaling-Line Circuits:

    1. Pathway Class Designations: NFPA 72, Class B

    2. Pathway Survivability: Level 0.

    E. Notification-Appliance Circuit:

    1. Audible appliances shall sound in a three-pulse temporal pattern, as defined in NFPA 72.

    2. Notification appliances alarm signals shall be a 520-Hz square wave with an intensity 15

    dB above the average ambient sound level or 5 dB above the maximum sound level, or

    at least 75 dBA, whichever is greater, measured at the furthest distance from the

    appliance.

    3. Visual alarm appliances shall flash in synchronization where multiple appliances are in

    the same field of view, as defined in NFPA 72.

    F. Remote Smoke-Detector Sensitivity Adjustment: Controls shall select specific addressable

    smoke detectors for adjustment, display their current status and sensitivity settings, and

    change those settings. Allow controls to be used to program repetitive, time-scheduled, and

    automated changes in sensitivity of specific detector groups. Record sensitivity adjustments

    and sensitivity-adjustment schedule changes in system memory.

    G. Transmission to Remote Alarm Receiving Station: Automatically transmit alarm, supervisory,

    and trouble signals to the Water Treatment Plant Fire Alarm Control Unit.

    H. Primary Power: 24-V dc obtained from 120-V ac service and a power-supply module. Initiating

    devices, notification appliances, signaling lines, and trouble signals shall be powered by 24-

    V dc source.

    1. Alarm current draw of entire fire-alarm system shall not exceed 80 percent of the

    power-supply module rating.

    I. Secondary Power: 24-V dc supply system with batteries, automatic battery charger, and

    automatic transfer switch.

    2.5 SYSTEM SMOKE DETECTORS

    A. Manufacturers: Subject to compliance with requirements, provide products by the following:

    1. Bosch Security Systems.

    2. Faraday.

    3. Fenwal Protection Systems; A UTC Fire & Security Company.

    4. Fire-Lite Alarms.

    5. GAMEWELL.

    6. GE UTC Fire & Security; A United Technologies Company.

    7. Gentex Corporation.

    8. Harrington Signal, Inc.

    9. Keltron Corporation.

    10. Mircom Technologies, Ltd.

  • 13850-7

    11. Notifier.

    12. Siemens Industry, Inc.; Fire Safety Division.

    13. Silent Knight.

    14. Simplex.

    15. System Sensor.

    16. Autocall.

    17. Kidde.

    18. Approved equal.

    B. General Requirements for System Smoke Detectors:

    1. Comply with UL 268; operating at 24-V dc, nominal.

    2. Shall be provided where “Smoke Alarm” is indicated on the Drawings.

    3. Detectors shall be four-wire type, photoelectric smoke detectors.

    4. Integral Addressable Module: Arranged to communicate detector status (normal,

    alarm, or trouble) to fire-alarm control unit.

    5. Base Mounting: Detector and associated electronic components shall be mounted with

    an adapter plate for outlet box mounting. Provide terminals in the fixed base for

    connection to building wiring.

    6. Self-Restoring: Detectors do not require resetting or readjustment after actuation to

    restore them to normal operation.

    7. Integral Visual-Indicating Light: LED type, indicating detector has operated and power-

    on status.

    8. Remote Control: Unless otherwise indicated, detectors shall be digital-addressable

    type, individually monitored at fire-alarm control unit for calibration, sensitivity, and

    alarm condition.

    a. Rate-of-rise temperature characteristic of combination smoke- and heat-

    detection units shall be selectable at fire-alarm control unit for 15 or 20 deg F per

    minute.

    b. Fixed-temperature sensing characteristic of combination smoke- and heat-

    detection units shall be independent of rate-of-rise sensing and shall be settable

    at fire-alarm control unit to operate at 135 or 155 deg F.

    C. Photoelectric Smoke Detectors:

    1. Detector address shall be accessible from fire-alarm control unit and shall be able to

    identify the detector's location within the system and its sensitivity setting.

    2. An operator at fire-alarm control unit, having the designated access level, shall be able

    to manually access the following for each detector:

    a. Primary status.

    b. Device type.

    c. Present average value.

    d. Present sensitivity selected.

    e. Sensor range (normal, dirty, etc.).

  • 13850-8

    2.6 CARBON MONOXIDE DETECTORS

    A. General: Carbon monoxide detector listed for connection to fire-alarm system.

    1. Shall be provided where “Smoke Alarm” is indicated on the Drawings.

    2. Mounting: Adapter plate for outlet box mounting.

    3. Testable by introducing test carbon monoxide into the sensing cell.

    4. Detector shall provide alarm contacts and trouble contacts.

    5. Detector shall send trouble alarm when nearing end-of-life, power supply problems, or

    internal faults.

    6. Comply with UL 2075.

    7. Locate, mount, and wire according to manufacturer's written instructions.

    8. Provide means for addressable connection to fire-alarm system.

    9. Test button simulates an alarm condition.

    2.7 HEAT DETECTORS

    A. Manufacturers: Subject to compliance with requirements, provide products by the following:

    1. Bosch Security Systems.

    2. Faraday.

    3. Fire-Lite Alarms.

    4. GAMEWELL.

    5. GE UTC Fire & Security; A United Technologies Company.

    6. Gentex Corporation.

    7. Harrington Signal, Inc.

    8. Keltron Corporation.

    9. Mircom Technologies, Ltd.

    10. Notifier.

    11. Siemens Industry, Inc.; Fire Safety Division.

    12. Silent Knight.

    13. Simplex.

    14. System Sensor.

    15. Autocall.

    16. Kidde.

    17. Approved equal.

  • 13850-9

    2.8 NOTIFICATION APPLIANCES

    A. Manufacturers: Subject to compliance with requirements, provide products by the following:

    1. Cooper Wheelock.

    2. Federal Signal Corporation.

    3. GE UTC Fire & Security; A United Technologies Company.

    4. Gentex Corporation.

    5. Harrington Signal, Inc.

    6. Keltron Corporation.

    7. Mircom Technologies, Ltd.

    8. Siemens Industry, Inc.; Fire Safety Division.

    9. Simplex.

    10. System Sensor.

    11. Autocall.

    12. Kidde.

    13. Approved equal.

    B. General Requirements for Notification Appliances: Connected to notification-appliance signal

    circuits, zoned as indicated, equipped for mounting as indicated, and with screw terminals for

    system connections.

    1. Combination Devices: Factory-integrated audible and visible devices in a single-

    mounting assembly, equipped for mounting as indicated, and with screw terminals for

    system connections.

    2. Shall be provided in accordance with Paragraph 1.3 of this specification.

    C. Chimes: Vibrating type.

    D. Horns: Electric-vibrating-polarized type, 24-V dc; with provision for housing the operating

    mechanism behind a grille. Comply with UL 464.

    E. Visible Notification Appliances: Xenon strobe lights complying with UL 1971, with clear or

    nominal white polycarbonate lens mounted on an aluminum faceplate. The word "FIRE" is

    engraved in minimum 1-inch- high letters on the lens.

    1. Mounting: Wall mounted unless otherwise indicated.

    2. Flashing shall be in a temporal pattern, synchronized with other units.

    3. Strobe Leads: Factory connected to screw terminals.

    4. Mounting Faceplate: Factory finished, red.

    2.9 ADDRESSABLE INTERFACE DEVICE

    A. General:

    1. Include address-setting means on the module.

    2. Store an internal identifying code for control panel use to identify the module type.

  • 13850-10

    3. Listed for controlling HVAC fan motor controllers.

    B. Monitor Module: Microelectronic module providing a system address for alarm-initiating

    devices for wired applications with normally open contacts.

    C. Integral Relay: Capable of providing a direct signal to circuit-breaker shunt trip for power

    shutdown to open the Hydro Generator Breaker.

    1. Allow the fire alarm control panel to switch the relay contacts on command.

    2. Have a minimum of two normally open and two normally closed contacts available for

    field wiring.

    D. Control Module:

    1. Operate notification devices.

    2. Open the Hydro Generator Breaker.

    3. Signal the Hydro Control Panel of fire alarm activation.

    PART 3 - EXECUTION

    3.1 EQUIPMENT INSTALLATION

    A. Comply with NFPA 72, NFPA 101, and requirements of authorities having jurisdiction for

    installation and testing of fire-alarm equipment. Install all electrical wiring to comply with

    requirements in NFPA 70 including, but not limited to, Article 760, "Fire Alarm Systems."

    B. Connecting to Existing Equipment: Verify that existing fire-alarm system is operational before

    making changes or connections.

    C. Equipment Mounting: Install fire-alarm control unit on finished floor.

    1. Comply with requirements for seismic-restraint devices.

    D. Install wall-mounted equipment, with tops of cabinets not more than 78 inches above the

    finished floor.

    1. Comply with requirements for seismic-restraint devices.

    E. Smoke- or Heat-Detector Spacing: Comply with NFPA 72.

    F. Single-Station Smoke Detectors: Where more than one smoke alarm is installed within a

    dwelling or suite, they shall be connected so that the operation of any smoke alarm causes the

    alarm in all smoke alarms to sound.

    G. Remote Status and Alarm Indicators: Install in a visible location near each smoke detector that

    is not readily visible from normal viewing position.

  • 13850-11

    H. Audible Alarm-Indicating Devices: Install at least 6 inches below the ceiling. Install bells and

    horns on flush-mounted back boxes with the device-operating mechanism concealed behind a

    grille. Install all devices at the same height unless otherwise indicated.

    I. Visible Alarm-Indicating Devices: Install adjacent to each alarm bell or alarm horn and at least

    6 inches below the ceiling. Install all devices at the same height unless otherwise indicated.

    J. Device Location-Indicating Lights: Locate in public space near the device they monitor.

    3.2 PATHWAYS

    A. Pathways above recessed ceilings and in nonaccessible locations may be routed exposed.

    1. Exposed pathways located less than 120 inches above the floor shall be installed in EMT.

    B. Pathways shall be installed in EMT.

    C. Exposed EMT shall be painted red enamel.

    3.3 CONNECTIONS

    A. Make addressable connections with a supervised interface device to the following devices and

    systems. Install the interface device less than 36 inches from the device controlled. Make an

    addressable confirmation connection when such feedback is available at the device or system

    being controlled.

    1. Alarm-initiating connection to open hydro generator breaker.

    2. Alarm-initiating connection to hydro control panel.

    3.4 IDENTIFICATION

    A. Identify system components, wiring, cabling, and terminals.

    B. Install framed instructions in a location visible from fire-alarm control unit.

    3.5 GROUNDING

    A. Ground fire-alarm control unit and associated circuits; comply with IEEE 1100 and the NEC.

    Install a ground wire from main service ground to fire-alarm control unit.

    B. Ground shielded cables at the control panel location only. Insulate shield at device location.

    3.6 FIELD QUALITY CONTROL

    A. Field tests shall be witnessed by Engineer.

  • 13850-12

    B. Perform the following tests and inspections with the assistance of a factory-authorized service

    representative:

    1. Visual Inspection: Conduct visual inspection prior to testing.

    a. Inspection shall be based on completed record Drawings and system

    documentation that is required by NFPA 72 in its "Completion Documents,

    Preparation" table in the "Documentation" section of the "Fundamentals"

    chapter.

    b. Comply with the "Visual Inspection Frequencies" table in the "Inspection" section

    of the "Inspection, Testing and Maintenance" chapter in NFPA 72; retain the

    "Initial/Reacceptance" column and list only the installed components.

    2. System Testing: Comply with the "Test Methods" table in the "Testing" section of the

    "Inspection, Testing and Maintenance" chapter in NFPA 72.

    3. Test audible appliances for the public operating mode according to manufacturer's

    written instructions. Perform the test using a portable sound-level meter complying

    with Type 2 requirements in ANSI S1.4.

    4. Test audible appliances for the private operating mode according to manufacturer's

    written instructions.

    5. Test visible appliances for the public operating mode according to manufacturer's

    written instructions.

    6. Factory-authorized service representative shall prepare the "Fire Alarm System Record

    of Completion" in the "Documentation" section of the "Fundamentals" chapter in

    NFPA 72 and the "Inspection and Testing Form" in the "Records" section of the

    "Inspection, Testing and Maintenance" chapter in NFPA 72.

    C. Reacceptance Testing: Perform reacceptance testing to verify the proper operation of added

    or replaced devices and appliances.

    D. Fire-alarm system will be considered defective if it does not pass tests and inspections.

    E. Prepare test and inspection reports.

    F. Annual Test and Inspection: One year after date of Substantial Completion, test fire-alarm

    system complying with visual and testing inspection requirements in NFPA 72. Use forms

    developed for initial tests and inspections.

    3.7 SOFTWARE SERVICE AGREEMENT

    A. Comply with UL 864.

    B. Upgrade Service: At Substantial Completion, update software to latest version.

    3.8 DEMONSTRATION

    A. Train Owner's maintenance personnel to adjust, operate, and maintain fire-alarm system.

    END OF SECTION

  • "General Decision Number: WY20210023 01/01/2021

    Superseded General Decision Number: WY20200023

    State: Wyoming

    Construction Type: Building

    County: Laramie County in Wyoming.

    BUILDING CONSTRUCTION PROJECTS (does not include single family

    homes or apartments up to and including 4 stories).

    Note: Under Executive Order (EO) 13658, an hourly minimum wage

    of $10.95 for calendar year 2021 applies to all contracts

    subject to the Davis-Bacon Act for which the contract is awarded

    (and any solicitation was issued) on or after January 1, 2015.

    If this contract is covered by the EO, the contractor must pay

    all workers in any classification listed on this wage

    determination at least $10.95 per hour (or the applicable

    wage rate listed on this wage determination, if it is higher)

    for all hours spent performing on the contract in calendar

    year 2021. If this contract is covered by the EO and a

    classification considered necessary for performance of work on

    the contract does not appear on this wage determination, the

    contractor must pay workers in that classification at least

    the wage rate determined through the conformance process set

    forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,

    if it is higher than the conformed wage rate). The EO minimum

    wage rate will be adjusted annually. Please note that

    this EO applies to the above-mentioned types of contracts

    entered into by the federal government that are subject

    to the Davis-Bacon Act itself, but it does not apply

    to contracts subject only to the Davis-Bacon Related Acts,

    including those set forth at 29 CFR 5.1(a)(2)-(60). Additional

    information on contractor requirements and worker protections

    under the EO is available at www.dol.gov/whd/govcontracts.

    Modification Number Publication Date

    0 01/01/2021

    * ELEV0025-003 01/01/2020

    Rates Fringes

    ELEVATOR MECHANIC................$ 46.53 35.245

  • FOOTNOTE:

    a: Vacation Pay: 8% with 5 or more years of service based on

    regular hourly rate for all hours worked, 6% under 5 years

    service based on hourly rate for all hours worked. b: Paid

    holidays: New Year's Day; Memorial Day; Independence Day;

    Labor Day; Veteran's Day; Thanksgiving Day; Friday after

    Thanksgiving and Christmas Day

    ----------------------------------------------------------------

    IRON0732-016 06/01/2017

    Rates Fringes

    IRONWORKER, STRUCTURAL...........$ 26.25 19.75

    ----------------------------------------------------------------

    PLUM0192-006 01/01/2018

    Rates Fringes

    PIPEFITTER (Excluding HVAC

    Pipe Installation)...............$ 31.34 17.94

    ----------------------------------------------------------------

    * SFWY0669-002 04/01/2020

    Rates Fringes

    SPRINKLER FITTER (Fire

    Sprinklers)......................$ 34.58 23.00

    ----------------------------------------------------------------

    SHEE0103-011 07/01/2018

    Rates Fringes

    SHEET METAL WORKER (Including

    HVAC System Installation

    (Excluding HVAC Duct

    Installation))...................$ 27.81 18.34

    ----------------------------------------------------------------

    SUWY2011-020 01/11/2011

    Rates Fringes

    CARPENTER (Form Work Only).......$ 17.18 3.20

    CARPENTER, Excludes Form Work....$ 21.55 6.15

    CEMENT MASON/CONCRETE FINISHER...$ 17.40 2.46

    ELECTRICIAN (Low Voltage

    Wiring and Installation of

  • Alarms)..........................$ 23.34 1.11

    ELECTRICIAN (Low Voltage

    Wiring and Installation of

    HVAC/Temperature Controls).......$ 22.25 1.70

    ELECTRICIAN, Includes Low

    Voltage Wiring for Computers

    and Phones (Excluding Low

    Voltage Wiring and

    Installation of Alarms and

    HVAC/Temperature Controls).......$ 25.24 2.17

    GLAZIER..........................$ 21.69 2.63

    HVAC MECHANIC (HVAC Pipe

    Installation)....................$ 32.00 2.83

    INSTALLER - SIGN.................$ 17.39 2.17

    LABORER: Common or General......$ 12.83 0.00

    LABORER: Mason Tender -

    Cement/Concrete..................$ 15.13 1.41

    PLUMBER, Excludes HVAC Pipe

    Installation.....................$ 21.45 13.35

    ROOFER...........................$ 16.92 0.00

    SHEET METAL WORKER (HVAC Duct

    Installation Only)...............$ 22.50 12.88

    TRUCK DRIVER: Dump Truck........$ 15.99 1.79

    ----------------------------------------------------------------

    WELDERS - Receive rate prescribed for craft performing

    operation to which welding is incidental.

    ================================================================

    Note: Executive Order (EO) 13706, Establishing Paid Sick Leave

    for Federal Contractors applies to all contracts subject to the

    Davis-Bacon Act for which the contract is awarded (and any

    solicitation was issued) on or after January 1, 2017. If this

    contract is covered by the EO, the contractor must provide

    employees with 1 hour of paid sick leave for every 30 hours

    they work, up to 56 hours of paid sick leave each year.

    Employees must be permitted to use paid sick leave for their

    own illness, injury or other health-related needs, including

  • preventive care; to assist a family member (or person who is

    like family to the employee) who is ill, injured, or has other

    health-related needs, including preventive care; or for reasons

    resulting from, or to assist a family member (or person who is

    like family to the employee) who is a victim of, domestic

    violence, sexual assault, or stalking. Additional information

    on contractor requirements and worker protections under the EO

    is available at www.dol.gov/whd/govcontracts.

    Unlisted classifications needed for work not included within

    the scope of the classifications listed may be added after

    award only as provided in the labor standards contract clauses

    (29CFR 5.5 (a) (1) (ii)).

    ----------------------------------------------------------------

    The body of each wage determination lists the classification

    and wage rates that have been found to be prevailing for the

    cited type(s) of construction in the area covered by the wage

    determination. The classifications are listed in alphabetical

    order of ""identifiers"" that indicate whether the particular

    rate is a union rate (current union negotiated rate for local),

    a survey rate (weighted average rate) or a union average rate

    (weighted union average rate).

    Union Rate Identifiers

    A four letter classification abbreviation identifier enclosed

    in dotted lines beginning with characters other than ""SU"" or

    ""UAVG"" denotes that the union classification and rate were

    prevailing for that classification in the survey. Example:

    PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of

    the union which prevailed in the survey for this

    classification, which in this example would be Plumbers. 0198

    indicates the local union number or district council number

    where applicable, i.e., Plumbers Local 0198. The next number,

    005 in the example, is an internal number used in processing

    the wage determination. 07/01/2014 is the effective date of the

    most current negotiated rate, which in this example is July 1,

    2014.

    Union prevailing wage rates are updated to reflect all rate

    changes in the collective bargaining agreement (CBA) governing

    this classification and rate.

    Survey Rate Identifiers

    Classifications listed under the ""SU"" identifier indicate that

  • no one rate prevailed for this classification in the survey and

    the published rate is derived by computing a weighted average

    rate based on all the rates reported in the survey for that

    classification. As this weighted average rate includes all

    rates reported in the survey, it may include both union and

    non-union rates. Example: SULA2012-007 5/13/2014. SU indicates

    the rates are survey rates based on a weighted average

    calculation of rates and are not majority rates. LA indicates

    the State of Louisiana. 2012 is the year of survey on which

    these classifications and rates are based. The next number, 007

    in the example, is an internal number used in producing the

    wage determination. 5/13/2014 indicates the survey completion

    date for the classifications and rates under that identifier.

    Survey wage rates are not updated and remain in effect until a

    new survey is conducted.

    Union Average Rate Identifiers

    Classification(s) listed under the UAVG identifier indicate

    that no single majority rate prevailed for those

    classifications; however, 100% of the data reported for the

    classifications was union data. EXAMPLE: UAVG-OH-0010

    08/29/2014. UAVG indicates that the rate is a weighted union

    average rate. OH indicates the state. The next number, 0010 in

    the example, is an internal number used in producing the wage

    determination. 08/29/2014 indicates the survey completion date

    for the classifications and rates under that identifier.

    A UAVG rate will be updated once a year, usually in January of

    each year, to reflect a weighted average of the current

    negotiated/CBA rate of the union locals from which the rate is

    based.

    ----------------------------------------------------------------

    WAGE DETERMINATION APPEALS PROCESS

    1.) Has there been an initial decision in the matter? This can

    be:

    * an existing published wage determination

    * a survey underlying a wage determination

    * a Wage and Hour Division letter setting forth a position on

    a wage determination matter

    * a conformance (additional classification and rate) ruling

    On survey related matters, initial contact, including requests

  • for summaries of surveys, should be with the Wage and Hour

    Regional Office for the area in which the survey was conducted

    because those Regional Offices have responsibility for the

    Davis-Bacon survey program. If the response from this initial

    contact is not satisfactory, then the process described in 2.)

    and 3.) should be followed.

    With regard to any other matter not yet ripe for the formal

    process described here, initial contact should be with the

    Branch of Construction Wage Determinations. Write to:

    Branch of Construction Wage Determinations

    Wage and Hour Division

    U.S. Department of Labor

    200 Constitution Avenue, N.W.

    Washington, DC 20210

    2.) If the answer to the question in 1.) is yes, then an

    interested party (those affected by the action) can request

    review and reconsideration from the Wage and Hour Administrator

    (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

    Wage and Hour Administrator

    U.S. Department of Labor

    200 Constitution Avenue, N.W.

    Washington, DC 20210

    The request should be accompanied by a full statement of the

    interested party's position and by any information (wage

    payment data, project description, area practice material,

    etc.) that the requestor considers relevant to the issue.

    3.) If the decision of the Administrator is not favorable, an

    interested party may appeal directly to the Administrative

    Review Board (formerly the Wage Appeals Board). Write to:

    Administrative Review Board

    U.S. Department of Labor

    200 Constitution Avenue, N.W.

    Washington, DC 20210

    4.) All decisions by the Administrative Review Board are final.

    ================================================================

    END OF GENERAL DECISION

    "

  • AutoCAD SHX TextOE

    AutoCAD SHX TextOE

    AutoCAD SHX TextOE

    AutoCAD SHX TextAPPROX. LOCATION OF 12" FIRE WATER LINE

    AutoCAD SHX TextEXISTING UTILITY TRANSFORMER. SCHD. OUTAGES WITH BLACK HILLS ENERGY. IF TRANFORMER NEEDS TO BE LIFTED, THEN BLACK HILLS ENERGY WILL PROVIDE THE LIFT AT THE CONTRACTORS EXPENSE. SEE SPEC SECTION 01042.

    AutoCAD SHX TextPROPOSED WEATHERPROOF SERVICE ENTRANCE SWITCHGEAR (SWGR 8000) WITH NEW MAIN UTILITY BREAKER ON HOUSEKEEPING PAD.

    AutoCAD SHX TextPROPOSED CONCRETE ENCASED DUCT BANK SEE DETAIL 1 ON SHEET C10.

    AutoCAD SHX TextAPPROX. LOCATION OF EXISTING DRAIN LINES

    AutoCAD SHX TextNORTH

    AutoCAD SHX Text10'

    AutoCAD SHX Text0

    AutoCAD SHX Text10'

    AutoCAD SHX TextSCALE 1" = 10'

    AutoCAD SHX TextEXISTING LIGHT POLE TO REMAIN

    AutoCAD SHX TextPROPOSED PRECAST MANHOLES LMH-3 & LMH-4

    AutoCAD SHX TextAPPROX. LOCATION OF 12" FIRE WATER LINE

    AutoCAD SHX TextAPPROX. LOCATION OF EXISTING ELECTRIC UTILITY SERVICE DROP

    AutoCAD SHX TextAPPROX. LOCATION OF EXISTING UTILITY SERVICE CONCRETE ENCASED DUCT BANK. NINE 4" CONDUITS (ONE IS A SPARE)

    AutoCAD SHX TextPROPOSED 6' CHAIN LINK FENCE

    AutoCAD SHX TextPROPOSED 10' CHAIN LINK DOUBLE GATE.

    AutoCAD SHX TextCOORDINATE MANHOLE LOCATION WITH EXISTING UNDERGROUND SYSTEMS PRIOR TO BEGINNING WORK. IF CONFLICTS ARE FOUND NOTIFY THE OWNER IMMEDIATELY. INTERCEPT EXISTING CONCRETE ENCASED DUCT BANK WITH NEW MANHOLES WITHOUT DISRUPTING EXISTING ELECTRICAL SERVICE.

    AutoCAD SHX TextNOTES: 1. PROVIDE SIGN ON GATE THAT READS "ARCFLASH PROVIDE SIGN ON GATE THAT READS "ARCFLASH HAZARD. DO NOT ENTER. CIRCUIT BREAKER CAN ONLY BE OPERATED REMOTELY. UTILITY FUSES MUST BE REMOVED BEFORE ENTERING." 2. PROVIDE A LOCKABLE SWITCH AT THE FENCE PROVIDE A LOCKABLE SWITCH AT THE FENCE BOUNDARY THAT WILL REMOTELY TRIP AND CLOSE THE MAIN UTILITY BREAKER. 3. SEE SPECS FOR PLANT SHUT DOWN AND TIE-IN SEE SPECS FOR PLANT SHUT DOWN AND TIE-IN DETAILS. 4. CONTRACTOR TO VERIFY LOCATION AND DEPTH OF CONTRACTOR TO VERIFY LOCATION AND DEPTH OF EXISTING UTILITIES PRIOR TO MANUFACTURING PRECAST MANHOLE TO CONFIRM THERE ARE NO INTERFERENCES. 5. CHAIN LINK FENCE AND GATES SHALL BE CHAIN LINK FENCE AND GATES SHALL BE GROUNDED AND BONDED IN ACCORDANCE WITH THE NEC AND IN ACCORDANCE WITH SHEET E0.1 AND DETAILS 17, 18, AND 19 ON SHEET E5.2.

    AutoCAD SHX TextADD ALTERNATE #1: WATER TREATMENT PLANT ELECTRICAL UPGRADES COMPLETE: SEE SPEC SECTION 01025.

    AutoCAD SHX TextSHORING REQUIRED. CONTRACTOR RESPONSIBLE FOR SHORING IN ACCORDANCE WITH OSHA.

    AutoCAD SHX Text4

    AutoCAD SHX Text4 (ALIGNMENT)

    AutoCAD SHX Text4 (ALIGNMENT)

    AutoCAD SHX Text4 (ALIGNMENT)

    AutoCAD SHX TextA

    AutoCAD SHX TextA

    AutoCAD SHX TextLEAVE EXISTING DUCT REINFORCING PROJECTING INTO WALL OPENING

    AutoCAD SHX TextPROVIDE PVC BELL ENDS

    AutoCAD SHX TextCLEAN DUCT SURFACE & APPLY BONDING AGENT

    AutoCAD SHX TextPLACE CONCRETE AROUND DUCT AND AT MANHOLE

    AutoCAD SHX TextEXISTING DUCT BANK

    AutoCAD SHX TextEXISTING DUCT BANK

    AutoCAD SHX TextPLAN VIEW

    AutoCAD SHX TextSECTION A-A

    AutoCAD SHX TextPROPOSED DUCT BANK

    AutoCAD SHX TextEXISTING DUCT BANK

    AutoCAD SHX TextPROPOSED WALL OPENING

    AutoCAD SHX TextEXISTING DUCT INTERCEPTION AT MANHOLE NO SCALE

    AutoCAD SHX TextNOTES: 1. TONE AND LOCATE DUCT. TONE AND LOCATE DUCT. 2. HAND EXCAVATE OR HYDRO EXCAVATE TO UNCOVER EXISTING DUCT. HAND EXCAVATE OR HYDRO EXCAVATE TO UNCOVER EXISTING DUCT. 3. REMOVE CONCRETE AROUND DUCT BANK AS MUCH AS 12" BEYOND THE PROPOSED LOCATION OF REMOVE CONCRETE AROUND DUCT BANK AS MUCH AS 12" BEYOND THE PROPOSED LOCATION OF OUTSIDE WALL (LEAVE CONDUIT IN PLACE). SUPPORT CONDUIT DURING CONSTRUCTION. 4. CONSTRUCT MANHOLE SO THAT DUCT IS INSIDE, AND AS CLOSE AS POSSIBLE, TO ONE INSIDE FACE CONSTRUCT MANHOLE SO THAT DUCT IS INSIDE, AND AS CLOSE AS POSSIBLE, TO ONE INSIDE FACE OF MANHOLE. STEPS MAY NEED TO BE INSTALLED AFTER DUCT IS REMOVED. 5. AFTER MANHOLE IS CONSTRUCTED, CUT AND REMOVE DUCTS FLUSH WITH INSIDE FACE OF WALL, WITH AFTER MANHOLE IS CONSTRUCTED, CUT AND REMOVE DUCTS FLUSH WITH INSIDE FACE OF WALL, WITH BELLS ENDS INSTALLED. 6. SUPPORT ANY CABLES FROM WALL RACK. IF CABLES CANNOT BE SUPPORTED FROM WALL, SUPPORT SUPPORT ANY CABLES FROM WALL RACK. IF CABLES CANNOT BE SUPPORTED FROM WALL, SUPPORT WITH TRAPEZE HANGERS FROM CEILING. 7. PLACE CONCRETE FROM DUCT BANK CUT BACK INTO NEW MANHOLE OPENING, AND GROUT AROUND PLACE CONCRETE FROM DUCT BANK CUT BACK INTO NEW MANHOLE OPENING, AND GROUT AROUND ANY DUCT ENDS NOT SUPPORTED BY CONCRETE. 8. FIRE WRAP ANY CABLES THAT WILL REMAIN WITH 3" WIDE TAPE (3M77). FIRE WRAP ANY CABLES THAT WILL REMAIN WITH 3" WIDE TAPE (3M77). 9. BOND GROUND CONDUCTOR TO SWITCHGEAR AND MANHOLE GROUND ELECTRODE SYSTEM AT DUCT BOND GROUND CONDUCTOR TO SWITCHGEAR AND MANHOLE GROUND ELECTRODE SYSTEM AT DUCT BANK TERMINATION POINTS. BOND DUCT BANK GROUND CONDUCTORS AT GROUND BAR IN MANHOLE. 10. MANHOLE INTERIOR SPACE TO BE CLASSIFIED NEMA 4X. MANHOLE INTERIOR SPACE TO BE CLASSIFIED NEMA 4X. 11. PROVIDE FLUSH MOUNT 30" ALUM. RING AND COVER AND STEPS RE: 9/S-401. HS-20 LOADING. PROVIDE FLUSH MOUNT 30" ALUM. RING AND COVER AND STEPS RE: 9/S-401. HS-20 LOADING. 12. PROVIDE 120V 20A WEATHER PROOF GFCI DUPLEX RECEPTACLE WITH COVER RATED WATER PROOF PROVIDE 120V 20A WEATHER PROOF GFCI DUPLEX RECEPTACLE WITH COVER RATED WATER PROOF WHILE IN USE IN MANHOLE FOR SUMP PUMP. RUN POWER (#10 WIRE) FROM LMH-2 THROUGH SPARE 4" CONDUIT. PROVIDE A PENTAIR FLOTEC FPZS25T SUMP PUMP (OR EQUAL), BREAKABLE UNION AND PIGGY BACK FLOAT LEVEL SWITCH. PUMP TO BE RATED AT 36 GPM @ 10' TDH, MINIMUM 1/4 HP AT 115V AC, 60 HZ. 13. RUN CONTROL WIRE FROM PROPOSED UTILITY BREAKER THROUGH SPARE 4" CONDUIT TO MANHOLE RUN CONTROL WIRE FROM PROPOSED UTILITY BREAKER THROUGH SPARE 4" CONDUIT TO MANHOLE LMH-2 AND THEN INTO ACC8601 (IN EXISTING ELECTRICAL ROOM) AND CONNECT TO ETHERNET SWITCH. IF NO CONDUIT CAPACITY IS AVAILABLE FROM LMH-2 TO ACC8601, THEN USE THE SPARE 4" CONDUIT TO SWGR-8001 AND ROUTE IN CONDUIT FROM THERE TO ACC8601 OR TO COMM. ROOM.

    AutoCAD SHX TextPLACE CONCRETE AROUND DUCT AND AT MANHOLE. REINFORCE OPENING WITH #4 @ 12" O.C. EACH WAY. LAP EXISTING REBAR 12". EPOXY DOWLS INTO MANHOLE.

    AutoCAD SHX TextSEE DETAIL 1 ON SHEET C10 FOR DUCTBANK CONSTRUCTION.

    AutoCAD SHX TextPLACE CONCRETE IN OPENING AFTER DUCT IS REMOVED.

    AutoCAD SHX TextPROPOSED PRECAST MANHOLE. TYPICAL FOR LMH-3 AND LMH-4.

    AutoCAD SHX TextPROVIDE SUMP WITH FLOAT OPERATED PUMP AND GALV GRATING. RUN 2" PUMP DISCHARGE PIPE TO DAYLIGHT.

    AutoCAD SHX TextFLUSH MOUNT 30" ALUM. RING AND LID AND STEPS. HS-20 LOADING.

    AutoCAD SHX TextHS-20 LOADING LID

    AutoCAD SHX Text2'x2'x2'D SUMP WITH PUMP AND GALV. GRATING

    AutoCAD SHX TextPROPOSED CONCRETE ENCASED DUCT BANK

    AutoCAD SHX TextEXISTING GRADE

    AutoCAD SHX TextRUN 2" PUMP DISCHARGE PIPE TO DAYLIGHT

    AutoCAD SHX TextFLUSH MOUNT 30" ALUM. RING AND LID AND STEPS. HS-20 LOADING.

    AutoCAD SHX Text4

    AutoCAD SHX Text4

    AutoCAD SHX Text4

    AutoCAD SHX Text4

    AutoCAD SHX Text4

    AutoCAD SHX Text4

    AutoCAD SHX Text4

    AutoCAD SHX TextREV NO.

    AutoCAD SHX TextCHK'D

    AutoCAD SHX TextSHEET NO.

    AutoCAD SHX TextDWG DATE

    AutoCAD SHX TextDWN BY

    AutoCAD SHX TextSHEET TITLE

    AutoCAD SHX TextPROJECT

    AutoCAD SHX TextCLIENT

    AutoCAD SHX TextREV

    AutoCAD SHX TextDWN

    AutoCAD SHX TextAPP

    AutoCAD SHX TextJanuary 17, 2021

    AutoCAD SHX TextC:\Users\WadDW0495\BIM 360\Wenck Associates\LREP\Project Files\Sherard Hydro\Site_20201208.dwg

    AutoCAD SHX TextPlot Date:

    AutoCAD SHX TextREV DATE

    AutoCAD SHX TextPROJECT NO.

    AutoCAD SHX TextSCALE

    AutoCAD SHX TextAPP'D

    AutoCAD SHX TextREVISION DESCRIPTION

    AutoCAD SHX TextPRELIMINARY

    AutoCAD SHX TextVARIES

    AutoCAD SHX Text07/2015

    AutoCAD SHX TextSWW

    AutoCAD SHX TextDWW

    AutoCAD SHX Text1

    AutoCAD SHX TextE9

    AutoCAD SHX Text4

    AutoCAD SHX Text2831-06

    AutoCAD SHX Text12/2020

    AutoCAD SHX TextSWW

    AutoCAD SHX TextSWW

    AutoCAD SHX TextDWW

    AutoCAD SHX TextSERVICE ENTRANCE

    AutoCAD SHX TextFINAL

    AutoCAD SHX Text12/2019

    AutoCAD SHX TextSWW

    AutoCAD SHX TextDWW

    AutoCAD SHX Text2

    AutoCAD SHX TextSHERARD HYDROELECTRIC GENERATION FACILITY

    AutoCAD SHX TextCHEYENNE BOARD OF PUBLIC UTILITIES

    AutoCAD SHX TextFORT COLLINS COLORADO

    AutoCAD SHX Text(970) 224-9100 [email protected]@THINKESC.COMTHINKESC.COM

    AutoCAD SHX TextSWITCHGEAR PLAN

    AutoCAD SHX TextSUITE 230

    AutoCAD SHX TextCHEYENNE, WY 82009

    AutoCAD SHX Text307-634-7848 PHONE

    AutoCAD SHX Text7000 YELLOWTAIL RD

    AutoCAD SHX Text3

    AutoCAD SHX TextISSUED_FOR_BID

    AutoCAD SHX TextDWW

    AutoCAD SHX TextSWW

    AutoCAD SHX Text12/2020

    AutoCAD SHX Text4

    AutoCAD SHX TextADDENDUM_#2

    AutoCAD SHX TextDWW

    AutoCAD SHX TextSWW

    AutoCAD SHX Text01/2021