Top Banner
Academic Outreach Project 24 Month Rolling Plan Jul2010 Jul12 Jan11 Jul10 Jul11 Jan12 2011 US Challenge Topic Announcement 2011 Academic Challenge Judging 2012 Academic Challenge Judging Student IDE Tool Kit Specifications OHT Curriculum Planning Academic Outreach HIMSS Challenge Announcement April 2010 Academic Challenge co-located with CONNEC First Summer Camp? 2012 Challenge Topic Announcements OHT Curriculum Planning Explore International
18

Academic Outreach Project 24 Month Rolling Plan Jul2010 Jul12 Jan11 Jul10 Jul11 Jan12 2011 US Challenge Topic Announcement 2011 Academic Challenge Judging.

Jan 12, 2016

Download

Documents

Buddy Gilmore
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Academic Outreach Project 24 Month Rolling Plan Jul2010 Jul12 Jan11 Jul10 Jul11 Jan12 2011 US Challenge Topic Announcement 2011 Academic Challenge Judging.

Academic Outreach Project24 Month Rolling Plan Jul2010

Jul12

Jan11

Jul10

Jul11

Jan12

2011 US Challenge Topic Announcement

2011 Academic Challenge Judging

2012 Academic Challenge Judging

Student IDE Tool Kit Specifications

OHT Curriculum Planning

Academic Outreach HIMSS Challenge Announcement

April 2010 Academic Challenge co-located with CONNECT

First Summer Camp? 2012 Challenge Topic Announcements

OHT Curriculum Planning

Explore International

Page 2: Academic Outreach Project 24 Month Rolling Plan Jul2010 Jul12 Jan11 Jul10 Jul11 Jan12 2011 US Challenge Topic Announcement 2011 Academic Challenge Judging.

Summary ReportProject Name: OHT Architecture Platform Project

The OHT Architecture Platform Project is developing the tools, techniques and processes for OHT Projects and the Architecture Council

To support independently managed OHT Projects to contribute to the vision of standards based interoperable technology components enabling comprehensive and secure access to consistent clinical information wherever needed

Completed Milestones:

Architecture Principles – Q1 2010

Upcoming Milestones:

Tooling Architecture Vision – Q3 2010

Architecture Framework – Q3 2010

Tooling Classification Template Q3 2010

Current Tools Classified Q4 2010

Page 3: Academic Outreach Project 24 Month Rolling Plan Jul2010 Jul12 Jan11 Jul10 Jul11 Jan12 2011 US Challenge Topic Announcement 2011 Academic Challenge Judging.

Summary Report

Project Name: CollabNet Infrastructure Project

Brief Project Description: CollabNet provides the Hosting and TeamForge Product and services for the Forge and Charter project work.

Major milestones to date – Pre-Migration Work

Projected milestones – To be done in July 2010

Major release dates – July 2010

Contribution date - Yearly

Contribution value – Product, Hosting, Services at very low rates

Page 4: Academic Outreach Project 24 Month Rolling Plan Jul2010 Jul12 Jan11 Jul10 Jul11 Jan12 2011 US Challenge Topic Announcement 2011 Academic Challenge Judging.

Summary Report

Project Name: HL7 Tooling Static Model Designer 1.1

The 1.1 version of the Static Model Designer is adding support for Universal Level validations and annotations

Completed Milestones:

NHS sponsored SMD 1.0

Upcoming Milestones:

Build for testing - Q3 2010

Release 1.1 – Q4 2010

Page 5: Academic Outreach Project 24 Month Rolling Plan Jul2010 Jul12 Jan11 Jul10 Jul11 Jan12 2011 US Challenge Topic Announcement 2011 Academic Challenge Judging.

Summary Report

Project Name: IHE Profiles

Brief Project Description:

The Integrating the Healthcare Enterprise (IHE) is an initiative by healthcare professionals and industry to improve the way computer systems in healthcare share information. IHE promotes the coordinated use of established standards such as DICOM and HL7 to address specific clinical needs in support of optimal patient care. Systems developed in accordance with IHE communicate with one another better, are easier to implement, and enable care providers to use information more effectively.

To lower the barrier to integration and expedite healthcare interoperability, OHT provides client side implementations of several key IHE profiles. These implementations were used successfully by over 35 systems to date at the 2007-2010 Connectathons in North America and Europe.

Major milestones to date: v1.0.0 – 3/2009, v1.1.0 – 5/2010

Projected milestones: v1.2.0 – 5/2011

Major release dates: (projected) pre-connectathon - 11/2010, post-conectathon 2/2011

Contribution date: continual since July 2008

Page 6: Academic Outreach Project 24 Month Rolling Plan Jul2010 Jul12 Jan11 Jul10 Jul11 Jan12 2011 US Challenge Topic Announcement 2011 Academic Challenge Judging.

Summary Report

Project Name: OpenExchange

Brief Project Description: OpenExchange platform provides standards based core infrastructure to exchange patient health information in a secure and timely manner, to advance the quality, safety and efficiency of healthcare delivery. The platform is a critical element of HIE infrastructure that provides clinicians and other members of the healthcare community with the right information at the right time by making patient information available across organizational boundaries. OpenExchange consists of open source projects that use Integrating the Healthcare Enterprise (IHE) profiles as the set of fundamental requirements.

Major milestones to date: Successfully completed OpenPIXPDQ, OpenXDS (with XCA) and OpenATNA

Projected milestones: OpenDSUB and OpenPIXPDQ V3.0

Major release dates: Q3 and Q4 2010

Contribution date: 2009, 2010

Contribution value (Person years or market value or lines of code): 325 Man days

Page 7: Academic Outreach Project 24 Month Rolling Plan Jul2010 Jul12 Jan11 Jul10 Jul11 Jan12 2011 US Challenge Topic Announcement 2011 Academic Challenge Judging.

AIP - Summary Report

Project Name: Application Integration Platform

Brief Description:

AIP comprises two components: NexJ Studio Express and NexJ Model Server Express

A Model-driven engineering IDE with a focus on enterprise application integration with UML

An adapter-based JEE application server that executes application integration solution models

Channel adapters include File, HTTP & JMS; Message format adapters include HL7, CSV, XML & fixed length record

Major milestones: NFCU, NexJ Scheme, OSS

Contribution dates: 2009: Q1, Q3, Q4, 2010: Q2

Contribution value: > 15 man years, > 300k lines

Page 8: Academic Outreach Project 24 Month Rolling Plan Jul2010 Jul12 Jan11 Jul10 Jul11 Jan12 2011 US Challenge Topic Announcement 2011 Academic Challenge Judging.

Summary Report

Project Name: IHTSDO Workbench

Brief Project Description: Development of a collaborative tool to allow maintenance of terminology, mapping to other coding systems, and translation.

Major milestones to date: Refset (6/10), Classifier (5/10)

Projected milestones: Translation module (11/10)

Major release dates: 06/10, 01/11

Contribution date: from 01/09 onwards

Contribution value: 9 person years

IHTSDO Workbench

Page 9: Academic Outreach Project 24 Month Rolling Plan Jul2010 Jul12 Jan11 Jul10 Jul11 Jan12 2011 US Challenge Topic Announcement 2011 Academic Challenge Judging.

Stepstone Summary

Soliciting increased participation from the Continua Health Alliance

Plan to donate WAN implementation in 1Q of 2011

Plan to award maintenance contract for these components

Page 10: Academic Outreach Project 24 Month Rolling Plan Jul2010 Jul12 Jan11 Jul10 Jul11 Jan12 2011 US Challenge Topic Announcement 2011 Academic Challenge Judging.

Summary Report

Project Name: Voluntary Universal Healthcare Identifiers

Brief Project Description: The VUHID project enables patients who are members of a health information exchange to obtain a globally unique set of healthcare IDs to enable error-free patient identification and enhanced privacy management of clinical data.

Major milestones to date: Server operational, 2008

Projected milestones: Production system, Q3, 2010, first HIE operational Q3, 2010

Major release dates: NA

Contribution date: Currently available for integration

Contribution value: 20 person years

Page 11: Academic Outreach Project 24 Month Rolling Plan Jul2010 Jul12 Jan11 Jul10 Jul11 Jan12 2011 US Challenge Topic Announcement 2011 Academic Challenge Judging.

Standard User Interface ToolingSummary Report

• The Standard User Interface tooling project is a partnership project to deliver elements of a healthcare standard user interface:

• Technology evaluation • A Reference implementation framework which

incorporates User interface guidelines and Snomed CT• open source prototype applications in the chosen

technology•Major milestones to date:

• Technology evaluation completed – Flex chosen• Development work on framework and architecture

commenced•Planned next steps:

• Delivery of architecture and meds list in reference platform September 2010

• Snomed CT single concept matching and Drug chart to follow in 3 month sprints

Page 12: Academic Outreach Project 24 Month Rolling Plan Jul2010 Jul12 Jan11 Jul10 Jul11 Jan12 2011 US Challenge Topic Announcement 2011 Academic Challenge Judging.

Summary Report - 2Q 2010

• Project Name: OpenPASS• Brief Project Description:

The project objective is to provide open source reference implementations of Privacy Access and Security Services (PASS) based on the HL7 healthcare standards and service oriented architecture (SOA) principles.

• Major milestones to date: n/a• Projected milestones: Milestone R1 – September, 2010• Major release dates: n/a• Contribution date: n/a• Contribution value: n/a

Page 13: Academic Outreach Project 24 Month Rolling Plan Jul2010 Jul12 Jan11 Jul10 Jul11 Jan12 2011 US Challenge Topic Announcement 2011 Academic Challenge Judging.

Summary Report

Project Name: Conformance Services

Brief Project Description: A set of tools to test that vendors have successfully implemented the requirements and specifications required to interoperate. Focus on HL7v3 messaging.

Simulation component (accepts message, returns result from test data DB to sender)

Logging and Reporting capabilities

Test Materials: Test Cases and Data, Test Scripts, Conformance Profiles

Major milestones to date: funding secured (June 2010)

Projected milestones: RFP written and issued for test tools/environment Sept 2010

Selection of test tools/environment complete and implemented Jan 2011

Test cases and test data prepared Jan 2011

Major release dates: Jan 2011

Contribution date

Contribution value (Person years or market value or lines of code)

Page 14: Academic Outreach Project 24 Month Rolling Plan Jul2010 Jul12 Jan11 Jul10 Jul11 Jan12 2011 US Challenge Topic Announcement 2011 Academic Challenge Judging.

Summary Report

Project Name: Message Builder API

Brief Project Description: Intended to simplify the implementation of HL7 v3 messaging. A Generator component takes MIF files and creates canonical models of health messages, plus APIs for Java, .NET and simple XML. These allow application developers to work with business objects rather than HL7 v3 objects.

Major milestones to date: implementation of all versions complete

Projected milestones: field testing completed Sept 2010

Major release dates: Jan 2011

Contribution date

Contribution value (Person years or market value or lines of code)

Page 15: Academic Outreach Project 24 Month Rolling Plan Jul2010 Jul12 Jan11 Jul10 Jul11 Jan12 2011 US Challenge Topic Announcement 2011 Academic Challenge Judging.

Packaging & Distribution Project

Summary ReportProject Name:

Brief Project Description:

The Packaging and Distribution Project can deal with three different aspects of deployment validation and verification:

• Intellectual Property constraints deal with assuring that the terms and conditions of software licenses are respected and that other legal obligations are being met

• Information Governance constraints focus on assuring that deployed software is in compliance with corporate governance and other applicable IT policies

• Configuration constraints deal with whether the various pieces that comprise a software system will fit together and work correctly; this mainly involves verifying that prerequisites and dependencies deriving from programming language and implementation technology considerations are satisfied

Major milestones to date: 1&2 Q 2010 define scope functional description

Projected milestones: TBD

Major release dates: TBD

Contribution date: TBD

Contribution value (Person years or market value or lines of code): TBD

Page 16: Academic Outreach Project 24 Month Rolling Plan Jul2010 Jul12 Jan11 Jul10 Jul11 Jan12 2011 US Challenge Topic Announcement 2011 Academic Challenge Judging.

AIP - Summary Report

Project Name: Application Integration Platform

Brief Description:

AIP comprises two components: NexJ Studio Express and NexJ Model Server Express

A Model-driven engineering IDE with a focus on enterprise application integration with UML

An adapter-based JEE application server that executes application integration solution models

Channel adapters include File, HTTP & JMS; Message format adapters include HL7, CSV, XML & fixed length record

Major milestones: NFCU, NexJ Scheme, OSS

Contribution dates: 2009: Q1, Q3, Q4, 2010: Q2

Contribution value: > 15 man years, > 300k lines

Page 17: Academic Outreach Project 24 Month Rolling Plan Jul2010 Jul12 Jan11 Jul10 Jul11 Jan12 2011 US Challenge Topic Announcement 2011 Academic Challenge Judging.

Summary Report

• Project Name: Device Integration Platform

• Brief Project Description:

Develop strategies, processes and code for integrating devices and communications capabilities into end to end connected health applications.

• Major milestones to date: Identify and engage stake holders,and collect their hopes, ideas and concerns.

• Projected milestones: Identify two pilot projects to start immediately, and provide a safe sandbox to address the concerns that have been raised to date:

– How to handle mixes of open source and proprietary sources in the same project?

– How to make use of multiple OHT members and resources in the same project?

– How to document and report on projects to provide real value to OHT members?

– How quickly can a carefully scoped and managed project be put into the field?

• Major release dates: 6 months or less

• Contribution date: 1Q2011

• Contribution value: Full documentation on pilot projects' business and technical process,

plus whatever source is identified during the pilot projects to be released into open source.

Page 18: Academic Outreach Project 24 Month Rolling Plan Jul2010 Jul12 Jan11 Jul10 Jul11 Jan12 2011 US Challenge Topic Announcement 2011 Academic Challenge Judging.

Summary Report

Project Name: Portable Re-Configurable UI Platform

Description: Create a platform to construct Portable Re-Configurable UI Platform that provides enhanced usability for health care providers; end user re-configurability; portability across multiple operating systems, browsers and devices; common usage models; enforces patient safety and other design constraints at runtime; includes integrated simulation, test and deployment capabilities.

Dependencies: Standard UI, Application Integration Platform Projects

Completed Milestones:

Concept and Requirements Q2 2010

Upcoming Milestones:

Feasibility Studies – Q3/Q4 201

Prototype Implementations – Q2 2011

Early Adopter Deployment – Q4 2011/Q1 2012

Release 1.0 – Q2 2012