Page 1: [A2] Ortigas Greenways

11/8/12

1

PGAA CASE STUDIES IN STREETSCAPE IMPROVEMENTS

AYALA AVENUE STREETSCAPE AYALA AVENUE STREETSCAPE

Page 2: [A2] Ortigas Greenways

11/8/12

2

AYALA AVENUE STREET IMPROVEMENT

AYALA AVENUE STREET IMPROVEMENT

Page 3: [A2] Ortigas Greenways

11/8/12

3

BEFORE: PLAN (100m SECTION) AFTER: PLAN (100m SECTION)

BEFORE: BLOW-UP PLAN OF SIDEWALK AFTER: BLOW-UP PLAN OF SIDEWALK

AYALA AVE. STREET IMPROVEMENT

BEFORE: SECTION THROUGH AYALA AVENUE

AFTER: SECTION THROUGH AYALA AVENUE

AYALA AVE. STREET IMPROVEMENT

Page 4: [A2] Ortigas Greenways

11/8/12

4

AYALA AVE. STREET IMPROVEMENT

AYALA CBD URBAN PATIOS AYALA CBD URBAN PATIOS

Page 5: [A2] Ortigas Greenways

11/8/12

5

AYALA CBD URBAN PATIOS

AYALA CBD URBAN PATIOS

Page 6: [A2] Ortigas Greenways

11/8/12

6

AYALA CBD URBAN PATIOS

AYALA CBD URBAN PATIOS

Page 7: [A2] Ortigas Greenways

11/8/12

7

AYALA CBD URBAN PATIOS

AYALA CBD URBAN PATIOS

Page 8: [A2] Ortigas Greenways

11/8/12

8

AYALA CBD URBAN PATIOS

AYALA TRIANGLE SIDEWALK IMPROVEMENT AYALA TRIANGLE SIDEWALK IMPROVEMENT

Page 9: [A2] Ortigas Greenways

11/8/12

9

AYALA TRIANGLE SIDEWALK IMPROVEMENT

AYALA TRIANGLE SIDEWALK IMPROVEMENT

Page 10: [A2] Ortigas Greenways

11/8/12

10

AYALA TRIANGLE SIDEWALK IMPROVEMENT

AYALA TRIANGLE SIDEWALK IMPROVEMENT

Page 11: [A2] Ortigas Greenways

11/8/12

11

AYALA TRIANGLE SIDEWALK IMPROVEMENT

AYALA TRIANGLE SIDEWALK IMPROVEMENT

Page 12: [A2] Ortigas Greenways

11/8/12

12

AYALA TRIANGLE SIDEWALK IMPROVEMENT

PASEO DE ROXAS SIDEWALK IMPROVEMENT PASEO DE ROXAS SIDEWALK IMPROVEMENT

Page 13: [A2] Ortigas Greenways

11/8/12

13

PASEO DE ROXAS SIDEWALK IMPROVEMENT

PASEO DE ROXAS SIDEWALK IMPROVEMENT

Page 14: [A2] Ortigas Greenways

11/8/12

14

PASEO DE ROXAS SIDEWALK IMPROVEMENT

PASEO DE ROXAS SIDEWALK IMPROVEMENT

Page 15: [A2] Ortigas Greenways

11/8/12

15

PASEO DE ROXAS SIDEWALK IMPROVEMENT

PASEO DE ROXAS SIDEWALK IMPROVEMENT

Page 16: [A2] Ortigas Greenways

11/8/12

16

PASEO DE ROXAS SIDEWALK IMPROVEMENT

PASEO DE ROXAS SIDEWALK IMPROVEMENT

Page 17: [A2] Ortigas Greenways

11/8/12

17

PASEO DE ROXAS SIDEWALK IMPROVEMENT

PASIG CBD STREETSCAPE RENOVATION PASIG CBD STREETSCAPE RENOVATION

Page 18: [A2] Ortigas Greenways

11/8/12

18

PASIG CENTRAL BUSINESS DISTRICT STREETSCAPE RENOVATION

EXISTING PROPOSED

PASIG CENTRAL BUSINESS DISTRICT STREETSCAPE RENOVATION

EXISTING F. ORTIGAS JR. ROAD COR.

ORTIGAS AVENUE

PROPOSED ENTRY PORTAL

Page 19: [A2] Ortigas Greenways

11/8/12

19

PASIG CENTRAL BUSINESS DISTRICT STREETSCAPE RENOVATION

PASIG CENTRAL BUSINESS DISTRICT STREETSCAPE RENOVATION

Page 20: [A2] Ortigas Greenways

11/8/12

20

PASIG CENTRAL BUSINESS DISTRICT STREETSCAPE RENOVATION

PASIG CENTRAL BUSINESS DISTRICT STREETSCAPE RENOVATION

Page 21: [A2] Ortigas Greenways

11/8/12

21

PASIG CENTRAL BUSINESS DISTRICT STREETSCAPE RENOVATION

PASIG CENTRAL BUSINESS DISTRICT STREETSCAPE RENOVATION

OPTION 1 OPTION 2

Page 22: [A2] Ortigas Greenways

11/8/12

22

PASIG CENTRAL BUSINESS DISTRICT STREETSCAPE RENOVATION

PROPOSALS FOR CENTRAL AVENUE

PASIG CENTRAL BUSINESS DISTRICT STREETSCAPE RENOVATION

Page 23: [A2] Ortigas Greenways

11/8/12

23

PASIG CENTRAL BUSINESS DISTRICT STREETSCAPE RENOVATION

PASIG CENTRAL BUSINESS DISTRICT STREETSCAPE RENOVATION

Page 24: [A2] Ortigas Greenways

11/8/12

24

PASIG CENTRAL BUSINESS DISTRICT STREETSCAPE RENOVATION

Enhancing walkability in the Ortigas Business District ORTIGAS GREENWAYS

Page 25: [A2] Ortigas Greenways

11/8/12

25

The Ortigas Business District as part of three

cities: Quezon City, Mandaluyong City &

Pasig City

Quezon City Boundary Mandaluyong City Boundary

Pasig City Boundary

Pasig City CBD Boundary

LEGEND:

Pasig LGU Proposed Key

Projects for Ortigas Business District

PROPOSED LOCATION OF ENTRY PORTAL AT F. ORTIGAS JR. ROAD CORNER ORTIGAS AVENUE

MAIN ENTRY PORTAL

F. ORTIGAS JR. ROAD (EMERALD AVENUE) AS CENTRAL AVENUE

CENTRAL AVENUE

PROPOSED CENTRAL PLAZA AT F. ORTIGAS JR. STREET CORNER DOÑA JULIA VARGAS AVENUE

CENTRAL PLAZA

PROPOSED ABOVE-GRADE PEDESTRIAN CONNECTIONS

WALKABILITY IMPROVEMENTS

IDENTIFICATION OF LOTS/DISTRICTS FOR REBLOCKING TO CREATE/RECOVER AN OPEN

SPACE NETWORK IN THE CBD

OPEN SPACE IMPROVEMENT

IMPROVEMENTS ON PAVING AND GREENING OF SIDEWALKS

Page 26: [A2] Ortigas Greenways

11/8/12

26

Ortigas Greenways Project as part of the walkability

improvements for the district

PROPOSED LOCATION OF ENTRY PORTAL AT F. ORTIGAS JR. ROAD CORNER ORTIGAS AVENUE

MAIN ENTRY PORTAL

F. ORTIGAS JR. ROAD (EMERALD AVENUE) AS CENTRAL AVENUE

CENTRAL AVENUE

PROPOSED CENTRAL PLAZA AT F. ORTIGAS JR. STREET CORNER DOÑA JULIA VARGAS AVENUE

CENTRAL PLAZA

PROPOSED ABOVE-GRADE PEDESTRIAN CONNECTIONS

WALKABILITY IMPROVEMENTS

IDENTIFICATION OF LOTS/DISTRICTS FOR REBLOCKING TO CREATE/RECOVER AN OPEN

SPACE NETWORK IN THE CBD

OPEN SPACE IMPROVEMENT

IMPROVEMENTS ON PAVING AND GREENING OF SIDEWALKS

The Ortigas Greenways MRT-

Metrowalk Corridor

LINKING MRT ORTIGAS STATION TO METROWALK:

*The need for a secondary pedestrian link

from EDSA (other than the Megamall-Ortigas Home Depot Doña Julia Vargas Ave. link) for

ease of going in and out of the district

*Connecting rapid public transport system to the district

*Providing more green public spaces to the

built-up district for people to enjoy

Page 27: [A2] Ortigas Greenways

11/8/12

27

Page 28: [A2] Ortigas Greenways

11/8/12

28

EDSA

EDSA

The Proposed Ortigas Greenway Corridor

PROPOSED ADB PERIMETER ELEVATED WALKWAY

PROPOSED OPAL RD. ELEVATED

PLAZA

PROPOSED ORTIGAS PARK &

OCAI SURROUNDINGS IMPROVEMENTS

PROPOSED ONYX RD. AT-GRADE

PARK

OPTION TO CONNECT TO

MERALCO AVE. NORTHBOUND

RA

MP

DO

WN

RAMP DOWN TO APPROX.

5.0m.ht. FFL FROM ROAD FFL

RAMP DOWN TO SIDEWALK

LEVEL

CONNECT TO ELEVATED PLAZA

ABOVE-GRADE LEVEL

(5.0m.ht. FFL FROM ROAD FFL)

RAMP DOWN TO SIDEWALK

LEVEL BELOW

Map showing the site for the Proposed Ortigas Greenway Corridor

GRAND STAIRCASE TAKES PEDESTRIAN

DOWN TO EXISTING ORTIGAS PARK (SAME LEVEL WITH SIDEWALK

FFL)

Page 29: [A2] Ortigas Greenways

11/8/12

29

THE PROPOSED ADB PERIMETER ELEVATED GREENWAY

PROPOSED ELEVATED GREENWAY ON EXISTING ADB PERIMETER FENCE

TREATMENT OPTIONS FOR THE ELEVATED WALKWAY CONCRETE WALL AT ADB PROPERTY SIDE:

OPTION 1: FIXED GLASS WINDOWS

OPTION 2: FIXED GLASS WINDOWS WITH SPACES IN BETWEEN FOR ADS

THE PROPOSED ADB PERIMETER ELEVATED GREENWAY

LANDSCAPE TREATMENT OF ELEVATED WALKWAY WALL AS VIEWED FROM ADB COMPLEX:

Page 30: [A2] Ortigas Greenways

11/8/12

30

GREENWALL MOOD IMAGES

THE ADB PERIMETER ELEVATED GREENWAY PROPOSED DEVELOPMENT

Page 31: [A2] Ortigas Greenways

11/8/12

31

THE ADB PERIMETER ELEVATED GREENWAY EXISTING CONDITION

THE ADB PERIMETER ELEVATED GREENWAY PROPOSED DEVELOPMENT

Page 32: [A2] Ortigas Greenways

11/8/12

32

THE ADB PERIMETER ELEVATED GREENWAY PROPOSED DEVELOPMENT

THE ADB PERIMETER ELEVATED GREENWAY PROPOSED DEVELOPMENT

Page 33: [A2] Ortigas Greenways

11/8/12

33

TOPA

Z RO

AD

TOPA

Z RO

AD

RU

BY R

OA

D

THE OPAL ROAD ELEVATED PLAZA EXISTING CONDITION

THE OPAL ROAD ELEVATED PLAZA PROPOSED DEVELOPMENT

RAMP DOWN BELOW

Page 34: [A2] Ortigas Greenways

11/8/12

34

THE OPAL ROAD ELEVATED PLAZA PROPOSED DEVELOPMENT

THE OPAL ROAD ELEVATED PLAZA PROPOSED DEVELOPMENT

Page 35: [A2] Ortigas Greenways

11/8/12

35

THE OPAL ROAD ELEVATED PLAZA PROPOSED DEVELOPMENT

THE OPAL ROAD ELEVATED PLAZA PROPOSED DEVELOPMENT

Page 36: [A2] Ortigas Greenways

11/8/12

36

ORTIGAS PARK & OCAI PERIMETER IMPROVEMENTS PROPOSED DEVELOPMENT

OCAI PERIMETER IMPROVEMENT EXISTING CONDITION

Page 37: [A2] Ortigas Greenways

11/8/12

37

OCAI PERIMETER IMPROVEMENT PROPOSED DEVELOPMENT

THE ONYX ROAD AT-GRADE PARK PROPOSED DEVELOPMENT

Page 38: [A2] Ortigas Greenways

11/8/12

38

THE ONYX ROAD AT-GRADE PARK VIEW FROM OCAI BUILDING ENTRANCE

THE ONYX ROAD AT-GRADE PARK VIEW OF SEATING AREAS & ACTIVITY SPACE

OUTDOOR FITNESS

EQUIPMENT

SEATING AREA

Page 39: [A2] Ortigas Greenways

11/8/12

39

THE ONYX ROAD AT-GRADE PARK

VIEW OF RETAIL KIOSK WITH AL FRESCO DINING SPACE & MINI PERFORMANCE STAGE

RETAIL KIOSK WITH

ALFRESCO DINING

SPACE FOR SMALL OUTDOOR

PERFORMANCES

CONNECTION TO METROWALK EXISTING CONDITION

OPTIONAL:

Page 40: [A2] Ortigas Greenways

11/8/12

40

CONNECTION TO METROWALK

OPTIONAL:

PROPOSED DEVELOPMENT

CONNECTION TO METROWALK EXISTING CONDITION

OPTIONAL:

Page 41: [A2] Ortigas Greenways

11/8/12

41

CONNECTION TO METROWALK PROPOSED DEVELOPMENT

OPTIONAL:

PROPOSED TYPICAL DESIGN OF ELEVATED GREENWAY

Page 42: [A2] Ortigas Greenways

11/8/12

42

“Roystonea elata” (ROYAL PALM)

RANDOM MACHINE CUT FLAMED GRANITE, SHADES OF GRAY

TREE GRATE

PROPOSED SIDEWALK IMPROVEMENT HARDSCAPE AND SOFTSCAPE MATERIALS

“Crinum asiaticum” (CRINUM)

“Heliconia sp.” (AMERICAN DWARF)

“Ophiopogon jaburan” (KYOTO GRASS)

OPTION 1: 200mm X 200mm DARK GRAY FLAMED GRANITE

FOR PAVING BANDING: FOR PAVING MAINFIELD:

OPTION 2: 100mm X 200mm GRAY INTERLOCKING PAVER

EDSA

EDSA

Rough Cost Estimates for the Proposed Ortigas Greenway Corridor Projects

PROPOSED ADB PERIMETER ELEVATED WALKWAY

PROPOSED OPAL RD. ELEVATED

PLAZA

PROPOSED ORTIGAS PARK &

OCAI SURROUNDINGS IMPROVEMENTS

PROPOSED ONYX RD. AT-GRADE

PARK

OPTION TO CONNECT TO

MERALCO AVE. NORTHBOUND

RA

MP

DO

WN

RAMP DOWN TO APPROX.

5.0m.ht. FFL FROM ROAD FFL

RAMP DOWN TO SIDEWALK

LEVEL

CONNECT TO ELEVATED PLAZA

ABOVE-GRADE LEVEL

(5.0m.ht. FFL FROM ROAD FFL)

RAMP DOWN TO SIDEWALK

LEVEL BELOW

GRAND STAIRCASE TAKES PEDESTRIAN

DOWN TO EXISTING ORTIGAS PARK (SAME LEVEL WITH SIDEWALK

FFL)

Php 30,301,000 Php 348,000,000 Php 12,552,000 Php 9,602,000

GRAND TOTAL: Php 408,405,000 (USD 9,915,298.50)

Php 7,950,000

Page 43: [A2] Ortigas Greenways

11/8/12

43

Page 44: [A2] Ortigas Greenways

11/8/12

44

THANK YOU! -end of presentation-

REFERENCES

  PGAA Pasig City Central Business District Urban Design and Landscape Development Projects

  PGAA Metrobank Plaza Site Inspection Images

  Google Image Search: MRT Ortigas Station

  Google Earth