    SITE SURVEY REPORT

    QM-GEN-25, Rev.1

    Ref. : 4251-SVR-T357-001

    To : Bang-on O. (Project Engineer)

    From : Sawit J. (Civil Engineer)

    Date : 03 Sep 2013Subject : SITE SURVEY REPORT 001

    Project :DETAIL ENGINEERING SERVICE FOR SEND VCM EMISSIONS TOINCINERATION PROJECT

    Project No : 4251

    1.0 GENERAL

    Prepared By : Sawit J. (TET, RBO)

    Date of the visit : 30 Aug 2013

    Time of the visit : 9.00 to 16.00

    Client : VINYTHAI PUBLIC COMPANY LIMITED

    Person Contacted: Khun Anex P. (VNT)

    Site Location : RAYONG

    2.0 PURPOSE OF THE VISIT

    To check and verify the proposed areas to confirm the feasibility, obstruction and

    interference free.

    3.0 FINDINGS

    New blower, heat exchanger and separator will be installed on new steel structure

    in PCP area.

    New 16 pipe will be routed on existing pipe racks and bridges from PCP area to

    existing incinerators in VCM area.

    4.0 AREAS OF CONCERNS (if any)

    None

  • 7/22/2019 4251 SVR T357 001_Civil Site Survey Report

    2/10

    Page 2 of 10

    SITE SURVEY REPORT

    QM-GEN-25, Rev.1

    5.0 CONCLUSIONS

    After performing site survey, we found that

    PCP area, existing stair will be demolished then replacing by the new steel structure.

    (Fig. 1)

    PCP area, the new blower will be installed at existing gravel area. So, new paving

    and spill wall will be constructed after installing of the new blower. (Fig. 2)

    PCP area, existing manhole will be relocated to any suitable area. (Fig. 1)

    PCP area, new analyzer house will be constructed next to the new blower. (Fig. 3)

    Spaces of existing pipe racks and bridges are available for the new 16 pipe.

    (Fig. 4 to 12)

    VCM area, new special pipe supports will be constructed for the new 16 pipe to

    incinerators. (Fig. 13 to 14)

    VCM area, two existing filters will be relocated for connecting the new 16 pipe

    to existing line, so new foundations of the filters are required. The new

    foundations are considered as additional work. (Fig. 15 to 16)

    6.0 REFERENCES

    None

  • 7/22/2019 4251 SVR T357 001_Civil Site Survey Report

    3/10

    Page 3 of 10

    SITE SURVEY REPORT

    QM-GEN-25, Rev.1

    7.0 ATTACHMENTS

    Fig. 1

    Fig. 2

    Existing manhole will be relocated to any suitable area.

    Existing stair will be demolished

    New structure will be constructed for new separator and heat exchanger.

    Existing spill wall

    will be demolished.

    New spill wall and paving

    will be constructed.

    New foundation of blower

    will be constructed.

  • 7/22/2019 4251 SVR T357 001_Civil Site Survey Report

    4/10

    Page 4 of 10

    SITE SURVEY REPORT

    QM-GEN-25, Rev.1

    Fig. 3

    Fig. 4

    The proposed area for new analyzer house.

    New 16 pipe will be routed on existing racks.

  • 7/22/2019 4251 SVR T357 001_Civil Site Survey Report

    5/10

    Page 5 of 10

    SITE SURVEY REPORT

    QM-GEN-25, Rev.1

    Fig. 5

    Fig. 6

    New 16 pipe will be routed on existing racks.

    PCP area.

    VCM area.

    PCP area.

    VCM area.

    New 16 pipe will be routed on existing racks.

  • 7/22/2019 4251 SVR T357 001_Civil Site Survey Report

    6/10

    Page 6 of 10

    SITE SURVEY REPORT

    QM-GEN-25, Rev.1

    Fig. 7

    Some supports will be added on pipe rack for new 16 pipe

    Option 1 Extend from existing columns.

    Option 2 Add new supports beside pipe sleepers.

    Fig. 8

    New 16 pipe will be routed on existing racks.PCP area.

    VCM area.

    New 16 pipe will be routed on existing racks.

    PCP area.

    VCM area.

  • 7/22/2019 4251 SVR T357 001_Civil Site Survey Report

    7/10

    Page 7 of 10

    SITE SURVEY REPORT

    QM-GEN-25, Rev.1

    Some supports will be added on pipe rack for new 16 pipe

    Option 1 Extend from existing columns.

    Option 2 Add new supports beside pipe sleepers.

    Fig. 9

    Fig. 10

    New 16 pipe will be routed on existing racks.

    VCM area.

    PCP area.

    New 16 pipe will be routed on existing racks.

    VCM area.

    PCP area.

  • 7/22/2019 4251 SVR T357 001_Civil Site Survey Report

    8/10

    Page 8 of 10

    SITE SURVEY REPORT

    QM-GEN-25, Rev.1

    Fig. 11

    Fig. 12

    New 16 pipe will be routed on existing racks.

    VCM area.

    PCP area.

    New 16 pipe will be routed on existing racks.

    PCP area.

    VCM area.

  • 7/22/2019 4251 SVR T357 001_Civil Site Survey Report

    9/10

    Page 9 of 10

    SITE SURVEY REPORT

    QM-GEN-25, Rev.1

    Fig. 13

    Fig. 14

    New 16 pipe will be routed on existing racks.

    Special pipe supports will be constructed for

    new 16 pipe.

    Incinerators.

    Special pipe supports will be constructed for

    new 16 pipe.

    New 16 pipe will be routed on existing racks.

    Incinerators.

  • 7/22/2019 4251 SVR T357 001_Civil Site Survey Report

    10/10

    Page 10 of 10

    SITE SURVEY REPORT

    QM-GEN-25, Rev.1

    Fig. 15

    Fig. 16

    Existing filter will be relocated.

    New location of filter.

    Existing filter will be relocated.

    New location of filter.