ABDUL GHANI BIN RASHED CC603 PROJECT MANAGEMENT SITE SUPERVISION AND ORGANISATION
Dec 07, 2014
ABDUL GHANI BIN RASHED
CC603PROJECT MANAGEMENT
SITE SUPERVISION
AND ORGANISATION
INTRODUCTION
A Gantt chart is a type of bar
chart.
Developed by Henry Gantt,
that illustrates a project schedule.
Illustrate the start
and
finish dates of the ter
minal elements and summary elements of a project.
Bar Chart or Gantt
Chart
Henry Laurence Gantt, A.B., M.E. (1861 – 23 November 1919) was an American mechanical engineer and management consultant who is best known for developing the Gantt chart in the 1910s.
DEMONSTRATE THE USAGE OF THE
BAR CHART AND GRANTT CHART
USAGE OF BAR CHART AND GANTT
CHART
When scheduling
and monitoring
tasks within a project.
When communicating plans or status of a project.
When the steps of the project or process, their sequence and their duration are
known.
When it’s not necessary to show which
tasks depend on completion of previous
tasks.
EXAMPLE OF GANTT CHART
INDICATE THE ARROW METHOD IN SITE
PLANNING
Indicate the Arrow Method in Site
Planning
The precedence relation between
activities is represented by
circles connecting to one or more
arrows. The length of the arrow
represents the duration of the
relevant activity.
It is used for scheduling
activities in a project plan.
Is a network diagramming
technique in which activities are
represented by arrows.
DEMONSTRATE THE CRITICAL PATH METHOD
(CPM)
Performed on a time scale or calendar in the form of a bar chartFor larger projects and are considered complex,
computer analyses.
Be presented in the form of a network diagram that shows the first and last events and the
critical path.
EXAMPLE OF CRITICAL PATH METHOD
BENEFIT OF THE CRITICAL PATH METHOD (CPM)
Benefit of the critical path method
Require the planner to think logically.
Activities that contractors must focus its efforts
during the implementation of
projects identified during the planning process.
Non-critical activities, were identified and
facilitate the adjustment of resources.
THE DUTIES OF A TECHNICIAN &
A SITE SUPERVISOR
MAIN TASK
Record, record activities of the project every day in site diary
Arrange joinery or construction worker
Regulate supervise work on site
Control and check work quality
Monitor work from building method aspect, installation way, finish
RELATED THE DUTY OF A TECHNICIAN WITH
AN ASSISTANT ENGINEER
Assistant Engineer
Engineers tend to go to work applying the science and mathematics
knowledge to solve problems and design processes and products.
Engineers with NDT backgrounds work on developing new
inspection equipment and procedures.
PREPARE A SITE DIARY
This document
usually includes
The date and weather
conditions
The number of workers in
various trades
Materials delivered to the site, the
quantity used and retained
Items of plant on site, working or idling, including
reasons for being idle.
Any work carried out in connection
with the utility service.Instructions
issued to the contractor.
Minimizes liability by providing accurate
records and valuable
evidence in the event of a dispute.
A comprehensi
ve tool for Site
Managers to fulfill
statuary obligations.
Quality and integrity of information is assured
and accurate.
Full transparenc
y of site activities.
Advantages