Dec 18, 2014
INDEX INDEX
01 ENTERPRISE
02 LOCATION
03 MONDRAGON COOPERATIVE CORPORATION
04 MISSION & VISION
05 PROJECT PORTFOLIO
01 Enterprise 01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects
ENTERPRISE CONCEPTENTERPRISE CONCEPTFULL MANAGEMENT OF EMBLEMATIC PROJECTS
CLADDING CONSTRUCTION
Curtain wall.Metallic claddings.Indoor metallic finishes.
CAPACITY TO ACTION ALL AREAS OF THE PROJECT Design, engineering, production, manufacturing, final mounting.
FOCUSED ON LEADERSHIP OF MAJOR BUILDING PROJECTS Public Sector: Airports, railway transport, elevation, hospitals, sports centers, theatres...Private Sector: managerial Headquarters, hotels, work centers...
TEAM OF 70 STAFF. ANNUAL TURNOVER OF 15M € LOCATED IN MONDRAGON COOPERATIVE CORPORATION
01 Enterprise
03 MCC
04 Mission & Vision
02 Location02 Location
05 Projects
CATALONIA OFFICE
Pasaje San Antoni Abad, nº1-5 · Local P.B.08015 · BarcelonaTel (+34) 932 929 040Fax (+34) 902 331 908
MADRID OFFICE
Tel (+34) 639657711Fax (+34) 902 331 902
HEADQUARTERS / PRODUCTION PLANT
Pol. Bildosola Auzunea, J1.48142 Artea . Bizkaia . SPAINTel. (+34) 902 541 212Fax. (+34) 902 331 902
LOCATION LOCATION HEADQUARTERS · FACTORIES · OFFICES
01 Enterprise
03 MCC03 MCC
04 Mission & Vision
02 Location
05 Projects
BUSINESS ENVIRONMENTBUSINESS ENVIRONMENTMONDRAGON COOPERATIVE CORPORATION
THE BIGGEST BUSINESS GROUP IN THE BASQUE COUNTRY
10th IN THE RANKING OF SPANISH COMPANIES
WORLDWIDE BENCHMARK IN WORK IN CO-OPERATION:83.860 staff
2010 TOTAL REFUNDS:14.755M €
A VERY DIVERSIFIED GROUP:Financial, Industrial, Distribution and Knowledg. PRESENT IN MORE THAN 70 COUNTRIES:With 77 Production plants and 9 Corporate offices TECHNOLOGICAL INNOVATION AND INTEGRATION AS THE DRIVING FORCES BEHIND ITS DEVELOPMENT
01 Enterprise
03 MCC03 MCC
04 Mission & Vision
02 Location
05 Projects
BUSINESS ENVIRONMENTBUSINESS ENVIRONMENTMCC BUSINESS AREAS / CONSTRUCTION
URSSAORONAULMAPROIEKBIURRARENAELUR
01 Enterprise
03 MCC
04 Mission & Vision04 Mission & Vision
02 Location
05 Projects
mission
vision
MISSION & VISIONMISSION & VISIONPROIEK’S MAIN OBJECTIVES
To guarantee and improve constantly form the quality of the façades [metallic claddings and curtain walls] and decorative metalworks in singular buildings by the contribution in design of technically solvent solutions and the development of innovative materials; staying closely focused on our customer needs for satisfying them in terms of quality, cost and deadlines.
To promote the personal development of our collaborators team, by an internal participative work methodology and sharing mutual aims, as a part of the corporate values that come from our Group.
To be a referrer in the sector, looking for the leadership in quality, offering profitable solutions to our clients, in collaboration with the architects, and based on an integral service of design, engineering,
manufacture and montage.
01 Enterprise
03 MCC
04 Mission & Vision04 Mission & Vision
02 Location
05 Projects
2
MISSION & VISIONMISSION & VISIONENTERPERISE CAPACITYS & PROJECT MANAGEMENT
CAPACITY OF ADD VALUE IN EVERY PHASE OF A PROJECT:
These capacitys are fully focused towards complex proyects, with high added value needs, due to the project volume, difficulty of execution or high class material use.
Industrial Capacity: 6.000 m factory equiped with high tech machinery.
Engineering team, expert in calculations, design of exclusive solutions and advanced software use.
Integral management capacity of the projects, key in hand.
Financial capacity.
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
MAIN SECTORS OF ACTUATION
PROJECT PORTFOLIO PROJECT PORTFOLIO
INFRAESTRUCTUREINFRAESTRUCTURE
BUSINESS CENTERSBUSINESS CENTERS
INSTITUTIONALINSTITUTIONALCULTURALCULTURAL
AND MOREAND MORE
HOSPITALSHOSPITALS
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
HOTEL CATALONIAHOTEL CATALONIA2012 · JEAN NOUVEL · DRAGADOS · 12.450m
Modular system of cold ventilated façade and warm wa-terproofed façade.
Cladding of prefabricated panel of concrete for the inte-rior face and exclusive front of aluminium and glass for the exterior face. Multilayer isolation system of minimal thickness and the latest technology.
Use of mirror finished composite panels, with up to 96% refraction.
110m high building.
2
2012 · JEAN NOUVEL · DRAGADOS · 12.450m
HOTEL CATALONIAHOTEL CATALONIA
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
2
PORTA FIRAL TORRE 3PORTA FIRAL TORRE 32012 · TDA · IBERDROLA · 10.000m
Development of Specific Modular façade system which combines affixed glass and composite panel. Exclusive and innovative fixing system of panels specially designed and developed for the project. Assembly system using suction cups and moved on rails, for an easier elevation and installation of the glass panels without using any crane or other elevation system. Corner modules made in one piece with no middle column between the two planes. More than 100m high building.
2
in process
in process
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
LIFE MARINA IBIZALIFE MARINA IBIZA2012 · JEAN NOUVEL · GPO
Development of the solution of handrails in terraces.
Handrail composed by steel pipes, curved with different radii and a piece of fixing particularly designed for this project.
Cladding of the building made of high standard aluminium carpentry, Dorma and Technal, composing sliding, folding or casement closings.
in processin process
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
LIFE MARINA IBIZALIFE MARINA IBIZA2012 · JEAN NOUVEL · GPO
01 Empresa
02 Entorno
03 Misión y Visión
04 Localización
05 Proyectos05 Proyectos
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
LLEIDA ALGÜAIRE AIRPORTLLEIDA ALGÜAIRE AIRPORT2009 · B720 · DRAGADOS - OBRUM · 7590 m
Continued roofing and cladding system, composed by three types of exterior coating:- Perforated scrolled sheet of galvanized and post-laquered steel.- Treated fir timber, R4 and solar protection.- Vegetable roofing based on 15 cm of vegetable substratum. Exclusive curtain wall formed of 300x15 mm of unique satin lacquered steel plate. Cladding in CORTEN steel of the wings of the roofing zone
2
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
LLEIDA ALGÜAIRE AIRPORTLLEIDA ALGÜAIRE AIRPORT2009 · B720 · DRAGADOS - OBRUM · 7590 m2
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 ProjectsDevelopment of light structure for the façade anchorage by a patented aluminium profile of large scale dimensions. Execution of curved, boat-shaped façade profiles Use of glass profiles allowing significantly more light using special U-Glass, extraclear with metallic filaments.
2
BARCELONA AIRPORT BARCELONA AIRPORT 2008 · IBERBOFIL · ACS / DRAGADOS / COMSA · 29.900m
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
BARCELONA AIRPORT BARCELONA AIRPORT 22008 · IBERBOFIL · ACS / DRAGADOS / COMSA · 29.900m
01 Empresa
02 Entorno
03 Misión y Visión
04 Localización
05 Proyectos05 ProyectosDevelopment, production and installation of more than 10m wide stain-less steel gateways made in one piece with multidirectional finishes. Development of the cladding and roofing based on solid profiles to be installed as a curtain wall
LOIU - BILBAO AIRPORT LOIU - BILBAO AIRPORT 2010 · SANTIAGO CALATRAVA · OHL · 3.000m 2
01 Empresa
02 Entorno
03 Misión y Visión
04 Localización
05 Proyectos05 Proyectos
LOIU - BILBAO AIRPORT LOIU - BILBAO AIRPORT 2010 · SANTIAGO CALATRAVA · OHL · 3.000m 2
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
UNDERGROUND STOP - BILBAOUNDERGROUND STOP - BILBAO2012 · UTE METRO TXURDINAGA · 160 Tn
Users' entrance to the station vestibules and metallic interiors realized in AISI 316L and AISI 310S. Execution of Elements by welding or mechanics no visible fixings. Development of specific solutions of different fixings for metallic interior claddings
IN PROCESSIN PROCESS
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
NEW EUSKOTREN HEADQUARTERSNEW EUSKOTREN HEADQUARTERS2012 · ZAHA HADID · UTE GELTOKI · 7.700m
Cladding in composite of Zinc - "alive” material with special characteristics of surface finishes. Development of cladding for irregular forms using 3D software tools. Technical solution to combine façade and roof.
IN PROCESSIN PROCESS
2
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
ATOCHA [ MADRID ] NEW COMPLEX ATOCHA [ MADRID ] NEW COMPLEX 2010 · RAFAEL MONEO · DRAGADOS · 4.150m2
Indoor metallic cladding by RAL9010 lacquered steel panel system of different dimensions, under indications of project and not visible fixings.
Exhaustive study of irregular joints among different paraments.
Development of specific solutions for metallic interior cladding fixings .
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
2010 · RAFAEL MONEO · DRAGADOS · 4.150m2
ATOCHA [ MADRID ] NEW COMPLEX ATOCHA [ MADRID ] NEW COMPLEX
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
TRAMWAY STOP SHELTERSTRAMWAY STOP SHELTERS
Modular shelter system installation at the stops of the tramway lines of Bilbao and Vitoria, adaptable to the specific needs and topography of every stop. Modular design which enables to include points of information, publicity panels, ticket machines...
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
2010 · JOSÉ MENCHACA · AMENABAR · 2.850m
ALTO DEBA HOSPITALALTO DEBA HOSPITAL2
Ventilated façade composed of affixed glass modules. Glass of 7 colours by silk-screen printing in face 2. Opening system made on glass profiles, with aesthetic continuity in line with the structural front.
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
2010 · JOSÉ MENCHACA · AMENABAR · 2.850m
ALTO DEBA HOSPITALALTO DEBA HOSPITAL2
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
2011 · JAVIER PÉREZ / IDOM · OTADUY· 4.300m
CRUCES HOSPITALCRUCES HOSPITAL2
Aluminium profile development of vertical components, 300mm deep, for the perfect fixing of the curtain wall..
Development of curtain wall tridimensional anchorage, to facilitate assembly and reduce execution times.
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
2011 · JAVIER PÉREZ / IDOM · OTADUY· 4.300m
CRUCES HOSPITALCRUCES HOSPITAL2
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
IMDEAIMDEA
Installation of double skin shaped by two layers of perforated plates, over a galvanized steel structure. Double skin module formed by an aluminum perfo-rated sheet in the exterior face and another sheet of perforated galvanized steel sheet in the interior face
2011 · PECSA · 2.580m2
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
IMDEAIMDEA2011 · PECSA · 2.580m2
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
EXPO ACTUR 4-5 BUILDINGEXPO ACTUR 4-5 BUILDING
Curtain wall based on a standard SCHÜCO aluminium system, with up to 7,80m mullions built in one piece and anchored in two points, in order to create a regular glass surface.
The wall surface is composed of High standard isolating glass plates and non transparent zones.
2012 · ESTUDIO LAMELA · UTE ACTUR 4-5 · 7.100m 2
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
EXPO ACTUR 4-5 BUILDINGEXPO ACTUR 4-5 BUILDING2012 · ESTUDIO LAMELA · UTE ACTUR 4-5 · 7.100m 2
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
OFFICE BUILDING ERMUAOFFICE BUILDING ERMUA
Double skin of glass façade composed by a first cladding formed of aluminium carpentry and insulating high standard glass and an exterior screen formed by laminated and tem-pered glass fixed by structural silicone to glass buttresses, leaving the exterior structure in the simplest form.
2010 · AVANZINI / PALACIOS · OLABARRI · 3.290m2
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
BBVA NEW HEADQUARTERSBBVA NEW HEADQUARTERS
Decorative interior metalwork on the project of the new Headquarters of the BBVA in Madrid (Phase I). Execution of handrails, banisters and metallic finished interiors with spe-cial attention to meetings between the different paraments.
Metallic interior doors of high standard, both multiuse and firebreak, and stainless steel carpentry and glass.
2012 · ORTIZ Y LEON · BBVA
IN PROCESSIN PROCESS
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
SAN TELMO MUSEUMSAN TELMO MUSEUM2010 · NIETO SOBEJANO · MOYUA / AMENABAR · 3.880m
2
Exterior skin of the building, roof and façade, formed by 8mm molten aluminium panels with perforations in a range of angles, with a specifically designed rugose finish.
Perforations made by an innovative machine which allows the execution the above mentioned perforations in different angles, producing sharp clean edges.
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
SAN TELMO MUSEUMSAN TELMO MUSEUM2010 · NIETO SOBEJANO · MOYUA / AMENABAR · 3.880m2
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 ProjectsFaçade and skylight roofing executed according to LEED certifaction standards. Implementation of photovoltaic systems and development of motorised systems for the automation of the openings of the zone of greenhouses. Design of sliding doors by adjusting Jansen brand systems.
BODEGAS ITURRIALDEBODEGAS ITURRIALDE22012 · ATERPEAN · BODEGAS ITURRIALDE 1.200m
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
2BODEGAS ITURRIALDEBODEGAS ITURRIALDE2012 · ATERPEAN · BODEGAS ITURRIALDE 1.200m
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 ProjectsStainless steel windows based on thermal break profile system of Jansen brand and isolating glass screen.
Curtain wall solution of aluminim reticle installed over a previous installed wooden structure.
CARLOS SANTAMARÍA LIBRARYCARLOS SANTAMARÍA LIBRARY2010 · JAAM / ANDER MARQUET RYAN · MOYUA · 2.000m2
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
CARLOS SANTAMARÍA LIBRARYCARLOS SANTAMARÍA LIBRARY2010 · JAAM / ANDER MARQUET RYAN · MOYUA · 2.000m2
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 ProjectsCollaboration in design and engineering development of mettallic façade cladding and metallic coatings.
Glass closing by commercial standard system of curtain wall composed of a gold anodized aluminium reticle, fixed to the concrete structur by galvanized steel anchorages.
BASQUE CULINARY CENTERBASQUE CULINARY CENTER2011 · JAAM / LKS · BCC FUNDAZIOA · 3.690m 2
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 ProjectsCurtain wall composed by isolating glass and aluminium system, anchored to an existent steel structure by exclusive anchors, designed specially for this project.
Ventilated cladding of motorised aluminium sunscreen profiles
PISCINAS MENDIZORROZAPISCINAS MENDIZORROZA2008 · FERNANDO BAJO · ZIKOTZ / URSSA · 6.100m2
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
PASARELA SALA BIKINIPASARELA SALA BIKINI
Tunnel of access to the Room Bikini of Barcelona, composed by 12 and 15 mm thick plaques of "Duplex" Stainless Steel, pioneer in architecture.
Variable formats of plaques, being someone of them of up to 20 meters of length,
2007 · RCR ARCHITECTES · CONTRATAS Y OBRAS
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
PASARELA SALA BIKINIPASARELA SALA BIKINI2007 · RCR ARCHITECTES · CONTRATAS Y OBRAS
STAIR COVER - VITORIASTAIR COVER - VITORIA
Cover of mechanical stairs in Vitoria. Cover composed of AISI 316 stainless steel gateways, polished, tubular profiles form-ing different rectangles creating a warped figure.
2007 · ROBERTO ERCILLA · EBA S.L.
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
STAIR COVER - VITORIASTAIR COVER - VITORIA2007 · ROBERTO ERCILLA · EBA S.L.
01 Enterprise
03 MCC
04 Mission & Vision
02 Location
05 Projects05 Projects
IBERDROLA HEADQUARTERSIBERDROLA HEADQUARTERS
Interior 37th level metallic cladding, made of 1mm thick “black satin” stainless steel plaques, directly glued to a fire stopping DM panel, in order to build a continuous surface and minimize the joints.
The black satin stainless steel is provided of an “antifingerprints” surface finishing, which makes the cleaning easier.
2011 · TBC · BALZOLA · 225m 2