ENTERPRISE CONCEPTENTERPRISE CONCEPTFULL MANAGEMENT OF EMBLEMATIC PROJECTS

CLADDING CONSTRUCTION

Curtain wall.Metallic claddings.Indoor metallic finishes.

CAPACITY TO ACTION ALL AREAS OF THE PROJECT Design, engineering, production, manufacturing, final mounting.

FOCUSED ON LEADERSHIP OF MAJOR BUILDING PROJECTS Public Sector: Airports, railway transport, elevation, hospitals, sports centers, theatres...Private Sector: managerial Headquarters, hotels, work centers...

TEAM OF 70 STAFF. ANNUAL TURNOVER OF 15M € LOCATED IN MONDRAGON COOPERATIVE CORPORATION

Page 4: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location02 Location

05 Projects

CATALONIA OFFICE

Pasaje San Antoni Abad, nº1-5 · Local P.B.08015 · BarcelonaTel (+34) 932 929 040Fax (+34) 902 331 908

MADRID OFFICE

Tel (+34) 639657711Fax (+34) 902 331 902

HEADQUARTERS / PRODUCTION PLANT

Pol. Bildosola Auzunea, J1.48142 Artea . Bizkaia . SPAINTel. (+34) 902 541 212Fax. (+34) 902 331 902

LOCATION LOCATION HEADQUARTERS · FACTORIES · OFFICES

Page 5: 2012 PROIEK EN

01 Enterprise

03 MCC03 MCC

04 Mission & Vision

02 Location

05 Projects

BUSINESS ENVIRONMENTBUSINESS ENVIRONMENTMONDRAGON COOPERATIVE CORPORATION

THE BIGGEST BUSINESS GROUP IN THE BASQUE COUNTRY

10th IN THE RANKING OF SPANISH COMPANIES

WORLDWIDE BENCHMARK IN WORK IN CO-OPERATION:83.860 staff

2010 TOTAL REFUNDS:14.755M €

A VERY DIVERSIFIED GROUP:Financial, Industrial, Distribution and Knowledg. PRESENT IN MORE THAN 70 COUNTRIES:With 77 Production plants and 9 Corporate offices TECHNOLOGICAL INNOVATION AND INTEGRATION AS THE DRIVING FORCES BEHIND ITS DEVELOPMENT

Page 6: 2012 PROIEK EN

01 Enterprise

03 MCC03 MCC

04 Mission & Vision

02 Location

05 Projects

BUSINESS ENVIRONMENTBUSINESS ENVIRONMENTMCC BUSINESS AREAS / CONSTRUCTION

URSSAORONAULMAPROIEKBIURRARENAELUR

Page 7: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision04 Mission & Vision

02 Location

05 Projects

mission

vision

MISSION & VISIONMISSION & VISIONPROIEK’S MAIN OBJECTIVES

To guarantee and improve constantly form the quality of the façades [metallic claddings and curtain walls] and decorative metalworks in singular buildings by the contribution in design of technically solvent solutions and the development of innovative materials; staying closely focused on our customer needs for satisfying them in terms of quality, cost and deadlines.

To promote the personal development of our collaborators team, by an internal participative work methodology and sharing mutual aims, as a part of the corporate values that come from our Group.

To be a referrer in the sector, looking for the leadership in quality, offering profitable solutions to our clients, in collaboration with the architects, and based on an integral service of design, engineering,

manufacture and montage.

Page 8: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision04 Mission & Vision

02 Location

05 Projects

2

MISSION & VISIONMISSION & VISIONENTERPERISE CAPACITYS & PROJECT MANAGEMENT

CAPACITY OF ADD VALUE IN EVERY PHASE OF A PROJECT:

These capacitys are fully focused towards complex proyects, with high added value needs, due to the project volume, difficulty of execution or high class material use.

Industrial Capacity: 6.000 m factory equiped with high tech machinery.

Engineering team, expert in calculations, design of exclusive solutions and advanced software use.

Integral management capacity of the projects, key in hand.

Financial capacity.

Page 9: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

MAIN SECTORS OF ACTUATION

PROJECT PORTFOLIO PROJECT PORTFOLIO

INFRAESTRUCTUREINFRAESTRUCTURE

BUSINESS CENTERSBUSINESS CENTERS

INSTITUTIONALINSTITUTIONALCULTURALCULTURAL

AND MOREAND MORE

HOSPITALSHOSPITALS

Page 10: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

HOTEL CATALONIAHOTEL CATALONIA2012 · JEAN NOUVEL · DRAGADOS · 12.450m

Modular system of cold ventilated façade and warm wa-terproofed façade.

Cladding of prefabricated panel of concrete for the inte-rior face and exclusive front of aluminium and glass for the exterior face. Multilayer isolation system of minimal thickness and the latest technology.

Use of mirror finished composite panels, with up to 96% refraction.

110m high building.

2

Page 11: 2012 PROIEK EN

2012 · JEAN NOUVEL · DRAGADOS · 12.450m

HOTEL CATALONIAHOTEL CATALONIA

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

2

Page 12: 2012 PROIEK EN

PORTA FIRAL TORRE 3PORTA FIRAL TORRE 32012 · TDA · IBERDROLA · 10.000m

Development of Specific Modular façade system which combines affixed glass and composite panel. Exclusive and innovative fixing system of panels specially designed and developed for the project. Assembly system using suction cups and moved on rails, for an easier elevation and installation of the glass panels without using any crane or other elevation system. Corner modules made in one piece with no middle column between the two planes. More than 100m high building.

2

in process

in process

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

Page 13: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

LIFE MARINA IBIZALIFE MARINA IBIZA2012 · JEAN NOUVEL · GPO

Development of the solution of handrails in terraces.

Handrail composed by steel pipes, curved with different radii and a piece of fixing particularly designed for this project.

Cladding of the building made of high standard aluminium carpentry, Dorma and Technal, composing sliding, folding or casement closings.

in processin process

Page 14: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

LIFE MARINA IBIZALIFE MARINA IBIZA2012 · JEAN NOUVEL · GPO

Page 15: 2012 PROIEK EN

01 Empresa

02 Entorno

03 Misión y Visión

04 Localización

05 Proyectos05 Proyectos

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

LLEIDA ALGÜAIRE AIRPORTLLEIDA ALGÜAIRE AIRPORT2009 · B720 · DRAGADOS - OBRUM · 7590 m

Continued roofing and cladding system, composed by three types of exterior coating:- Perforated scrolled sheet of galvanized and post-laquered steel.- Treated fir timber, R4 and solar protection.- Vegetable roofing based on 15 cm of vegetable substratum. Exclusive curtain wall formed of 300x15 mm of unique satin lacquered steel plate. Cladding in CORTEN steel of the wings of the roofing zone

2

Page 16: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

LLEIDA ALGÜAIRE AIRPORTLLEIDA ALGÜAIRE AIRPORT2009 · B720 · DRAGADOS - OBRUM · 7590 m2

Page 17: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 ProjectsDevelopment of light structure for the façade anchorage by a patented aluminium profile of large scale dimensions. Execution of curved, boat-shaped façade profiles Use of glass profiles allowing significantly more light using special U-Glass, extraclear with metallic filaments.

2

BARCELONA AIRPORT BARCELONA AIRPORT 2008 · IBERBOFIL · ACS / DRAGADOS / COMSA · 29.900m

Page 18: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

BARCELONA AIRPORT BARCELONA AIRPORT 22008 · IBERBOFIL · ACS / DRAGADOS / COMSA · 29.900m

Page 19: 2012 PROIEK EN

01 Empresa

02 Entorno

03 Misión y Visión

04 Localización

05 Proyectos05 ProyectosDevelopment, production and installation of more than 10m wide stain-less steel gateways made in one piece with multidirectional finishes. Development of the cladding and roofing based on solid profiles to be installed as a curtain wall

LOIU - BILBAO AIRPORT LOIU - BILBAO AIRPORT 2010 · SANTIAGO CALATRAVA · OHL · 3.000m 2

Page 20: 2012 PROIEK EN

01 Empresa

02 Entorno

03 Misión y Visión

04 Localización

05 Proyectos05 Proyectos

LOIU - BILBAO AIRPORT LOIU - BILBAO AIRPORT 2010 · SANTIAGO CALATRAVA · OHL · 3.000m 2

Page 21: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

UNDERGROUND STOP - BILBAOUNDERGROUND STOP - BILBAO2012 · UTE METRO TXURDINAGA · 160 Tn

Users' entrance to the station vestibules and metallic interiors realized in AISI 316L and AISI 310S. Execution of Elements by welding or mechanics no visible fixings. Development of specific solutions of different fixings for metallic interior claddings

IN PROCESSIN PROCESS

Page 22: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

NEW EUSKOTREN HEADQUARTERSNEW EUSKOTREN HEADQUARTERS2012 · ZAHA HADID · UTE GELTOKI · 7.700m

Cladding in composite of Zinc - "alive” material with special characteristics of surface finishes. Development of cladding for irregular forms using 3D software tools. Technical solution to combine façade and roof.

IN PROCESSIN PROCESS

2

Page 23: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

ATOCHA [ MADRID ] NEW COMPLEX ATOCHA [ MADRID ] NEW COMPLEX 2010 · RAFAEL MONEO · DRAGADOS · 4.150m2

Indoor metallic cladding by RAL9010 lacquered steel panel system of different dimensions, under indications of project and not visible fixings.

Exhaustive study of irregular joints among different paraments.

Development of specific solutions for metallic interior cladding fixings .

Page 24: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

2010 · RAFAEL MONEO · DRAGADOS · 4.150m2

ATOCHA [ MADRID ] NEW COMPLEX ATOCHA [ MADRID ] NEW COMPLEX

Page 25: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

TRAMWAY STOP SHELTERSTRAMWAY STOP SHELTERS

Modular shelter system installation at the stops of the tramway lines of Bilbao and Vitoria, adaptable to the specific needs and topography of every stop. Modular design which enables to include points of information, publicity panels, ticket machines...

Page 26: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

2010 · JOSÉ MENCHACA · AMENABAR · 2.850m

ALTO DEBA HOSPITALALTO DEBA HOSPITAL2

Ventilated façade composed of affixed glass modules. Glass of 7 colours by silk-screen printing in face 2. Opening system made on glass profiles, with aesthetic continuity in line with the structural front.

Page 27: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

2010 · JOSÉ MENCHACA · AMENABAR · 2.850m

ALTO DEBA HOSPITALALTO DEBA HOSPITAL2

Page 28: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

2011 · JAVIER PÉREZ / IDOM · OTADUY· 4.300m

CRUCES HOSPITALCRUCES HOSPITAL2

Aluminium profile development of vertical components, 300mm deep, for the perfect fixing of the curtain wall..

Development of curtain wall tridimensional anchorage, to facilitate assembly and reduce execution times.

Page 29: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

2011 · JAVIER PÉREZ / IDOM · OTADUY· 4.300m

CRUCES HOSPITALCRUCES HOSPITAL2

Page 30: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

IMDEAIMDEA

Installation of double skin shaped by two layers of perforated plates, over a galvanized steel structure. Double skin module formed by an aluminum perfo-rated sheet in the exterior face and another sheet of perforated galvanized steel sheet in the interior face

2011 · PECSA · 2.580m2

Page 31: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

IMDEAIMDEA2011 · PECSA · 2.580m2

Page 32: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

EXPO ACTUR 4-5 BUILDINGEXPO ACTUR 4-5 BUILDING

Curtain wall based on a standard SCHÜCO aluminium system, with up to 7,80m mullions built in one piece and anchored in two points, in order to create a regular glass surface.

The wall surface is composed of High standard isolating glass plates and non transparent zones.

2012 · ESTUDIO LAMELA · UTE ACTUR 4-5 · 7.100m 2

Page 33: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

EXPO ACTUR 4-5 BUILDINGEXPO ACTUR 4-5 BUILDING2012 · ESTUDIO LAMELA · UTE ACTUR 4-5 · 7.100m 2

Page 34: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

OFFICE BUILDING ERMUAOFFICE BUILDING ERMUA

Double skin of glass façade composed by a first cladding formed of aluminium carpentry and insulating high standard glass and an exterior screen formed by laminated and tem-pered glass fixed by structural silicone to glass buttresses, leaving the exterior structure in the simplest form.

2010 · AVANZINI / PALACIOS · OLABARRI · 3.290m2

Page 35: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

BBVA NEW HEADQUARTERSBBVA NEW HEADQUARTERS

Decorative interior metalwork on the project of the new Headquarters of the BBVA in Madrid (Phase I). Execution of handrails, banisters and metallic finished interiors with spe-cial attention to meetings between the different paraments.

Metallic interior doors of high standard, both multiuse and firebreak, and stainless steel carpentry and glass.

2012 · ORTIZ Y LEON · BBVA

IN PROCESSIN PROCESS

Page 36: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

SAN TELMO MUSEUMSAN TELMO MUSEUM2010 · NIETO SOBEJANO · MOYUA / AMENABAR · 3.880m

2

Exterior skin of the building, roof and façade, formed by 8mm molten aluminium panels with perforations in a range of angles, with a specifically designed rugose finish.

Perforations made by an innovative machine which allows the execution the above mentioned perforations in different angles, producing sharp clean edges.

Page 37: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

SAN TELMO MUSEUMSAN TELMO MUSEUM2010 · NIETO SOBEJANO · MOYUA / AMENABAR · 3.880m2

Page 38: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 ProjectsFaçade and skylight roofing executed according to LEED certifaction standards. Implementation of photovoltaic systems and development of motorised systems for the automation of the openings of the zone of greenhouses. Design of sliding doors by adjusting Jansen brand systems.

BODEGAS ITURRIALDEBODEGAS ITURRIALDE22012 · ATERPEAN · BODEGAS ITURRIALDE 1.200m

Page 39: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

2BODEGAS ITURRIALDEBODEGAS ITURRIALDE2012 · ATERPEAN · BODEGAS ITURRIALDE 1.200m

Page 40: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 ProjectsStainless steel windows based on thermal break profile system of Jansen brand and isolating glass screen.

Curtain wall solution of aluminim reticle installed over a previous installed wooden structure.

CARLOS SANTAMARÍA LIBRARYCARLOS SANTAMARÍA LIBRARY2010 · JAAM / ANDER MARQUET RYAN · MOYUA · 2.000m2

Page 41: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

CARLOS SANTAMARÍA LIBRARYCARLOS SANTAMARÍA LIBRARY2010 · JAAM / ANDER MARQUET RYAN · MOYUA · 2.000m2

Page 42: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 ProjectsCollaboration in design and engineering development of mettallic façade cladding and metallic coatings.

Glass closing by commercial standard system of curtain wall composed of a gold anodized aluminium reticle, fixed to the concrete structur by galvanized steel anchorages.

BASQUE CULINARY CENTERBASQUE CULINARY CENTER2011 · JAAM / LKS · BCC FUNDAZIOA · 3.690m 2

Page 43: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 ProjectsCurtain wall composed by isolating glass and aluminium system, anchored to an existent steel structure by exclusive anchors, designed specially for this project.

Ventilated cladding of motorised aluminium sunscreen profiles

PISCINAS MENDIZORROZAPISCINAS MENDIZORROZA2008 · FERNANDO BAJO · ZIKOTZ / URSSA · 6.100m2

Page 44: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

PASARELA SALA BIKINIPASARELA SALA BIKINI

Tunnel of access to the Room Bikini of Barcelona, composed by 12 and 15 mm thick plaques of "Duplex" Stainless Steel, pioneer in architecture.

Variable formats of plaques, being someone of them of up to 20 meters of length,

2007 · RCR ARCHITECTES · CONTRATAS Y OBRAS

Page 45: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

PASARELA SALA BIKINIPASARELA SALA BIKINI2007 · RCR ARCHITECTES · CONTRATAS Y OBRAS

Page 46: 2012 PROIEK EN

STAIR COVER - VITORIASTAIR COVER - VITORIA

Cover of mechanical stairs in Vitoria. Cover composed of AISI 316 stainless steel gateways, polished, tubular profiles form-ing different rectangles creating a warped figure.

2007 · ROBERTO ERCILLA · EBA S.L.

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

Page 47: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

STAIR COVER - VITORIASTAIR COVER - VITORIA2007 · ROBERTO ERCILLA · EBA S.L.

Page 48: 2012 PROIEK EN

01 Enterprise

03 MCC

04 Mission & Vision

02 Location

05 Projects05 Projects

IBERDROLA HEADQUARTERSIBERDROLA HEADQUARTERS

Interior 37th level metallic cladding, made of 1mm thick “black satin” stainless steel plaques, directly glued to a fire stopping DM panel, in order to build a continuous surface and minimize the joints.

The black satin stainless steel is provided of an “antifingerprints” surface finishing, which makes the cleaning easier.

2011 · TBC · BALZOLA · 225m 2