    Performance Improvement of theDistribution Segment

    (A Case Study of NDPL)

    Arup Ghosh , Chief Operating OfficerNorth Delhi Power Limited

    Department of Industrial and Management Engineering

    Indian Institute of Technology Kanpur3 rd Capacity Building Programme for

    Officers of Electricity Regulatory Commissions23 28 August, 2010

    Forum of Regulators

    2

    Structure of Presentation:

    Background

    Strategic Road Map and Strategic Decisions

    Key Initiatives

    Results

    Rewards & Recognitions

    Issues / areas requiring attention of Regulators

  • 8/7/2019 16 - Y S Butola - Performance Improvement of the Distribution Segment A Case Study of NDPL

    2/25

    3

    Delhi Vidyut Board in the Year - 2002:

    AT & C Loss - More than 53%

    Financial Loss - Approx Rs 10 Cr / Day

    Govt. Subsidies - Approx. 1,200 Cr / Annum

    Billing Receivables - Close to 1 year outstanding

    Equipments / Network - Pathetic

    Consumer Records - Manual & incomplete

    Consumer Care - None, No focus

    Power Interruptions - Availability 16 hrs/Day

    0

    10

    20

    30

    40

    50

    60

    1983-84

    1985-86

    1987-88

    1989-90

    1991-92

    1993-94

    1995-96

    1997-98

    1999-00

    2001-02

    Percentage T&D Losses

    T & D Loss Trend - Pre-privatization

    4

  • 8/7/2019 16 - Y S Butola - Performance Improvement of the Distribution Segment A Case Study of NDPL

    3/25

    5

    Key Parameters - In Year 2002

    Billing Efficiency = 53.72

    Collection Efficiency = 97.18

    AT & C Loss Level = approx 53 %

    6

    Geographic Description:

    NDPL

    BSESRajdhani

    BSESYamuna

    NDMCMES

    Joint Venture of TATA Group with Delhi Govt.51:49 %

  • 8/7/2019 16 - Y S Butola - Performance Improvement of the Distribution Segment A Case Study of NDPL

    4/25

    NDPL Profile:

    7

    As on dateRs. 2,759 Cr (FY 0910)

    1,313 MW (Jul10)

    6,911 MU

    1.21 Million

    3,950

    510 Sq Kms

    4.8 Million

    1,439 *2,372

    0.57

    08% / 06%

    As on Jul2002Rs. 1,095 Cr

    850 MW

    5,237 MU

    0.8 Million

    5,400

    510 Sq Kms

    4.2 Million

    1,246

    1,568

    1.03

    -

    ParticularsTurnover

    Peak Load

    Energy Requirement

    Total Registered Consumers

    Number of Employees

    Area of Distribution

    Population Serviced (approx)

    Per Capita Consumption (Units)

    No of Consumers / Sq km

    Employees / MU input

    Load / Energy Growth

    * (National Average of 500, Mumbai close to 850)

    8

    Structure of Presentation:

    Background

    Strategic Road Map and Strategic Decisions

    Key Initiatives

    Results

    Rewards & Recognitions

    Issues / areas requiring attention of Regulators

  • 8/7/2019 16 - Y S Butola - Performance Improvement of the Distribution Segment A Case Study of NDPL

    5/25

    Strategic Roadmap:

    WHAT NDPL INHERITED JULY 2002

    AT&C Losses> 53%

    No concept ofconsumer service

    & IT Interface

    Electricity SupplySystem on the

    verge of collapse

    Lack ofPerformanceOrientation

    STRATEGY FOR THE 1 S T CONTROL PERIOD (2002 2007)

    AT&C Losses

  • 8/7/2019 16 - Y S Butola - Performance Improvement of the Distribution Segment A Case Study of NDPL

    6/25

    Background

    Strategic Road Map and Strategic Decisions

    Key Initiatives

    Results

    Rewards & Recognitions

    Issues / areas requiring attention of Regulators

    Structure of Presentation:

    11

    Identification of components of AT&C Losses

    Loss Reduction Strategy - Technical Solutions

    Energy Accounting

    Re-engineering of Commercial Processes (BPR) AMR for all connections above 10 KW

    Automation Roadmap

    Technical & Process Related Initiatives

    Initiatives in association with Govt.

    Initiatives related to Society

    Key Initiatives & Implementation:

    12

  • 8/7/2019 16 - Y S Butola - Performance Improvement of the Distribution Segment A Case Study of NDPL

    7/25

    Collection Process Deficiencies:20. Part Payment by Consumer21. Non Delivery of Bills22. Non Payment by Consumer (Defaulters)

    23. Premise Disconnected with Dues

    Billing Process Deficiencies:14. Consumer not billed / under-billed15. Provisional Billing16. Bills pending for Quality Check (BQC)17. Bills pending for assessment18. Meters installed but not appearing in data base19. Un-metered connections:

    (Unauthorized Colonies, JJ ClustersStreet Lights Poles)

    Metering Process Deficiencies:

    7. Meter (address) not traceable8. Import / Export Metering Error9. CT Ratio Errors

    10. Stop / Slow / Defective Meter11. CT Ratio Errors12. Meters not read13. Mismatch of Meters

    Theft / Unauthorized Use:2. Direct Hooking3. Tampering / By -passing of Meter4. Misuse of Category5. Use of Multiple Connections - Misuse of Slab6. Sanctioned Load lower than actual usage

    Technical Loses:1. Iron & Copper losses at

    Sub-transmission (66kV/33kV) &Distribution (11kV & below) Network

    Components of AT & C Losses:

    13

    Identification of components of AT&C Losses

    Loss Reduction Strategy - Technical Solutions

    Energy Accounting

    Re-engineering of Commercial Processes (BPR) AMR for all connections above 10 KW

    Automation Roadmap

    Technical & Process Related Initiatives

    Initiatives in association with Govt.

    Initiatives related to Society

    Key Initiatives & Implementation:

    14

  • 8/7/2019 16 - Y S Butola - Performance Improvement of the Distribution Segment A Case Study of NDPL

    8/25

    HVDS

    High Loss

    HighResistance

    Areas

    Implemented in morethan 250 areas, more

    under implementation.

    High Loss

    LowResistance

    Areas

    LT ABCApprox. 2,500 Kms of

    LT ABC laid, moreunder implementation

    MeteringInitiatives

    ElectronicMeters, AMR,

    Pre-PaidMetering

    Schemes implementedsuccessfully, more

    under implementation

    Loss Reduction Strategy Technical Solutions

    15

    Identification of components of AT&C Losses

    Loss Reduction Strategy - Technical Solutions

    Energy Accounting

    Re-engineering of Commercial Processes (BPR) AMR for all connections above 10 KW

    Automation Roadmap

    Technical & Process Related Initiatives

    Initiatives in association with Govt.

    Initiatives related to Society

    Key Initiatives & Implementation:

    16

  • 8/7/2019 16 - Y S Butola - Performance Improvement of the Distribution Segment A Case Study of NDPL

    9/25

    17

    M

    M

    M

    M

    By STU

    66 or 33 KV

    11KV

    At Consumer PremisesWith HT Load

    Feeder Meter

    11KV/415 V DT

    For Energy Accounting

    At ConsumerPremises

    66/33/11 KV

    STU to DISCOM

    FEEDERS TO ZONES

    Tier 1: Transmission level

    M

    Tier 2 : Sub transmission Level

    Tier 3 : Distribution level

    M

    Energy Accounting Flow Chart

    Identification of components of AT&C Losses

    Loss Reduction Strategy - Technical Solutions

    Energy Accounting

    Re-engineering of Commercial Processes (BPR) AMR for all connections above 10 KW

    Automation Roadmap

    Technical & Process Related Initiatives

    Initiatives in association with Govt.

    Initiatives related to Society

    Key Initiatives & Implementation:

    18

  • 8/7/2019 16 - Y S Butola - Performance Improvement of the Distribution Segment A Case Study of NDPL

    10/25

    19

    CMG RRG RDGMRG RBG RCGMMG

    RAG

    Policy Regulatory Bench Data Revenue InfrastructureAdvocacy Compliance Marking Analysis Protection Support

    Consumers

    CallCenter

    CustomerCare Center

    Website E mail LettersDrop

    boxes

    SAMBANDH Integrated Commercial Package software- Industry First!!

    Business Process Re-engineering (BPR)

    CCG

    Identification of components of AT&C Losses

    Loss Reduction Strategy - Technical Solutions

    Energy Accounting

    Re-engineering of Commercial Processes (BPR) AMR for all connections above 10 KW

    Automation Roadmap

    Technical & Process Related Initiatives

    Initiatives in association with Govt.

    Initiatives related to Society

    Key Initiatives & Implementation:

    20

  • 8/7/2019 16 - Y S Butola - Performance Improvement of the Distribution Segment A Case Study of NDPL

    11/25

    Automatic Meter Reading (AMR):

    METER

    GSM-MODEM GSM-Network

    PSTN-NetworkPSTN-MODEM

    S/W

    USERS

    LAN

    DB

    DEBS

    I. METERING

    II. COMMUNICATION

    III. BACK OFFICE

    21

    Identification of components of AT&C Losses

    Loss Reduction Strategy - Technical Solutions

    Energy Accounting

    Re-engineering of Commercial Processes (BPR) AMR for all connections above 10 KW

    Automation Roadmap

    Technical & Process Related Initiatives

    Initiatives in association with Govt.

    Initiatives related to Society

    Key Initiatives & Implementation:

    22

  • 8/7/2019 16 - Y S Butola - Performance Improvement of the Distribution Segment A Case Study of NDPL

    12/25

    Automation Roadmap: Journey so far

    23

    GIS - Completed

    GSAS - Completed

    Communication Network - Established and Stabilized

    SCADA - In Operation

    DMS - Under Implementation

    DA - Under Implementation

    OMS - Under Implementation

    Identification of components of AT&C Losses

    Loss Reduction Strategy - Technical Solutions

    Energy Accounting

    Re-engineering of Commercial Processes (BPR) AMR for all connections above 10 KW

    Automation Roadmap

    Technical & Process Related Initiatives

    Initiatives in association with Govt.

    Initiatives related to Society

    Key Initiatives & Implementation:

    24

  • 8/7/2019 16 - Y S Butola - Performance Improvement of the Distribution Segment A Case Study of NDPL

    13/25

    Technical / Process Related Initiatives:

    Development of Tamper Proof Energy Meters

    Payment Avenues increased from 20 Nos. (July 2002) tomore than 1500 Nos.

    Door delivery of new Electricity Connection

    SMS Based Complaint Management System

    Instant Camp Connections at JJ Clusters

    25

    Identification of components of AT&C Losses

    Loss Reduction Strategy - Technical Solutions

    Energy Accounting

    Re-engineering of Commercial Processes (BPR) AMR for all connections above 10 KW

    Automation Roadmap

    Technical & Process Related Initiatives

    Initiatives in association with Govt.

    Initiatives related to Society

    Key Initiatives & Implementation:

    26

  • 8/7/2019 16 - Y S Butola - Performance Improvement of the Distribution Segment A Case Study of NDPL

    14/25

    Initiatives in association with Govt.:

    Constitution of Special Court

    Assistance of Police Force / CISF during EnforcementActivities

    Relocation of JJ Clusters to a new resettlement Colony(Sawda Ghevra) for providing better services

    Amnesty schemes for settlement of old disputed cases (DT/ DAE etc)

    27

    Identification of components of AT&C Losses

    Loss Reduction Strategy - Technical Solutions

    Energy Accounting

    Re-engineering of Commercial Processes (BPR) AMR for all connections above 10 KW

    Automation Roadmap

    Technical & Process Related Initiatives

    Initiatives in association with State Govt.

    Initiatives related to Society

    Key Initiatives & Implementation:

    28

  • 8/7/2019 16 - Y S Butola - Performance Improvement of the Distribution Segment A Case Study of NDPL

    15/25

    Initiatives / Programmes related to Society:

    Life Insurance Policy for Socially / Economically BackwardConsumers

    Development of local people as Franchisee

    Energy Conservation and Awareness through Energy Club(more than 31,000 Students covered)

    Woman Empowerment (Vocational Training, beauticianCourses etc)

    Health Check-ups, Blood Donation etc

    Adult Literacy, Drug / alcohol de-addiction, Support toOrphanages, HIV / AIDS awareness etc.

    Engagement with the Public Representatives

    29

    New Initiatives:

    108 MW Combined Cycle Power Plant

    Solar PV Based Power Plant

    GPRS based spot Billing

    SAP ISU (Billing + CRM)(Industry Specific Solution for Utilities Industry)

    Centralized Call Centre (No current + Commercial)

    Special Consumer Group

    30

  • 8/7/2019 16 - Y S Butola - Performance Improvement of the Distribution Segment A Case Study of NDPL

    16/25

    31

    Structure of Presentation:

    Background

    Strategic Road Map and Strategic Decisions

    Key Initiatives

    Results

    Rewards & Recognitions

    Issues / areas requiring attention of Regulators

    Savings to Govt. Victory Curve

    32

  • 8/7/2019 16 - Y S Butola - Performance Improvement of the Distribution Segment A Case Study of NDPL

    17/25

    Loss Reduction (Trend):

    33

    Parameters FY 02-03 FY 03-04 FY 04-05 FY 05-06 FY 06-07 FY 07-08 FY 08-09 FY 09-10

    Energy Input (MU) 5,237 5,552 5,549 5,695 5,986 6,281 6,327 6,911

    Units Billed (MU) 2,813 3,196 3,667 4,154 4,351 4,975 5,225 5,816

    Amt. Billed1,126 1,272 1,565 1,883 2,032 2,323 2,468 2,722

    (Rs Cr)

    Amt. Collected (RsCr) 1,095 1,219 1,568 1,897 2,132 2,394 2,539 2,759

    AT&C Loss47.79 44.86 33.79 26.52 23.72 18.38 15 .04 14.47

    (%)

    Billing Efficiency(%)

    53.72 57.56 66.08 72.95 72.68 79.21 82.58 84.16

    CollectionEfficiency (%)

    97.18 95.78 100.2 100.73 104.94 103.04 102.87 101.34

    Augmentation of Network Capacity:

    Particulars VoltageLevel

    Unit On Takeover- Jul 2002

    2010 (Ason date)

    % Change

    TransformationCapacity

    66 kV MVA 860 1,545 80

    33 kV MVA 791 1,484 88

    11 kV MVA 1703 3,770 121

    Total (MVA) MVA 3,354 6,799 102

    TransmissionLines

    66 kV KM 176 309 76

    33 kV KM 156 318 103

    11 kV KM 2,245 3,555 58

    Total (KM) KM 2,578 4,182 62

    34

  • 8/7/2019 16 - Y S Butola - Performance Improvement of the Distribution Segment A Case Study of NDPL

    18/25

    Results Few other parameters

    PARAMETERS / PARTICULARS BEFORETAKEOVER

    ATPRESENT

    OPERATIONAL:

    Capital Investment (Rs Crores) 1,210(Valuation)

    Add. 2,500

    Transformer Failures w.r.t Installed Capacity (%) 11 1.2Percentage Share in Load Shedding (In Delhi) 40 < 1

    COMMERCIAL:

    Average Days for New Connection Energization (Days) 51.8 8.0

    Number of Electronic Meters - > 1.2 Million% Provisional Billing 22.5 < 1DT Wise Energy Auditing (%) - 100

    Special Courts (Nos) - 2

    AT&C Losses (%) 53 < 14.0

    35

    36

    Structure of Presentation:

    Background

    Strategic Road Map and Strategic Decisions

    Key Initiatives

    Results

    Rewards & Recognitions

    Issues / areas requiring attention of Regulators

  • 8/7/2019 16 - Y S Butola - Performance Improvement of the Distribution Segment A Case Study of NDPL

    19/25

    37

    Awards & Recognitions - To name a few

    National Award for Meritorious Performance(For Years 2004-2005 & 2005-2006)

    38

    Awards & Recognitions - To name a few

    National Award for Meritorious Performance(For Year 2007-08)

  • 8/7/2019 16 - Y S Butola - Performance Improvement of the Distribution Segment A Case Study of NDPL

    20/25

    39

    Awards & Recognitions - To name a few

    National Award for Meritorious Performance(For Year 2008-09)

    40

    Awards & Recognitions - To name a few

    ASIAN POWER AWARDS POWER UTILITY OF THE YEAR

    (FOR YEARS - 2007, 2008 & 2009)

  • 8/7/2019 16 - Y S Butola - Performance Improvement of the Distribution Segment A Case Study of NDPL

    21/25

    41

    Edison Electric Institute (EEI) 2008 - Award for Implementation of GIS

    Edison Electric Institute (EEI) 2009 Award for Policy Advocacy

    Awards & Recognitions - To name a few

    Awards & Recognitions - To name a few

    Public Lok Adalat Awardfor the 10,000 Settlements

    in 2 years

    Expert Choice Awardfor Most AdmiredOrganization - By

    Power Line

    SUGAM Award forTransparency in Billing

    System

    Intelligent EnterpriseAward for IT initiatives

    - By Indian Express

    Award for CorporateSocial Responsibility -

    By Amity

    Leadership Award forexcellence in Power

    Distribution By Amity

    42

  • 8/7/2019 16 - Y S Butola - Performance Improvement of the Distribution Segment A Case Study of NDPL

    22/25

    43

    Structure of Presentation:

    Background

    Strategic Road Map and Strategic Decisions

    Key Initiatives

    Results

    Rewards & Recognitions

    Issues / areas requiring attention of Regulators

    Issues / Areas requiring attention of Regulator :

    Appropriate balancing between the interests of allstakeholders (Consumer, Society, Environment, Govt.DISCOM etc):

    a) Cost reflective tariff

    b) Timely recovery of Costc) Encourage settlement of disputed arrears

    d) Sharing of Income (Section 51, EA 2003) Attractive sharing ofprofit / income to encourage Asset Sweating

    e) Promotion of green power through Regulatory provisions

    44

  • 8/7/2019 16 - Y S Butola - Performance Improvement of the Distribution Segment A Case Study of NDPL

    23/25

    Regulatory Asset:a) Against economic principles

    b) Sends improper economic signal

    c) Unnecessary burden of carrying cost

    d) Deferment of problem, not a solution

    e) Hence, use of this facility should be minimum and should not berepetitive

    45

    Issues / Areas requiring attention of Regulator :

    46

    Practical approach while framing performance standardregulations keeping in view the ground realities

    Focus on long term development / sustainability of power sector

    An equitable approach towards various incentives / penalties

    provisions of performance standard regulations Regulatory provisions for introduction / promotion of new

    technologies / Systems

    Long term road map for the development of the power sector

    Pro-active measures to remove difficulties / problems faced byDISCOM (which are beyond the reasonable control of DISCOM)

    Issues / Areas requiring attention of Regulator :

  • 8/7/2019 16 - Y S Butola - Performance Improvement of the Distribution Segment A Case Study of NDPL

    24/25

    Harmonization of regulations in power sector :

    Fuel price variance:

    a) Immediate pass through for Generator

    b) Annual / Periodic pass through for DISCOM

    Large disparity on treatment of various parameters:

    a) O & M Costs (Normative Vs Actual)

    b) Consolidated O & M Costs

    c) Separate allowance for employee / A & G / R & M Costs

    d) R & M Costs: Yearly inflation / % of Gross Fixed Asset

    e) Employee and A & G Costs: Yearly inflation / Yearly inflationtogether with increased growth (MU / Consumers)

    47

    Harmonization of regulations in power sector :

    Large disparity on treatment of various parameters:

    f) Depreciation rate:

    - Ministry of Power, GOI specified rates

    - CERC rates (2004 notification) with provision ofAdvance Against Depreciation (AAD) provision

    - As per Companies Act

    g) Allowance of Depreciation:

    - Allowed on all assets

    - Depreciation not allowed on assets financed from grants / consumer contribution

    48

  • 8/7/2019 16 - Y S Butola - Performance Improvement of the Distribution Segment A Case Study of NDPL

    25/25

    Harmonization of regulations in power sector :

    Large disparity on treatment of various parameters:

    h) Start Date for depreciation:

    - From the year of Capitalization

    - From the succeeding year after capitalization

    i) Provisioning of bad debts:

    - No provision

    - Based on actual bad debts

    - As a % of approved ARR

    j) Return:- Return on Equity

    - Return on Capital

    49