1 A Mission Ahead
Mar 26, 2015
1
A Mission Ahead
2
Need: In-time Reporting Supervision, Monitoring and Evaluation of Program
Improved approach through decision-making
Introduction of new intervention tools
3
Components of Information System (Computerized)
Key elements of Information System
Information
4
Stages for Development of HMIS
SWOT analysis
Problem identification
Elements identification that can be
Retained
Modified
Abolished
Summarize the observation
Re-think and finalize
5
Reviewing the Existing System
6
Stages for Development of HMIS
Different roles and responsibilities at different
level of Health system.
Therefore different needs of data at different level
Identify the relevant datasets
7
Data Needs
Level Functions (Examples)
Sub-centre Case finding, Service delivery
PHC Diagnosis, Treatment, Referral
District Hospital Besides above, Management of referred cases
State Program planning, Implementation, M & E
National Policy formulation
Source from where data can be obtained, e.g.
Referral slip/ card/ register/ note
OPD register
Diagnosis register
Treatment card/ drug register
Stock book/ Inventory register
Supervisors’ checklist
8
Data Source
Features
Easy to fill up, Simple and Short
Must contain all the identified data items
No ambiguity
Hints for user should be there
Coding system should be encouraged
Checks for data integrity (Computerized system)
9
Data Collection Tool
Features
Flexibility: Both Line listing and Comprehensive
Easy to understand
Must contain all the relevant information
No ambiguity
Hints for user should be there
May be tabular, pictorial or mixture of both
10
Reporting Tool
11
Steps for Development of Data collection and Reporting Tool
12
Issues to be looked into for Automation
Hardware
SoftwareFront end
Back end
Data entry format
Data integrity and quality checks
Data analysis
Output format
Users’ manual
Training
13
Maintenance & Sustainability
Operation by skilled/ trained personnel
Back up facility for data and application software
AMC contract
Proper supply chain system for Logistics
Periodic monitoring
Monitoring frequency subjected to Data load
Possibility of man-made errors
Corrective measures, if required
14
Report Dissemination
Manually
ElectronicallyEmail
Online – Instant Reporting
15
Issues for Online System
Networking – LAN, MAN, WAN
Topology
MoDem
Internet connection
Client/ Server architecture
16
A simple flowchart of Processes
Indoor
17
HMIS Automation – A dynamic process
Indoor
OPD
Diag
T/t T/t assess
.F.U.
Indoor
OPD
Diag
T/t T/t assess
.F.U.
Indoor
OPD
Diag
T/t T/t assess
.F.U.Indoor
OPD
Diag
T/t T/t assess
.F.U.
Mission
Ahead
18
HMIS: Always need Improvement
Assessment
Improvement in H/W and S/W
Compatibility
Flexibility
Faster
More accuracy
Thank You
19