Top Banner
1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake DUSEL FAARM AARM Collaboration Meeting UC Berkeley March 19-20, 2010
20

1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.

Jan 14, 2016

Download

Documents

Shonda Phelps
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.

1 Homes take DUSELNSF Preliminary Baseline Review - April 13-15, 2010

Bob AltesEngineer- ISE

Water Shield Engineering

Figure Courtesy PDG and LBNL

Homestake DUSEL FAARM AARM Collaboration Meeting

UC Berkeley

March 19-20, 2010

Page 2: 1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.

2 Homestake DUSELAARM Collaboration Meeting - March 19-20, 2010

OverviewOverview

• Structure–Construction Concepts–Strength Issues

• Design issues• Fabrication• Transport• Assembly Integration

4850 Level Campus

7400 Level Campus

Page 3: 1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.

3 Homestake DUSELAARM Collaboration Meeting - March 19-20, 2010

ConceptsConcepts

• Liquid/Metal Skin Modular–Structural modules-building blocks–Non structural modules-external structure

• Liquid/Plastic container modules–External structure requirements

4850 Level Campus

7400 Level Campus

Page 4: 1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.

4 Homestake DUSELAARM Collaboration Meeting - March 19-20, 2010

Steel Modular Water ShieldSteel Modular Water Shield

• Six foot water shielded hot cell

• Chevron interfaces

• Mild steel-3/16in. Thick– Stiffened vertical plates for

Hydrostatic pressure &Gravity loads

• Inside dimensions– 5’x8’x12’

• Air vented to top row of tanks

4850 Level Campus

7400 Level Campus

Page 5: 1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.

5 Homestake DUSELAARM Collaboration Meeting - March 19-20, 2010

Tank ModularTank Modular

4850 Level Campus

7400 Level Campus

Page 6: 1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.

6 Homestake DUSELAARM Collaboration Meeting - March 19-20, 2010

Steel modular Water ShieldSteel modular Water Shield

• 6 foot water shielded facility

4850 Level Campus

7400 Level Campus

Page 7: 1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.

7 Homestake DUSELAARM Collaboration Meeting - March 19-20, 2010

Concepts-Cont.Concepts-Cont.

• Plastic Shielding–Type of material and implementation method–Availability–Castings

• Cast Block modules• Panels (thick) built-up from thinner plates or castings

–Sprayed in place• Probably less dense than cast material• Possible EH&S restrictions

–External structural requirements

7400 Level Campus

Page 8: 1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.

8 Homestake DUSELAARM Collaboration Meeting - March 19-20, 2010

Acrylic Panel ShieldAcrylic Panel Shield• Concept

4850 Level Campus

7400 Level Campus

Page 9: 1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.

9 Homestake DUSELAARM Collaboration Meeting - March 19-20, 2010

Strength IssuesStrength Issues

• Walls–Vertical and Lateral stability –Bracing requirements

• Roof–Design for shielding wt. plus ancillaries–Tensile/compression and shear stress–Lateral stability-buckling–More challenging for plastic

• Cavity floor–Loading/stiffness requirements–Minimize mass of less radio pure materials

Page 10: 1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.

10 Homestake DUSELAARM Collaboration Meeting - March 19-20, 2010

Cavity Floor ConceptCavity Floor Concept

• Removable Panels– Like Computer room floor– Box construction– Face thickness to support

Concentrated loads– Web for support of

Distributed Loads• Box support structure below

Panels-Stiff• Piers below stiff support

structure – Shimmed/grouted to module

floor

4850 Level Campus

7400 Level Campus

Page 11: 1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.

11 Homestake DUSELAARM Collaboration Meeting - March 19-20, 2010

Design for minimum “shine”Design for minimum “shine”

• Water/Steel or plastic containment Modules–Walls

•Venting and Head issues•Stepped horizontal joints

–Metal/metal, plastic to plastic gaps–Air voids–Hydrogenous thickness

•Roof–Stepped vertical joints–Hydrogenous thickness

•Utility penetrations

4850 Level Campus

7400 Level Campus

Page 12: 1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.

12 Homestake DUSELAARM Collaboration Meeting - March 19-20, 2010

Tank InterfacesTank Interfaces

• Horizontal interfaces– Metal/metal on shoulders-tolerances– Air removal on flat headers difficult– Possible hydrogenous 1/3-2/3 t

• Chevron Interfaces– Metal /metal contact through

interface– Air removal easy-anything over

3 degrees good– Hydrogenous greater than ½ t

4850 Level Campus

Page 13: 1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.

13 Homestake DUSELAARM Collaboration Meeting - March 19-20, 2010

Tank InterfacesTank Interfaces

• Vertical Interfaces– Metal to metal on shoulders

and lower vertical surfaces

– Clearance on upper vertical surfaces

– Clearance gaps filledwith plastic plate/sheet (Polyethylene for example)

– Hydrogenous shieldingt/2 or greater in joint region

Page 14: 1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.

14 Homestake DUSELAARM Collaboration Meeting - March 19-20, 2010

Fabrication and TransportFabrication and Transport

Fabrication Materials and Equipment Transport Rely on 18000 kg (18 Ton) Yates Super Cage

Dimensions: Height 4.9m,16 ftLength 4.1m,13.4ftWidth 3.2m,10.5ft

4850 Level CampusSuper CageAuxiliary Hoist

Page 15: 1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.

15 Homestake DUSELAARM Collaboration Meeting - March 19-20, 2010

Fabrication-cont.Fabrication-cont.

• Metal modules•Fabrication at 4850 level

–Plate and equipment size limits–Where?–Quality Control and EH&S issuesoMaterial handlingoWeldingoChemical cleaning and passivation type processes

•Vendor surface shops–Module finish size limits

• Structural Elements•Vendor surface shops•Yates lift limited (same as raw stock)

Page 16: 1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.

16 Homestake DUSELAARM Collaboration Meeting - March 19-20, 2010

Fabrication-cont.Fabrication-cont.

• Plastic modules•Plastic Panels

–Vendor surface shopsoCastingoMachining and module assembly /disassemblyoShipping

•Module assembly–Components and assemblies to 4850 –Yates size limit –Assembly in module

4850 Level Campus

7400 Level Campus

Page 17: 1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.

17 Homestake DUSELAARM Collaboration Meeting - March 19-20, 2010

Assembly IntegrationAssembly Integration

• Scheduling by module occupants–Staging area and crane use

• FAARM assembly plans–Water shield–Immersion tank –Ancillary equipment

• Cranes rigging and special fixtures–Module 30-40 ton monorail and 20 bridge –Small crane inside the water shield–Experiment supplied fixtures and rigging

• Many design related issues here 7400 Level Campus

Page 18: 1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.

18 Homestake DUSELAARM Collaboration Meeting - March 19-20, 2010

Module Space/Crane Issue Module Space/Crane Issue

• Layout assumptions– Design of Monorail can be brought back to 2m– Bridge crane available

During assembly

• Risk– Assembly scheduling

For 3 experiments– Bridge crane may be

Blocked by other users– Agreements necessary

among module occupants

Page 19: 1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.

19 Homestake DUSELAARM Collaboration Meeting - March 19-20, 2010

Shielding LiquidShielding Liquid

• Processing system

• Breech containment–Processing system–Shield volume 4850 Level Campus

7400 Level Campus

Page 20: 1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.

20 Homestake DUSELAARM Collaboration Meeting - March 19-20, 2010