1 BASIC COAL FIRED BOILER ATTENDANCE TRAINING COURSE
Mar 31, 2015
1
BASIC COAL FIRED BOILER
ATTENDANCE TRAINING COURSE
2
TO TRAIN BOILER OPERATORS TO GENERATE STEAM SAFELY,
EFFICIENTLY AND COST EFFECTIVELY
OBJECTIVE
3
Minimum trainee requirements:
• Good eye sight.
• Good hearing.
• Physically fit and mentally alert.
• A sober disposition.
• Ability to work and move around in confined spaces.
• A tolerance to heat, loud noises and heights.
• Literate
4
Dryden Combustion Present:
BOILER OPERATOR TRAINING COURSE
5
BASIC SUBJECTS COVERED DURING THE TRAINING PROGRAMME
• Example of some items covered during the Training Course which contribute to the efficient use and correct operation of your boiler
6
1. Identifying the component parts by name and knowing their
function and how to test them.
• Gauge Glasses
• Mobreys
• Boiler
• Water treatment
• Undergrate Dampers
• Different Valves
• Sootblowers
• Coal Handling Equipment
• Plus more ….
7
2. Preliminary checks undertaken by the operator before lighting up the boiler and raising steam pressure
8
PRELIMINARY CHECKS:-
• Coal
• Water softener
• Chemicals
• Valve positions
• Water level
• Ash removal trolley
• Grit removal trolley
9
3. The CORRECT way to light a fire and raise steam pressure:-
• Guillotine door height
• Length of coal bed
• Where to place the wood fire
• All other relevant steps up to raising steam pressure
10
4. Maintaining steam pressure safely and efficiently:-
• Understanding correct air fuel ratios
• Ash removal
• Blowdown Procedure
• and more……
cost impact saving approximately 10% of your current coal costs
11
5. Banking the fire correctly:-
• Correct tools to complete the task
• Proper personal protection equipment for the tasks
• Advantages:-
- Not to make a fire from start up again
- Raise steam pressure without causing
stress to the boiler.
12
6. Starting up from a banked fire:-
• Procedure on how to re-ignite correctly
• Valve Positions
• Damper Settings
13
7. Emergency procedures:-
• Power failure
• Safety valve blow off
• Shear pin failure
• Broken gauge glass
• Blowdown valve jams in the open position
14
8. Shutdown and standby procedure:-
• Short standby (30 mins or less)
• Correct shutting down of a boiler for more than 18 hours.
15
9. Problems and remedies:- • Identification of problem
• Diagnosis of problem and apply correct remedies.
• Protecting the boiler
• Do not waste time and coal
16
17
COURSE OPTIONS
18
BASIC BOILER OPERATORS COURSE
Written Report issued to the Department on each student
Preliminary Exam Written to Evaluate each Trainees Capability
Course conducted in English by a multi-lingual SETA registered Facilitator
Theory – conducted in a classroom together with DVD presentations
Practical training – conducted in the boiler house
Final Exam
Examinations evaluated by a SETA registered Assessor
Issuing of Certificate
Boiler Operator Cap to successful students
19
20
COURSE OPTIONS Individual “on site” training course to be run
at your factory on your boiler
or Purchase DVD Training Course. Course to be owned
and run by the client, in their own time. Future training / refresher courses will then be at no additional costs to the Company
On site training of operators – backed up by the DVD Training Course – which shall remain on site for constant refresher courses for the operators at no additional cost
or
21
DURATION OF EACH COURSE
Each Course will take 5 days (40 hours)
Traveling to and from site will be additional
22
REQUIREMENTS
1. Classroom complete with tables and chairs, white board and markers
2. Availability of fully operational stand-by boiler for start / stop operation during practical training
3. Recommendation of a maximum of 8 students per class
23