Top Banner
1 UPK Alignment with QRIS January 2012
40

0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

Jan 18, 2016

Download

Documents

Kenneth Webster
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

1

UPK Alignment with QRIS

January 2012

Page 2: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

UPK Policy Objectives Implemented in FY11 and FY12

For FY11 and FY12, the following policy objectives were implemented to begin alignment with UPK and QRIS:

1. For FY12, UPK programs were required to participate in QRIS by June 1, 2011;

2. Programs shall use a portion of UPK funding to support progress on QRIS for FY12;

3. An agreement to allow EEC staff to conduct on-site ECERS/FCCERS reviews;

4. An agreement to provide staff information, including compensation and education level, through EEC’s registry or other designated mechanism; and

5. An agreement to provide child level data, with parent consent, allowing children to be assigned a State Assigned Student Identification (SASID) number.

UPK grantees were also notified that FY11 was a planning year for the purpose of restructuring UPK in FY12 and beyond.

Subject to EEC Board approval, programs may be required to be level 3 in QRIS by FY13.

2

Page 3: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

Committee Feedback Regarding UPK Alignment with QRIS

Over the past few months, various committees and subcommittees convened to discuss ideas to align UPK and QRIS and provided recommendations:

• The Planning and Evaluation Committee convened on November 29, 2011 and December 21, 2011.

• The K-12 & Higher Education Subcommittee of the Advisory Board convened on December 16, 2011.

The Full Advisory Council will address this issue at the upcoming January 13, 2012 meeting.

The Committees generated 5 recommendations for the Board to consider in the subsequent slides.

3

Page 4: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

Recommendation #1: QRIS Level

Programs in UPK must be at least a level 3 in QRIS.

Current UPK programs who do not satisfy level 3 in QRIS may be grandfathered in for one year.

Any program that attains level 3 in QRIS will be considered a UPK program.

4

Page 5: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

Recommendation #2: Access

Focus on “high needs children.” Currently, Massachusetts defines “high needs

children” as those with sufficiently low household incomes, those in need of special education assistance, and other priority populations who qualify for federal and/or state aid.

Massachusetts is moving toward a broader definition of “high needs children.”

Programs will be required to conduct formative assessments and screenings to identify “high needs children.”

The documentation and assessment data will need to be submitted to the EEC: in the past EEC has not required programs to submit individual child information.

5

Page 6: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

Recommendation #3: Grant Eligibility

To be eligible for a UPK grant, programs would have to demonstrate they serve “high needs children” as defined in the RTTT-ELC grant. Programs would have to demonstrate that they serve

children with multiple risk factors that meet this broader definition.

This will include providing screening and/or formative assessment scores for targeted group of children.

UPK programs must demonstrate movement toward median salary for lead teachers.

Program match is required. Grants will be competitive: potential grantees would

have to compete annually for funding. Programs will be required to demonstrate PreK-3

alignment with the school district in which they are located.

6

Page 7: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

Recommendation #4: Change the Funding Formula

However, keep it as a grant to programs based on revised numbers and criteria.

Formula based on the number or percentage of high risk children the programs serve.

The amount is determined by 50% of the annual full time subsidy rate per expansion child.

For current subsidy children, the add-on amount will be less than 50% of the subsidy rate.

7

Page 8: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

Recommendation #5: Use of Funds

Grants could be used to increase access to high risk children, but spent on normal and expected expenses when running an early childhood program.

UPK funds should not be used to help programs move up in QRIS because other funds will be used for that.

8

Page 9: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

Background Information

9

1. Review of UPK Policy Objectives Implemented in FY11 and FY12

2. How UPK Compares to QRIS

3. Definition of “High Needs Children”

3. Materials on Preschool to Grade 3

Page 10: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

10

Review of UPK Policy Objectives Implemented in FY11 and FY12

Page 11: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

11

UPK Funding Background FY07: $4.6 million

Pilot implementation grants for Universal Pre-Kindergarten (UPK) FY08: $7.1 million

Budget provided increase of $2.5M FY09: $10.9 million (post 9c)

Budget initially provided an increase of $5M for UPK; reduced by $1.25M in mid-year budget reductions

FY10: $8.0 million Budget reduced funding by $2.9M All grant awards were reduced by 37% from FY09

FY11: $7.5 million Budget reduced funding by $500K All grant awards were reduced by 5.23% to compensate for the cut in funding

FY12: $7.5 million

Grants are awarded for specific classrooms in a programs and have been renewed yearly to date (with additional new grants being awarded in FY08 and FY09). A portion of each years funds were allocated to evaluation and planning activities, as well as in FY07, FY08 and FY09 funding for Assessment Planning grants to help programs move towards UPK eligibility).

Funding is determined by the number of children and portion of subsidized children in each classroom, and operating hours and full or part-time/year status.

Total classroom enrollment x $500 + total subsidized enrollment x $1500 = total grant award [total is then prorated based on full or part-time/year status]

Page 12: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

12

UPK Grant Program EligibilityEvolving to Align with QRIS

*The EEC-selected assessment tools include: Work Sampling, High Scope Child Observation Record (COR), Creative Curriculum, Teaching Strategies GOLD and Ages and Stages (programs using Ages and Stages are transitioning to other tools for the purpose of assessment). **NEASC included in FY08 accreditation options; CDA or “higher” included in FY09 and forward as accreditation alternatives for family child care.

Criteria FY07 FY08 -FY10

FY11 and FY12

EEC Licensed or License-Exempt

Use one of the EEC-selected assessment tools for at least one year*

Use Early Childhood Program Standards For Three and Four Year Olds and Guidelines for Preschool Learning Experiences

Have teacher/provider with BA in each UPK classroom/setting

Or

Used as selection priority

Have National Association for the Education of Young Children (NAEYC) accreditation or New England Association of Schools and Colleges or for family child care, National Association for Family Child Care (NAFCC) accreditation or a Child Development Associate (CDA) credential or higher

** **

Serve or willing to serve children receiving financial assistance

Provide access to full-day full-year services

Participation in QRIS

Page 13: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

13

UPK Grantee OverviewGrant Program

# Program

Sites

# UPK Classrooms/

Homes

# UPK Children

# Cities/ Towns

FY12 UPK Current Classroom Quality Grantees

210 442 6,163 86

FY11 UPK Classroom Quality Grantees

252 457 6193 107

FY10 UPK Classroom Quality Grantees (originally funded in FY07, FY08 or FY09 and renewed each year)

277 464 6,400 97

FY09 UPK Classroom Quality Grantees (originally funded in FY07, FY08 and renewed each year or new in FY09)

293 481 6,600 97

FY08 UPK Classroom Quality Grantees (originally funded in FY07 and renewed or new in FY08)

216 311 5,700 94

FY07 UPK Classroom Quality Grantees

130 192 3,000 60

Page 14: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

UPK Studies on Classroom Quality: Abt. Associates, Inc.

In the spring of 2009, EEC commissioned Abt Associates, Inc. to conduct a study to:

(1) describe the quality of licensed and license-exempt early childhood care and education programs in the state that serve a majority of subsidized children; and

(2) determine the extent to which these programs are providing high quality learning environments.

14

Page 15: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

Abt Associates, Inc.’s Findings: Quality of Preschool Programs

Emotional Support • Average rating: 5.6 out of 7

Classroom Organization• Average rating: 5.1 out of 7

Instructional Support • Average rating: 2.6 out of 7

Overall quality across 3 domains• 21% are high quality; 41% are average quality; 22%

are below-average quality; and 15% are low quality

Page 16: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

Abt Associates, Inc.’s Findings: Quality of Family Child Care

Emotional Support • Average rating: 5.6 out of 7

Classroom Organization• Average rating: 4.9 out of 7

Instructional Support • Average rating: 1.8 out of 7

Overall quality across 3 domains • 4% are high quality; 41% are average quality;

41% are below-average quality; 15% are low quality

Page 17: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

Abt Associates, Inc.’s Findings: Differences in Quality of Care

Preschool programs• Instructional Support: significantly higher level

of quality in public school programs than either Head Start programs or licensed child care centers

• No statistically significant differences by UPK status

Family child care homes• No statistically significant differences by UPK

status

Page 18: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

UPK Studies on Formative Assessment: Oldham Innovative Research

In the spring of 2010, EEC commissioned Oldham Innovative Research to conduct a study to: (1) analyze the FY10 UPK child assessment data, (2) investigate what child assessment tools are

currently being used in Massachusetts, and (3) investigate how other states are utilizing their

child assessment data.

The study generated 9 recommendations that are outlined on the next two slides.

* To see the full report, please go to the following website: http://www.eec.state.ma.us/docs1/research_planning/20101103_upk_assessment.pdf

18

Page 19: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

Oldham Innovative Research’s Recommendations

(1) Using web-based submissions as a way of collecting data should be a requirement of UPK grantees;

(2) EEC’s web-based licensees should indicate if they are a UPK grantee and specify the program’s UPK children;

(3) While UPK grantees should be allowed to assess all of the children in their programs through the on-line license, they must delineate the children that are enrolled in UPK;

(4) Increased and efficient communication with family child care grantees that belong to a family child care system needs to be systematically planned in order to raise submission rates;

19

Page 20: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

Oldham Innovative Research’s Recommendations (cont…)

(5) Domain completion rates could be increased with professional development;

(6) Professional development on how best to utilize the web-based system of assessing children should be offered annually;

(7) To determine specific professional development needs for teachers as related to early childhood assessment, EEC will need to depend on director interviews, teacher interviews and/or focus groups or observation;

(8) Professional development coupled with technical assistance should be a systemic part of offering UPK grants and initiatives; and

(9) Provide professional development and technical assistance to UPK grantees on how they can use their aggregated child assessment data at the local level.

20

Page 21: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

Sustainability/Program Drop Off

Various reasons for the drop in number of programs participating in UPK:Program sites were closed;Accreditation for program revoked;Program failed to submit assessment

data; andProgram not interested in continuing

with UPK.

21

Page 22: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

22

How UPK Compares to QRIS

Page 23: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

How UPK Compares to QRIS

23

UPK is based on six basic eligibility criteria: Licensed or license-exempt, Provides access to full-day full-year services, Serve or willing to serve children receiving financial assistance, NAEYC accredited for center-based and public school programs, and NAFCC

accredited or a CDA or higher for family child care, Uses the Guidelines for Preschool Learning Experiences, Uses one of the EEC approved assessment systems.

UPK funds allow programs to maintain and enhance quality criteria as they choose, without defined measurable criteria to assess and improve quality.

QRIS offers a comprehensive way to assess, improve and communicate quality to the field.

Quality criteria is organized into standards and exceeds the scope of UPK eligibility criteria. A few examples are:

Curriculum and Learning: Assessment subcategory requires programs implement developmental screening within 45 days of children’s program entry, whereas only formative assessment is explicitly required by UPK, and

Workforce standards require that directors are not only trained in the Guidelines for Preschool Learning Experiences, but also child development and Strengthening Families protective factors.

QRIS requires measurement of quality through environmental ratings by an outside evaluator (ECERS, FCCERS, etc.)

Page 24: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

UPK Eligibility Requirements Compared to Level 3 QRIS

Below is a summary of how the UPK requirements align with the QRIS levels. Licensed or license-exempt

• Level 1 Provides access to full-day full-year services

• Not required in QRIS Serve or willing to serve children receiving financial assistance

• Not required in QRIS NAEYC accredited for center-based and public school programs, and NAFCC accredited or a CDA or

higher for family child care• Accreditation may be used for documentation for select standards in levels 2 through 4

Uses the Guidelines for Preschool Learning Experiences,• At level 3, programs are required to receive training on the Guidelines and at level 4 they are

required to align it with curricula, however UPK does not explicitly require either. Uses one of the EEC approved assessment systems.

• QRIS does not require specific formative assessment tools, but states that at level 2 programs must receive professional development related to assessment, at level 3 the data is used to set goals, and at level 4 to improve curriculum planning.

Many level 3 QRIS standards can be documented with accreditation, which is a requirement of UPK,

however some QRIS requires documentation in addition to accreditation for certain standards, and

some standards cannot be met by accreditation at all. A main difference between QRIS and accreditation is use of the environmental rating

scales (ERS tools).

24

Page 25: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

Standards Beyond Which Accreditation Can be Used to Document Meeting a Level 3 Standard

Category 1: Curriculum and LearningCurriculum, Assessment and Diversity1A.3.2 Staff has received formal professional development in the curriculum; using the MA Guidelines for

Preschool Learning Standards or Infant / Toddler Learning; documenting children’s progress; and working with children from diverse languages and cultures and second language acquisition. (documented with PQ Registry)

1A.3.4 Staff demonstrate language and literacy skills either in English or the child’s language that provide a model for children. (documented with ERS tools)

Teacher Child Relationships and Interactions1B.3.1 All staff engage children in meaningful conversations, use open-ended questions and provide

opportunities throughout the day to scaffold their language to support the development of more complex receptive and expressive language, support children’s use of language to share ideas, problem solve and have positive peer interactions. (documented with ERS tools and other QRIS measurement tools)

1B.4.1 Staff utilize teaching strategies that ensure a positive classroom environment, engage childrenin learning and promote critical thinking skills. (documented with ERS tools and other QRIS measurement

tools)

Category 2: Safe Healthy Indoor and Outdoor Environments2A.3.2 Staff are trained in how to work with children with special diets, allergies and specialized feeding

issues. (documented with PQ Registry)

2A.3.3 Demonstrates healthy, safe and clean indoor and outdoor environments. (documented with ERS tools)

25

Page 26: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

Standards Beyond Which Accreditation Can be Used to Document Meeting a Level 3 Standard

Category 3: Workforce Qualifications and Professional DevelopmentDesignated Program Administrator Qualifications and Professional Development3A.3.1 Program administrator has at least a Bachelor’s degree. (as indicated in PQ Registry)

3A.3.2 Program administrator has at least 9 credit-bearing hours of specialized college-level course workin administration, leadership, and management. (as indicated in PQ Registry)

3A.3.3 Program administrator has at least 24 credit-bearing hours of specialized college-level coursework in early childhood education, child development, elementary education, or early childhood specialeducation OR Documents that a plan is in place to meet the above qualifications within five years. (as indicated in PQ

Registry)

Program Staff Qualifications and Professional Development3B.3.1 75 percent of classrooms have Educator(s) with a Bachelor’s degree or higher who work for the fullprogram day. (as indicated in PQ Registry)

Category 4: Family and Community Engagement4A.3.2 Families are encouraged to volunteer in the program, to assist in the classroom, and share culturaland language traditions or other interests such as their jobs, hobbies and other relevant information. (documented

with ERS tools)

4A.3.4 Program representative(s) participate in local community group work that is related to early childhood, and the cultural groups served by the program and/or family support. (documented with Program Administration Scale (PAS))

26

Page 27: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

Standards Beyond Which Accreditation Can be Used to Document Meeting a Level 3 Standard

Category 5: Leadership, Management and AdministrationLeadership, Management and Administration5A.3.1 Program tracks and monitors absences of individual children and contacts families when children are absent more than

20% in a month.

5A.3.2 Program director, staff and family input is solicited on an annual basis through a survey to evaluate the program. (documented with PAS)

5A.3.3 Results of the annual survey are used to develop a comprehensive written program improvement plan.

5A.3.4 Program has an annual review conducted of the accounting records by an independent partywho has accounting or bookkeeping expertise.

5A.3.5 Program tracks and monitors teacher turn over and has plan for addressing turn over.

Supervision5B.3.1 Program uses at least 3 types of internal communication on a monthly basis to inform staff ofprogram activities, policies, etc.

5B.3.2 Staff receive at least one benefit (paid vacation time, sick time, health insurance, tuition/PDreimbursement or retirement plan option). (documented with PAS)

5B.3.3 Staff are given feedback that give examples of best practice at least twice a month. (documented with PAS)

5B.3.4 The program has a system to support the career development of staff through a career ladder (e.g., regularly scheduled time to meet with a supervisor or mentor to monitor progress towards career goals). (documented with PAS)

5B.3.5 Staff salary scales reflect the educational levels, experience and performance levels, as determined by the annual evaluation of the staff members, and is comparable with the current wage level of others in the community with the same levels of education. (documented by PAS)

27

Page 28: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

28

Definition of “High Needs Children”

Page 29: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

Broader Definition of “High Needs Children” Include children who have multiple risk factors linked to

poor school and life outcomes:i. Children and parents with special needs;ii. Children whose home language is not English;iii. Families and children involved with multiple

state agencies;iv. English language learners;v. Recent immigrants;vi. Children with parents who are deployed and are

not living on a military base;vii. Low-income households; andviii. Parents with less than a high school education;ix. Children who are homeless or move more than

once a year.

29

Page 30: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

Broader Definition of “High Needs Children” (cont…)

The state estimates that as many as 135,000 children from birth to age five face one or more risk factors each day that could lead to toxic stress, with as many as 20,000 (15%) facing three or more risk factors that without intervention are likely to lead to developmental delays.*

*National Center for Children in Poverty. Young Child Risk Calculator. Retrieved from http://www.nccp.org/tools/risk/

30

Page 31: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

31

P-3 Alignments:Key Principles and Elements

Page 32: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

Mission Statements Support Alignment

provide the foundation that supports all children in their development as lifelong learners and contributing members of the community, and supports families in their essential work as parents and caregivers.

strengthen the Commonwealth’s public education system so that every student is prepared to succeed in postsecondary education, compete in the global economy, and understand the rights and responsibilities of American citizens, and in so doing, to close all proficiency gaps.

Department of Early Education and Care

Department of Elementary and Secondary Education

32

Head StartImprove Children’s school readiness outcomes and promote changes that integrate children into a continuum of high-quality early care and education spanning from birth to age eight.

Page 33: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

33

Children Experiencing Multiple Risks in MA

Page 34: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

Key Principles in the P-3 Alignment

1. Horizontal alignment

2. Vertical alignment

3. Temporal alignment

34

Page 35: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

Principle 1: Horizontal Alignment

Horizontal alignment

Vertical alignment

Temporal alignment

Horizontal alignment

is created by using consistent learning approaches within an age range or grade.

Full-day kindergarten

35

Page 36: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

Principle 2: Vertical Alignment

Horizontal alignment

Vertical alignment

Temporal alignment

Vertical alignment is created by using consistent learning approaches across ages or grades.

1st grade

K

Pre-K

2nd grade

3rd grade

36

Page 37: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

Principle 3: Temporal Alignment

Horizontal alignment

Vertical alignment

Temporal alignment

Temporal alignment is created by using consistent learning approaches across a child’s day.

37

Page 38: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

Need to evaluate alignment onseveral parameters

Balance: the degree to which the two documents address the same domains

Depth: the degree to which the two documents address the same specific skill and knowledge within a domain

Difficulty: the degree to which the expectations within the two documents reflect a similar level of difficulty or age-level

Kagan, Scott-Little, Reid & Greenburg, 200738

Data from the Office Of Head Start Summit, “On the Road to

School Readiness”presented by Catherine Scott-Little

on February 15-17, 2011Baltimore, MD

Page 39: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

What does P-3 look like in Massachusetts?

A coordinated and collaborative approach

39

Page 40: 0 UPK Alignment with QRIS January 2012. UPK Policy Objectives Implemented in FY11 and FY12 For FY11 and FY12, the following policy objectives were implemented.

40

Mechanisms forCross-Sector

Alignment

Teacher Quality &Capacity

Transitions and Pathways

Administrators &Leadership

Quality

Engaged Families

InstructionalEnvironment

(school andClassroom)

Data andAssessment

InstructionalTools and Practices

Cross AgencyCollaboration

on P-3