* Reference – Carry Over Work
KHAN to perform Turret COW, divided into 2 stages called as
“Phase 1” for work preparation and “Phase 2” for execution.
Project:
BP Quad 204 Turret Carry Over Work
Phase -1
Project Owner: BP
Period: Oct. 2013 ~ Jan. 2014
Peak M/P : 10
Scope of Work:
- Site Survey
- Preparation of Carry Over Work Packs & Issue of Job Cards
(Total 233)
(E& I: 109 / Machinery & Hydro: 25 / Pipe &
Structure : 99 Packages)
- Review & Analyze COW Construction Availability and Reflect
to Job Cards
- Execute COW at Phase-2 Stage in accordance with Job Cards
13
>> BP Quad 204 Turret Carry Over Work, Phase-1
-
Project:
BP Quad 204 Turret Carry Over Work, Phase -2
Project Owner / Client: BP
EPCI Contractor: HHI
Period: Feb. 2014 ~ Dec. 2015
Peak M/P: 150
Man-hours: 498,456 MH
Scope of Work:
- Execution of the Carry-Over Work Packs & Job Cards
- Additional Work / Changes instructed by Client
- Discipline: E&I, Pipe & Mech., Structure,
Materials
14
>> BP Quad 204 Turret Carry Over Work, Phase-2
* Reference – Carry Over Work
-
Project: Shell Prelude FLNG Turret Carry Over Work
Project Owner: Shell
Client : SBM Offshore
Period: Dec. 2015 ~ Ongoing
Scope of Work:
- Site Survey
- Job Card Development
- Project Completion System
- Material Preparation
- Tool & Consumables Preparation
- Planning / Scheduling / Mobilizing COW in accordance with
Phase-1
- Execution of the Carry-Over Work Packs & Job Cards
- Additional Work / Changes instructed by Client
>> Shell Prelude FLNG Turret Carry Over Work, Phase-1,
2
15
* Reference – Carry Over Work
-
Project: SHELL Prelude FLNG MEG Module Carry Over Work
Project Owner: SHELL
Client : Fjords Processing
Period: Sep. 2015 ~ Ongoing
Peak M/P : 80
16
>> Shell Prelude FLNG MEG Module Carry Over Work,
Phase-2
- Insulation
Scope of Work:
- Site Survey, Planning, Mobilizing, Materials Management
&
Procurement (for Piping/Instrument/Electrical Equipment
Installation)
- Preparation and Development of Carry Over Work Packs
- Execution of Carry Over Work Packs
- E&I: Termination, Instrument and Cable Tray
Installation,
‘Ex’ Equipment Installation, Inspection, MC, etc.
- Piping: HT-Package Work - 127 PKGs
- Structure and Mechanical COW
- Surface Preparation and Coating (TSA)
- MC including Specified Testing of all Identified Systems
* Reference – Carry Over Work
-
• QA/QC plan
• HSE plan
• Progress plan
• Qualification plan
• Mobilization plan
• Job Card creation
• Capability evaluation
• Approval by Company
• Check
• Tracking for receipt
• Identification
• Classification
• Record
• Review of drawings / work
volume / work package etc
• Analysis of construction
availability
PLANNING PLANNING
PREPARATION
MATERIAL
PHASE1
Project:
INPEX Ichthys FPSO Turret Integration Work Phase-1
Project Owner: INPEX
EPCI Contractor: DSME
Period: Aug. 2014 ~ May 2015
Scope of Work
- Site Survey
- Preparation of Carry Over Work Packs & Job Cards
- Issue of Management Deliverables required for Phase-2
17
>> INPEX Ichthys FPSO Turret Carry Over Work, Phase-1
* Reference – Carry Over Work
-
Project:
INPEX Ichthys FPSO Turret Carry Over Work
Project Owner: INPEX
Client : SBM Offshore
Period: Dec. 2015 ~ Ongoing
Scope of Work :
- Supply of Nylon Pads (material, fabrication &
installation)
- HVAC Ducting Fabrication
- Site Queries
1. Handrail Modification
2. Cable Gland Replacement
3. Pad Eyes Load Test & NDT Inspection
4. Material Supply of PDZT Bracket / Transfer Rail /
Utility Station / T-Guard
18
>> INPEX Ichthys FPSO Turret Carry Over Work, Phase-2
* Reference – Carry Over Work
-
* Reference – Carry Over Work
Project: BP Quad 204 Water Injection Pump Skids Carry Over
Work
Project Owner: BP
Period: May 2013 ~ June 2013
Total Man-hour: 1,765 MH
Pump Skid Weight: Approx. 70 Ton
Peak M/P: 35
Scope of Work:
- Loading / Unloading - Installation / Assembly Work
- E&I - Piping
- Machinery - Punch Clear
- Fabrication (Outfitting)
19
>> BP Quad 204 Injection Skids Carry Over Work
-
6
* Reference – Carry Over Work
NO.
PERIOD OWNER CLIENT PROJECT NAME SCOPE OF WORK
START DELIVERY
1 Feb. 2017 Ongoing Statoil KCA
DEUTAK
Statoil CAT-J Carry Over
Work Phase-2
Site Survey, Planning, Mobilization, Materials
Management & Procurement
E&I, Painting, Scaffolding, Insulation, Piping
2 May 2016 Ongoing Petronas
Carigali
UZMA
Engineering
Petronas Carigali
Kinanbalu NAG Phase-II
Gas Compressor Module
Carry Over Work
Job Card Development, Reviewing of Detail
Design & Shop Drawing / As-Built Drawing,
Onshore Fabrication Procurement & Logistics
for Installation Works
3 Dec. 2015 Ongoing SHELL SBM
Offshore
SHELL Prelude FLNG
Turret Carry Over Work
Phase-1, 2
Phase-1 : Job Card Development, Project
Completion System, Material Preparation
Phase-2 : Execution of Work Pack & Job Card
(Planning / Scheduling / Mobilizing)
4 Sep. 2015 Dec. 2017 SHELL Technip
SHELL Prelude FLNG
MEG Module Carry Over
Work Phase-2
Site Survey, Planning, Mobilizing, Materials
Management & Procurement
Work Pack Development and Execution of
Carry Over Work Packs
5 Aug. 2014 Ongoing INPEX SBM
Offshore
INPEX Ichthys FPSO
Turret Carry Over Work
Phase-1, 2
Phase-1 : Work Pack & Job Card Preparation
Phase-2 : Supply of Nylon Pads, HVAC
Ducting Fabrication, Site Queries
6 July 2014 May 2016 BP HHI BP Clair Ridge Topside
Module Construction Work
FPSO & Platform Construction Work in E&I,
Pipe, Mech., Structure, Paint, Scaffolding,
HVAC
-
7
* Reference – Carry Over Work
NO.
PERIOD OWNER CLIENT PROJECT NAME SCOPE OF WORK
START DELIVERY
7 Oct. 2013 Dec. 2015 BP HHI BP Quad 204 Turret Carry
Over Work, Phase -1, 2
Phase-1 : Site Survey, Work Pack
Preparation, Job Card Issue
Phase-2 : Execution of Work Pack & Job Card
8 May 2013 June 2013 BP BP
BP Quad 204 Water
Injection Pump Skids Carry
Over Work
Loading / Unloading, Installation / Assembly
Work, E&I, Piping, Machinery, Punch Clear,
Fabrication(Outfitting)