* Reference Carry Over Work KHAN to perform Turret COW, divided into 2 stages called as Phase 1for work preparation and Phase 2for execution. Project: BP Quad 204 Turret Carry Over Work Phase -1 Project Owner: BP Period: Oct. 2013 ~ Jan. 2014 Peak M/P : 10 <Turret Construction Site in Singapore> Scope of Work: - Site Survey - Preparation of Carry Over Work Packs & Issue of Job Cards (Total 233) (E& I: 109 / Machinery & Hydro: 25 / Pipe & Structure : 99 Packages) - Review & Analyze COW Construction Availability and Reflect to Job Cards - Execute COW at Phase-2 Stage in accordance with Job Cards 13 >> BP Quad 204 Turret Carry Over Work, Phase-1 <Sample of Job Card approved>
9

* Reference Carry Over Workkhan-offshore.com/wp-content/uploads/2017/04/Reference...E&I, Painting, Scaffolding, Insulation, Piping 2 May 2016 Ongoing Petronas Carigali UZMA Engineering

Feb 09, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • * Reference – Carry Over Work

    KHAN to perform Turret COW, divided into 2 stages called as “Phase 1” for work preparation and “Phase 2” for execution.

    Project:

    BP Quad 204 Turret Carry Over Work

    Phase -1

    Project Owner: BP

    Period: Oct. 2013 ~ Jan. 2014

    Peak M/P : 10

    Scope of Work:

    - Site Survey

    - Preparation of Carry Over Work Packs & Issue of Job Cards (Total 233)

    (E& I: 109 / Machinery & Hydro: 25 / Pipe & Structure : 99 Packages)

    - Review & Analyze COW Construction Availability and Reflect to Job Cards

    - Execute COW at Phase-2 Stage in accordance with Job Cards

    13

    >> BP Quad 204 Turret Carry Over Work, Phase-1

  • Project:

    BP Quad 204 Turret Carry Over Work, Phase -2

    Project Owner / Client: BP

    EPCI Contractor: HHI

    Period: Feb. 2014 ~ Dec. 2015

    Peak M/P: 150

    Man-hours: 498,456 MH

    Scope of Work:

    - Execution of the Carry-Over Work Packs & Job Cards

    - Additional Work / Changes instructed by Client

    - Discipline: E&I, Pipe & Mech., Structure, Materials

    14

    >> BP Quad 204 Turret Carry Over Work, Phase-2

    * Reference – Carry Over Work

  • Project: Shell Prelude FLNG Turret Carry Over Work

    Project Owner: Shell

    Client : SBM Offshore

    Period: Dec. 2015 ~ Ongoing

    Scope of Work:

    - Site Survey

    - Job Card Development

    - Project Completion System

    - Material Preparation

    - Tool & Consumables Preparation

    - Planning / Scheduling / Mobilizing COW in accordance with

    Phase-1

    - Execution of the Carry-Over Work Packs & Job Cards

    - Additional Work / Changes instructed by Client

    >> Shell Prelude FLNG Turret Carry Over Work, Phase-1, 2

    15

    * Reference – Carry Over Work

  • Project: SHELL Prelude FLNG MEG Module Carry Over Work

    Project Owner: SHELL

    Client : Fjords Processing

    Period: Sep. 2015 ~ Ongoing

    Peak M/P : 80

    16

    >> Shell Prelude FLNG MEG Module Carry Over Work, Phase-2

    - Insulation

    Scope of Work:

    - Site Survey, Planning, Mobilizing, Materials Management &

    Procurement (for Piping/Instrument/Electrical Equipment Installation)

    - Preparation and Development of Carry Over Work Packs

    - Execution of Carry Over Work Packs

    - E&I: Termination, Instrument and Cable Tray Installation,

    ‘Ex’ Equipment Installation, Inspection, MC, etc.

    - Piping: HT-Package Work - 127 PKGs

    - Structure and Mechanical COW

    - Surface Preparation and Coating (TSA)

    - MC including Specified Testing of all Identified Systems

    * Reference – Carry Over Work

  • • QA/QC plan

    • HSE plan

    • Progress plan

    • Qualification plan

    • Mobilization plan

    • Job Card creation

    • Capability evaluation

    • Approval by Company

    • Check

    • Tracking for receipt

    • Identification

    • Classification

    • Record

    • Review of drawings / work

    volume / work package etc

    • Analysis of construction

    availability

    PLANNING PLANNING

    PREPARATION

    MATERIAL

    PHASE1

    Project:

    INPEX Ichthys FPSO Turret Integration Work Phase-1

    Project Owner: INPEX

    EPCI Contractor: DSME

    Period: Aug. 2014 ~ May 2015

    Scope of Work

    - Site Survey

    - Preparation of Carry Over Work Packs & Job Cards

    - Issue of Management Deliverables required for Phase-2

    17

    >> INPEX Ichthys FPSO Turret Carry Over Work, Phase-1

    * Reference – Carry Over Work

  • Project:

    INPEX Ichthys FPSO Turret Carry Over Work

    Project Owner: INPEX

    Client : SBM Offshore

    Period: Dec. 2015 ~ Ongoing

    Scope of Work :

    - Supply of Nylon Pads (material, fabrication & installation)

    - HVAC Ducting Fabrication

    - Site Queries

    1. Handrail Modification

    2. Cable Gland Replacement

    3. Pad Eyes Load Test & NDT Inspection

    4. Material Supply of PDZT Bracket / Transfer Rail /

    Utility Station / T-Guard

    18

    >> INPEX Ichthys FPSO Turret Carry Over Work, Phase-2

    * Reference – Carry Over Work

  • * Reference – Carry Over Work

    Project: BP Quad 204 Water Injection Pump Skids Carry Over Work

    Project Owner: BP

    Period: May 2013 ~ June 2013

    Total Man-hour: 1,765 MH

    Pump Skid Weight: Approx. 70 Ton

    Peak M/P: 35

    Scope of Work:

    - Loading / Unloading - Installation / Assembly Work

    - E&I - Piping

    - Machinery - Punch Clear

    - Fabrication (Outfitting)

    19

    >> BP Quad 204 Injection Skids Carry Over Work

  • 6

    * Reference – Carry Over Work

    NO.

    PERIOD OWNER CLIENT PROJECT NAME SCOPE OF WORK

    START DELIVERY

    1 Feb. 2017 Ongoing Statoil KCA

    DEUTAK

    Statoil CAT-J Carry Over

    Work Phase-2

    Site Survey, Planning, Mobilization, Materials

    Management & Procurement

    E&I, Painting, Scaffolding, Insulation, Piping

    2 May 2016 Ongoing Petronas

    Carigali

    UZMA

    Engineering

    Petronas Carigali

    Kinanbalu NAG Phase-II

    Gas Compressor Module

    Carry Over Work

    Job Card Development, Reviewing of Detail

    Design & Shop Drawing / As-Built Drawing,

    Onshore Fabrication Procurement & Logistics

    for Installation Works

    3 Dec. 2015 Ongoing SHELL SBM

    Offshore

    SHELL Prelude FLNG

    Turret Carry Over Work

    Phase-1, 2

    Phase-1 : Job Card Development, Project

    Completion System, Material Preparation

    Phase-2 : Execution of Work Pack & Job Card

    (Planning / Scheduling / Mobilizing)

    4 Sep. 2015 Dec. 2017 SHELL Technip

    SHELL Prelude FLNG

    MEG Module Carry Over

    Work Phase-2

    Site Survey, Planning, Mobilizing, Materials

    Management & Procurement

    Work Pack Development and Execution of

    Carry Over Work Packs

    5 Aug. 2014 Ongoing INPEX SBM

    Offshore

    INPEX Ichthys FPSO

    Turret Carry Over Work

    Phase-1, 2

    Phase-1 : Work Pack & Job Card Preparation

    Phase-2 : Supply of Nylon Pads, HVAC

    Ducting Fabrication, Site Queries

    6 July 2014 May 2016 BP HHI BP Clair Ridge Topside

    Module Construction Work

    FPSO & Platform Construction Work in E&I,

    Pipe, Mech., Structure, Paint, Scaffolding,

    HVAC

  • 7

    * Reference – Carry Over Work

    NO.

    PERIOD OWNER CLIENT PROJECT NAME SCOPE OF WORK

    START DELIVERY

    7 Oct. 2013 Dec. 2015 BP HHI BP Quad 204 Turret Carry

    Over Work, Phase -1, 2

    Phase-1 : Site Survey, Work Pack

    Preparation, Job Card Issue

    Phase-2 : Execution of Work Pack & Job Card

    8 May 2013 June 2013 BP BP

    BP Quad 204 Water

    Injection Pump Skids Carry

    Over Work

    Loading / Unloading, Installation / Assembly

    Work, E&I, Piping, Machinery, Punch Clear,

    Fabrication(Outfitting)