Top Banner
© 2018 PETROLIAM NASIONAL BERHAD (PETRONAS) All rights reserved. No part of this document may be reproduced, stored in a retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner. Open
19

© 2018 PETROLIAM NASIONAL BERHAD (PETRONAS)

May 20, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: © 2018 PETROLIAM NASIONAL BERHAD (PETRONAS)

© 2018 PETROLIAM NASIONAL BERHAD (PETRONAS)

All rights reserved. No part of this document may be reproduced, stored in a retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.

Open

Page 2: © 2018 PETROLIAM NASIONAL BERHAD (PETRONAS)

Open

Page 3: © 2018 PETROLIAM NASIONAL BERHAD (PETRONAS)

Open

Page 4: © 2018 PETROLIAM NASIONAL BERHAD (PETRONAS)

Open

Page 5: © 2018 PETROLIAM NASIONAL BERHAD (PETRONAS)

Open

Page 6: © 2018 PETROLIAM NASIONAL BERHAD (PETRONAS)

Open

Page 7: © 2018 PETROLIAM NASIONAL BERHAD (PETRONAS)

Open

Page 8: © 2018 PETROLIAM NASIONAL BERHAD (PETRONAS)

Open

Page 9: © 2018 PETROLIAM NASIONAL BERHAD (PETRONAS)

Open

Page 10: © 2018 PETROLIAM NASIONAL BERHAD (PETRONAS)

Open

Page 11: © 2018 PETROLIAM NASIONAL BERHAD (PETRONAS)

Open

Page 12: © 2018 PETROLIAM NASIONAL BERHAD (PETRONAS)

Surveillance

Ground Patrol Air Patrol

……

Pig Receiver

Pig Launcher

Above Ground WallThickness Check

Crossing

Inter Pipe CrossingBlock Valve

10 Y (max)

Metering Station

Above Ground Piping Inspection

Cleaning Pig

• Clean inside pipe wall• Prepare pipe ready to

inspect

CP Station

• Check DC Voltage Source supply to protect pipe.

• Adjust to good protection

Compressor Station

• Above Ground Piping Inspection•Gas Turbine Monitoring

Close Internal Pipe Survey

(CIPS)

Direct Coating Voltage

Gradient (DCVG)

Detect Coating Defect Check protection

voltage every 1 meter

• Check pipe wall loss• Detect Corrosion

Valve & Actuator Maintenance

Pipe-to-Soil CP Survey

Annual CP Survey at every test post

Real Time Leak Detection

Pipeline Leak Detection

System (PLDS)

MFL PIG

Open

Page 13: © 2018 PETROLIAM NASIONAL BERHAD (PETRONAS)

Open

Page 14: © 2018 PETROLIAM NASIONAL BERHAD (PETRONAS)

Open

Page 15: © 2018 PETROLIAM NASIONAL BERHAD (PETRONAS)

Open

Page 16: © 2018 PETROLIAM NASIONAL BERHAD (PETRONAS)

Open

Page 17: © 2018 PETROLIAM NASIONAL BERHAD (PETRONAS)

Open

Page 18: © 2018 PETROLIAM NASIONAL BERHAD (PETRONAS)

Open

Page 19: © 2018 PETROLIAM NASIONAL BERHAD (PETRONAS)

19Open